ELEVATION "C" 1:50 PROJECT No. DRAWING No.
scale
date
drawn
revision
1:50
JULY 2015
ROMEO
DESCRIPTION
NOTES
THE DESIGN OF THIS DRAWING IS A COPYRIGHT
AND REMAINS THE PROPERTY OF THE
ARCHTITECT.
ALL WORK TO BE CARRIED OUT STRICTLY IN
ACCORDANCE WITH MUNICIPAL REGULATIONS.
FIGURED DIMENSIONS TO BE TAKEN IN
PREFERENCE TO SCALING DRAWINGS.
ALL RELEVANT DETAILS, LEVELS, DIMENSIONS TO
BE CHECKED ON SITE BEFORE COMMENCEMENT
OF WORK.
PROJECT
17 WATERLOO RD
WYNBERG
7800
TEL (021) 762 5924
FAX (021) 762 9528
INFO@NLARCHITECTS.CO.ZA
REVISIONS
CONSTRUCTION DRAWINGS
SECTION "A" 1:50
IN 'DANONE' FACTORY ,
99 SKEW RD,
ANDERBOLT , BOKSBERG
PROPOSED NEW FACTORY FOR:
WD215-129
FACTORY OFFICE
ALTERATIONS
SECTION "B" 1:50
REMOVE EXISTING DOUBLE DOOR TO
RE-USE - BRICK UP OPENING,
PLASTER & PAINT TO MATCH EXISTING
1
NEW DRYWALL UP TO SUSPENDED
CEILING2
3
4
WALLS
90mm OR 102mm (HEIGHT DEPENDING) DONN CERTIFIED
DRYWALL WITH ULTRASTEEL STUDS. 60x60 STEEL STIFFENING
POSTS ADJACENT DOORS AND WHERE INDICATED.
SKIMMED AND PAINTED WITH:1x COAT DULUX TRADE ECOSURE
PLASTER PRIMER AND 2x COATS DULUX TRADE 100 LOW SHEEN.
MIDNIGHT IRIS 6
ABOVE DRYWALLING FROM 950mm TO 2,8m AFL, FITTED WITH
6,38mm LAMINATED SAFETY GLASS
CONSTRUCTION NOTES :
NEW DRYWALL WITH ALUMINUM
TOPLIGHT FITTED WITH RE-USED
ALUMINUM GLAZED DOOR
INSTALL NEW GLASS PARTITIONING & FIT
RE-USED DOUBLE DOOR - SEE SCHEDULE
4
2
3
1
3

More Related Content

What's hot

hazem mohamed cv - Copy
hazem mohamed cv - Copyhazem mohamed cv - Copy
hazem mohamed cv - Copyhazem mansour
 
VG_Lee_CV_2015_1
VG_Lee_CV_2015_1VG_Lee_CV_2015_1
VG_Lee_CV_2015_1Vincent Lee
 
Resume updated
Resume updatedResume updated
Resume updatedbight anto
 
Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1Toni AZAR
 
Roger Beck resume
Roger Beck resumeRoger Beck resume
Roger Beck resumeRoger Beck
 
Brophy resume,8-2016
Brophy resume,8-2016Brophy resume,8-2016
Brophy resume,8-2016brian brophy
 
TED_BEERY_RESUME
TED_BEERY_RESUMETED_BEERY_RESUME
TED_BEERY_RESUMETed Beery
 

What's hot (12)

hazem mohamed cv - Copy
hazem mohamed cv - Copyhazem mohamed cv - Copy
hazem mohamed cv - Copy
 
Roberts CV
Roberts CVRoberts CV
Roberts CV
 
VG_Lee_CV_2015_1
VG_Lee_CV_2015_1VG_Lee_CV_2015_1
VG_Lee_CV_2015_1
 
SIEMENS HQ
SIEMENS HQSIEMENS HQ
SIEMENS HQ
 
Resume updated
Resume updatedResume updated
Resume updated
 
Project Engineer Cv
Project Engineer CvProject Engineer Cv
Project Engineer Cv
 
RESUME DJT van der Merwe
RESUME DJT van der MerweRESUME DJT van der Merwe
RESUME DJT van der Merwe
 
Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1Resume Wizard of Eng Toni Azar- rev1
Resume Wizard of Eng Toni Azar- rev1
 
Roger Beck resume
Roger Beck resumeRoger Beck resume
Roger Beck resume
 
Resume AFB
Resume AFBResume AFB
Resume AFB
 
Brophy resume,8-2016
Brophy resume,8-2016Brophy resume,8-2016
Brophy resume,8-2016
 
TED_BEERY_RESUME
TED_BEERY_RESUMETED_BEERY_RESUME
TED_BEERY_RESUME
 

Similar to 15-129_DANONE_WD2_ELEVATNS.PDF

Selleck, Matthew NEDF Built Environment Project
Selleck, Matthew NEDF Built Environment Project Selleck, Matthew NEDF Built Environment Project
Selleck, Matthew NEDF Built Environment Project MatthewSelleck1
 
Revi Project # 1_1
Revi Project # 1_1Revi Project # 1_1
Revi Project # 1_1Jobin Jose
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology ProjectTomcully18
 
House Visagie As Build02
House Visagie As Build02House Visagie As Build02
House Visagie As Build02David Dinsdale
 
Layout Dominos Solo.pdf
Layout Dominos Solo.pdfLayout Dominos Solo.pdf
Layout Dominos Solo.pdfRizqiNoviant
 
HAFIZ A WAHEED PORTFOLIO 2
HAFIZ A WAHEED PORTFOLIO 2HAFIZ A WAHEED PORTFOLIO 2
HAFIZ A WAHEED PORTFOLIO 2Hafiz Waheed
 
House Shaw Floorplan Final 03
House Shaw Floorplan Final 03House Shaw Floorplan Final 03
House Shaw Floorplan Final 03Terence Botha
 
SALVACION-SAN-FRANCISCO.pdf road design final
SALVACION-SAN-FRANCISCO.pdf road design finalSALVACION-SAN-FRANCISCO.pdf road design final
SALVACION-SAN-FRANCISCO.pdf road design finalSherwinNatino
 
ZEEPAY ACHITECTURAL DRAWINGS.pdf
ZEEPAY ACHITECTURAL DRAWINGS.pdfZEEPAY ACHITECTURAL DRAWINGS.pdf
ZEEPAY ACHITECTURAL DRAWINGS.pdfGabochie Design
 
Adrian Matejko Portfolio 2016
Adrian Matejko Portfolio 2016Adrian Matejko Portfolio 2016
Adrian Matejko Portfolio 2016Adrian Matejko
 
Ck21 presentation team 3
Ck21 presentation team 3Ck21 presentation team 3
Ck21 presentation team 3Campus
 
67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA s67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA sMike Darwich
 
Construction Documents Fall 2014
Construction Documents Fall 2014Construction Documents Fall 2014
Construction Documents Fall 2014Martin Pauly
 

Similar to 15-129_DANONE_WD2_ELEVATNS.PDF (20)

Selleck, Matthew NEDF Built Environment Project
Selleck, Matthew NEDF Built Environment Project Selleck, Matthew NEDF Built Environment Project
Selleck, Matthew NEDF Built Environment Project
 
Revi Project # 1_1
Revi Project # 1_1Revi Project # 1_1
Revi Project # 1_1
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology Project
 
POWER SYSTEM.pdf
POWER SYSTEM.pdfPOWER SYSTEM.pdf
POWER SYSTEM.pdf
 
CONSTRUCTION DOCS_FINAL TO PRINT
CONSTRUCTION DOCS_FINAL TO PRINTCONSTRUCTION DOCS_FINAL TO PRINT
CONSTRUCTION DOCS_FINAL TO PRINT
 
House Visagie As Build02
House Visagie As Build02House Visagie As Build02
House Visagie As Build02
 
Final Plans
Final PlansFinal Plans
Final Plans
 
Layout Dominos Solo.pdf
Layout Dominos Solo.pdfLayout Dominos Solo.pdf
Layout Dominos Solo.pdf
 
