Improve Phase Roadmap (Level 3)
Six Sigma-Improve – Lesson 1
A deeper look into level 3 of the DMAIC roadmap that identifies critical
steps and tools for navigating a project through the Improve phase.
Six Sigma Overview #05 – DMAIC Roadmap (Levels 1 & 2)
Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted by any means
(electronic, mechanical, photographic, photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
DMAIC Roadmap (Level 1)
o Below is how these apply to the Six Sigma DMAIC project methodology
• Each phase of DMAIC has a high-level question that can be answered:
2
Six Sigma DMAIC Questions:
Do you understand the severity and scope
of the problem?
Do you know the potential root causes and
have enough reliable data to test them?
Can you statistically validate what are the
root causes?
Do you know what improvements will fix
the root causes and by how much?
Did the improvements successfully and
permanently resolve the original problem?
Understand
the problem
Gather
reliable info
Identify
root cause
Fix
root cause
Sustain
Improvement
Define
Measure
Analyze
Improve
Control
Problem Resolution: Six Sigma DMAIC:
Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be
reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic,
photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
DMAIC Roadmap (Level 2)
o The DMAIC roadmap can be followed in detail by asking 3 or 4 questions per phase.
• The recommended tools/resources are identified that may help answer those questions.
3
Tool/Resource
CTQ Drilldown, Problem Statement, Project Scope,
Project Financial Savings, Pre-Assessment
(Min/Max Analysis)
Stakeholder Analysis (ARMI), Buy-In/Sponsorship
(CAP model)
High-level Process Map, SIPOC
Project Charter, Project Storyboard
OUTPUTS:
Can you clearly define the problem and its potential impact to the
organization?
Do you have a team that agrees with the project focus?
Do you understand the high-level process related to the problem?
Do you have a method for communicating the project information?
Question Levels 1 to 2
Define
Do you fully understand the severity and scope of the problem?
Project Storyboard, Charter, CTQ Drilldown, ARMI, SIPOC, High-Level Process Map, and Benefits Pre-Assessment.
Project Y (output)
Voice of Customer (VOC), Operational Definitions
C&E Diagram, 5 Whys, C&E Matrix, Data Collection
Plan (DCP), Sample Size Calculator, Short/Long
Term Data
Measurement System Analysis (MSA)
OUTPUTS:
Do you know if your collected data is accurate, repeatable and
reproducible?
Do you know what metric reflects the output described by the
problem statement?
Do you know how to define defects in the process and/or outputs?
Do you have enough data measuring the Y and potential inputs (Xs)?
Measure
Do you know the potential root causes (inputs or Xs) and have enough reliable data to test them?
Updated Project Storyboard, Definition of the VOC, Y & Xs, and a reliable and relatively complete dataset.
Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be
reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic,
photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
DMAIC Roadmap (Level 2) – cont’d
o Below is the continuation of the detailed questions for the last 3 phases of DMAIC:
4
Tool/Resource
Descriptive Statistics, I-MR chart, Normality Plot
(AD test), Process Capability (with six pack)
Performance Objectives
Hypothesis Testing
OUTPUTS:
Do you know what the process capability is (a.k.a. Voice of Process or
VOP)?
Do you know what the target sigma level or performance objectives
are for the project?
Analyze
Can you statistically validate what are the root causes (inputs or Xs)?
Updated Project Storyboard, key process capability metrics, and hypothesis testing results.
Have you done hypothesis testing to identify which potential Xs are
statistically significant?
Question Levels 1 to 2
Compiling Statistical Test Results, Transfer
Function
Brainstorming Solutions, Impact Matrix (PICK
chart), FMEA
Pilot/Implementation Plan, Pilot Duration,
Scorecard, MSA
OUTPUTS:
Do you know which potential Xs are independent and statistically
significant?
Do you know what improvements can be made to fix the root causes
(inputs or Xs)?
Did you pilot the improvements and get successful results?
Improve
Do you know what improvements will fix the root causes (inputs or Xs) and by how much?
Updated Project Storyboard, list of improvements, data/charts (e.g., scorecard) validating success of the pilot.
FMEA, Pilot/Implementation Plan, Scorecard, MSA
Control Charts
SOPs, Control Plan
Project Closure, Sponsorship
OUTPUTS:
Control
Did the improvements successfully and permanently resolve the original problem?
Updated final project storyboard, control plan, SOP, agreement from entire team that the project is complete.
Did you fully transfer control and responsibility of the improvements
to the process owner?
Did you implement the improvements?
Are the improvements successfully meeting expected results
(sustained and in control)?
Does the team (including the Sponsor & Champion) agree the project
is complete?
Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be
reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic,
photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
Improve Phase Roadmap (Level 3)
o The DMAIC roadmap can be drilled down even deeper to a 3rd level for each phase.
• Level 3 questions can guide someone to the specific tool(s) for navigating a project or initiative.
5
Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be
reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic,
photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
Tool/Resource
Do you know which potential Xs are independent and statistically significant?
Have you compiled all your hypothesis testing results for the statistically significant Xs? Compiling Statistical Test Results
Do you know what the inter-relationship (multicollinearity) is between the significant Xs? Compiling Statistical Test Results
Have you built a transfer function? (if possible) Transfer Function
Does the team agree with the analysis results? Buy-in/Sponsorship (CAP model)
Do you know what improvements can be made to fix the root causes (inputs or Xs)?
Did you brainstorm potential improvements with the team? Brainstorming Solutions
Did you assess the impact/benefit vs. difficulty/complexity for each potential improvement? Impact Matrix (PICK chart)
Did you assess the potential risks for the key improvements? Risk assessment (FMEA)
Did you pilot the improvements and get successful results?
Did you build a pilot plan for the key improvements? Pilot/Implementation Plan
Did you define a time & location scope for the pilot? Pilot Duration
Did you build a scorecard for the pilot? Scorecard
Do you know if your scorecard data is accurate, and the method of collecting it (if manual) was
repeatable and reproducible?
Measurement System Analysis (MSA)
Did you get agreement from your team where the improvements will be piloted? Buy-in/Sponsorship (CAP model)
OUTPUTS:
Improve
Updated Project Storyboard, list of improvements, data/charts (e.g., scorecard) validating the success of the pilot
Do you know what improvements will fix the root causes (inputs or Xs) and by how much?
Question Levels 1 to 3
Practical Application
o Identify at least 2 projects you led or worked on in the past.
• For each project, review all the questions in the Improve phase level 3 roadmap.
 What questions and related tools/resources were not addressed in the project?
 Why were they not addressed?
 What different outcome or results could’ve been realized if they were addressed in the project?
Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be
reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic,
photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
6

