SlideShare a Scribd company logo
1 of 44
Download to read offline
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
D06/11/16
A-CVR-001
COVERSHEET
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
GROUND FLOOR - ENTRANCE LOOBY VIEW - 1
3
GROUND FLOOR - ENTRANCE LOOBY VIEW - 2
2
GROUND FLOOR - STAIRCASE & ELEVATOR LOOBY VIEW
5
NINTH FLOOR - OFFICE VIEW
4
ISOMETRIC CUT VIEW - 2
8
ISOMETRIC CUT VIEW - 1
7
DRAWING LIST
Sheet Number Sheet Name
Current
Revision Drawn By
A-CVR-001 COVER SHEET D Jobin
A-DET-001 TYPICAL DETAILS A Jobin
A-FP-001 BASEMENT FLOOR - PLAN A Jobin
A-FP-002 GROUND FLOOR - PLAN A Jobin
A-FP-003 FIRST FLOOR - PLAN A Jobin
A-FP-004 SECOND FLOOR - PLAN A Jobin
A-FP-005 THIRD FLOOR - PLAN A Jobin
A-FP-006 FOURTH FLOOR - PLAN A Jobin
A-FP-007 FIFTH FLOOR - PLAN A Jobin
A-FP-008 SIXTH FLOOR A Jobin
A-FP-009 SEVENTH FLOOR A Jobin
A-FP-010 EIGHTH FLOOR A Jobin
A-FP-011 NINTH FLOOR - PLAN A Jobin
A-FP-012 PENTHHOUSE FLOOR - PLAN A Jobin
A-FP-013 PENTHOUSE ROOF - PLAN A Jobin
A-FPD-001 STAIR-01 FLOOR PLANS A Jobin
A-FPD-002 STAIR-02 FLOOR PLANS A Jobin
A-FPD-003 ELEVATOR FLOOR PLANS A Jobin
A-FPD-004 TOILET DETAILS A Jobin
A-FPD-005 TOILET DETAILS A Jobin
A-OCP-001 BASEMENT FLOOR - OCCUPANCY PLAN A Jobin
A-OCP-002 GROUND FLOOR - OCCUPANCY PLAN A Jobin
A-OCP-003 FIRST TO NINTH FLOOR -TYPICAL OCCUPANCY PLAN A Jobin
A-OCP-004 PENTHOUSE FLOOR - OCCUPANCY PLAN A Jobin
A-RCP-001 GOUND FLOOR - REFLECTED CEILING PLAN A Jobin
A-RCP-002 FIRST FLOOR - REFLECTED CEILING PLAN A Jobin
A-RCP-003 SECOND FLOOR - REFLECTED CEILING PLAN A Jobin
A-RCP-004 THIRD FLOOR - REFLECTED CEILING PLAN A Jobin
A-RCP-005 FOURTH FLOOR - REFLECTED CEILING PLAN A Jobin
A-RCP-006 FIFTH FLOOR - REFLECTED CEILING PLAN A Jobin
A-RCP-007 SIXTH FLOOR - REFLECTED CEILING PLAN A Jobin
A-RCP-008 SEVENTH FLOOR - REFLECTED CEILING PLAN A Jobin
A-RCP-009 EIGHTH FLOOR - REFLECTED CEILING PLAN A Jobin
A-RCP-010 NINTH FLOOR - REFLECTED CEILING PLAN A Jobin
A-RCP-011 PENT HOUSE FLOOR - REFLECTED CEILING PLAN A Jobin
A-SEC-001 SECTION A Jobin
A-SEC-002 SECTION A Jobin
A-SEC-003 STAIR-01 SECTION A Jobin
A-SEC-004 STAIR-02 & ELEVATOR SECTION A Jobin
A-SHD-001 ROOM SCHEDULE A Jobin
A-SHD-002 ROOM SCHEDULE A Jobin
A-SHD-003 DOOR SCHEDULE A Jobin
A-SHD-004 DOOR SCHEDULE A Jobin
A-SP-001 SITE PLAN A Jobin
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
B Schematic Design 1 07/01/2016
C Design Drawing 14/01/2016
D Issued For tender 21/01/2016
10793
COVE LIGHT
GYPSUM CEILING
12mm THICK
LIGHT FIXTURE
CEILING HANGER
CEILING SUPPORT
175
GYPSUM WALL
WITH INSULATION
CONCRETE UPSTAND
EXTERIOR CLADDING
FLOOR FINISH
CEMENT SCREED BASE
STRUCTURAL SLAB
7550
25
13
25
113 75 150
CLADDING
SUPPORT
INTERIOR
26500FFL
EXTERIOR
PENTHOUSE ROOF
56500
PENTHOUSE ROOF PARAPET
58500
EXTERIOR
CLADDING
CLADDING
SUPPORT
METAL COPING
FOR PARAPET
PLASTERING
INSULATION
PAVER BLOCKS
ON SUPPORT
STRUCT. SLAB
200
15
WATER
PROOFING
SCREED
TO SLOPE
CONCRETE
MASONRY
10793
175
LIGHTING FIXTURE
CEILING SUPPORT
GYPSUM CEILING
12mm THICK
CELING HANGER
COVE LIGHT
STRUCTURAL SLAB
STRUC. SLAB
GYPSUM WALL
WITH INSULATION
CLADDING SUPPORT
EXTERIOR CLADDING
CMU WALL FLOOR
FINISH
CEMENT
SCREED
BASE
13
25
113 75 200
15
PLASTERING
INTERIOR
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A
As
indicated
06/10/16
A-DET-001
TYPICAL DETAILS
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 5
CEILING DETAIL - 1
1 1 : 10
FLOOR & WALL SECTION - 1
2 1 : 20
PARAPET DETAIL
3
1 : 5
CEILING DETAIL - 2
4 1 : 10
FLOOR & WALL SECTION - 2
5
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
UP
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
5300 5050 4650 5000 4250 4250 5000 4650 5050 5300
5300505046505000425042505000465050505300
BASEMENT LOBBY
B-01
STAIR-01
ST-01
STAIR-02
ST-02
ELEVATOR
EL-01
ELEVATOR
EL-02
MEP SERVICE ROOM
MEP-02
MEP SERVICE ROOM
MEP-03
MEP SERVICE ROOM
MEP-01
MEP SERVICE ROOM
MEP-04
SREVICE AREA - 1
B-02
SREVICE AREA - 2
B-03
SREVICE AREA - 3
B-04
SERVER ROOM
B-05
STORE
B-06
STORE
B-07
SERVICE AREA - 4
B-08
ELECTRICAL ROOM -
1
B-09
GENERATOR - 1
B-10
FUEL - 1
B-11
PUMP ROOM
B-12
WATER STORAGE
B-13
FUEL - 2
B-14
GENERATOR - 2
B-15
ELECTRICAL ROOM
B-16
?