HAFIZ A WAHEED PORTFOLIO 2
HAFIZ A WAHEED PORTFOLIO 2HAFIZ A WAHEED PORTFOLIO 2
HAFIZ A WAHEED PORTFOLIO 2
 
IS252_PAA
IS252_PAAIS252_PAA
IS252_PAA
 
House Shaw Floorplan Final 03
House Shaw Floorplan Final 03House Shaw Floorplan Final 03
House Shaw Floorplan Final 03
 
SALVACION-SAN-FRANCISCO.pdf road design final
SALVACION-SAN-FRANCISCO.pdf road design finalSALVACION-SAN-FRANCISCO.pdf road design final
SALVACION-SAN-FRANCISCO.pdf road design final
 
ZEEPAY ACHITECTURAL DRAWINGS.pdf
ZEEPAY ACHITECTURAL DRAWINGS.pdfZEEPAY ACHITECTURAL DRAWINGS.pdf
ZEEPAY ACHITECTURAL DRAWINGS.pdf
 
Adrian Matejko Portfolio 2016
Adrian Matejko Portfolio 2016Adrian Matejko Portfolio 2016
Adrian Matejko Portfolio 2016
 
SAMPLE PORTFOLIO
SAMPLE PORTFOLIOSAMPLE PORTFOLIO
SAMPLE PORTFOLIO
 
Ck21 presentation team 3
Ck21 presentation team 3Ck21 presentation team 3
Ck21 presentation team 3
 
+
++
+
 
Panel Cladding.pdf
Panel Cladding.pdfPanel Cladding.pdf
Panel Cladding.pdf
 
67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA s67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA s
 
Construction Documents Fall 2014
Construction Documents Fall 2014Construction Documents Fall 2014
Construction Documents Fall 2014
 

15-129_DANONE_WD2_ELEVATNS.PDF

  • 1. ELEVATION "C" 1:50 PROJECT No. DRAWING No. scale date drawn revision 1:50 JULY 2015 ROMEO DESCRIPTION NOTES THE DESIGN OF THIS DRAWING IS A COPYRIGHT AND REMAINS THE PROPERTY OF THE ARCHTITECT. ALL WORK TO BE CARRIED OUT STRICTLY IN ACCORDANCE WITH MUNICIPAL REGULATIONS. FIGURED DIMENSIONS TO BE TAKEN IN PREFERENCE TO SCALING DRAWINGS. ALL RELEVANT DETAILS, LEVELS, DIMENSIONS TO BE CHECKED ON SITE BEFORE COMMENCEMENT OF WORK. PROJECT 17 WATERLOO RD WYNBERG 7800 TEL (021) 762 5924 FAX (021) 762 9528 INFO@NLARCHITECTS.CO.ZA REVISIONS CONSTRUCTION DRAWINGS SECTION "A" 1:50 IN 'DANONE' FACTORY , 99 SKEW RD, ANDERBOLT , BOKSBERG PROPOSED NEW FACTORY FOR: WD215-129 FACTORY OFFICE ALTERATIONS SECTION "B" 1:50 REMOVE EXISTING DOUBLE DOOR TO RE-USE - BRICK UP OPENING, PLASTER & PAINT TO MATCH EXISTING 1 NEW DRYWALL UP TO SUSPENDED CEILING2 3 4 WALLS 90mm OR 102mm (HEIGHT DEPENDING) DONN CERTIFIED DRYWALL WITH ULTRASTEEL STUDS. 60x60 STEEL STIFFENING POSTS ADJACENT DOORS AND WHERE INDICATED. SKIMMED AND PAINTED WITH:1x COAT DULUX TRADE ECOSURE PLASTER PRIMER AND 2x COATS DULUX TRADE 100 LOW SHEEN. MIDNIGHT IRIS 6 ABOVE DRYWALLING FROM 950mm TO 2,8m AFL, FITTED WITH 6,38mm LAMINATED SAFETY GLASS CONSTRUCTION NOTES : NEW DRYWALL WITH ALUMINUM TOPLIGHT FITTED WITH RE-USED ALUMINUM GLAZED DOOR INSTALL NEW GLASS PARTITIONING & FIT RE-USED DOUBLE DOOR - SEE SCHEDULE 4 2 3 1 3