More Related Content

Similar to Improve Phase Roadmap (Level 3)

Measure Phase Roadmap (Level 3) with Matt Hansen at StatStuff
Measure Phase Roadmap (Level 3) with Matt Hansen at StatStuffMeasure Phase Roadmap (Level 3) with Matt Hansen at StatStuff
Measure Phase Roadmap (Level 3) with Matt Hansen at StatStuffMatt Hansen
 
Control Phase Roadmap (Level 3)
Control Phase Roadmap (Level 3)Control Phase Roadmap (Level 3)
Control Phase Roadmap (Level 3)Matt Hansen
 
Define Phase Roadmap (Level 3) with Matt Hansen at StatStuff
Define Phase Roadmap (Level 3) with Matt Hansen at StatStuffDefine Phase Roadmap (Level 3) with Matt Hansen at StatStuff
Define Phase Roadmap (Level 3) with Matt Hansen at StatStuffMatt Hansen
 
The DMAIC Roadmap (Levels 1 & 2) with Matt Hansen at StatStuff
The DMAIC Roadmap (Levels 1 & 2) with Matt Hansen at StatStuffThe DMAIC Roadmap (Levels 1 & 2) with Matt Hansen at StatStuff
The DMAIC Roadmap (Levels 1 & 2) with Matt Hansen at StatStuffMatt Hansen
 
Adapting Lean to Six Sigma DMAIC Flow with Matt Hansen at StatStuff
Adapting Lean to Six Sigma DMAIC Flow with Matt Hansen at StatStuffAdapting Lean to Six Sigma DMAIC Flow with Matt Hansen at StatStuff
Adapting Lean to Six Sigma DMAIC Flow with Matt Hansen at StatStuffMatt Hansen
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 
Understand dmaic
Understand dmaicUnderstand dmaic
Understand dmaicAjit Kumar
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklistsSteven Bonacorsi
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklistsSteven Bonacorsi
 
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptxProject-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptxPhngPhmTrung
 
concept of evaluation "Character insight"
concept of evaluation "Character insight"concept of evaluation "Character insight"
concept of evaluation "Character insight"Shafiyazahoor327
 