7335
4985 4750 4350
5000
5020
4771 8200
10050
9320 4750 4970
5000
7320
2571
5070
32623
14770
4871
4770
4968
19670
8385
10270
19670
4968
14770
32638
4870
4770
4770
4770
5070
2586
4770
4770
2500
2200
2500
2200
4720
14370
5300
9420
8170
7863 2445 7863
5000 8170 5000
4650
4650
14670
4720
5100
10350
9700
5315
5065
1
A-FPD-001
1
A-FPD-002
1
A-FPD-003
1
A-SEC-002
1
A-SEC-001
Flooring 150mmFlooring 150mmFlooring 150mmFlooring 150mmFlooring 150mmFlooring 150mmFlooring 150mm
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A1 : 100 05/14/16
A-FP-001
BASEMENT FLOOR - PLAN
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
BASEMENT FLOOR - PLAN
1
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
DN
DN
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
5300 5050 4650 5000 4250 4250 5000 4650 5050 5300
5300505046505000425042505000465050505300
ELEVATOR & STAIR
LOBBY
0002
ENTRANCE LOBBY - 1
0001
ENTRANCE LOBBY - 2
0003
OFFICE SPACE
0004
TOILET
0005
W.C
0005A
W.C
0005B
W.C
0005C
TOILET
0006
W.C
0006A
W.C
0006B
W.C
0006C
TOILET
0007
W.C
0007A
W.C
0007B
W.C
0007C
TOILET
0008
W.C
0008A
W.C
0008B
W.C
0008C
RECEPTION
0001A
FILES
0001B
OFFICE SPACE
0009
TOILET
0010
W.C
0010A
W.C
0010B
W.C
0010C
TOILET
0011
W.C
0011A
W.C
0011B
W.C
0011C
TOILET
0012
TOILET
0013
W.C
0012C
W.C
0012B
W.C
0012A
W.C
0013C
W.C
0013B
W.C
0013A
103738045
9300
8050
3735 4128 2445 4128 3735
2500
2200
2500
2200
9300
10373
628 8045 628
4761
9861
4761 5100
956193009561
10439 4761
5100
9861
2518
2095
2624
4761
500089005000170030744761
8170
8170
50008900500048484761
9861
957493009561
4761 10439
5000
1
A-FPD-004
3
A-FPD-004
2
A-FPD-005
1
A-FPD-005
2
A-FPD-001 2
A-FPD-002
2
A-FPD-003
1
A-SEC-002
1
A-SEC-001
Flooring 150mmFlooring 150mm
28002800 2450
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A1 : 100 05/14/16
A-FP-002
GROUNDFLOOR - PLAN
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
GROUND FLOOR - PLAN
1
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
UP
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
5300 5050 4650 5000 4250 4250 5000 4650 5050 5300
5300505046505000425042505000465050505300
LOBBY
0101
OFFICE SPACE
0102
TOILET
0103
W.C
0103A
W.C
0103B
W.C
0103C
TOILET
0104 W.C
0104A
W.C
0104B
W.C
0104C
OFFICE SPACE
0105
TOILET
0106
W.C
0106A
W.C
0106B
W.C
0106C
TOILET
0107
W.C
0107A
W.C
0107B
W.C
0107C
TOILET
0108
TOILET
0109
W.C
0108A
W.C
0108B
W.C
0108C
W.C
0109A
W.C
0109B
W.C
0109C
OFFICE SPACE
0110
TOILET
0111
TOILET
0112
W.C
0111A
W.C
0111B
W.C
0111C
W.C
0112A
W.C
0112B
W.C
0112C
LOBBY
0101
TOILET
0103
TOILET
0104
OFFICE SPACE
0105
TOILET
0106
TOILET
0107
TOILET
0108
TOILET
0109
OFFICE SPACE
0110
TOILET
0111
TOILET
0112
14135 4035
8170
2600
2800 2500 2800
2650
2650
5400
50004615
4615
11050
9300
92659265 9600
5400
50004615
4615
3900
5100
54004615
20300
4500
10900
9265
92658950
4150
9300
10900 4300
53658235
3900
5100
540020300
4500
10900
8950
4150
9300
109004300
53658235
9265
9265
465
465465
465
Sim
1
A-FPD-005
Sim
2
A-FPD-005
2
A-FPD-004
4
A-FPD-0043
A-FPD-001
3
A-FPD-002
3
A-FPD-003
1
A-SEC-002
1
A-SEC-001
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A1 : 100 05/14/16
A-FP-003
FIRST FLOOR - PLAN
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
FIRST FLOOR - PLAN
1
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
UP
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
5300 5050 4650 5000 4250 4250 5000 4650 5050 5300
5300505046505000425042505000465050505300
LOBBY
0201
OFFICE SPACE
0202
TOILET
0203
TOILET
0204
OFFICE SPACE
0205
TOILET
0206
TOILET
0207
TOILET
0208
TOILET
0209
OFFICE SPACE
0210
TOILET
0211
TOILET
0212
W.C
0203A
W.C
0203B
W.C
0203C
W.C
0204A
W.C
0204B
W.C
0204C
W.C
0206A
W.C
0206B
W.C
0206C
W.C
0207A
W.C
0207B
Room
0207C
W.C
0208A
W.C
0208B
W.C
0208C
W.C
0209A
W.C
0209B
W.C
0209C
W.C
0211A
W.C
0211B
W.C
0211C
W.C
0212A
W.C
0212B
W.C
0212C
18170
8170
2800 2500 2800
2650
2650
5400
5000
11050
9300
9600
5400
5000
5100
5400
4500
8950
4150
9300
53658235
5400
20300
8950
4150
9300
15200
53658235
4150465
4615
3509265
9265
4150
350
465
4615
9265
9265
9615
1090010900
20300
4500
9265
9265
9265 4650 4650 9265
3900 3900
5100
465 465
465
465
465
465
Sim
1
A-FP-003
Sim
2
A-FPD-004
Sim
4
A-FPD-004
4
A-FPD-001
4
A-FPD-002
4
A-FPD-003
1
A-SEC-002
1
A-SEC-001
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A1 : 100 05/14/16
A-FP-004
SECONDFLOOR - PLAN
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
SECOND FLOOR - PLAN
1
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
UP
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
5300 5050 4650 5000 4250 4250 5000 4650 5050 5300
5300505046505000425042505000465050505300
LOBBY
0301
OFFICE SPACE
0302
TOILET
0303
TOILET
0304
OFFICE SPACE
0305
TOILET
0306
TOILET
0307
TOILET
