Global Software Project Management
Presented by
Mr. Manish Tripathi ( I – 15-18-19)
Thakur Institute of Management Studies
&
Research
(Saturday, 17 February 2018)
ABOUT ABB
● Allmänna Svenska Elektriska Aktiebolaget (English translation: General
Swedish Electric Company; Swedish abbreviation: ASEA) was a Swedish
industrial company
● ASEA was founded 1883 by Ludvig Fredholm in Västerås as manufacturer of
electrical light and generators
● Brown, Boveri (BBC) was a Swiss group of electrical engineering companies
● It was founded in Baden, Switzerland, in 1891 by Charles Eugene Lancelot
Brown and Walter Boveri
● ABB (ASEA Brown Boveri) is a Swedish-Swiss multinational corporation
headquartered in Zürich, Switzerland founded in 1988
● Operating in robotics, power, heavy electrical equipments, and automation
ABOUT ABB
● Revenue: US$33.828 billion (2016)
● Operating income: US$4.191 billion (2016)
● Profit: US$1.899 billion (2016)
● A heritage spanning more than 130 years
● ABB operates in more than 100 countries
● Employs around 135,000 people
● ABB is traded on the SIX Swiss Exchange in Zürich, Nasdaq Stockholm and
the New York Stock Exchange in the United States
Global Software Project Management: A Case Study
● Based on a Conference Paper · June 2010
● Authores: Petra Björndal, Karen Smiley, and Prateeti Mohapatra
● Global software development (GSD) is a growing phenomenon in industry
● The ABB Group of companies has a long history of executing globally
distributed development projects
● The paper presents aggregate findings from qualitative interviews with people
across different sites in the organization, and describe how identifying,
measuring, and actively managing GSD-related risks can help project
managers and leaders in planning and executing projects more effectively.
● All data collection was conducted between 26th of June and 11th of
November 2009
Challenges in Global Software Project Management
● Geographic separation
● Temporal separation
● Culturally-based misunderstandings
● Language effects
● PEST challenges
● Intellectual property rights
● Communication methods
● Managing Virtual Teams
● Deciding and Controlling International Project Cost
● GSD poses challenges both on management and technical levels
The Approach
● Six cases of GSD projects within ABB, and one additional reference GSD
project in a large non-ABB commercial organization
● None of the cases we studied had multi-company integration situations
● The projects were selected for diversity with regard to types of software
developed, geographic distribution patterns, team sizes, number of sites
involved, and development methodology (conventional or agile)
● Collected the data on PM’s experiences and perceptions through interviews
and a questionnaire
Data Collection and Analysis
● The study was carried out in four steps:
1) definition of GSD metrics, 2)questionnaires,
3) interviews, 4) analysis of data
● The question set was designed to cover general context of the project (roles
and responsibilities), communication and collaboration, issues perceived, and
experiences gained during specific software activities
● Contacts were sought with projects known to have GSD experience with a
high degree of collaboration distributed over multiple countries and time
zones
● Four of the projects were studied with interviews from a broad perspective
collecting the project managers’ experiences as well as the project teams’
views, three projects were studied with interviews focusing more closely on
the project management layer, carefully examining overall GSD issues
Data Collection and Analysis
● In total, 31 interviews were done with members of GSD teams located at
seven sites
● Each semi structured interview lasted for about one and a half hours
Project# Time zones Remark
1 2 4.5 hours in
time-zone difference , ABB
2 2 7 hours in time-zone difference, ABB
3 4 Two in the same time zone; maximum
time-zone difference was 11.5 hours, ABB
4 2 7 hours in time-zone
Difference, ABB
5 3 two in the same time zone and the third
4.5 hours away, ABB
6 2 4.5 hours in
time-zone difference, ABB
7 2 same time zone, non - ABB
Role Coverage
Analysis and Discussion of Findings
Common GSD challenges, consequences, and mitigation strategies
Global software project management
Global software project management
Global software project management
Global software project management
Global software project management
Global software project management
Global software project management

More Related Content

Similar to Global software project management

Speed Dating for Project Management Software
Speed Dating for Project Management SoftwareSpeed Dating for Project Management Software
Speed Dating for Project Management SoftwareMargot
 
Project Types and their importance
Project Types and their importanceProject Types and their importance
Project Types and their importanceUjjwal Joshi
 
