DMAIC Roadmap (Levels 1 & 2)
Six Sigma-Overview – Lesson 5
An introduction to the DMAIC roadmap that identifies critical steps and
tools for navigating a project through the DMAIC methodology.
Six Sigma Overview #01 – Problem Resolution using DMAIC
Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted by any means
(electronic, mechanical, photographic, photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
DMAIC Roadmap (Level 1)
o Below is how problem resolution steps apply to the DMAIC project methodology.
• Each phase of DMAIC has a high-level question that can be answered:
2
Six Sigma DMAIC Questions:
Do you understand the severity and scope
of the problem?
Do you know the potential root causes and
have enough reliable data to test them?
Can you statistically validate what are the
root causes?
Do you know what improvements will fix
the root causes and by how much?
Did the improvements successfully and
permanently resolve the original problem?
Understand
the problem
Gather
reliable info
Identify
root cause
Fix
root cause
Sustain
Improvement
Define
Measure
Analyze
Improve
Control
Problem Resolution: Six Sigma DMAIC:
Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be
reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic,
photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
DMAIC Roadmap (Level 2)
o The DMAIC roadmap can be followed in detail by asking 3 or 4 questions per phase.
• The recommended tools/resources are identified that may help answer those questions.
3
Tool/Resource
CTQ Drilldown, Problem Statement, Project Scope,
Project Financial Savings, Pre-Assessment
(Min/Max Analysis)
Stakeholder Analysis (ARMI), Buy-In/Sponsorship
(CAP model)
High-level Process Map, SIPOC
Project Charter, Project Storyboard
OUTPUTS:
Can you clearly define the problem and its potential impact to the
organization?
Do you have a team that agrees with the project focus?
Do you understand the high-level process related to the problem?
Do you have a method for communicating the project information?
Question Levels 1 to 2
Define
Do you fully understand the severity and scope of the problem?
Project Storyboard, Charter, CTQ Drilldown, ARMI, SIPOC, High-Level Process Map, and Benefits Pre-Assessment.
Project Y (output)
Voice of Customer (VOC), Operational Definitions
C&E Diagram, 5 Whys, C&E Matrix, Data Collection
Plan (DCP), Sample Size Calculator, Short/Long
Term Data
Measurement System Analysis (MSA)
OUTPUTS:
Do you know if your collected data is accurate, repeatable and
reproducible?
Do you know what metric reflects the output described by the
problem statement?
Do you know how to define defects in the process and/or outputs?
Do you have enough data measuring the Y and potential inputs (Xs)?
Measure
Do you know the potential root causes (inputs or Xs) and have enough reliable data to test them?
Updated Project Storyboard, Definition of the VOC, Y & Xs, and a reliable and relatively complete dataset.
Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be
reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic,
photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
DMAIC Roadmap (Level 2) – cont’d
o Below is the continuation of the detailed questions for the last 3 phases of DMAIC:
4
Tool/Resource
Descriptive Statistics, I-MR chart, Normality Plot
(AD test), Process Capability (with six pack)
Performance Objectives
Hypothesis Testing
OUTPUTS:
Do you know what the process capability is (a.k.a. Voice of Process or
VOP)?
Do you know what the target sigma level or performance objectives
are for the project?
Analyze
Can you statistically validate what are the root causes (inputs or Xs)?
Updated Project Storyboard, key process capability metrics, and hypothesis testing results.
Have you done hypothesis testing to identify which potential Xs are
statistically significant?
Question Levels 1 to 2
Compiling Statistical Test Results, Transfer
Function
Brainstorming Solutions, Impact Matrix (PICK
chart), FMEA
Pilot/Implementation Plan, Pilot Duration,
Scorecard, MSA
OUTPUTS:
Do you know which potential Xs are independent and statistically
significant?
Do you know what improvements can be made to fix the root causes
(inputs or Xs)?
Did you pilot the improvements and get successful results?
Improve
Do you know what improvements will fix the root causes (inputs or Xs) and by how much?
Updated Project Storyboard, list of improvements, data/charts (e.g., scorecard) validating success of the pilot.
FMEA, Pilot/Implementation Plan, Scorecard, MSA
Control Charts
SOPs, Control Plan
Project Closure, Sponsorship
OUTPUTS:
Control
Did the improvements successfully and permanently resolve the original problem?
Updated final project storyboard, control plan, SOP, agreement from entire team that the project is complete.
Did you fully transfer control and responsibility of the improvements
to the process owner?
Did you implement the improvements?
Are the improvements successfully meeting expected results
(sustained and in control)?
Does the team (including the Sponsor & Champion) agree the project
is complete?
Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be
reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic,
photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
Practical Application
o Identify at least 2 projects you led or worked on in the past.
• For each project, review all the questions in the DMAIC roadmap.
 What questions and related tools/resources were not addressed in the project?
 Why were they not addressed?
 What different outcome or results could’ve been realized if they were addressed in the project?
Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be
reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic,
photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
5