0308
TOILET
0309
OFFICE SPACE
0310
TOILET
0311
TOILET
0312
W.C
0303A
W.C
0303B
W.C
0303C
W.C
0304A
W.C
0304B
W.C
0304C
W.C
0306A
W.C
0306B
W.C
0306C
W.C
0307A
W.C
0307B
W.C
0307C
W.C
0308A
W.C
0308B
W.C
0308C
W.C
0309A
W.C
0309B
W.C
0309C
W.C
0311A
W.C
0311B
W.C
0311C
W.C
0312A
W.C
0312B
W.C
0312C
5300 5050 4650 5000 4250 4250 5000 4650 5050 5300
5300505046505000425042505000465050505300
5300 5050 4650 5000 4250 4250 5000 4650 5050 5300
5300505046505000425042505000465050505300
18170
8170
2800 2500 2800
2650
2650
5400
5000
11050
9300
9600
5400
5000
5100
5400
4500
8950
4150
9300
53658235
5400
20300
8950
4150
9300
15200
53658235
4150
350
4150
350
10900
10900
20300
4500
4650 4650
3900 3900
5100
4639
4639
15200
15200
4639
4639
4639
4639
15050
4639
4639
9289 9289
9289
9289
9289 9289
109004300
430010900
489 489
489 489
9289
9289
489
489
489
489
Sim
1
A-FP-004
Sim
1
A-FP-004
5
A-FPD-001
5
A-FPD-002
1
A-SEC-002
1
A-SEC-001
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A1 : 100 05/14/16
A-FP-005
THIRDFLOOR - PLAN
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
THIRD FLOOR - PLAN
1
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
UP
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
5300 5050 4650 5000 4250 4250 5000 4650 5050 5300
5300505046505000425042505000465050505300
LOBBY
0401
OFFICE SPACE
0402
TOILET
0403
TOILET
0404
OFFICE SPACE
0405
TOILET
0406
TOILET
0407
TOILET
0408
TOILET
0409
OFFICE SPACE
0410
TOILET
0411
TOILET
0412
W.C
0403A
W.C
0403B
W.C
0403C
W.C
0404A
W.C
0404B
W.C
0404C
W.C
0407A
W.C
0407B
W.C
0407C
W.C
0406A
W.C
0406B
W.C
0406C
W.C
0408A
W.C
0408B
W.C
0408C
W.C
0409A
W.C
0409B
W.C
0409C
W.C
0411A
W.C
0411B
W.C
0411C
W.C
0412A
W.C
0412B
W.C
0412C
18170
8170
2800 2500 2800
2650
2650
5400
5000
11050
9300
9600
5400
5000
5100
5400
4500
8950
4150
9300
53658235
5400
20300
8950
4150
9300
15200
53658235
4150
350
4150
350
20300
4650
3900
5100
15200
15200
15050
9484 9484
9484
9834
9484
9834
9484
9484
3900
4650 9484
9484
4500
684 684
684 684
684
684
684
684
Sim
1
A-FP-005
Sim
1
A-FP-005
6
A-FPD-001
6
A-FPD-002
5
A-FPD-003
1
A-SEC-002
1
A-SEC-001
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A1 : 100 05/14/16
A-FP-006
FOURTHFLOOR - PLAN
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
FOURTH FLOOR - PLAN
1
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
UP
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
5300 5050 4650 5000 4250 4250 5000 4650 5050 5300
5300505046505000425042505000465050505300
LOBBY
0501
OFFICE SPACE
0502
TOILET
0503
TOILET
0504
OFFICE SPACE
0505
TOILET
0506
TOILET
0507
TOILET
0508
TOILET
0509
OFFICE SPACE
0510
TOILET
0511
TOILET
0512
W.C
0503A
W.C
0503B
W.C
0503C
W.C
0504A
W.C
0504B
W.C
0504C
W.C
0506A
W.C
0506B
W.C
0506C
W.C
0507A
W.C
0507B
W.C
0507C
W.C
0508A
W.C
0508B
W.C
0508C
W.C
0509A
W.C
0509B
W.C
0509C
W.C
0511A
W.C
0511B
W.C
0511C
W.C
0512A
W.C
0512B
W.C
0512C
18170
8170
2800 2500 2800
2650
2650
5400
5000
11050
9300
9600
5400
5000
5100
5400
4500
8950
4150
9300
53658235
5400
20300
8950
4150
9300
15200
53658235
4150
350
4150
350
10900
10900
20300
4650
3900
5100
15200
15200
15050
3900
4650
4500
9850
9850 9850
9850
9850
9850 9850
9850
1050 1050
1050 1050
1050
1050
1050
1050
Sim
1
A-FP-006
Sim
1
A-FP-006
7
A-FPD-001
7
A-FPD-002
6
A-FPD-003
1
A-SEC-002
1
A-SEC-001
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A1 : 100 05/14/16
A-FP-007
FIFTHFLOOR - PLAN
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
FIFTH FLOOR - PLAN
1
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
UP
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
5300 5050 4650 5000 4250 4250 5000 4650 5050 5300
5300505046505000425042505000465050505300
LOBBY
0601
OFFICE SPACE
0602
TOILET
0603
TOILET
0604
OFFICE SPACE
0605
TOILET
0606
TOILET
0607
TOILET
0608
TOILET
0609
OFFICE SPACE
0610
TOILET
0611
TOILET
0612
W.C
0603A
W.C
0603B
W.C
0603C
W.C
0604A
W.C
0604B
W.C
0604C
W.C
0606A
W.C
0606B
W.C
0606C
W.C
0607A
W.C
0607B
W.C
0607C
W.C
0608A
W.C
0608B
W.C
0608C
W.C
0609A
W.C
0609B
W.C
0609C
W.C
06011A
W.C
06011B
W.C
06011C
W.C
06012A
W.C
06012B
W.C
06012C
18170
8170
2800 2500 2800
2650
2650
5400
5000
11050
9300
9600
5400
5000
5100
5400
4500
8950
4150
9300
53658235
5400
20300
8950
4150
9300
15200
53658235
4150
350
4150
350
10900
10900
20300
4650
3900
5100
15200
15200
15050
3900
4650
4500
10389
1589
1589
10389
1589
10389
10389
1589
1038910389
10389
10389
1589
1589
1589
1589
Sim
1
A-FP-007
Sim
1
A-FP-007
8
A-FPD-001
8
A-FPD-002
7
A-FPD-003
1
A-SEC-002
1
A-SEC-001
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A1 : 100 05/14/16
A-FP-008
SIXTHFLOOR
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
SIXTH FLOOR - PLAN
1
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
UP
