1. Objective/ Overview
The Project will establish efficient, cost-effective, environment
friendly, sustainable and safe Urban Transport System (UTS) through
construction of 20 kilometer Bus Rapid Transit (BRT) along the
Gazipur-Tongi-Uttara-Airport corridor.
This pilot project provides a holistic solution for integrated urban
mobility, bearing a demonstration effect as no modern mass-transit
system exists in Bangladesh yet.
1. Objective/ Overview
Name of the Project:
Greater Dhaka Sustainable Urban Transport Project.
Division:
Road Transport and Highways Division
Executing Agency:
Roads and Highways Department (RHD)
Bangladesh Bridge Authority (BBA)
Local Government Engineering Department (LGED)
Construction Period:
December 2012- December 2018
December 2012- June 2020 (Proposed)
Length:
20.50 Kilometers
Stations: Terminal:
25 nos. 02 nos.
Flyovers: Bridge:
06 nos. 01 no.
Travel Time:
50 minutes (Gazipur to Airport)
Frequency of Buses:
2 to 5 minutes
1.1 Map & Some Visual Station
1.2 Photos of BRT Project.
2. Planning
The Planner: Road Transport and Highways Division
The Road Transport and Highways Division was the
planner of BRT (Airport-Gazipur) by Ministry of
Road Transport and Bridge.
The Roads and Highways Department (RHD) will implement
the main corridor restructuring, excluding the elevated
section;
2. Planning
The Planner: Road Transport and Highways Division
The Project is also well aligned with ADB recent
strong focus on urban transport, as outlined in ADB’s
Sustainable Transport Initiative Operational Plan.
3. Organizing
01. As a Implementing Agencies…
 Roads & Highways Department (RHD)
 Bangladesh Bridge Authority (BBA)
 Local Government Engineering Department (LGED)
 Dhaka Bus Rapid Transit Company Ltd. (DBRTCL)
There is several organization and companies In Organizing section.
By two different areas.
3. Organizing
02. As a Project Funding…
 Asian Development Bank (ADB)
 Agence Française de Développent (AFD)
 Government of Bangladesh (GoB)
 Global Environment Facility (GEF)
There is several organization and companies In Organizing section.
By two different areas.
4. Leading
EPCM Consultant:
SMEC & Associates is the Leading section as a Design and
Construction team leader.
Leading in Design section:
Preparation of EIA, EMP. Incorporation of EMP clauses into bidding
documents. Reporting to ADB.
Leading in Construction section:
Monitoring of EMP Implementation, Audit and Reporting to ADB.
5. Controlling
The Controller of BRT Project-
BRT Operator: Special Purpose Organization (SPO)
as a Managing Director in this controlling area.
With the responsibilities of Operation and Maintenance of BRT
Corridor. Implementation of EMP Monitoring during Operation.
5. Controlling
Under the SPO those Consultants are working in Field.
01: Engineering, Procurement and Construction Management(EPCM)
Design, Procurement, Construction, supervision & Contract Management.
02: Project Management Coordination and Capacity Building (PMCCB)
Project Management, Institutional Development, Procurement Support/
Communication, Public Participation etc.
03: Operational Design and Business Model (ODBM)
BRT Operation Plan, Business Model, Service Start up, Specifications for Buses,
Negotiation with the Operators.
04: Christian Commission for the Development of Bangladesh (CCDB)
Preparation of PAP and compensation to them.
References
01: Dhaka Bus Rapid Transit Co. Ltd.
[http://dhakabrt.webappline.com/en/background-objectives]
02: Environmental Monitoring Report :
Greater Dhaka Sustainable Urban Transport Project.
[Project Number: 42169-013. Semi-Annual Report. June 2018]
03. Map. [The Daily Star- https://www.thedailystar.net/news/frontpage/airport-
gazipur-brt-line-cost-doubles-20pc-progress-6-years-1624615]
04. Photos and Visual Details. [SajivSaiful-
https://www.youtube.com/watch?v=10TqVWhKm1M&ab_channel=SajivSaiful]
The End

More Related Content

Similar to BRT Project(Gazipur to Uttara).pptx

Ahmedabad metro.
Ahmedabad metro.Ahmedabad metro.
Ahmedabad metro.Axay Sharma
 
GM CV-Nov16
GM CV-Nov16 GM CV-Nov16
GM CV-Nov16 Babu Mama
 
36551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp0136551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp01Akshay Gaikwad
 
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_TienDuong Nguyen
 
20140828 - Final Print - Reduced
20140828 - Final Print - Reduced20140828 - Final Print - Reduced
20140828 - Final Print - ReducedBenya Manajitt
 
Road Construction nhdp 2014
Road Construction nhdp 2014Road Construction nhdp 2014
Road Construction nhdp 2014Arnaud Renard
 
Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...
Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...
Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...Life of A Public Auditor
 