More Related Content

What's hot

Prioritization Using a QFD Tool with Matt Hansen at StatStuff
Prioritization Using a QFD Tool with Matt Hansen at StatStuffPrioritization Using a QFD Tool with Matt Hansen at StatStuff
Prioritization Using a QFD Tool with Matt Hansen at StatStuffMatt Hansen
 
Corporate CTQ Drilldown by Matt Hansen at StatStuff
Corporate CTQ Drilldown by Matt Hansen at StatStuffCorporate CTQ Drilldown by Matt Hansen at StatStuff
Corporate CTQ Drilldown by Matt Hansen at StatStuffMatt Hansen
 
Introduction to Lean and Six Sigma by Matt Hansen at StatStuff (S02)
Introduction to Lean and Six Sigma by Matt Hansen at StatStuff (S02)Introduction to Lean and Six Sigma by Matt Hansen at StatStuff (S02)
Introduction to Lean and Six Sigma by Matt Hansen at StatStuff (S02)Matt Hansen
 
Change Acceleration Process (CAP) Model with Matt Hansen at StatStuff
Change Acceleration Process (CAP) Model with Matt Hansen at StatStuffChange Acceleration Process (CAP) Model with Matt Hansen at StatStuff
Change Acceleration Process (CAP) Model with Matt Hansen at StatStuffMatt Hansen
 
Setting Project Milestones with Matt Hansen at StatStuff
Setting Project Milestones with Matt Hansen at StatStuffSetting Project Milestones with Matt Hansen at StatStuff
Setting Project Milestones with Matt Hansen at StatStuffMatt Hansen
 
5S Program with Matt Hansen at StatStuff
5S Program with Matt Hansen at StatStuff5S Program with Matt Hansen at StatStuff
5S Program with Matt Hansen at StatStuffMatt Hansen
 
Leading a Lean Workout (Kaizen Event) with Matt Hansen at StatStuff
Leading a Lean Workout (Kaizen Event) with Matt Hansen at StatStuffLeading a Lean Workout (Kaizen Event) with Matt Hansen at StatStuff
Leading a Lean Workout (Kaizen Event) with Matt Hansen at StatStuffMatt Hansen
 
Value Stream Maps (VSM) with Matt Hansen at StatStuff
Value Stream Maps (VSM) with Matt Hansen at StatStuffValue Stream Maps (VSM) with Matt Hansen at StatStuff
Value Stream Maps (VSM) with Matt Hansen at StatStuffMatt Hansen
 
Value Added with Matt Hansen at StatStuff
Value Added with Matt Hansen at StatStuffValue Added with Matt Hansen at StatStuff
Value Added with Matt Hansen at StatStuffMatt Hansen
 
Adapting Lean to Six Sigma DMAIC Flow with Matt Hansen at StatStuff
Adapting Lean to Six Sigma DMAIC Flow with Matt Hansen at StatStuffAdapting Lean to Six Sigma DMAIC Flow with Matt Hansen at StatStuff
Adapting Lean to Six Sigma DMAIC Flow with Matt Hansen at StatStuffMatt Hansen
 
Poka Yoke with Matt Hansen at StatStuff
Poka Yoke with Matt Hansen at StatStuffPoka Yoke with Matt Hansen at StatStuff
Poka Yoke with Matt Hansen at StatStuffMatt Hansen
 
Compiling Operational Definitions with Matt Hansen at StatStuff
Compiling Operational Definitions with Matt Hansen at StatStuffCompiling Operational Definitions with Matt Hansen at StatStuff
Compiling Operational Definitions with Matt Hansen at StatStuffMatt Hansen
 
Closing a Project
Closing a ProjectClosing a Project
Closing a ProjectMatt Hansen
 
Documenting a New Process with SOPs
Documenting a New Process with SOPsDocumenting a New Process with SOPs
Documenting a New Process with SOPsMatt Hansen
 