Identify Root Causes – DCP Overview
Identify Root Causes – DCP OverviewIdentify Root Causes – DCP Overview
Identify Root Causes – DCP OverviewMatt Hansen
 
Structured problem solving
Structured problem solvingStructured problem solving
Structured problem solvingVaseem Ahamad
 
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 daysPROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 daysGoLeanSixSigma.com
 
Profolio
ProfolioProfolio
ProfolioVanWert
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Benefiting from a Quality Problem Management Program
Benefiting from a Quality Problem Management ProgramBenefiting from a Quality Problem Management Program
Benefiting from a Quality Problem Management ProgramHDI Orange County
 

Similar to Improve Phase Roadmap (Level 3) (20)

Measure Phase Roadmap (Level 3) with Matt Hansen at StatStuff
Measure Phase Roadmap (Level 3) with Matt Hansen at StatStuffMeasure Phase Roadmap (Level 3) with Matt Hansen at StatStuff
Measure Phase Roadmap (Level 3) with Matt Hansen at StatStuff
 
Control Phase Roadmap (Level 3)
Control Phase Roadmap (Level 3)Control Phase Roadmap (Level 3)
Control Phase Roadmap (Level 3)
 
Define Phase Roadmap (Level 3) with Matt Hansen at StatStuff
Define Phase Roadmap (Level 3) with Matt Hansen at StatStuffDefine Phase Roadmap (Level 3) with Matt Hansen at StatStuff
Define Phase Roadmap (Level 3) with Matt Hansen at StatStuff
 
The DMAIC Roadmap (Levels 1 & 2) with Matt Hansen at StatStuff
The DMAIC Roadmap (Levels 1 & 2) with Matt Hansen at StatStuffThe DMAIC Roadmap (Levels 1 & 2) with Matt Hansen at StatStuff
The DMAIC Roadmap (Levels 1 & 2) with Matt Hansen at StatStuff
 
Adapting Lean to Six Sigma DMAIC Flow with Matt Hansen at StatStuff
Adapting Lean to Six Sigma DMAIC Flow with Matt Hansen at StatStuffAdapting Lean to Six Sigma DMAIC Flow with Matt Hansen at StatStuff
Adapting Lean to Six Sigma DMAIC Flow with Matt Hansen at StatStuff
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Six sigma project
Six sigma projectSix sigma project
Six sigma project
 
Understand dmaic
Understand dmaicUnderstand dmaic
Understand dmaic
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
 
Lean six sigma tollgate checklists
Lean six sigma tollgate checklistsLean six sigma tollgate checklists
Lean six sigma tollgate checklists
 
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptxProject-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
Project-Improvement-Story-Roadmap-DMAIC-2018-for-students.pptx
 
concept of evaluation "Character insight"
concept of evaluation "Character insight"concept of evaluation "Character insight"
concept of evaluation "Character insight"
 
Identify Root Causes – DCP Overview
Identify Root Causes – DCP OverviewIdentify Root Causes – DCP Overview
Identify Root Causes – DCP Overview
 
Structured problem solving
Structured problem solvingStructured problem solving
Structured problem solving
 
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 daysPROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
PROJECT STORYBOARD: Reducing Software Bug Fix Lead Time From 25 to 15 days
 
Profolio
ProfolioProfolio
Profolio
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Benefiting from a Quality Problem Management Program
Benefiting from a Quality Problem Management ProgramBenefiting from a Quality Problem Management Program
Benefiting from a Quality Problem Management Program
 

More from Matt Hansen

Getting Feedback with a Plus/Delta Tool
Getting Feedback with a Plus/Delta ToolGetting Feedback with a Plus/Delta Tool
Getting Feedback with a Plus/Delta ToolMatt Hansen
 
Closing a Project
Closing a ProjectClosing a Project
Closing a ProjectMatt Hansen
 
Documenting a New Process with SOPs
Documenting a New Process with SOPsDocumenting a New Process with SOPs
Documenting a New Process with SOPsMatt Hansen
 
Building a Control Plan
Building a Control PlanBuilding a Control Plan
Building a Control PlanMatt Hansen
 
Control Charts: Recalculating Control Limits
Control Charts: Recalculating Control LimitsControl Charts: Recalculating Control Limits
Control Charts: Recalculating Control LimitsMatt Hansen
 
Control Charts: U Chart
Control Charts: U ChartControl Charts: U Chart
Control Charts: U ChartMatt Hansen
 
