Sewer Network Distribution
Md. Mehedi Hassan Masum
Lecturer
Department of Civil Engineering
Port City International University
Department of CEN, PCIU
Department of CE, CUET2
Introduction Result & Discussion Conclusion
𝐹𝑖𝑔 01: 𝑃𝑙𝑎𝑛 𝑜𝑓 𝑎 𝑝𝑜𝑤𝑒𝑟 𝑝𝑙𝑎𝑛𝑡
Department of CE, CUET3
Introduction Result & Discussion Conclusion
𝐹𝑖𝑔 03: 𝑁𝑒𝑡𝑤𝑜𝑟𝑘 𝑑𝑖𝑎𝑔𝑟𝑎𝑚
Department of CE, CUET4
Introduction Result & Discussion Conclusion
𝐹𝑖𝑔 04: 𝑁𝑒𝑡𝑤𝑜𝑟𝑘 𝑑𝑖𝑎𝑔𝑟𝑎𝑚 (𝑃 − 1)
Department of CE, CUET5
Introduction Result & Discussion Conclusion
𝐹𝑖𝑔 05: 𝑁𝑒𝑡𝑤𝑜𝑟𝑘 𝑑𝑖𝑎𝑔𝑟𝑎𝑚 (𝑃 − 2)
Department of CE, CUET6
Introduction Result & Discussion Conclusion
𝐹𝑖𝑔 06: 𝐿𝑜𝑜𝑝 𝑠𝑒𝑙𝑒𝑐𝑡𝑒𝑑 𝑓𝑜𝑟 𝑎𝑛𝑎𝑙𝑦𝑠𝑖𝑠
Department of CE, CUET7
Introduction Result & Discussion Conclusion
Pipe
Sub-
Area
Population
Per capita
consumpti
on (lpcd)
Water
Demand
(m3/day)
Peak
factor
% of
wastewater
Total
wastewater
(m3/day)
P1
A1 432 135 58.32 2.50 70 102.06
A2 768 135 103.68 2.50 70 181.44
A9 384 135 51.84 3.00 90 139.97
P2
A3 768 135 103.68 2.50 70 181.44
A4 768 135 103.68 2.50 70 181.44
P3
A5 1152 135 155.52 2.50 70 272.16
A6 1152 135 155.52 2.50 70 272.16
A7 1152 135 155.52 2.50 70 272.16
A8 300 100 30.00 3.00 90 81.00
Total 917.76 23.50 1683.83
Table: Wastewater Generation from household
Department of CE, CUET8
Introduction Result & Discussion Conclusion
Table: Wastewater Generation from household
Pipe Sub-Area Area (sq.m) Area (ha)
Peak
infiltration
factor
(m3/ha-day)
Infiltration , I
(m3/day)
P1
A1 7432.2400 0.7432
8.7500 22.6962
A2 7618.0460 0.7618
A9 10888.2316 1.0888
P2
A3 7543.7236 0.7544
8.7500 13.1690
A4 7506.5624 0.7507
P3
A5 7580.8848 0.7581
8.7500 24.8097
A6 7618.0460 0.7618
A7 7432.2400 0.7432
A8 5722.8248 0.5723
Total 69342.7992 6.9343 60.6749
Department of CE, CUET9
Introduction Result & Discussion Conclusion
Total Wastewater Generation
Total wastewater generation =
1683.73+60.6749 = 1744.59 𝑚3/𝑑𝑎𝑦
Department of CE, CUET10
Department of CE, CUET11

More Related Content

Similar to L 6 sewer_design

Application of artificial neural network in metropolitan landscape
Application of artificial neural network in metropolitan landscapeApplication of artificial neural network in metropolitan landscape
Application of artificial neural network in metropolitan landscapeIAEME Publication
 
DEVELOPMENT OF CLEAN WATER DISTRIBUTION NETWORK CAPACITY BY USING WATERCAD
DEVELOPMENT OF CLEAN WATER DISTRIBUTION NETWORK CAPACITY BY USING WATERCADDEVELOPMENT OF CLEAN WATER DISTRIBUTION NETWORK CAPACITY BY USING WATERCAD
DEVELOPMENT OF CLEAN WATER DISTRIBUTION NETWORK CAPACITY BY USING WATERCADIAEME Publication
 
1st phase analysis
1st phase analysis1st phase analysis
1st phase analysisRohit Sahai
 
Stormwater Asset Management Using Gis V5
Stormwater Asset Management Using Gis V5Stormwater Asset Management Using Gis V5
Stormwater Asset Management Using Gis V5Vithal Deshpande
 