Developing a Project Strategy Using IPO-FAT Tool with Matt Hansen at StatStuff
Developing a Project Strategy Using IPO-FAT Tool with Matt Hansen at StatStuffDeveloping a Project Strategy Using IPO-FAT Tool with Matt Hansen at StatStuff
Developing a Project Strategy Using IPO-FAT Tool with Matt Hansen at StatStuffMatt Hansen
 
Work in Process with Matt Hansen at StatStuff
Work in Process with Matt Hansen at StatStuffWork in Process with Matt Hansen at StatStuff
Work in Process with Matt Hansen at StatStuffMatt Hansen
 
Project Financial Benefits with Matt Hansen at StatStuff
Project Financial Benefits with Matt Hansen at StatStuffProject Financial Benefits with Matt Hansen at StatStuff
Project Financial Benefits with Matt Hansen at StatStuffMatt Hansen
 
Building a SIPOC with Matt Hansen at StatStuff
Building a SIPOC with Matt Hansen at StatStuffBuilding a SIPOC with Matt Hansen at StatStuff
Building a SIPOC with Matt Hansen at StatStuffMatt Hansen
 
Getting Feedback with a Plus/Delta Tool
Getting Feedback with a Plus/Delta ToolGetting Feedback with a Plus/Delta Tool
Getting Feedback with a Plus/Delta ToolMatt Hansen
 
7 Deadly Wastes with Matt Hansen at StatStuff
7 Deadly Wastes with Matt Hansen at StatStuff7 Deadly Wastes with Matt Hansen at StatStuff
7 Deadly Wastes with Matt Hansen at StatStuffMatt Hansen
 

What's hot (20)

Prioritization Using a QFD Tool with Matt Hansen at StatStuff
Prioritization Using a QFD Tool with Matt Hansen at StatStuffPrioritization Using a QFD Tool with Matt Hansen at StatStuff
Prioritization Using a QFD Tool with Matt Hansen at StatStuff
 
Corporate CTQ Drilldown by Matt Hansen at StatStuff
Corporate CTQ Drilldown by Matt Hansen at StatStuffCorporate CTQ Drilldown by Matt Hansen at StatStuff
Corporate CTQ Drilldown by Matt Hansen at StatStuff
 
Introduction to Lean and Six Sigma by Matt Hansen at StatStuff (S02)
Introduction to Lean and Six Sigma by Matt Hansen at StatStuff (S02)Introduction to Lean and Six Sigma by Matt Hansen at StatStuff (S02)
Introduction to Lean and Six Sigma by Matt Hansen at StatStuff (S02)
 
Change Acceleration Process (CAP) Model with Matt Hansen at StatStuff
Change Acceleration Process (CAP) Model with Matt Hansen at StatStuffChange Acceleration Process (CAP) Model with Matt Hansen at StatStuff
Change Acceleration Process (CAP) Model with Matt Hansen at StatStuff
 
Setting Project Milestones with Matt Hansen at StatStuff
Setting Project Milestones with Matt Hansen at StatStuffSetting Project Milestones with Matt Hansen at StatStuff
Setting Project Milestones with Matt Hansen at StatStuff
 
5S Program with Matt Hansen at StatStuff
5S Program with Matt Hansen at StatStuff5S Program with Matt Hansen at StatStuff
5S Program with Matt Hansen at StatStuff
 
Leading a Lean Workout (Kaizen Event) with Matt Hansen at StatStuff
Leading a Lean Workout (Kaizen Event) with Matt Hansen at StatStuffLeading a Lean Workout (Kaizen Event) with Matt Hansen at StatStuff
Leading a Lean Workout (Kaizen Event) with Matt Hansen at StatStuff
 
Value Stream Maps (VSM) with Matt Hansen at StatStuff
Value Stream Maps (VSM) with Matt Hansen at StatStuffValue Stream Maps (VSM) with Matt Hansen at StatStuff
Value Stream Maps (VSM) with Matt Hansen at StatStuff
 
Value Added with Matt Hansen at StatStuff
Value Added with Matt Hansen at StatStuffValue Added with Matt Hansen at StatStuff
Value Added with Matt Hansen at StatStuff
 