Control Charts: P Chart
Control Charts: P ChartControl Charts: P Chart
Control Charts: P ChartMatt Hansen
 
Control Charts: Xbar-S Chart
Control Charts: Xbar-S ChartControl Charts: Xbar-S Chart
Control Charts: Xbar-S ChartMatt Hansen
 
Control Charts: I-MR Chart
Control Charts: I-MR ChartControl Charts: I-MR Chart
Control Charts: I-MR ChartMatt Hansen
 
Control Charts: Finding the Right Control Chart
Control Charts: Finding the Right Control ChartControl Charts: Finding the Right Control Chart
Control Charts: Finding the Right Control ChartMatt Hansen
 
Building a Scorecard
Building a ScorecardBuilding a Scorecard
Building a ScorecardMatt Hansen
 
Piloting Solutions: Build the Pilot Plan
Piloting Solutions: Build the Pilot PlanPiloting Solutions: Build the Pilot Plan
Piloting Solutions: Build the Pilot PlanMatt Hansen
 
Piloting Solutions: The Process
Piloting Solutions: The ProcessPiloting Solutions: The Process
Piloting Solutions: The ProcessMatt Hansen
 
Risk Assessment with a FMEA Tool
Risk Assessment with a FMEA ToolRisk Assessment with a FMEA Tool
Risk Assessment with a FMEA ToolMatt Hansen
 
Prioritize Solutions with an Impact Matrix
Prioritize Solutions with an Impact MatrixPrioritize Solutions with an Impact Matrix
Prioritize Solutions with an Impact MatrixMatt Hansen
 
Brainstorm Solutions with an Affinity Diagram
Brainstorm Solutions with an Affinity DiagramBrainstorm Solutions with an Affinity Diagram
Brainstorm Solutions with an Affinity DiagramMatt Hansen
 
Brainstorm & Prioritize Solutions with a Workout
Brainstorm & Prioritize Solutions with a WorkoutBrainstorm & Prioritize Solutions with a Workout
Brainstorm & Prioritize Solutions with a WorkoutMatt Hansen
 
Testing for Multicollinearity
Testing for MulticollinearityTesting for Multicollinearity
Testing for MulticollinearityMatt Hansen
 
Compiling Analysis Results
Compiling Analysis ResultsCompiling Analysis Results
Compiling Analysis ResultsMatt Hansen
 
Hypothesis Testing: Relationships (Compare 2+ Factors)
Hypothesis Testing: Relationships (Compare 2+ Factors)Hypothesis Testing: Relationships (Compare 2+ Factors)
Hypothesis Testing: Relationships (Compare 2+ Factors)Matt Hansen
 

More from Matt Hansen (20)

Getting Feedback with a Plus/Delta Tool
Getting Feedback with a Plus/Delta ToolGetting Feedback with a Plus/Delta Tool
Getting Feedback with a Plus/Delta Tool
 
Closing a Project
Closing a ProjectClosing a Project
Closing a Project
 
Documenting a New Process with SOPs
Documenting a New Process with SOPsDocumenting a New Process with SOPs
Documenting a New Process with SOPs
 
Building a Control Plan
Building a Control PlanBuilding a Control Plan
Building a Control Plan
 
Control Charts: Recalculating Control Limits
Control Charts: Recalculating Control LimitsControl Charts: Recalculating Control Limits
Control Charts: Recalculating Control Limits
 
Control Charts: U Chart
Control Charts: U ChartControl Charts: U Chart
Control Charts: U Chart
 
Control Charts: P Chart
Control Charts: P ChartControl Charts: P Chart
Control Charts: P Chart
 
Control Charts: Xbar-S Chart
Control Charts: Xbar-S ChartControl Charts: Xbar-S Chart
Control Charts: Xbar-S Chart
 
Control Charts: I-MR Chart
Control Charts: I-MR ChartControl Charts: I-MR Chart
Control Charts: I-MR Chart
 
Control Charts: Finding the Right Control Chart
Control Charts: Finding the Right Control ChartControl Charts: Finding the Right Control Chart
Control Charts: Finding the Right Control Chart
 
Building a Scorecard
Building a ScorecardBuilding a Scorecard
Building a Scorecard
 
Piloting Solutions: Build the Pilot Plan
Piloting Solutions: Build the Pilot PlanPiloting Solutions: Build the Pilot Plan
Piloting Solutions: Build the Pilot Plan
 