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
5300 5050 4650 5000 4250 4250 5000 4650 5050 5300
5300505046505000425042505000465050505300
LOBBY
0701
OFFICE SPACE
0702
TOILET
0703
TOILET
0704
OFFICE SPACE
0705
TOILET
0706
TOILET
0707
TOILET
0708
TOILET
0709
OFFICE SPACE
0710
TOILET
0711
TOILET
0712
W.C
0703A
W.C
0703B
W.C
0703C
W.C
0704A
W.C
0704B
W.C
0704C
W.C
0706A
W.C
0706B
W.C
0706C
W.C
0707A
W.C
0707B
W.C
0707C
W.C
0708A
W.C
0708B
W.C
0708C
W.C
0709A
W.C
0709B
W.C
0709C
W.C
0711A
W.C
0711B
W.C
0711C
Room
0712A
W.C
0712B
W.C
0712C
18170
8170
2800 2500 2800
2650
2650
5400
5000
11050
9300
9600
5400
5000
5100
5400
4500
8950
4150
9300
53658235
540020300
8950
4150
9300
15200
53658235
4150
350
4150
350
10900
10900
20300
4650
3900
5100
15200
15200
15050
3900
4650
4500
2303
11103
2303
2303
6453
6453
11103 11103
11103
2303
11103
11103
2303
41502303
23034150
2303
11103
11103
Sim
1
A-FP-008
Sim
1
A-FP-008
9
A-FPD-001
9
A-FPD-002
8
A-FPD-003
1
A-SEC-002
1
A-SEC-001
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A1 : 100 05/14/16
A-FP-009
SEVENTHFLOOR
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
SEVENTH FLOOR - PLAN
1
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
UP
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
5300 5050 4650 5000 4250 4250 5000 4650 5050 5300
5300505046505000425042505000465050505300
LOBBY
0801
OFFICE SPACE
0802
TOILET
0803
TOILET
0804
OFFICE SPACE
0805
TOILET
0806
TOILET
0807
TOILET
0808
TOILET
0809
OFFICE SPACE
0810
TOILET
0811
TOILET
0812
W.C
0803A
W.C
0803B
W.C
0803C
W.C
0804A
W.C
0804B
W.C
0804C
W.C
0806A
W.C
0806B
W.C
0806C
W.C
0807A
W.C
0807B
W.C
0807C
W.C
0808A
W.C
0808B
W.C
0808C
W.C
0809A
W.C
0809B
W.C
0809C
W.C
0811A
W.C
0811B
W.C
0811C
Room
0812A
W.C
0812B
W.C
0812C
18170
8170
2800 2500 2800
2650
2650
5400
5000
11050
9300
9600
5400
5000
5100
5400
4500
8950
4150
9300
53658235
5400
20300
8950
4150
9300
15200
53658235
4150
350
4150
350
10900
10900
20300
4650
3900
5100
15200
15200
15050
3900
4650
4500
4150
4150
11992 11992
3192
3192
3192 3192
3192
3192
11992
11992 11992
11992
319211992
11992
Sim
1
A-FP-009
Sim
1
A-FP-009
10
A-FPD-001
10
A-FPD-002
9
A-FPD-003
1
A-SEC-002
1
A-SEC-001
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A1 : 100 05/14/16
A-FP-010
EIGHTHFLOOR
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
EIGHTH FLOOR - PLAN
1
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
UP
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
5300 5050 4650 5000 4250 4250 5000 4650 5050 5300
5300505046505000425042505000465050505300
LOBBY
0901
OFFICE SPACE
0902
TOILET
0903
TOILET
0904
OFFICE SPACE
0905
TOILET
0906
TOILET
0907
TOILET
0908
TOILET
0909
OFFICE SPACE
0910
TOILET
0911
TOILET
0912
W.C
0903A
W.C
0903B
W.C
0903C
W.C
0904A
W.C
0904B
W.C
0904C
W.C
0906A
W.C
0906B
W.C
0906C
W.C
0907A
W.C
0907B
W.C
0907C
W.C
0908A
W.C
0908B
W.C
0908C
W.C
0909A
W.C
0909B
W.C
0909C
W.C
0911A
W.C
0911B
W.C
0911C
W.C
0912A
W.C
0912B
W.C
0912C
18170
8170
2800 2500 2800
2650
2650
5400
5000
11050
9300
9600
5400
5000
5100
5400
4500
8950
4150
9300
53658235
5400
20300
8950
4150
9300
15200
53658235
4150
350
4150
350
10900
10900
20300
4650
3900
5100
15200
15200
15050
3900
4650
4500
4150
4150
4258
13058
13058
4258 4258
13058
13058
4258
4258
13058
13058
4258
4258
13058
13058
4258
Sim
1
A-FP-010
Sim
1
A-FP-010
11
A-FPD-001
11
A-FPD-002
10
A-FPD-003
1
A-SEC-002
1
A-SEC-001
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A1 : 100 05/14/16
A-FP-011
NINTHFLOOR - PLAN
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
NINTH FLOOR - PLAN
1
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
5300 5050 4650 5000 4250 4250 5000 4650 5050 5300
5300505046505000425042505000465050505300
LOBBY
10001
MEP SERVICE ROOM
MEP-05
MEP SERVICE ROOM
MEP-06
MEP SERVICE ROOM
MEP-07
MEP SERVICE ROOM
MEP-08
OPEN TERRACE
T1-01
OPEN TERRACE
T1-02
OPEN TERRACE
T1-03
OPEN TERRACE
T1-04
9170
154004870
827114702
14702
14702
14702
9170
4870
8271
10300 487110300
9171
8270
14652
14702
14652
14702
2835 2570 2835
8270
2600
2600
128004870
128004870
9170
18170
8170
12
A-FPD-001
12
A-FPD-002
11
A-FPD-003
1
A-SEC-002
1
A-SEC-001
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A1 : 100 05/14/16
A-FP-012
PENTHHOUSE FLOOR - PLAN
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
PENTHOUSE FLOOR - PLAN
1
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
5300 5050 4650 5000 4250 4250 5000 4650 5050 5300
5300505046505000425042505000465050505300
OPEN
TERRACE
T2-01
20000 9200 20000
20000920020000
1
A-SEC-002
1
A-SEC-001
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A1 : 100 05/14/16
A-FP-013
PENTHOUSE ROOF - PLAN
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
PENTHOUSE ROOF - PLAN
1
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