IRJET- Traffic Congestion Analysis: A Case Study of Kacherithazham -Muvattupu...
IRJET- Traffic Congestion Analysis: A Case Study of Kacherithazham -Muvattupu...IRJET- Traffic Congestion Analysis: A Case Study of Kacherithazham -Muvattupu...
IRJET- Traffic Congestion Analysis: A Case Study of Kacherithazham -Muvattupu...IRJET Journal
 
Riverine passenger vessel overload detedtion and monitoring system
Riverine passenger vessel overload detedtion and monitoring systemRiverine passenger vessel overload detedtion and monitoring system
Riverine passenger vessel overload detedtion and monitoring systemMd Mamunoor Islam
 
manual-road-drainage-chapter-5 (1).pdf
manual-road-drainage-chapter-5 (1).pdfmanual-road-drainage-chapter-5 (1).pdf
manual-road-drainage-chapter-5 (1).pdfRastaXaimaca
 
IRJET-Environmental Impact Assessment for Infrastructure Development project...
IRJET-Environmental Impact Assessment for Infrastructure  Development project...IRJET-Environmental Impact Assessment for Infrastructure  Development project...
IRJET-Environmental Impact Assessment for Infrastructure Development project...IRJET Journal
 
2016 GMekong Forum - Session 02 - inclusive development paths red river
2016 GMekong Forum - Session 02 - inclusive development paths red river2016 GMekong Forum - Session 02 - inclusive development paths red river
2016 GMekong Forum - Session 02 - inclusive development paths red riverWater, Land and Ecosystems (WLE)
 
Impacts of Red Light Photo Enforcement Cameras on Clearance Lost Time at Sign...
Impacts of Red Light Photo Enforcement Cameras on Clearance Lost Time at Sign...Impacts of Red Light Photo Enforcement Cameras on Clearance Lost Time at Sign...
Impacts of Red Light Photo Enforcement Cameras on Clearance Lost Time at Sign...Fatemeh Baratian
 
The Study on Notification and Decision-Making Processes on the Hydropower in ...
The Study on Notification and Decision-Making Processes on the Hydropower in ...The Study on Notification and Decision-Making Processes on the Hydropower in ...
The Study on Notification and Decision-Making Processes on the Hydropower in ...CPWF Mekong
 
Development of a Laser-Based Water Level Sensor for Fine-Scale Ecohydrologica...
Development of a Laser-Based Water Level Sensor for Fine-Scale Ecohydrologica...Development of a Laser-Based Water Level Sensor for Fine-Scale Ecohydrologica...
Development of a Laser-Based Water Level Sensor for Fine-Scale Ecohydrologica...Joshua Benjamin, E.I.
 
Analysis and design of an efficient drainage system in Chittagong city
Analysis and design of an efficient  drainage system in Chittagong cityAnalysis and design of an efficient  drainage system in Chittagong city
Analysis and design of an efficient drainage system in Chittagong citySabbir . Ahmmed
 
L 1 organogram_demand calculation
L 1 organogram_demand calculationL 1 organogram_demand calculation
L 1 organogram_demand calculationMEHEDIMASUM2
 
DSD-INT 2018 Tidal propagation and salt intrusion in the multi-channel estuar...
DSD-INT 2018 Tidal propagation and salt intrusion in the multi-channel estuar...DSD-INT 2018 Tidal propagation and salt intrusion in the multi-channel estuar...
DSD-INT 2018 Tidal propagation and salt intrusion in the multi-channel estuar...Deltares
 

Similar to L 6 sewer_design (20)

Application of artificial neural network in metropolitan landscape
Application of artificial neural network in metropolitan landscapeApplication of artificial neural network in metropolitan landscape
Application of artificial neural network in metropolitan landscape
 
Chapter 4.pdf
Chapter 4.pdfChapter 4.pdf
Chapter 4.pdf
 
CFD modeling
CFD modelingCFD modeling
CFD modeling
 
3 erakv 3rd seminar_risk
3 erakv 3rd seminar_risk3 erakv 3rd seminar_risk
3 erakv 3rd seminar_risk
 
DEVELOPMENT OF CLEAN WATER DISTRIBUTION NETWORK CAPACITY BY USING WATERCAD
DEVELOPMENT OF CLEAN WATER DISTRIBUTION NETWORK CAPACITY BY USING WATERCADDEVELOPMENT OF CLEAN WATER DISTRIBUTION NETWORK CAPACITY BY USING WATERCAD
DEVELOPMENT OF CLEAN WATER DISTRIBUTION NETWORK CAPACITY BY USING WATERCAD
 
1st phase analysis
1st phase analysis1st phase analysis
1st phase analysis
 
Stormwater Asset Management Using Gis V5
Stormwater Asset Management Using Gis V5Stormwater Asset Management Using Gis V5
Stormwater Asset Management Using Gis V5
 
IRJET- Traffic Congestion Analysis: A Case Study of Kacherithazham -Muvattupu...
IRJET- Traffic Congestion Analysis: A Case Study of Kacherithazham -Muvattupu...IRJET- Traffic Congestion Analysis: A Case Study of Kacherithazham -Muvattupu...
IRJET- Traffic Congestion Analysis: A Case Study of Kacherithazham -Muvattupu...
 