PERFORMANCE ANALYSIS OF BRTS OF INDORE CITY FOR SUSTAINABLE TRANSPORT SYSTEM
PERFORMANCE ANALYSIS OF BRTS OF INDORE CITY FOR SUSTAINABLE TRANSPORT SYSTEMPERFORMANCE ANALYSIS OF BRTS OF INDORE CITY FOR SUSTAINABLE TRANSPORT SYSTEM
PERFORMANCE ANALYSIS OF BRTS OF INDORE CITY FOR SUSTAINABLE TRANSPORT SYSTEMIRJET Journal
 
Reserach study on Delhi Metro project
Reserach study on Delhi Metro projectReserach study on Delhi Metro project
Reserach study on Delhi Metro projectSAKSHI AGHI
 
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)DBTGrupoIndia
 
Implementation and Systemic Change with UTTIPEC Street Design Guidelines
Implementation and Systemic Change with  UTTIPEC Street Design GuidelinesImplementation and Systemic Change with  UTTIPEC Street Design Guidelines
Implementation and Systemic Change with UTTIPEC Street Design GuidelinesUttipec Dda
 

Similar to BRT Project(Gazipur to Uttara).pptx (20)

Vijay banga
Vijay banga Vijay banga
Vijay banga
 
Ahmedabad metro.
Ahmedabad metro.Ahmedabad metro.
Ahmedabad metro.
 
Biswajit Das_Resume
Biswajit Das_ResumeBiswajit Das_Resume
Biswajit Das_Resume
 
GM CV-Nov16
GM CV-Nov16 GM CV-Nov16
GM CV-Nov16
 
36551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp0136551105 delhi-metro-120908024323-phpapp01
36551105 delhi-metro-120908024323-phpapp01
 
CV Sriinivas 1i doc
CV Sriinivas 1i docCV Sriinivas 1i doc
CV Sriinivas 1i doc
 
Intern final report
Intern final reportIntern final report
Intern final report
 
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
06.3. Highway Engineer 3 - NGUYEN Ngoc Duong_JB_Tien
 
Muhammad Asad Shaheen - CV
Muhammad Asad Shaheen - CVMuhammad Asad Shaheen - CV
Muhammad Asad Shaheen - CV
 
20140828 - Final Print - Reduced
20140828 - Final Print - Reduced20140828 - Final Print - Reduced
20140828 - Final Print - Reduced
 
Road Construction nhdp 2014
Road Construction nhdp 2014Road Construction nhdp 2014
Road Construction nhdp 2014
 
Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...
Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...
Report No.19 of 2023 – Union Government – Ministry of Road Transport and High...
 
PERFORMANCE ANALYSIS OF BRTS OF INDORE CITY FOR SUSTAINABLE TRANSPORT SYSTEM
PERFORMANCE ANALYSIS OF BRTS OF INDORE CITY FOR SUSTAINABLE TRANSPORT SYSTEMPERFORMANCE ANALYSIS OF BRTS OF INDORE CITY FOR SUSTAINABLE TRANSPORT SYSTEM
PERFORMANCE ANALYSIS OF BRTS OF INDORE CITY FOR SUSTAINABLE TRANSPORT SYSTEM
 
Reserach study on Delhi Metro project
Reserach study on Delhi Metro projectReserach study on Delhi Metro project
Reserach study on Delhi Metro project
 
CV Shubham Bhargava
CV  Shubham BhargavaCV  Shubham Bhargava
CV Shubham Bhargava
 
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
Andhra Pradesh, India : Análisis de los proyectos PPP (marzo 2009)
 
Hmis newsetter 22
Hmis newsetter 22Hmis newsetter 22
Hmis newsetter 22
 
USM-28-6-16
USM-28-6-16USM-28-6-16
USM-28-6-16
 
CV Shubham Bhargava
CV Shubham BhargavaCV Shubham Bhargava
CV Shubham Bhargava
 
Implementation and Systemic Change with UTTIPEC Street Design Guidelines
Implementation and Systemic Change with  UTTIPEC Street Design GuidelinesImplementation and Systemic Change with  UTTIPEC Street Design Guidelines
Implementation and Systemic Change with UTTIPEC Street Design Guidelines
 

Recently uploaded

Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Call Girls Mumbai
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdfAldoGarca30
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Ramkumar k
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...drmkjayanthikannan
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementDr. Deepak Mudgal
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptAfnanAhmad53
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsvanyagupta248
 
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...gragchanchal546
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdfKamal Acharya
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdfKamal Acharya
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...vershagrag
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdfKamal Acharya
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 

Recently uploaded (20)

Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
Bhubaneswar🌹Call Girls Bhubaneswar ❤Komal 9777949614 💟 Full Trusted CALL GIRL...
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
1_Introduction + EAM Vocabulary + how to navigate in EAM.pdf
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
Unit 4_Part 1 CSE2001 Exception Handling and Function Template and Class Temp...
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Ground Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth ReinforcementGround Improvement Technique: Earth Reinforcement
Ground Improvement Technique: Earth Reinforcement
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 
AIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech studentsAIRCANVAS[1].pdf mini project for btech students
AIRCANVAS[1].pdf mini project for btech students
 
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
Ghuma $ Russian Call Girls Ahmedabad ₹7.5k Pick Up & Drop With Cash Payment 8...
 
