1. Smallville Water System
SCADA Network Layout
MasterSite
SHEET NO.
FILE NAME
Revisions
2
4
Change:
# Date
1
5
3
Architect:
Engineer:
Contractor:
Designed by:
Software by:
Checked by:
DG 8/10/2015
Date:
This drawing not valid without original seal and signature
JS 8/10/2015
Date:
MM 8/10/2015
Date:
Customer’s Firewall/
Router
Link to Controller
User: demo, Pass: demo Communications Options
Satellite
Licensed /
Unlicensed Radio
Wireless Ethernet/
802.xx
Phone Line
PSTN-
Dial-Up
Leased Line
Twisted Pair
Cellular
Data Plan
Text Only Plans
Dialup Plans
Ethernet/IP
PCCC
DF1
Modbus/TCP/UDP
Modbus RTU
Moadbus ASCII
Master
Outstation
Serial/ Ethernet
SDX
Master/Slave
Serial/ Ethernet
AES Encrypted
Protocols Included
Integrated Trending
Web Graphical User Interface
Integrated Alarming, System
Documentation,etc.
Controller Overview Info
2. Tank
Level
Power
Fail
Relay
PRV
Open/
Closed
CMD
PRV
Closed
Status
PRV
Upstream
Pressure
PRV
Downstream
Pressure
Power
Fail
Relay
Link to Tank & PRV Site Controller
Local I/O Display
Min/Max w/ Time Stamps
Stpt.Control w/ Scheduler
OnBoard Trending
Integrated E-Dialer
Smallville Water System
SCADA Network Layout
Wtr-Remote-1
SHEET NO.
FILE NAME
Revisions
2
4
Change:
# Date
1
5
3
Architect:
Engineer:
Contractor:
Designed by:
Software by:
Checked by:
DG 8/10/2015
Date:
This drawing not valid without original seal and signature
JS 8/10/2015
Date:
MM 8/10/2015
Date:
Water Tanks PRVs
Link to Tank & PRV Site Controller
Local I/O Display
Min/Max w/ Time Stamps
Stpt.Control w/ Scheduler
OnBoard Trending
Integrated E-Dialer
3. Tank
Level
Power
Fail
Relay
Smallville Water System
SCADA Network Layout
Wtr-Remote-2
SHEET NO.
FILE NAME
Revisions
2
4
Change:
# Date
1
5
3
Architect:
Engineer:
Contractor:
Designed by:
Software by:
Checked by:
DG 8/10/2015
Date:
This drawing not valid without original seal and signature
JS 8/10/2015
Date:
MM 8/10/2015
Date:
Water Tanks
Pumping
Station
Communications and/or Direct I/O
4. Smallville Wastewater System
SCADA Network Layout
WW-Blower
SHEET NO.
FILE NAME
Revisions
2
4
Change:
# Date
1
5
3
Architect:
Engineer:
Contractor:
Designed by:
Software by:
Checked by:
DG 8/10/2015
Date:
This drawing not valid without original seal and signature
JS 8/10/2015
Date:
MM 8/10/2015
Date:
Pumping
Station
Communications and/or Direct I/O
Blower Control
E
T
H
E
R
N
E
T
Air Flow
Temperature
Pressure
Dissolved
Oxygen
Temperature
Blower #1
Blower #2
VFD #2
VFD #1
Modbus