031617 global projects pmi presentation john mc hugh
031617 global projects pmi presentation john mc hugh031617 global projects pmi presentation john mc hugh
031617 global projects pmi presentation john mc hughJohn McHugh
 
É possível medir se um gigante é ágil?
É possível medir se um gigante é ágil?É possível medir se um gigante é ágil?
É possível medir se um gigante é ágil?Alan Braz
 
NRENs in the Dissemination of Innovative Low Cost Global Solutions: From Univ...
NRENs in the Dissemination of Innovative Low Cost Global Solutions: From Univ...NRENs in the Dissemination of Innovative Low Cost Global Solutions: From Univ...
NRENs in the Dissemination of Innovative Low Cost Global Solutions: From Univ...Daniela Brauner
 
Roberto carmone english cv
Roberto carmone english cvRoberto carmone english cv
Roberto carmone english cvRoberto CARMONE
 
Roberto carmone english cv
Roberto carmone english cvRoberto carmone english cv
Roberto carmone english cvRoberto CARMONE
 
Roberto CARMONE english cv
Roberto CARMONE english cvRoberto CARMONE english cv
Roberto CARMONE english cvRoberto CARMONE
 
Netflix OSS Meetup Season 4 Episode 4
Netflix OSS Meetup Season 4 Episode 4Netflix OSS Meetup Season 4 Episode 4
Netflix OSS Meetup Season 4 Episode 4aspyker
 
ING's Customer-Centric Data Journey from Community Idea to Private Cloud Depl...
ING's Customer-Centric Data Journey from Community Idea to Private Cloud Depl...ING's Customer-Centric Data Journey from Community Idea to Private Cloud Depl...
ING's Customer-Centric Data Journey from Community Idea to Private Cloud Depl...DataWorks Summit/Hadoop Summit
 
Speed Dating for Project Management Software
Speed Dating for Project Management SoftwareSpeed Dating for Project Management Software
Speed Dating for Project Management SoftwareAnnis Lee Adams
 
Future of land use project overview - august 2019
Future of land use   project overview - august 2019Future of land use   project overview - august 2019
Future of land use project overview - august 2019Future Agenda
 
The Software Sustainability Institute Fellowship
The Software Sustainability Institute FellowshipThe Software Sustainability Institute Fellowship
The Software Sustainability Institute FellowshipAlejandra Gonzalez-Beltran
 
Sandip Mukherjee CV
Sandip Mukherjee CVSandip Mukherjee CV
Sandip Mukherjee CVsandipm
 
Cn mo11 2_alt_status_and_planning_final_hessel
Cn mo11 2_alt_status_and_planning_final_hesselCn mo11 2_alt_status_and_planning_final_hessel
Cn mo11 2_alt_status_and_planning_final_hesselErik van den Elsen
 
Chapter 01 - Introduction to Software Project Management
Chapter 01 - Introduction to Software Project ManagementChapter 01 - Introduction to Software Project Management
Chapter 01 - Introduction to Software Project ManagementRohanMistry15
 

Similar to Global software project management (20)

Speed Dating for Project Management Software
Speed Dating for Project Management SoftwareSpeed Dating for Project Management Software
Speed Dating for Project Management Software
 
Project Types and their importance
Project Types and their importanceProject Types and their importance
Project Types and their importance
 
031617 global projects pmi presentation john mc hugh
031617 global projects pmi presentation john mc hugh031617 global projects pmi presentation john mc hugh
031617 global projects pmi presentation john mc hugh
 
É possível medir se um gigante é ágil?
É possível medir se um gigante é ágil?É possível medir se um gigante é ágil?
É possível medir se um gigante é ágil?
 
NRENs in the Dissemination of Innovative Low Cost Global Solutions: From Univ...
NRENs in the Dissemination of Innovative Low Cost Global Solutions: From Univ...NRENs in the Dissemination of Innovative Low Cost Global Solutions: From Univ...
NRENs in the Dissemination of Innovative Low Cost Global Solutions: From Univ...
 