Piloting Solutions: The Process
Piloting Solutions: The ProcessPiloting Solutions: The Process
Piloting Solutions: The Process
 
Risk Assessment with a FMEA Tool
Risk Assessment with a FMEA ToolRisk Assessment with a FMEA Tool
Risk Assessment with a FMEA Tool
 
Prioritize Solutions with an Impact Matrix
Prioritize Solutions with an Impact MatrixPrioritize Solutions with an Impact Matrix
Prioritize Solutions with an Impact Matrix
 
Brainstorm Solutions with an Affinity Diagram
Brainstorm Solutions with an Affinity DiagramBrainstorm Solutions with an Affinity Diagram
Brainstorm Solutions with an Affinity Diagram
 
Brainstorm & Prioritize Solutions with a Workout
Brainstorm & Prioritize Solutions with a WorkoutBrainstorm & Prioritize Solutions with a Workout
Brainstorm & Prioritize Solutions with a Workout
 
Testing for Multicollinearity
Testing for MulticollinearityTesting for Multicollinearity
Testing for Multicollinearity
 
Compiling Analysis Results
Compiling Analysis ResultsCompiling Analysis Results
Compiling Analysis Results
 
Hypothesis Testing: Relationships (Compare 2+ Factors)
Hypothesis Testing: Relationships (Compare 2+ Factors)Hypothesis Testing: Relationships (Compare 2+ Factors)
Hypothesis Testing: Relationships (Compare 2+ Factors)
 

Recently uploaded

9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableDipal Arora
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Serviceritikaroy0888
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseribangash
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...Paul Menig
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 

Recently uploaded (20)

9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service AvailableCall Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
Call Girls Pune Just Call 9907093804 Top Class Call Girl Service Available
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Call Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine ServiceCall Girls In Panjim North Goa 9971646499 Genuine Service
Call Girls In Panjim North Goa 9971646499 Genuine Service
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
VVVIP Call Girls In Greater Kailash ➡️ Delhi ➡️ 9999965857 🚀 No Advance 24HRS...
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...7.pdf This presentation captures many uses and the significance of the number...
7.pdf This presentation captures many uses and the significance of the number...
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 

Improve Phase Roadmap (Level 3)