UP UP UP UP
UP UP UP UP
UP UP UP
54
E
G
F
1
A-SEC-00314851485500
14TREADS@300mm
4200501
8 TREADS @ 300mm
24001501485
1485 150
7 TREADS @ 300mm
2100
-3500
STAIR-01
ST-01
54
E
G
F
1
A-SEC-003
8 TREADS @ 300mm
24001501485
1485501
14TREADS@300mm
42005001485
1485 150
7 TREADS @ 300mm
2100
1500
ELEVATOR & STAIR
LOBBY
0002
54
E
G
F
1
A-SEC-003
8 TREADS @ 300mm
24001501485
1485501
14TREADS@300mm
42005001485
1485 150
7 TREADS @ 300mm
2100
6500
LOBBY
0101
54
E
G
F
1
A-SEC-003
8 TREADS @ 300mm
24001501485
1485501
14TREADS@300mm
42005001485
1485 150
7 TREADS @ 300mm
2100
11500
LOBBY
0201
54
E
G
F
1
A-SEC-003
8 TREADS @ 300mm
24001501485
1485501
14TREADS@300mm
42005001485
1485 150
7 TREADS @ 300mm
2100
1650016500
LOBBY
0301
54
E
G
F
1
A-SEC-003
8 TREADS @ 300mm
24001501485
1485501
14TREADS@300mm
42005001485
1485 150
7 TREADS @ 300mm
2100
21500
LOBBY
0401
54
E
G
F
1
A-SEC-003
8 TREADS @ 300mm
24001501485
1485501
14TREADS@300mm
42005001485
1485 150
7 TREADS @ 300mm
2100
26500
LOBBY
0501
2
A-SEC-003
54
E
G
F
8 TREADS @ 300mm
24001501485
1485501
14TREADS@300mm
42005001485
1485 150
7 TREADS @ 300mm
2100
31500
LOBBY
0601
2
A-SEC-003
54
E
G
F
8 TREADS @ 300mm
2400150
501
14TREADS@300mm
4200500
150
1485
1485
7 TREADS @ 300mm
2100
14851485
36500
LOBBY
0701
2
A-SEC-003
54
E
G
F
8 TREADS @ 300mm
2400150
501
14TREADS@300mm
4200500
150
1485
1485
1485
7 TREADS @ 300mm
2100
1485
41500
LOBBY
0801
2
A-SEC-003
54
E
G
F
8 TREADS @ 300mm
2400150
501
14TREADS@300mm
4200500
150
1485
14851485
1485
7 TREADS @ 300mm
2100
46500
LOBBY
0901
2
A-SEC-003
54
E
G
F
150
501
14TREADS@300mm
4200500
150
8 TREADS @ 300mm
21001485
14851485
1485
7 TREADS @ 300mm
2100
51500
LOBBY
10001
2
A-SEC-003
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A1 : 50 05/17/16
A-FPD-001
STAIR-01 FLOOR PLANS
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 50
STAIR-01 PLAN - BASEMENT LEVEL
1 1 : 50
STAIR-01 PLAN - GROUND FLOOR
2 1 : 50
STAIR-01 PLAN - LEVEL 01
3 1 : 50
STAIR-01 PLAN - LEVEL 02
4
1 : 50
STAIR-01 PLAN - LEVEL 03
5 1 : 50
STAIR-01 PLAN - LEVEL 04
6 1 : 50
STAIR-01 PLAN - LEVEL 05
7 1 : 50
STAIR-01 PLAN - LEVEL 06
8
1 : 50
STAIR-01 PLAN - LEVEL 07
9 1 : 50
STAIR-01 PLAN - LEVEL 08
10 1 : 50
STAIR-01 PLAN - LEVEL 09
11 1 : 50
STAIR-01 PLAN - LEVEL 10
12
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
UP UP UP UP
UP UP UP UP
UP UP UP
7 8
E
G
F
1
A-SEC-004
-3500
8 TREADS @ 300mm
2400 150 1485
1485501
14TREADS@300mm
42005001485
7 TREADS @ 300mm
2100 150 1485
STAIR-02
ST-02
7 8
E
G
F
1
A-SEC-004
8 TREADS @ 300mm
2400 150 1485
1485501
14TREADS@300mm
42005001485
7 TREADS @ 300mm
2100 150 1485
1500
ELEVATOR & STAIR
LOBBY
0002
7 8
E
G
F
1
A-SEC-004
8 TREADS @ 300mm
2400 150 1485
1485501
14TREADS@300mm
42005001485
7 TREADS @ 300mm
2100 150 1485
6500
LOBBY
0101
7 8
E
G
F
1
A-SEC-004
11500
8 TREADS @ 300mm
2400 150 1485
1485501
14TREADS@300mm
42005001485
7 TREADS @ 300mm
2100 150 1485
LOBBY
0201
7 8
E
G
F
1
A-SEC-004
16500
8 TREADS @ 300mm
2400 150 1485
1485501
14TREADS@300mm
42005001485
7 TREADS @ 300mm
2100 150 1485
LOBBY
0301
7 8
E
G
F
1
A-SEC-004
21500
8 TREADS @ 300mm
2400 150 1485
1485501
14TREADS@300mm
42005001485
7 TREADS @ 300mm
2100 150 1485
LOBBY
0401
7 8
E
G
F
1
A-SEC-004
26500
8 TREADS @ 300mm
2400 150 1485
1485501
14TREADS@300mm
42005001485
7 TREADS @ 300mm
2100 150 1485
LOBBY
0501
2
A-SEC-004
7 8
E
G
F
31500
8 TREADS @ 300mm
2400 150 1485
1485501
14TREADS@300mm
42005001485
2100 150 1485
LOBBY
0601
2
A-SEC-004
7 8
E
G
F
36500
8 TREADS @ 300mm
2400 150 1485
1485501
14TREADS@300mm
42005001485
7 TREADS @ 300mm
2100 150 1485
LOBBY
0701
2
A-SEC-004
7 8
E
G
F
41500
8 TREADS @ 300mm
2400 150 1485
1485501
14TREADS@300mm
42005001485
7 TREADS @ 300mm
2100 150 1485
LOBBY
0801
2
A-SEC-004
7 8
E
G
F
46500
8 TREADS @ 300mm
2400 150 1485
1485501
14TREADS@300mm
42005001485
7 TREADS @ 300mm
2100 150 1485
LOBBY
0901
2
A-SEC-004
7 8
E
G
F
51500
8 TREADS @ 300mm
2400 150 1485
1485501
14TREADS@300mm
42005001485
7 TREADS @ 300mm
2100 150 1485
LOBBY
10001
2
A-SEC-004
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A1 : 50 05/17/16
A-FPD-002
STAIR-02 FLOOR PLANS
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 50
STAIR-02 PLAN - BASEMENT LEVEL
1
1 : 50
STAIR-02 PLAN - GROUND FLOOR PLAN
2 1 : 50
STAIR-02 PLAN - LEVEL 01
3 1 : 50
STAIR-02 PLAN - LEVEL 02
4
1 : 50
STAIR-02 PLAN - LEVEL 03
5 1 : 50
STAIR-02 PLAN - LEVEL 04
6
1 : 50
STAIR-02 PLAN - LEVEL 05
7 1 : 50
STAIR-02 PLAN - LEVEL 06
8
1 : 50
STAIR-02 PLAN - LEVEL 07
9 1 : 50
STAIR-02 PLAN - LEVEL 08
10 1 : 50
STAIR-02 PLAN - LEVEL 09
11 1 : 50
STAIR-02 PLAN - LEVEL 10
12
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
5 76
E
3
A-SEC-004
2500
2200
2200
750 1000 750 750 1000 750
2500
-3500
SERVICE AREA - 4