Online food ordering system project report.pdf
Online food ordering system project report.pdfOnline food ordering system project report.pdf
Online food ordering system project report.pdf
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
School management system project Report.pdf
School management system project Report.pdfSchool management system project Report.pdf
School management system project Report.pdf
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 

BRT Project(Gazipur to Uttara).pptx

  • 1. WELCOME PRESENTATION ON Greater Dhaka Sustainable Urban Transport Project. (BRT Gazipur-Airport)
  • 2. Group Information Present By – Structural Group (Project BRT) Batch- 16th Department of Civil Engineering (Evening) Uttara University. Name of the Group Member:  Suraya Akhter - 2161391065  Md Jahir Uddin - 2173391004  Md Rahat Hosen Arafat - 2173391017  Md Abi Abdullah - 2173391024  Md Mozaharul Islam - 2173391030
  • 3. 1. Objective/ Overview The Project will establish efficient, cost-effective, environment friendly, sustainable and safe Urban Transport System (UTS) through construction of 20 kilometer Bus Rapid Transit (BRT) along the Gazipur-Tongi-Uttara-Airport corridor. This pilot project provides a holistic solution for integrated urban mobility, bearing a demonstration effect as no modern mass-transit system exists in Bangladesh yet.
  • 4. 1. Objective/ Overview Name of the Project: Greater Dhaka Sustainable Urban Transport Project. Division: Road Transport and Highways Division Executing Agency: Roads and Highways Department (RHD) Bangladesh Bridge Authority (BBA) Local Government Engineering Department (LGED) Construction Period: December 2012- December 2018 December 2012- June 2020 (Proposed) Length: 20.50 Kilometers Stations: Terminal: 25 nos. 02 nos. Flyovers: Bridge: 06 nos. 01 no. Travel Time: 50 minutes (Gazipur to Airport) Frequency of Buses: 2 to 5 minutes
  • 5. 1.1 Map & Some Visual Station
  • 6. 1.2 Photos of BRT Project.
  • 7. 2. Planning The Planner: Road Transport and Highways Division The Road Transport and Highways Division was the planner of BRT (Airport-Gazipur) by Ministry of Road Transport and Bridge. The Roads and Highways Department (RHD) will implement the main corridor restructuring, excluding the elevated section;
  • 8. 2. Planning The Planner: Road Transport and Highways Division The Project is also well aligned with ADB recent strong focus on urban transport, as outlined in ADB’s Sustainable Transport Initiative Operational Plan.
  • 9. 3. Organizing 01. As a Implementing Agencies…  Roads & Highways Department (RHD)  Bangladesh Bridge Authority (BBA)  Local Government Engineering Department (LGED)  Dhaka Bus Rapid Transit Company Ltd. (DBRTCL) There is several organization and companies In Organizing section. By two different areas.
  • 10. 3. Organizing 02. As a Project Funding…  Asian Development Bank (ADB)  Agence Française de Développent (AFD)  Government of Bangladesh (GoB)  Global Environment Facility (GEF) There is several organization and companies In Organizing section. By two different areas.
  • 11. 4. Leading EPCM Consultant: SMEC & Associates is the Leading section as a Design and Construction team leader. Leading in Design section: Preparation of EIA, EMP. Incorporation of EMP clauses into bidding documents. Reporting to ADB. Leading in Construction section: Monitoring of EMP Implementation, Audit and Reporting to ADB.
  • 12. 5. Controlling The Controller of BRT Project- BRT Operator: Special Purpose Organization (SPO) as a Managing Director in this controlling area. With the responsibilities of Operation and Maintenance of BRT Corridor. Implementation of EMP Monitoring during Operation.
  • 13. 5. Controlling Under the SPO those Consultants are working in Field. 01: Engineering, Procurement and Construction Management(EPCM) Design, Procurement, Construction, supervision & Contract Management. 02: Project Management Coordination and Capacity Building (PMCCB) Project Management, Institutional Development, Procurement Support/ Communication, Public Participation etc. 03: Operational Design and Business Model (ODBM) BRT Operation Plan, Business Model, Service Start up, Specifications for Buses, Negotiation with the Operators. 04: Christian Commission for the Development of Bangladesh (CCDB) Preparation of PAP and compensation to them.
  • 14. References 01: Dhaka Bus Rapid Transit Co. Ltd. [http://dhakabrt.webappline.com/en/background-objectives] 02: Environmental Monitoring Report : Greater Dhaka Sustainable Urban Transport Project. [Project Number: 42169-013. Semi-Annual Report. June 2018] 03. Map. [The Daily Star- https://www.thedailystar.net/news/frontpage/airport- gazipur-brt-line-cost-doubles-20pc-progress-6-years-1624615] 04. Photos and Visual Details. [SajivSaiful- https://www.youtube.com/watch?v=10TqVWhKm1M&ab_channel=SajivSaiful]