Roberto carmone english cv
Roberto carmone english cvRoberto carmone english cv
Roberto carmone english cv
 
Roberto carmone english cv
Roberto carmone english cvRoberto carmone english cv
Roberto carmone english cv
 
Roberto CARMONE english cv
Roberto CARMONE english cvRoberto CARMONE english cv
Roberto CARMONE english cv
 
MSR-2022.pdf
MSR-2022.pdfMSR-2022.pdf
MSR-2022.pdf
 
Netflix OSS Meetup Season 4 Episode 4
Netflix OSS Meetup Season 4 Episode 4Netflix OSS Meetup Season 4 Episode 4
Netflix OSS Meetup Season 4 Episode 4
 
Slides 2015 for contact 1
Slides 2015 for contact 1Slides 2015 for contact 1
Slides 2015 for contact 1
 
ING's Customer-Centric Data Journey from Community Idea to Private Cloud Depl...
ING's Customer-Centric Data Journey from Community Idea to Private Cloud Depl...ING's Customer-Centric Data Journey from Community Idea to Private Cloud Depl...
ING's Customer-Centric Data Journey from Community Idea to Private Cloud Depl...
 
Speed Dating for Project Management Software
Speed Dating for Project Management SoftwareSpeed Dating for Project Management Software
Speed Dating for Project Management Software
 
From Research to Development Outcomes in the Volta River Basin (2012)
From Research to Development Outcomes in the Volta River Basin (2012)From Research to Development Outcomes in the Volta River Basin (2012)
From Research to Development Outcomes in the Volta River Basin (2012)
 
Future of land use project overview - august 2019
Future of land use   project overview - august 2019Future of land use   project overview - august 2019
Future of land use project overview - august 2019
 
The Software Sustainability Institute Fellowship
The Software Sustainability Institute FellowshipThe Software Sustainability Institute Fellowship
The Software Sustainability Institute Fellowship
 
Sandip Mukherjee CV
Sandip Mukherjee CVSandip Mukherjee CV
Sandip Mukherjee CV
 
Cn mo11 2_alt_status_and_planning_final_hessel
Cn mo11 2_alt_status_and_planning_final_hesselCn mo11 2_alt_status_and_planning_final_hessel
Cn mo11 2_alt_status_and_planning_final_hessel
 
Chapter 01 - Introduction to Software Project Management
Chapter 01 - Introduction to Software Project ManagementChapter 01 - Introduction to Software Project Management
Chapter 01 - Introduction to Software Project Management
 
6th COBWEB Consortium Meeting
6th COBWEB Consortium Meeting6th COBWEB Consortium Meeting
6th COBWEB Consortium Meeting
 

More from A P

Social media-workplace-13 september2015
Social media-workplace-13 september2015Social media-workplace-13 september2015
Social media-workplace-13 september2015A P
 
Rote wto-it-diffusion
Rote wto-it-diffusionRote wto-it-diffusion
Rote wto-it-diffusionA P
 
Role of-wto-in-promoting-un-sustainable-development-goals
Role of-wto-in-promoting-un-sustainable-development-goalsRole of-wto-in-promoting-un-sustainable-development-goals
Role of-wto-in-promoting-un-sustainable-development-goalsA P
 
Microsoft nokia-acquisition
Microsoft nokia-acquisitionMicrosoft nokia-acquisition
Microsoft nokia-acquisitionA P
 
Manish tripathi-tcs-financial-management-9 october2016
Manish tripathi-tcs-financial-management-9 october2016Manish tripathi-tcs-financial-management-9 october2016
Manish tripathi-tcs-financial-management-9 october2016A P
 
Manish tripathi-sqa&m-six-sigma-12 feb2017
Manish tripathi-sqa&m-six-sigma-12 feb2017Manish tripathi-sqa&m-six-sigma-12 feb2017
Manish tripathi-sqa&m-six-sigma-12 feb2017A P
 
Manish tripathi-sqa&m-11 feb2017 -
Manish tripathi-sqa&m-11 feb2017 -Manish tripathi-sqa&m-11 feb2017 -
Manish tripathi-sqa&m-11 feb2017 -A P
 
Manish tripathi-se-failure stories-12feb2017
Manish tripathi-se-failure stories-12feb2017Manish tripathi-se-failure stories-12feb2017
Manish tripathi-se-failure stories-12feb2017A P
 