Riverine passenger vessel overload detedtion and monitoring system
Riverine passenger vessel overload detedtion and monitoring systemRiverine passenger vessel overload detedtion and monitoring system
Riverine passenger vessel overload detedtion and monitoring system
 
manual-road-drainage-chapter-5 (1).pdf
manual-road-drainage-chapter-5 (1).pdfmanual-road-drainage-chapter-5 (1).pdf
manual-road-drainage-chapter-5 (1).pdf
 
IRJET-Environmental Impact Assessment for Infrastructure Development project...
IRJET-Environmental Impact Assessment for Infrastructure  Development project...IRJET-Environmental Impact Assessment for Infrastructure  Development project...
IRJET-Environmental Impact Assessment for Infrastructure Development project...
 
2016 GMekong Forum - Session 02 - inclusive development paths red river
2016 GMekong Forum - Session 02 - inclusive development paths red river2016 GMekong Forum - Session 02 - inclusive development paths red river
2016 GMekong Forum - Session 02 - inclusive development paths red river
 
Impacts of Red Light Photo Enforcement Cameras on Clearance Lost Time at Sign...
Impacts of Red Light Photo Enforcement Cameras on Clearance Lost Time at Sign...Impacts of Red Light Photo Enforcement Cameras on Clearance Lost Time at Sign...
Impacts of Red Light Photo Enforcement Cameras on Clearance Lost Time at Sign...
 
Presentation CIE619
Presentation CIE619 Presentation CIE619
Presentation CIE619
 
The Study on Notification and Decision-Making Processes on the Hydropower in ...
The Study on Notification and Decision-Making Processes on the Hydropower in ...The Study on Notification and Decision-Making Processes on the Hydropower in ...
The Study on Notification and Decision-Making Processes on the Hydropower in ...
 
Development of a Laser-Based Water Level Sensor for Fine-Scale Ecohydrologica...
Development of a Laser-Based Water Level Sensor for Fine-Scale Ecohydrologica...Development of a Laser-Based Water Level Sensor for Fine-Scale Ecohydrologica...
Development of a Laser-Based Water Level Sensor for Fine-Scale Ecohydrologica...
 
Analysis and design of an efficient drainage system in Chittagong city
Analysis and design of an efficient  drainage system in Chittagong cityAnalysis and design of an efficient  drainage system in Chittagong city
Analysis and design of an efficient drainage system in Chittagong city
 
การนำเสนอบทความวิชาการระดับชาติ
การนำเสนอบทความวิชาการระดับชาติการนำเสนอบทความวิชาการระดับชาติ
การนำเสนอบทความวิชาการระดับชาติ
 
L 1 organogram_demand calculation
L 1 organogram_demand calculationL 1 organogram_demand calculation
L 1 organogram_demand calculation
 
DSD-INT 2018 Tidal propagation and salt intrusion in the multi-channel estuar...
DSD-INT 2018 Tidal propagation and salt intrusion in the multi-channel estuar...DSD-INT 2018 Tidal propagation and salt intrusion in the multi-channel estuar...
DSD-INT 2018 Tidal propagation and salt intrusion in the multi-channel estuar...
 

More from MEHEDIMASUM2

More from MEHEDIMASUM2 (13)

L 4 pump_capacity
L 4 pump_capacityL 4 pump_capacity
L 4 pump_capacity
 
L 2 wastewater_treatment
L 2 wastewater_treatmentL 2 wastewater_treatment
L 2 wastewater_treatment
 
L 7 plumbing_design
L 7 plumbing_designL 7 plumbing_design
L 7 plumbing_design
 
L 8 septic_tank
L 8 septic_tankL 8 septic_tank
L 8 septic_tank
 
L 3 well_design
L 3 well_designL 3 well_design
L 3 well_design
 
L6 infiltrationr rate calculation
L6 infiltrationr rate calculationL6 infiltrationr rate calculation
L6 infiltrationr rate calculation
 