B-08
5 76
E
3
A-SEC-004
2500
2200
2200
750 1000 750
1500
2500
2200
2200
750 1000 750
1500
ENTRANCE LOBBY - 2
0003
ELEVATOR & STAIR
LOBBY
0002
750 1000 750
2500
5 76
E
3
A-SEC-004
6500
OFFICE SPACE
0105
LOBBY
0101
750 1000 750
2500
2200
2200
750 1000 750
2500
5 76
E
3
A-SEC-004
11500
OFFICE SPACE
0205
LOBBY
0201
2200
2200
750 1000 750
2500
750 1000 750
2500
5 76
E
3
A-SEC-004
21500
OFFICE SPACE
0405
LOBBY
0401
750 1000 750 7501000750
2500 2500
2200
2200
5 76
E
3
A-SEC-004
26500
OFFICE SPACE
0505
LOBBY
0501
2200
750 1000 750
2500
750 1000 750
2500
2200
4
A-SEC-004
5 76
E
31500
OFFICE SPACE
0605
LOBBY
0601
750 1000 750
2500
2200
750 1000 750
2500
2200
4
A-SEC-004
5 76
E
36500
OFFICE SPACE
0705
LOBBY
0701
750 1000 750
2500
750 1000 750
2500
2200
2200
4
A-SEC-004 5 76
E
2200
2200
41500
OFFICE SPACE
0805
LOBBY
0801
750 1000 750
2500
750 1000 750
2500
2200
2200
4
A-SEC-004
5 76
E
46500
OFFICE SPACE
0905
LOBBY
0901
750 1000 750
2500
750 1000 750
2500
2200
2200
4
A-SEC-004
5 76
E
51500
MEP SERVICE ROOM
MEP-07
LOBBY
10001
750 1000 750
2500
750 1000 750
2500
2200
2200
4
A-SEC-004
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A1 : 50 05/17/16
A-FPD-003
ELEVATOR FLOOR PLANS
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 50
ELEVATORS FLOOR PLAN - BASEMENT LEVEL
1 1 : 50
ELEVATORS FLOOR PLAN - GROUND FLOOR
2 1 : 50
ELEVATORS FLOOR PLAN - LEVEL 01
3
1 : 50
ELEVATORS FLOOR PLAN - LEVEL 02
4 1 : 50
ELEVATORS FLOOR PLAN - LEVEL 04
5 1 : 50
ELEVATORS FLOOR PLAN - LEVEL 05
6
1 : 50
ELEVATORS FLOOR PLAN - LEVEL 06
7 1 : 50
ELEVATORS FLOOR PLAN - LEVEL 07
8 1 : 50
ELEVATORS FLOOR PLAN - LEVEL 08
9
1 : 50
ELEVATORS FLOOR PLAN - LEVEL 09
10 1 : 50
ELEVATORS FLOOR PLAN - LEVEL 10
11
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
54
E
D
TOILET
0007
W.C
0007B
W.C
0007C
TOILET
0008W.C
0008A
W.C
0008B
W.C
0008C
1625
1200
4360
980
1175
980
1175
1090
950 150 1175
1050
1250
1625
1200
4360
980
1175
980
1175
1090
1175 150 850
100
W.C
0007A
775 775
390
850
950
GWC1
CMW1
GW1
GW1
GWC1
CMW2
GW1
CMW2
GW1
GWC1
GW1
GW1
GW1 GW1
GW1 GW1
GW1
GWC1
CMW1
GW1
GW1
GW1
CMW2
CMW2
GWC1
CMW2
GWC1
GW1
GW1
GWC1
CMW1
GWC1
240
1000 900
240
WB1
WB1
WB1
WB1
WC1
WC1
WC1
WC1
WC1
WC1
GW1
PTD1 PTD1
PTD1PTD1
PTD1 PTD1
A-FPD-005 3
A-FPD-005 7
9
A-FPD-005 7
Sim
A-FPD-005 7
Sim
9 Sim
9 Sim
A-FPD-0054
A-FPD-0058
10
A-FPD-0058
Sim
10Sim
A-FPD-0058
Sim
10Sim
5
6
54
E
D
TOILET
0107
W.C
0107A
W.C
0107B
W.C
0107C
TOILET
0106
W.C
0106A
W.C
0106B
W.C
0106C
1625
1200
9809801090
1175
1175
1175
950
4360
1625
1200
980
1175
1175
4360
100850
950
CMW1
CMW1
GW1
GW1
GW1
CMW1
CMW1
GW1
GWC1
GW1
GW1
GWC1
GWC1
GWC1
GWC1
GWC1
1090980
GWC1
GW1
GW1
WC1
WC1
WC1 WC1
WC1
WC1
WB1
WB1
775
WB1
WB1
775
GW1
GW1
GW1
CMW1
GW1
GW1
GWC1
A-FPD-005 3
Sim
5 Sim
A-FPD-0054
Sim
6 Sim
A-FPD-005 7
Sim
9 Sim
A-FPD-005 7
Sim
9 Sim
A-FPD-005 7
Sim
9 Sim
A-FPD-0058
Sim
6 Sim
A-FPD-0058
Sim
6 Sim
A-FPD-0058
Sim
6 Sim
PTD1
PTD1
PTD1
PTD1
PTD1
PTD1
GWC1
1175
7 8
E
D
TOILET
0010
W.C
0010A
W.C
0010B
W.C
0010C
TOILET
0011
W.C
0011A
W.C
0011B
W.C
0011C
1630
775
1200
100 850
21602200
1175
980
1175
980
1175
1175
1090
1175
1050
1250
1625
1200
775
980980
1175
1175
1090
1175
950
4360
900
240
240
1000
GW1
GWC1
GWC1
CMW1
GWC1
GW1
GW1
GW1
GW1
GW1
GWC1
GWC1
GWC1
CMW1
GW1 GW1
GW1
GW1
GWC1GW1
GW1
CMW1
GW1
GW1
GW1
GWC1WB1
WB1
WC1
WC1
WC1
PTD1 PTD1
PTD1 PTD1
PTD1PTD1
WB1
WB1
WC1
WC1
WC1
CMW2
A-FPD-005 7
Sim
9 Sim
A-FPD-005 7
Sim
9 Sim
A-FPD-005 7
Sim
9 Sim
A-FPD-0058
Sim
10Sim
A-FPD-0058
Sim
10Sim
A-FPD-0058
Sim
10Sim
A-FPD-005 3
Sim
A-FPD-0054
Sim
5 Sim
6 Sim
7 8
E
D
TOILET
0108
W.C
0108A
W.C
0108B
W.C
0108C
TOILET
0109
W.C
0109A
W.C
0109B
W.C
0109C
1200
725
775950
9809801090
1175
1175
4360
850100
950
16251050
1250
CMW1
CMW1
CMW1
GW1
GWC1
GWC1
GW1
GW1
CMW2
GWC1
GWC1 GWC1
GWC1
GW1
GW1 GW1
GW1
GW1
PTD1
PTD1
PTD1 PTD1
PTD1
PTD1
WC1
WC1
WC1
WC1
WC1
WC1
WB1
WB1
WB1
WB1
A-FPD-005 3
Sim
5 Sim
A-FPD-005 7
Sim
9 Sim
A-FPD-005 7
Sim
9 Sim
A-FPD-005 7
Sim
9 Sim
A-FPD-0054
Sim
6 Sim
A-FPD-0058
Sim
9 Sim
A-FPD-0058
Sim
9 Sim
A-FPD-0058
Sim
9 Sim
775 950
1200
1175
1090980980
11751175
1175
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A1 : 20 06/10/16
A-FPD-004
TOILET DETAILS
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 20
ENLARGED PLAN - TOILET-TYPE A
1
1 : 20
ENLARGED PLAN - TOILET-TYPE A1
2
1 : 20
ENLARGED PLAN - TOILET-TYPE B
3
1 : 20
ENLARGED PLAN - TOILET-TYPE B1
4
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
7 8
G
H
TOILET
0012
W.C
0012A
W.C
0012B
W.C
0012C
TOILET
0013
W.C
0013A
W.C
0013B
W.C
0013C
1200
1025
4800
8501225
1060 1045 1045
1200
1025
4800
8501225
1060 1045 1045
650
1200
CMW1
CMW1
CMW1
GW1
GW1 GWC1
GW1
CMW1
GW1
GW1
GWC1
GW1
CMW1
GW1GW1
GW1
GWC1 GWC1 CMW2
GWC1
GW1
GW1
GW1GW1GW1
GW1
GWC1
GWC1 GW1 GW1
WC1 WC1 WC1