Manish tripathi-se-cmm-5 feb2017
Manish tripathi-se-cmm-5 feb2017Manish tripathi-se-cmm-5 feb2017
Manish tripathi-se-cmm-5 feb2017A P
 
Manish tripathi-principals-of-management-book-review-21 august2015
Manish tripathi-principals-of-management-book-review-21 august2015Manish tripathi-principals-of-management-book-review-21 august2015
Manish tripathi-principals-of-management-book-review-21 august2015A P
 
Manish tripathi-mis-erp-failure-14 august2016
Manish tripathi-mis-erp-failure-14 august2016Manish tripathi-mis-erp-failure-14 august2016
Manish tripathi-mis-erp-failure-14 august2016A P
 
Manish tripathi-itim-incident-management
Manish tripathi-itim-incident-managementManish tripathi-itim-incident-management
Manish tripathi-itim-incident-managementA P
 
Manish tripathi-itim-dr
Manish tripathi-itim-drManish tripathi-itim-dr
Manish tripathi-itim-drA P
 
Manish tripathi-innovation-trends-19 august2016
Manish tripathi-innovation-trends-19 august2016Manish tripathi-innovation-trends-19 august2016
Manish tripathi-innovation-trends-19 august2016A P
 
Manish tripathi-innovation-26 august2016
Manish tripathi-innovation-26 august2016Manish tripathi-innovation-26 august2016
Manish tripathi-innovation-26 august2016A P
 
Manish tripathi-innovation-5 august2016
Manish tripathi-innovation-5 august2016Manish tripathi-innovation-5 august2016
Manish tripathi-innovation-5 august2016A P
 
Manish tripathi-innovation-2 septembre2016
Manish tripathi-innovation-2 septembre2016Manish tripathi-innovation-2 septembre2016
Manish tripathi-innovation-2 septembre2016A P
 
Manish tripathi-i-15-18-19-bia-ppt-oil-gas
Manish tripathi-i-15-18-19-bia-ppt-oil-gasManish tripathi-i-15-18-19-bia-ppt-oil-gas
Manish tripathi-i-15-18-19-bia-ppt-oil-gasA P
 
Manish tripathi-hrm-leadership-6 april2016
Manish tripathi-hrm-leadership-6 april2016Manish tripathi-hrm-leadership-6 april2016
Manish tripathi-hrm-leadership-6 april2016A P
 
Manish tripathi-gst-27 august2016
Manish tripathi-gst-27 august2016Manish tripathi-gst-27 august2016
Manish tripathi-gst-27 august2016A P
 

More from A P (20)

Social media-workplace-13 september2015
Social media-workplace-13 september2015Social media-workplace-13 september2015
Social media-workplace-13 september2015
 
Rote wto-it-diffusion
Rote wto-it-diffusionRote wto-it-diffusion
Rote wto-it-diffusion
 
Role of-wto-in-promoting-un-sustainable-development-goals
Role of-wto-in-promoting-un-sustainable-development-goalsRole of-wto-in-promoting-un-sustainable-development-goals
Role of-wto-in-promoting-un-sustainable-development-goals
 
Microsoft nokia-acquisition
Microsoft nokia-acquisitionMicrosoft nokia-acquisition
Microsoft nokia-acquisition
 
Manish tripathi-tcs-financial-management-9 october2016
Manish tripathi-tcs-financial-management-9 october2016Manish tripathi-tcs-financial-management-9 october2016
Manish tripathi-tcs-financial-management-9 october2016
 
Manish tripathi-sqa&m-six-sigma-12 feb2017
Manish tripathi-sqa&m-six-sigma-12 feb2017Manish tripathi-sqa&m-six-sigma-12 feb2017
Manish tripathi-sqa&m-six-sigma-12 feb2017
 
Manish tripathi-sqa&m-11 feb2017 -
Manish tripathi-sqa&m-11 feb2017 -Manish tripathi-sqa&m-11 feb2017 -
Manish tripathi-sqa&m-11 feb2017 -
 
Manish tripathi-se-failure stories-12feb2017
Manish tripathi-se-failure stories-12feb2017Manish tripathi-se-failure stories-12feb2017
Manish tripathi-se-failure stories-12feb2017
 
Manish tripathi-se-cmm-5 feb2017
Manish tripathi-se-cmm-5 feb2017Manish tripathi-se-cmm-5 feb2017
Manish tripathi-se-cmm-5 feb2017
 