  • 1. Section & Lesson #: Pre-Requisite Lessons: Complex Tools + Clear Teaching = Powerful Results Improve Phase Roadmap (Level 3) Six Sigma-Improve – Lesson 1 A deeper look into level 3 of the DMAIC roadmap that identifies critical steps and tools for navigating a project through the Improve phase. Six Sigma Overview #05 – DMAIC Roadmap (Levels 1 & 2) Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic, photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
  • 2. DMAIC Roadmap (Level 1) o Below is how these apply to the Six Sigma DMAIC project methodology • Each phase of DMAIC has a high-level question that can be answered: 2 Six Sigma DMAIC Questions: Do you understand the severity and scope of the problem? Do you know the potential root causes and have enough reliable data to test them? Can you statistically validate what are the root causes? Do you know what improvements will fix the root causes and by how much? Did the improvements successfully and permanently resolve the original problem? Understand the problem Gather reliable info Identify root cause Fix root cause Sustain Improvement Define Measure Analyze Improve Control Problem Resolution: Six Sigma DMAIC: Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic, photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
  • 3. DMAIC Roadmap (Level 2) o The DMAIC roadmap can be followed in detail by asking 3 or 4 questions per phase. • The recommended tools/resources are identified that may help answer those questions. 3 Tool/Resource CTQ Drilldown, Problem Statement, Project Scope, Project Financial Savings, Pre-Assessment (Min/Max Analysis) Stakeholder Analysis (ARMI), Buy-In/Sponsorship (CAP model) High-level Process Map, SIPOC Project Charter, Project Storyboard OUTPUTS: Can you clearly define the problem and its potential impact to the organization? Do you have a team that agrees with the project focus? Do you understand the high-level process related to the problem? Do you have a method for communicating the project information? Question Levels 1 to 2 Define Do you fully understand the severity and scope of the problem? Project Storyboard, Charter, CTQ Drilldown, ARMI, SIPOC, High-Level Process Map, and Benefits Pre-Assessment. Project Y (output) Voice of Customer (VOC), Operational Definitions C&E Diagram, 5 Whys, C&E Matrix, Data Collection Plan (DCP), Sample Size Calculator, Short/Long Term Data Measurement System Analysis (MSA) OUTPUTS: Do you know if your collected data is accurate, repeatable and reproducible? Do you know what metric reflects the output described by the problem statement? Do you know how to define defects in the process and/or outputs? Do you have enough data measuring the Y and potential inputs (Xs)? Measure Do you know the potential root causes (inputs or Xs) and have enough reliable data to test them? Updated Project Storyboard, Definition of the VOC, Y & Xs, and a reliable and relatively complete dataset. Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic, photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
  • 4. DMAIC Roadmap (Level 2) – cont’d o Below is the continuation of the detailed questions for the last 3 phases of DMAIC: 4 Tool/Resource Descriptive Statistics, I-MR chart, Normality Plot (AD test), Process Capability (with six pack) Performance Objectives Hypothesis Testing OUTPUTS: Do you know what the process capability is (a.k.a. Voice of Process or VOP)? Do you know what the target sigma level or performance objectives are for the project? Analyze Can you statistically validate what are the root causes (inputs or Xs)? Updated Project Storyboard, key process capability metrics, and hypothesis testing results. Have you done hypothesis testing to identify which potential Xs are statistically significant? Question Levels 1 to 2 Compiling Statistical Test Results, Transfer Function Brainstorming Solutions, Impact Matrix (PICK chart), FMEA Pilot/Implementation Plan, Pilot Duration, Scorecard, MSA OUTPUTS: Do you know which potential Xs are independent and statistically significant? Do you know what improvements can be made to fix the root causes (inputs or Xs)? Did you pilot the improvements and get successful results? Improve Do you know what improvements will fix the root causes (inputs or Xs) and by how much? Updated Project Storyboard, list of improvements, data/charts (e.g., scorecard) validating success of the pilot. FMEA, Pilot/Implementation Plan, Scorecard, MSA Control Charts SOPs, Control Plan Project Closure, Sponsorship OUTPUTS: Control Did the improvements successfully and permanently resolve the original problem? Updated final project storyboard, control plan, SOP, agreement from entire team that the project is complete. Did you fully transfer control and responsibility of the improvements to the process owner? Did you implement the improvements? Are the improvements successfully meeting expected results (sustained and in control)? Does the team (including the Sponsor & Champion) agree the project is complete? Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic, photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher.
  • 5. Improve Phase Roadmap (Level 3) o The DMAIC roadmap can be drilled down even deeper to a 3rd level for each phase. • Level 3 questions can guide someone to the specific tool(s) for navigating a project or initiative. 5 Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic, photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher. Tool/Resource Do you know which potential Xs are independent and statistically significant? Have you compiled all your hypothesis testing results for the statistically significant Xs? Compiling Statistical Test Results Do you know what the inter-relationship (multicollinearity) is between the significant Xs? Compiling Statistical Test Results Have you built a transfer function? (if possible) Transfer Function Does the team agree with the analysis results? Buy-in/Sponsorship (CAP model) Do you know what improvements can be made to fix the root causes (inputs or Xs)? Did you brainstorm potential improvements with the team? Brainstorming Solutions Did you assess the impact/benefit vs. difficulty/complexity for each potential improvement? Impact Matrix (PICK chart) Did you assess the potential risks for the key improvements? Risk assessment (FMEA) Did you pilot the improvements and get successful results? Did you build a pilot plan for the key improvements? Pilot/Implementation Plan Did you define a time & location scope for the pilot? Pilot Duration Did you build a scorecard for the pilot? Scorecard Do you know if your scorecard data is accurate, and the method of collecting it (if manual) was repeatable and reproducible? Measurement System Analysis (MSA) Did you get agreement from your team where the improvements will be piloted? Buy-in/Sponsorship (CAP model) OUTPUTS: Improve Updated Project Storyboard, list of improvements, data/charts (e.g., scorecard) validating the success of the pilot Do you know what improvements will fix the root causes (inputs or Xs) and by how much? Question Levels 1 to 3
  • 6. Practical Application o Identify at least 2 projects you led or worked on in the past. • For each project, review all the questions in the Improve phase level 3 roadmap.  What questions and related tools/resources were not addressed in the project?  Why were they not addressed?  What different outcome or results could’ve been realized if they were addressed in the project? Copyright © 2011-2019 by Matthew J. Hansen. All Rights Reserved. No part of this publication may be reproduced, stored in a retrieval system, or transmitted by any means (electronic, mechanical, photographic, photocopying, recording or otherwise) without prior permission in writing by the author and/or publisher. 6