WC1WC1WC1
PTD1 PTD1 PTD1
PTD1PTD1PTD1
WB1 WB1
WB1WB1
A-FPD-005
3 Sim
5
Sim
A-FPD-005
8 Sim
6
Sim
A-FPD-005
7 Sim
9
Sim
A-FPD-005
7 Sim
9
Sim
A-FPD-005
7 Sim
9
Sim
A-FPD-005
8 Sim
10
Sim
A-FPD-005
8 Sim
10
Sim
A-FPD-005
8 Sim
10
Sim
54
G
H
TOILET
0005
TOILET
0006
W.C
0005A
W.C
0005B
W.C
0005C
W.C
0006A
W.C
0006B
W.C
0006C
1200
1025
1225
1045 1045
1225
1060
1225
4800
8508501225
1225
1045 1045
1225
1060
1200
1025
4800
850
1200
650
CMW1
GWC1
GW1
GW1
GW1
CMW1
GWC1
GWC1GW1GW1
GW1GW1
GW1
GWC1GW1GW1
GW1GW1
GW1
GWC1GW1GW1
CMW1
GWC1GW1GW1
GWC1
GWC1
GWC1
WB1
WB1 WC1 WC1 WC1
PTD1 PTD1 PTD1
PTD1
PTD1
PTD1
WB1
WB1
A-FPD-005
3 Sim
5
Sim
A-FPD-005
7 Sim
9
Sim
A-FPD-005
7 Sim
9
Sim
A-FPD-005
7 Sim
9
Sim
A-FPD-005
8 Sim
6
Sim
A-FPD-005
8 Sim
10
Sim
A-FPD-005
8 Sim
10
Sim
A-FPD-005
8 Sim
10
Sim
GROUND FLOOR
1500
00-GFL-RCP-LOW
4200
800100700
MIR-01MIR-01
WB1 WB1
2700
GROUND FLOOR
1500
00-GFL-RCP-LOW
4200
800100700
2700
WB1 WB1
MIR-01 MIR-01
GROUND FLOOR
1500
00-GFL-RCP-LOW
4200
800100700
2700
MIR-01
WB1
GROUND FLOOR
1500
00-GFL-RCP-LOW
4200
800100700
2700
WB1
MIR-01
GROUND FLOOR
1500
00-GFL-RCP-LOW
4200
450
WC1
2700
GROUND FLOOR
1500
00-GFL-RCP-LOW
4200
450
WC1
2700
GROUND FLOOR
1500
00-GFL-RCP-LOW
4200
WC1
PTD1
700
2700
GROUND FLOOR
1500
00-GFL-RCP-LOW
4200
WC1
PTD1
700
2700
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A1 : 20 06/10/16
A-FPD-005
TOILET DETAILS
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 20
ENLARGED PLAN - TOILET-TYPE C
1 1 : 20
ENLARGED PLAN - TOILET-TYPE D
2
1 : 20
WASH BASIN ELEVATION - 1 (TYPICAL)
3 1 : 20
WASH BASIN ELEVATION - 1M (TYPICAL)
4 1 : 20
WASH BASIN ELEVATION - 2 (TYPICAL)
5 1 : 20
WASH BASIN ELEVATION - 2M (TYPICAL)
6
1 : 20
WC ELEVATION - 1 (TYPICAL)
7 1 : 20
WC ELEVATION - 1M (TYPICAL)
8 1 : 20
WC ELEVATION - 2 (TYPICAL)
9 1 : 20
WC ELEVATION - 2M (TYPICAL)
10
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
UP
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
BASEMENT LOBBY
B-01
STAIR-01
ST-01
STAIR-02
ST-02
ELEVATOR
EL-01
ELEVATOR
EL-02
MEP SERVICE ROOM
MEP-02
MEP SERVICE ROOM
MEP-03
MEP SERVICE ROOM
MEP-01
MEP SERVICE ROOM
MEP-04
SREVICE AREA - 1
B-02
SREVICE AREA - 2
B-03
SREVICE AREA - 3
B-04
SERVER ROOM
B-05
STORE
B-06
STORE
B-07
SERVICE AREA - 4
B-08
ELECTRICAL ROOM -
1
B-09
GENERATOR - 1
B-10
FUEL - 1
B-11
PUMP ROOM
B-12
WATER STORAGE
B-13
FUEL - 2
B-14
GENERATOR - 2
B-15
ELECTRICAL ROOM
B-16
?
Room Legend
ELEVATOR
LOBBY
SERVICES
STAIR
STORAGE
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A1 : 100 05/15/16
A-OCP-001
BASEMENT FLOOR - OCCUPANCY PLAN
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
BASEMENT FLOOR - OCCUPANCY PLAN
1
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
DN
DN
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
ELEVATOR & STAIR
LOBBY
0002
ENTRANCE LOBBY - 1
0001
ENTRANCE LOBBY - 2
0003
OFFICE SPACE
0004
TOILET
0005
W.C
0005A
W.C
0005B
W.C
0005C
TOILET
0006
W.C
0006A
W.C
0006B
W.C
0006C
TOILET
0007
W.C
0007A
W.C
0007B
W.C
0007C
TOILET
0008
W.C
0008A
W.C
0008B
W.C
0008C
RECEPTION
0001A
FILES
0001B
OFFICE SPACE
0009
TOILET
0010
W.C
0010A
W.C
0010B
W.C
0010C
TOILET
0011
W.C
0011A
W.C
0011B
W.C
0011C
TOILET
0012
TOILET
0013
W.C
0012C
W.C
0012B
W.C
0012A
W.C
0013C
W.C
0013B
W.C
0013A
Room Legend
LOBBY
OFFICE
TOILET
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A1 : 100 05/15/16
A-OCP-002
GROUNDFLOOR - OCCUPANCY PLAN
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
GROUND FLOOR - OCCUPANCY PLAN
1
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
UP
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
LOBBY
0101
OFFICE SPACE
0102
TOILET
0103
W.C
0103A
W.C
0103B
W.C
0103C
TOILET
0104 W.C
0104A
W.C
0104B
W.C
0104C
OFFICE SPACE
0105
TOILET
0106
W.C
0106A
W.C
0106B
W.C
0106C
TOILET
0107
W.C
0107A
W.C
0107B
W.C
0107C
TOILET
0108
TOILET
0109
W.C
0108A
W.C
0108B
W.C
0108C
W.C
0109A
W.C
0109B
W.C
0109C
OFFICE SPACE
0110
TOILET
0111
TOILET
0112
W.C
0111A
W.C
0111B
W.C
0111C
W.C
0112A
W.C
0112B
W.C
0112C
LOBBY
0101
TOILET
0103
TOILET
0104
OFFICE SPACE
0105
TOILET
0106
TOILET
0107
TOILET
0108
TOILET
0109
OFFICE SPACE
0110
TOILET
0111
TOILET
0112
Room Legend
LOBBY
OFFICE
TOILET
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A1 : 100 05/15/16
A-OCP-003
FIRST TONINTHFLOOR -TYPICAL
OCCUPANCY PLAN
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
FIRST FLOOR - OCCUPANCY PLAN
1
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
LOBBY
10001
MEP SERVICE ROOM
MEP-05
MEP SERVICE ROOM
MEP-06
MEP SERVICE ROOM
MEP-07
MEP SERVICE ROOM
MEP-08
OPEN TERRACE
T1-01
OPEN TERRACE
T1-02
OPEN TERRACE
T1-03
OPEN TERRACE
T1-04
Room Legend
LOBBY
SERVICES
TERRACE
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A1 : 100 05/15/16
A-OCP-004