Manish tripathi-principals-of-management-book-review-21 august2015
Manish tripathi-principals-of-management-book-review-21 august2015Manish tripathi-principals-of-management-book-review-21 august2015
Manish tripathi-principals-of-management-book-review-21 august2015
 
Manish tripathi-mis-erp-failure-14 august2016
Manish tripathi-mis-erp-failure-14 august2016Manish tripathi-mis-erp-failure-14 august2016
Manish tripathi-mis-erp-failure-14 august2016
 
Manish tripathi-itim-incident-management
Manish tripathi-itim-incident-managementManish tripathi-itim-incident-management
Manish tripathi-itim-incident-management
 
Manish tripathi-itim-dr
Manish tripathi-itim-drManish tripathi-itim-dr
Manish tripathi-itim-dr
 
Manish tripathi-innovation-trends-19 august2016
Manish tripathi-innovation-trends-19 august2016Manish tripathi-innovation-trends-19 august2016
Manish tripathi-innovation-trends-19 august2016
 
Manish tripathi-innovation-26 august2016
Manish tripathi-innovation-26 august2016Manish tripathi-innovation-26 august2016
Manish tripathi-innovation-26 august2016
 
Manish tripathi-innovation-5 august2016
Manish tripathi-innovation-5 august2016Manish tripathi-innovation-5 august2016
Manish tripathi-innovation-5 august2016
 
Manish tripathi-innovation-2 septembre2016
Manish tripathi-innovation-2 septembre2016Manish tripathi-innovation-2 septembre2016
Manish tripathi-innovation-2 septembre2016
 
Manish tripathi-i-15-18-19-bia-ppt-oil-gas
Manish tripathi-i-15-18-19-bia-ppt-oil-gasManish tripathi-i-15-18-19-bia-ppt-oil-gas
Manish tripathi-i-15-18-19-bia-ppt-oil-gas
 
Manish tripathi-hrm-leadership-6 april2016
Manish tripathi-hrm-leadership-6 april2016Manish tripathi-hrm-leadership-6 april2016
Manish tripathi-hrm-leadership-6 april2016
 
Manish tripathi-gst-27 august2016
Manish tripathi-gst-27 august2016Manish tripathi-gst-27 august2016
Manish tripathi-gst-27 august2016
 

Recently uploaded

internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic managementharfimakarim
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Hedda Bird
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdfAlejandromexEspino
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Pooja Nehwal
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampPLCLeadershipDevelop
 
Strategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal AnalsysisStrategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal Analsysistanmayarora45
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceDelhi Call girls
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...Pooja Nehwal
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607dollysharma2066
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentNimot Muili
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field ArtilleryKennethSwanberg
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxalinstan901
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptxAss.Prof. Dr. Mogeeb Mosleh
 

Recently uploaded (15)

internal analysis on strategic management
internal analysis on strategic managementinternal analysis on strategic management
internal analysis on strategic management
 
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...Dealing with Poor Performance - get the full picture from 3C Performance Mana...
Dealing with Poor Performance - get the full picture from 3C Performance Mana...
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
Call now : 9892124323 Nalasopara Beautiful Call Girls Vasai virar Best Call G...
 
Day 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC BootcampDay 0- Bootcamp Roadmap for PLC Bootcamp
Day 0- Bootcamp Roadmap for PLC Bootcamp
 
Strategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal AnalsysisStrategic Management, Vision Mission, Internal Analsysis
Strategic Management, Vision Mission, Internal Analsysis
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort ServiceBDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
BDSM⚡Call Girls in Sector 99 Noida Escorts >༒8448380779 Escort Service
 
Intro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptxIntro_University_Ranking_Introduction.pptx
Intro_University_Ranking_Introduction.pptx
 
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...Call Now Pooja Mehta :  7738631006 Door Step Call Girls Rate 100% Satisfactio...
Call Now Pooja Mehta : 7738631006 Door Step Call Girls Rate 100% Satisfactio...
 