Adapting Lean to Six Sigma DMAIC Flow with Matt Hansen at StatStuff
Adapting Lean to Six Sigma DMAIC Flow with Matt Hansen at StatStuffAdapting Lean to Six Sigma DMAIC Flow with Matt Hansen at StatStuff
Adapting Lean to Six Sigma DMAIC Flow with Matt Hansen at StatStuff
 
Poka Yoke with Matt Hansen at StatStuff
Poka Yoke with Matt Hansen at StatStuffPoka Yoke with Matt Hansen at StatStuff
Poka Yoke with Matt Hansen at StatStuff
 
Compiling Operational Definitions with Matt Hansen at StatStuff
Compiling Operational Definitions with Matt Hansen at StatStuffCompiling Operational Definitions with Matt Hansen at StatStuff
Compiling Operational Definitions with Matt Hansen at StatStuff
 
Closing a Project
Closing a ProjectClosing a Project
Closing a Project
 
Documenting a New Process with SOPs
Documenting a New Process with SOPsDocumenting a New Process with SOPs
Documenting a New Process with SOPs
 
Developing a Project Strategy Using IPO-FAT Tool with Matt Hansen at StatStuff
Developing a Project Strategy Using IPO-FAT Tool with Matt Hansen at StatStuffDeveloping a Project Strategy Using IPO-FAT Tool with Matt Hansen at StatStuff
Developing a Project Strategy Using IPO-FAT Tool with Matt Hansen at StatStuff
 
Work in Process with Matt Hansen at StatStuff
Work in Process with Matt Hansen at StatStuffWork in Process with Matt Hansen at StatStuff
Work in Process with Matt Hansen at StatStuff
 
Project Financial Benefits with Matt Hansen at StatStuff
Project Financial Benefits with Matt Hansen at StatStuffProject Financial Benefits with Matt Hansen at StatStuff
Project Financial Benefits with Matt Hansen at StatStuff
 
Building a SIPOC with Matt Hansen at StatStuff
Building a SIPOC with Matt Hansen at StatStuffBuilding a SIPOC with Matt Hansen at StatStuff
Building a SIPOC with Matt Hansen at StatStuff
 
Getting Feedback with a Plus/Delta Tool
Getting Feedback with a Plus/Delta ToolGetting Feedback with a Plus/Delta Tool
Getting Feedback with a Plus/Delta Tool
 
7 Deadly Wastes with Matt Hansen at StatStuff
7 Deadly Wastes with Matt Hansen at StatStuff7 Deadly Wastes with Matt Hansen at StatStuff
7 Deadly Wastes with Matt Hansen at StatStuff
 

Similar to The DMAIC Roadmap (Levels 1 & 2) with Matt Hansen at StatStuff

Control Phase Roadmap (Level 3)
Control Phase Roadmap (Level 3)Control Phase Roadmap (Level 3)
Control Phase Roadmap (Level 3)Matt Hansen
 
Improve Phase Roadmap (Level 3)
Improve Phase Roadmap (Level 3)Improve Phase Roadmap (Level 3)
Improve Phase Roadmap (Level 3)Matt Hansen
 
Measure Phase Roadmap (Level 3) with Matt Hansen at StatStuff
Measure Phase Roadmap (Level 3) with Matt Hansen at StatStuffMeasure Phase Roadmap (Level 3) with Matt Hansen at StatStuff
Measure Phase Roadmap (Level 3) with Matt Hansen at StatStuffMatt Hansen
 
Analyze Phase Roadmap (Level 3)
Analyze Phase Roadmap (Level 3)Analyze Phase Roadmap (Level 3)
Analyze Phase Roadmap (Level 3)Matt Hansen
 
Understand dmaic
Understand dmaicUnderstand dmaic
Understand dmaicAjit Kumar
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklistsSteven Bonacorsi
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklistsSteven Bonacorsi
 
Quality Engineering material
Quality Engineering materialQuality Engineering material
Quality Engineering materialTeluguSudhakar3
 
Benefiting from a Quality Problem Management Program
Benefiting from a Quality Problem Management ProgramBenefiting from a Quality Problem Management Program
Benefiting from a Quality Problem Management ProgramHDI Orange County
 
Structured problem solving
Structured problem solvingStructured problem solving
Structured problem solvingVaseem Ahamad
 
Profolio
ProfolioProfolio
ProfolioVanWert
 
concept of evaluation "Character insight"
concept of evaluation "Character insight"concept of evaluation "Character insight"
concept of evaluation "Character insight"Shafiyazahoor327
 