L5 infiltration
L5 infiltrationL5 infiltration
L5 infiltration
 
L3 evaporation
L3 evaporationL3 evaporation
L3 evaporation
 
L2 precipitation
L2 precipitationL2 precipitation
L2 precipitation
 
L4 stream flow
L4 stream flowL4 stream flow
L4 stream flow
 
L8 unit hydrograph
L8 unit hydrographL8 unit hydrograph
L8 unit hydrograph
 
L7 hydrograph
L7 hydrographL7 hydrograph
L7 hydrograph
 
L1 introduction
L1 introductionL1 introduction
L1 introduction
 

Recently uploaded

Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdfKamal Acharya
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxfenichawla
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756dollysharma2066
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingrknatarajan
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfRagavanV2
 

Recently uploaded (20)

Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
University management System project report..pdf
University management System project report..pdfUniversity management System project report..pdf
University management System project report..pdf
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar  ≼🔝 Delhi door step de...
Call Now ≽ 9953056974 ≼🔝 Call Girls In New Ashok Nagar ≼🔝 Delhi door step de...
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 

L 6 sewer_design

  • 1. Sewer Network Distribution Md. Mehedi Hassan Masum Lecturer Department of Civil Engineering Port City International University Department of CEN, PCIU
  • 2. Department of CE, CUET2 Introduction Result & Discussion Conclusion 𝐹𝑖𝑔 01: 𝑃𝑙𝑎𝑛 𝑜𝑓 𝑎 𝑝𝑜𝑤𝑒𝑟 𝑝𝑙𝑎𝑛𝑡
  • 3. Department of CE, CUET3 Introduction Result & Discussion Conclusion 𝐹𝑖𝑔 03: 𝑁𝑒𝑡𝑤𝑜𝑟𝑘 𝑑𝑖𝑎𝑔𝑟𝑎𝑚
  • 4. Department of CE, CUET4 Introduction Result & Discussion Conclusion 𝐹𝑖𝑔 04: 𝑁𝑒𝑡𝑤𝑜𝑟𝑘 𝑑𝑖𝑎𝑔𝑟𝑎𝑚 (𝑃 − 1)
  • 5. Department of CE, CUET5 Introduction Result & Discussion Conclusion 𝐹𝑖𝑔 05: 𝑁𝑒𝑡𝑤𝑜𝑟𝑘 𝑑𝑖𝑎𝑔𝑟𝑎𝑚 (𝑃 − 2)
  • 6. Department of CE, CUET6 Introduction Result & Discussion Conclusion 𝐹𝑖𝑔 06: 𝐿𝑜𝑜𝑝 𝑠𝑒𝑙𝑒𝑐𝑡𝑒𝑑 𝑓𝑜𝑟 𝑎𝑛𝑎𝑙𝑦𝑠𝑖𝑠
  • 7. Department of CE, CUET7 Introduction Result & Discussion Conclusion Pipe Sub- Area Population Per capita consumpti on (lpcd) Water Demand (m3/day) Peak factor % of wastewater Total wastewater (m3/day) P1 A1 432 135 58.32 2.50 70 102.06 A2 768 135 103.68 2.50 70 181.44 A9 384 135 51.84 3.00 90 139.97 P2 A3 768 135 103.68 2.50 70 181.44 A4 768 135 103.68 2.50 70 181.44 P3 A5 1152 135 155.52 2.50 70 272.16 A6 1152 135 155.52 2.50 70 272.16 A7 1152 135 155.52 2.50 70 272.16 A8 300 100 30.00 3.00 90 81.00 Total 917.76 23.50 1683.83 Table: Wastewater Generation from household
  • 8. Department of CE, CUET8 Introduction Result & Discussion Conclusion Table: Wastewater Generation from household Pipe Sub-Area Area (sq.m) Area (ha) Peak infiltration factor (m3/ha-day) Infiltration , I (m3/day) P1 A1 7432.2400 0.7432 8.7500 22.6962 A2 7618.0460 0.7618 A9 10888.2316 1.0888 P2 A3 7543.7236 0.7544 8.7500 13.1690 A4 7506.5624 0.7507 P3 A5 7580.8848 0.7581 8.7500 24.8097 A6 7618.0460 0.7618 A7 7432.2400 0.7432 A8 5722.8248 0.5723 Total 69342.7992 6.9343 60.6749
  • 9. Department of CE, CUET9 Introduction Result & Discussion Conclusion Total Wastewater Generation Total wastewater generation = 1683.73+60.6749 = 1744.59 𝑚3/𝑑𝑎𝑦