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607GENUINE Babe,Call Girls IN Baderpur  Delhi | +91-8377087607
GENUINE Babe,Call Girls IN Baderpur Delhi | +91-8377087607
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
Agile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptxAgile Coaching Change Management Framework.pptx
Agile Coaching Change Management Framework.pptx
 
Reviewing and summarization of university ranking system to.pptx
Reviewing and summarization of university ranking system  to.pptxReviewing and summarization of university ranking system  to.pptx
Reviewing and summarization of university ranking system to.pptx
 

Global software project management

  • 1. Global Software Project Management Presented by Mr. Manish Tripathi ( I – 15-18-19) Thakur Institute of Management Studies & Research (Saturday, 17 February 2018)
  • 2. ABOUT ABB ● Allmänna Svenska Elektriska Aktiebolaget (English translation: General Swedish Electric Company; Swedish abbreviation: ASEA) was a Swedish industrial company ● ASEA was founded 1883 by Ludvig Fredholm in Västerås as manufacturer of electrical light and generators ● Brown, Boveri (BBC) was a Swiss group of electrical engineering companies ● It was founded in Baden, Switzerland, in 1891 by Charles Eugene Lancelot Brown and Walter Boveri ● ABB (ASEA Brown Boveri) is a Swedish-Swiss multinational corporation headquartered in Zürich, Switzerland founded in 1988 ● Operating in robotics, power, heavy electrical equipments, and automation
  • 3. ABOUT ABB ● Revenue: US$33.828 billion (2016) ● Operating income: US$4.191 billion (2016) ● Profit: US$1.899 billion (2016) ● A heritage spanning more than 130 years ● ABB operates in more than 100 countries ● Employs around 135,000 people ● ABB is traded on the SIX Swiss Exchange in Zürich, Nasdaq Stockholm and the New York Stock Exchange in the United States
  • 4.
  • 5.
  • 6. Global Software Project Management: A Case Study ● Based on a Conference Paper · June 2010 ● Authores: Petra Björndal, Karen Smiley, and Prateeti Mohapatra ● Global software development (GSD) is a growing phenomenon in industry ● The ABB Group of companies has a long history of executing globally distributed development projects ● The paper presents aggregate findings from qualitative interviews with people across different sites in the organization, and describe how identifying, measuring, and actively managing GSD-related risks can help project managers and leaders in planning and executing projects more effectively. ● All data collection was conducted between 26th of June and 11th of November 2009
  • 7. Challenges in Global Software Project Management ● Geographic separation ● Temporal separation ● Culturally-based misunderstandings ● Language effects ● PEST challenges ● Intellectual property rights ● Communication methods ● Managing Virtual Teams ● Deciding and Controlling International Project Cost ● GSD poses challenges both on management and technical levels
  • 8. The Approach ● Six cases of GSD projects within ABB, and one additional reference GSD project in a large non-ABB commercial organization ● None of the cases we studied had multi-company integration situations ● The projects were selected for diversity with regard to types of software developed, geographic distribution patterns, team sizes, number of sites involved, and development methodology (conventional or agile) ● Collected the data on PM’s experiences and perceptions through interviews and a questionnaire
  • 9. Data Collection and Analysis ● The study was carried out in four steps: 1) definition of GSD metrics, 2)questionnaires, 3) interviews, 4) analysis of data ● The question set was designed to cover general context of the project (roles and responsibilities), communication and collaboration, issues perceived, and experiences gained during specific software activities ● Contacts were sought with projects known to have GSD experience with a high degree of collaboration distributed over multiple countries and time zones ● Four of the projects were studied with interviews from a broad perspective collecting the project managers’ experiences as well as the project teams’ views, three projects were studied with interviews focusing more closely on the project management layer, carefully examining overall GSD issues
  • 10. Data Collection and Analysis ● In total, 31 interviews were done with members of GSD teams located at seven sites ● Each semi structured interview lasted for about one and a half hours
  • 11. Project# Time zones Remark 1 2 4.5 hours in time-zone difference , ABB 2 2 7 hours in time-zone difference, ABB 3 4 Two in the same time zone; maximum time-zone difference was 11.5 hours, ABB 4 2 7 hours in time-zone Difference, ABB 5 3 two in the same time zone and the third 4.5 hours away, ABB 6 2 4.5 hours in time-zone difference, ABB 7 2 same time zone, non - ABB
  • 13. Analysis and Discussion of Findings
  • 14. Common GSD challenges, consequences, and mitigation strategies