Overview Six sigma by D&H Engineers
Overview Six sigma by D&H EngineersOverview Six sigma by D&H Engineers
Overview Six sigma by D&H EngineersD&H Engineers
 
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptxProject-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptxPhngPhmTrung
 
1Grand Canyon UniversityInstructor Name MIS-652 Busines
1Grand Canyon UniversityInstructor Name MIS-652 Busines1Grand Canyon UniversityInstructor Name MIS-652 Busines
1Grand Canyon UniversityInstructor Name MIS-652 BusinesEttaBenton28
 
Lean Six Sigma: DMAIC In-Depth
Lean Six Sigma: DMAIC In-DepthLean Six Sigma: DMAIC In-Depth
Lean Six Sigma: DMAIC In-DepthGoLeanSixSigma.com
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 

Similar to The DMAIC Roadmap (Levels 1 & 2) with Matt Hansen at StatStuff (20)

Control Phase Roadmap (Level 3)
Control Phase Roadmap (Level 3)Control Phase Roadmap (Level 3)
Control Phase Roadmap (Level 3)
 
Improve Phase Roadmap (Level 3)
Improve Phase Roadmap (Level 3)Improve Phase Roadmap (Level 3)
Improve Phase Roadmap (Level 3)
 
Measure Phase Roadmap (Level 3) with Matt Hansen at StatStuff
Measure Phase Roadmap (Level 3) with Matt Hansen at StatStuffMeasure Phase Roadmap (Level 3) with Matt Hansen at StatStuff
Measure Phase Roadmap (Level 3) with Matt Hansen at StatStuff
 
Analyze Phase Roadmap (Level 3)
Analyze Phase Roadmap (Level 3)Analyze Phase Roadmap (Level 3)
Analyze Phase Roadmap (Level 3)
 
Understand dmaic
Understand dmaicUnderstand dmaic
Understand dmaic
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
 
Quality Engineering material
Quality Engineering materialQuality Engineering material
Quality Engineering material
 
Benefiting from a Quality Problem Management Program
Benefiting from a Quality Problem Management ProgramBenefiting from a Quality Problem Management Program
Benefiting from a Quality Problem Management Program
 
Structured problem solving
Structured problem solvingStructured problem solving
Structured problem solving
 
Six sigma project
Six sigma projectSix sigma project
Six sigma project
 
Profolio
ProfolioProfolio
Profolio
 
concept of evaluation "Character insight"
concept of evaluation "Character insight"concept of evaluation "Character insight"
concept of evaluation "Character insight"
 
Overview Six sigma by D&H Engineers
Overview Six sigma by D&H EngineersOverview Six sigma by D&H Engineers
Overview Six sigma by D&H Engineers
 
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptxProject-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
 
1Grand Canyon UniversityInstructor Name MIS-652 Busines
1Grand Canyon UniversityInstructor Name MIS-652 Busines1Grand Canyon UniversityInstructor Name MIS-652 Busines
1Grand Canyon UniversityInstructor Name MIS-652 Busines
 
Introduction to six sigma (www.gotoaims.com)
Introduction to six sigma (www.gotoaims.com)Introduction to six sigma (www.gotoaims.com)
Introduction to six sigma (www.gotoaims.com)
 
Lean Six Sigma: DMAIC In-Depth
Lean Six Sigma: DMAIC In-DepthLean Six Sigma: DMAIC In-Depth
Lean Six Sigma: DMAIC In-Depth
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 

More from Matt Hansen

Building a Control Plan
Building a Control PlanBuilding a Control Plan
Building a Control PlanMatt Hansen
 
Control Charts: Recalculating Control Limits
Control Charts: Recalculating Control LimitsControl Charts: Recalculating Control Limits
Control Charts: Recalculating Control LimitsMatt Hansen
 
Control Charts: U Chart
Control Charts: U ChartControl Charts: U Chart
Control Charts: U ChartMatt Hansen
 
Control Charts: P Chart
Control Charts: P ChartControl Charts: P Chart
Control Charts: P ChartMatt Hansen
 
Control Charts: Xbar-S Chart
Control Charts: Xbar-S ChartControl Charts: Xbar-S Chart
Control Charts: Xbar-S ChartMatt Hansen
 
Control Charts: I-MR Chart
Control Charts: I-MR ChartControl Charts: I-MR Chart
Control Charts: I-MR ChartMatt Hansen
 
Control Charts: Finding the Right Control Chart
Control Charts: Finding the Right Control ChartControl Charts: Finding the Right Control Chart
Control Charts: Finding the Right Control ChartMatt Hansen
 
Building a Scorecard
Building a ScorecardBuilding a Scorecard
Building a ScorecardMatt Hansen
 
Piloting Solutions: Build the Pilot Plan
Piloting Solutions: Build the Pilot PlanPiloting Solutions: Build the Pilot Plan
Piloting Solutions: Build the Pilot PlanMatt Hansen
 
Piloting Solutions: The Process
Piloting Solutions: The ProcessPiloting Solutions: The Process
Piloting Solutions: The ProcessMatt Hansen
 
Risk Assessment with a FMEA Tool
Risk Assessment with a FMEA ToolRisk Assessment with a FMEA Tool
Risk Assessment with a FMEA ToolMatt Hansen
 
Prioritize Solutions with an Impact Matrix
Prioritize Solutions with an Impact MatrixPrioritize Solutions with an Impact Matrix
Prioritize Solutions with an Impact MatrixMatt Hansen
 
Brainstorm Solutions with an Affinity Diagram
Brainstorm Solutions with an Affinity DiagramBrainstorm Solutions with an Affinity Diagram
Brainstorm Solutions with an Affinity DiagramMatt Hansen
 
Brainstorm & Prioritize Solutions with a Workout
Brainstorm & Prioritize Solutions with a WorkoutBrainstorm & Prioritize Solutions with a Workout
Brainstorm & Prioritize Solutions with a WorkoutMatt Hansen
 
Testing for Multicollinearity
Testing for MulticollinearityTesting for Multicollinearity
Testing for MulticollinearityMatt Hansen
 
Compiling Analysis Results
Compiling Analysis ResultsCompiling Analysis Results
Compiling Analysis ResultsMatt Hansen
 
Hypothesis Testing: Relationships (Compare 2+ Factors)
Hypothesis Testing: Relationships (Compare 2+ Factors)Hypothesis Testing: Relationships (Compare 2+ Factors)
Hypothesis Testing: Relationships (Compare 2+ Factors)Matt Hansen
 
Hypothesis Testing: Relationships (Compare 1:1)
Hypothesis Testing: Relationships (Compare 1:1)Hypothesis Testing: Relationships (Compare 1:1)
Hypothesis Testing: Relationships (Compare 1:1)Matt Hansen
 
Hypothesis Testing: Relationships (Overview)
Hypothesis Testing: Relationships (Overview)Hypothesis Testing: Relationships (Overview)
Hypothesis Testing: Relationships (Overview)Matt Hansen
 
Hypothesis Testing: Spread (Compare 2+ Factors)
Hypothesis Testing: Spread (Compare 2+ Factors)Hypothesis Testing: Spread (Compare 2+ Factors)
Hypothesis Testing: Spread (Compare 2+ Factors)Matt Hansen
 

More from Matt Hansen (20)

Building a Control Plan
Building a Control PlanBuilding a Control Plan
Building a Control Plan
 
Control Charts: Recalculating Control Limits
Control Charts: Recalculating Control LimitsControl Charts: Recalculating Control Limits
Control Charts: Recalculating Control Limits
 
Control Charts: U Chart
Control Charts: U ChartControl Charts: U Chart
Control Charts: U Chart
 
Control Charts: P Chart
Control Charts: P ChartControl Charts: P Chart
Control Charts: P Chart
 
Control Charts: Xbar-S Chart
Control Charts: Xbar-S ChartControl Charts: Xbar-S Chart
Control Charts: Xbar-S Chart
 
Control Charts: I-MR Chart
Control Charts: I-MR ChartControl Charts: I-MR Chart
Control Charts: I-MR Chart
 
Control Charts: Finding the Right Control Chart
Control Charts: Finding the Right Control ChartControl Charts: Finding the Right Control Chart
Control Charts: Finding the Right Control Chart
 
Building a Scorecard
Building a ScorecardBuilding a Scorecard
Building a Scorecard
 
Piloting Solutions: Build the Pilot Plan
Piloting Solutions: Build the Pilot PlanPiloting Solutions: Build the Pilot Plan
Piloting Solutions: Build the Pilot Plan
 
Piloting Solutions: The Process
Piloting Solutions: The ProcessPiloting Solutions: The Process
Piloting Solutions: The Process
 
Risk Assessment with a FMEA Tool
Risk Assessment with a FMEA ToolRisk Assessment with a FMEA Tool
Risk Assessment with a FMEA Tool
 
Prioritize Solutions with an Impact Matrix
Prioritize Solutions with an Impact MatrixPrioritize Solutions with an Impact Matrix
Prioritize Solutions with an Impact Matrix
 
Brainstorm Solutions with an Affinity Diagram
Brainstorm Solutions with an Affinity DiagramBrainstorm Solutions with an Affinity Diagram
Brainstorm Solutions with an Affinity Diagram
 
Brainstorm & Prioritize Solutions with a Workout
Brainstorm & Prioritize Solutions with a WorkoutBrainstorm & Prioritize Solutions with a Workout
Brainstorm & Prioritize Solutions with a Workout
 
Testing for Multicollinearity
Testing for MulticollinearityTesting for Multicollinearity
Testing for Multicollinearity
 
Compiling Analysis Results
Compiling Analysis ResultsCompiling Analysis Results
Compiling Analysis Results
 
Hypothesis Testing: Relationships (Compare 2+ Factors)
Hypothesis Testing: Relationships (Compare 2+ Factors)Hypothesis Testing: Relationships (Compare 2+ Factors)
Hypothesis Testing: Relationships (Compare 2+ Factors)
 
Hypothesis Testing: Relationships (Compare 1:1)
Hypothesis Testing: Relationships (Compare 1:1)Hypothesis Testing: Relationships (Compare 1:1)
Hypothesis Testing: Relationships (Compare 1:1)
 
Hypothesis Testing: Relationships (Overview)
Hypothesis Testing: Relationships (Overview)Hypothesis Testing: Relationships (Overview)
Hypothesis Testing: Relationships (Overview)
 
Hypothesis Testing: Spread (Compare 2+ Factors)
Hypothesis Testing: Spread (Compare 2+ Factors)Hypothesis Testing: Spread (Compare 2+ Factors)
Hypothesis Testing: Spread (Compare 2+ Factors)
 

Recently uploaded

Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCRsoniya singh
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfmuskan1121w
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creationsnakalysalcedo61
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Serviceankitnayak356677
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsApsara Of India
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCRsoniya singh
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedKaiNexus
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024christinemoorman
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Timedelhimodelshub1
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...lizamodels9
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...lizamodels9
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiMalviyaNagarCallGirl
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 

Recently uploaded (20)

Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Mahipalpur 🔝 Delhi NCR
 
rishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdfrishikeshgirls.in- Rishikesh call girl.pdf
rishikeshgirls.in- Rishikesh call girl.pdf
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Marketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet CreationsMarketing Management Business Plan_My Sweet Creations
Marketing Management Business Plan_My Sweet Creations
 
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts ServiceVip Female Escorts Noida 9711199171 Greater Noida Escorts Service
Vip Female Escorts Noida 9711199171 Greater Noida Escorts Service
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call GirlsCash Payment 9602870969 Escort Service in Udaipur Call Girls
Cash Payment 9602870969 Escort Service in Udaipur Call Girls
 
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
(8264348440) 🔝 Call Girls In Keshav Puram 🔝 Delhi NCR
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… AbridgedLean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
Lean: From Theory to Practice — One City’s (and Library’s) Lean Story… Abridged
 
The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024The CMO Survey - Highlights and Insights Report - Spring 2024
The CMO Survey - Highlights and Insights Report - Spring 2024
 
Call Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any TimeCall Girls Miyapur 7001305949 all area service COD available Any Time
Call Girls Miyapur 7001305949 all area service COD available Any Time
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
Call Girls In Sikandarpur Gurgaon ❤️8860477959_Russian 100% Genuine Escorts I...
 
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
Lowrate Call Girls In Sector 18 Noida ❤️8860477959 Escorts 100% Genuine Servi...
 
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | DelhiFULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
FULL ENJOY - 9953040155 Call Girls in Chhatarpur | Delhi
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 

The DMAIC Roadmap (Levels 1 & 2) with Matt Hansen at StatStuff

  • 1. Section & Lesson #: Pre-Requisite Lessons: Complex Tools + Clear Teaching = Powerful Results DMAIC Roadmap (Levels 1 & 2) Six Sigma-Overview – Lesson 5 An introduction to the DMAIC roadmap that identifies critical steps and tools for navigating a project through the DMAIC methodology. Six Sigma Overview #01 – Problem Resolution using DMAIC Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic, photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
  • 2. DMAIC Roadmap (Level 1) o Below is how problem resolution steps apply to the DMAIC project methodology. • Each phase of DMAIC has a high-level question that can be answered: 2 Six Sigma DMAIC Questions: Do you understand the severity and scope of the problem? Do you know the potential root causes and have enough reliable data to test them? Can you statistically validate what are the root causes? Do you know what improvements will fix the root causes and by how much? Did the improvements successfully and permanently resolve the original problem? Understand the problem Gather reliable info Identify root cause Fix root cause Sustain Improvement Define Measure Analyze Improve Control Problem Resolution: Six Sigma DMAIC: Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic, photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
  • 3. DMAIC Roadmap (Level 2) o The DMAIC roadmap can be followed in detail by asking 3 or 4 questions per phase. • The recommended tools/resources are identified that may help answer those questions. 3 Tool/Resource CTQ Drilldown, Problem Statement, Project Scope, Project Financial Savings, Pre-Assessment (Min/Max Analysis) Stakeholder Analysis (ARMI), Buy-In/Sponsorship (CAP model) High-level Process Map, SIPOC Project Charter, Project Storyboard OUTPUTS: Can you clearly define the problem and its potential impact to the organization? Do you have a team that agrees with the project focus? Do you understand the high-level process related to the problem? Do you have a method for communicating the project information? Question Levels 1 to 2 Define Do you fully understand the severity and scope of the problem? Project Storyboard, Charter, CTQ Drilldown, ARMI, SIPOC, High-Level Process Map, and Benefits Pre-Assessment. Project Y (output) Voice of Customer (VOC), Operational Definitions C&E Diagram, 5 Whys, C&E Matrix, Data Collection Plan (DCP), Sample Size Calculator, Short/Long Term Data Measurement System Analysis (MSA) OUTPUTS: Do you know if your collected data is accurate, repeatable and reproducible? Do you know what metric reflects the output described by the problem statement? Do you know how to define defects in the process and/or outputs? Do you have enough data measuring the Y and potential inputs (Xs)? Measure Do you know the potential root causes (inputs or Xs) and have enough reliable data to test them? Updated Project Storyboard, Definition of the VOC, Y & Xs, and a reliable and relatively complete dataset. Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic, photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
  • 4. DMAIC Roadmap (Level 2) – cont’d o Below is the continuation of the detailed questions for the last 3 phases of DMAIC: 4 Tool/Resource Descriptive Statistics, I-MR chart, Normality Plot (AD test), Process Capability (with six pack) Performance Objectives Hypothesis Testing OUTPUTS: Do you know what the process capability is (a.k.a. Voice of Process or VOP)? Do you know what the target sigma level or performance objectives are for the project? Analyze Can you statistically validate what are the root causes (inputs or Xs)? Updated Project Storyboard, key process capability metrics, and hypothesis testing results. Have you done hypothesis testing to identify which potential Xs are statistically significant? Question Levels 1 to 2 Compiling Statistical Test Results, Transfer Function Brainstorming Solutions, Impact Matrix (PICK chart), FMEA Pilot/Implementation Plan, Pilot Duration, Scorecard, MSA OUTPUTS: Do you know which potential Xs are independent and statistically significant? Do you know what improvements can be made to fix the root causes (inputs or Xs)? Did you pilot the improvements and get successful results? Improve Do you know what improvements will fix the root causes (inputs or Xs) and by how much? Updated Project Storyboard, list of improvements, data/charts (e.g., scorecard) validating success of the pilot. FMEA, Pilot/Implementation Plan, Scorecard, MSA Control Charts SOPs, Control Plan Project Closure, Sponsorship OUTPUTS: Control Did the improvements successfully and permanently resolve the original problem? Updated final project storyboard, control plan, SOP, agreement from entire team that the project is complete. Did you fully transfer control and responsibility of the improvements to the process owner? Did you implement the improvements? Are the improvements successfully meeting expected results (sustained and in control)? Does the team (including the Sponsor & Champion) agree the project is complete? Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic, photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
  • 5. Practical Application o Identify at least 2 projects you led or worked on in the past. • For each project, review all the questions in the DMAIC roadmap.  What questions and related tools/resources were not addressed in the project?  Why were they not addressed?  What different outcome or results could’ve been realized if they were addressed in the project? Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic, photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher. 5