PENTHOUSE FLOOR - OCCUPANCY PLAN
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
PENTH HOUSE FLOOR - OCCUPANCY PLAN
1
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
425
300
7508873750655375029507506550750102507508875750
750 7800 750
750 6550 750
9199
300 1845 300
750 6550 750
7503261750
750 8361 750
75026921750
750 13700 750
7507800750
750 3261 750
1
A-SEC-002
1
A-SEC-001
RECESSED LIGHT
FLAT ROUND LIGHT 60 / 100 W
DOWN LIGHT RECESSED CAN INCANDESCENT
DOWN LIGHT RECESSED CAN FLOURESCENT
TOFFER LIGHT 600X600mm
SQUARE AIR RETURN 300X300mm
SQUARE AIR SUPPLY 300X300mm
SQUARE AIR RETURN 600X600mm
SQUARE AIR SUPPLY 600X600mm
SPRINKLER - PENDENT FULLY RECESSED
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A
As
indicated
05/15/16
A-RCP-001
GOUNDFLOOR - REFLECTEDCEILING
PLAN
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
GROUND FLOOR - REFLECTED CEILING PLAN
1
1 : 50
RCP - LEGEND
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
1
A-SEC-002
1
A-SEC-001
RECESSED LIGHT
FLAT ROUND LIGHT 60 / 100 W
DOWN LIGHT RECESSED CAN INCANDESCENT
DOWN LIGHT RECESSED CAN FLOURESCENT
TOFFER LIGHT 600X600mm
SQUARE AIR RETURN 300X300mm
SQUARE AIR SUPPLY 300X300mm
SQUARE AIR RETURN 600X600mm
SQUARE AIR SUPPLY 600X600mm
SPRINKLER - PENDENT FULLY RECESSED
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A
As
indicated
05/15/16
A-RCP-002
FIRST FLOOR - REFLECTEDCEILINGPLAN
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
FIRST FLOOR - REFLCTED CEILING PLAN
1
1 : 50
RCP - LEGEND
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
1
A-SEC-002
1
A-SEC-001
RECESSED LIGHT
FLAT ROUND LIGHT 60 / 100 W
DOWN LIGHT RECESSED CAN INCANDESCENT
DOWN LIGHT RECESSED CAN FLOURESCENT
TOFFER LIGHT 600X600mm
SQUARE AIR RETURN 300X300mm
SQUARE AIR SUPPLY 300X300mm
SQUARE AIR RETURN 600X600mm
SQUARE AIR SUPPLY 600X600mm
SPRINKLER - PENDENT FULLY RECESSED
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A
As
indicated
05/15/16
A-RCP-003
SECONDFLOOR - REFLECTEDCEILING
PLAN
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
SECOND FLOOR - REFLECTED CEILING PLAN
1
1 : 50
RCP - LEGEND
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
1
A-SEC-002
1
A-SEC-001
RECESSED LIGHT
FLAT ROUND LIGHT 60 / 100 W
DOWN LIGHT RECESSED CAN INCANDESCENT
DOWN LIGHT RECESSED CAN FLOURESCENT
TOFFER LIGHT 600X600mm
SQUARE AIR RETURN 300X300mm
SQUARE AIR SUPPLY 300X300mm
SQUARE AIR RETURN 600X600mm
SQUARE AIR SUPPLY 600X600mm
SPRINKLER - PENDENT FULLY RECESSED
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A
As
indicated
05/15/16
A-RCP-004
THIRDFLOOR - REFLECTEDCEILINGPLAN
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
THIRD FLOOR - REFLECTED CEILING PLAN
1
1 : 50
RCP - LEGEND
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
1
A-SEC-002
1
A-SEC-001
RECESSED LIGHT
FLAT ROUND LIGHT 60 / 100 W
DOWN LIGHT RECESSED CAN INCANDESCENT
DOWN LIGHT RECESSED CAN FLOURESCENT
TOFFER LIGHT 600X600mm
SQUARE AIR RETURN 300X300mm
SQUARE AIR SUPPLY 300X300mm
SQUARE AIR RETURN 600X600mm
SQUARE AIR SUPPLY 600X600mm
SPRINKLER - PENDENT FULLY RECESSED
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A
As
indicated
05/15/16
A-RCP-005
FOURTHFLOOR - REFLECTEDCEILING
PLAN
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
FOURTH FLOOR - REFLECTED CEILING PLAN
1
1 : 50
RCP - LEGEND
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
1
A-SEC-002
1
A-SEC-001
RECESSED LIGHT
FLAT ROUND LIGHT 60 / 100 W
DOWN LIGHT RECESSED CAN INCANDESCENT
DOWN LIGHT RECESSED CAN FLOURESCENT
TOFFER LIGHT 600X600mm
SQUARE AIR RETURN 300X300mm
SQUARE AIR SUPPLY 300X300mm
SQUARE AIR RETURN 600X600mm
SQUARE AIR SUPPLY 600X600mm
SPRINKLER - PENDENT FULLY RECESSED
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A
As
indicated
05/15/16
A-RCP-006
FIFTHFLOOR - REFLECTEDCEILINGPLAN
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
FIFTH FLOOR - REFLECTED CEILING PLAN
1
1 : 50
RCP - LEGEND
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
1
A-SEC-002
1
A-SEC-001
RECESSED LIGHT
FLAT ROUND LIGHT 60 / 100 W
DOWN LIGHT RECESSED CAN INCANDESCENT
DOWN LIGHT RECESSED CAN FLOURESCENT
TOFFER LIGHT 600X600mm
SQUARE AIR RETURN 300X300mm
SQUARE AIR SUPPLY 300X300mm
SQUARE AIR RETURN 600X600mm
SQUARE AIR SUPPLY 600X600mm
SPRINKLER - PENDENT FULLY RECESSED
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A
As
indicated
05/15/16
A-RCP-007
SIXTHFLOOR - REFLECTEDCEILINGPLAN
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
SIXTH FLOOR - REFLECTED CEILING PLAN
1
1 : 50
RCP - LEGEND
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
1
A-SEC-002
1
A-SEC-001
RECESSED LIGHT
FLAT ROUND LIGHT 60 / 100 W
DOWN LIGHT RECESSED CAN INCANDESCENT
DOWN LIGHT RECESSED CAN FLOURESCENT
TOFFER LIGHT 600X600mm
SQUARE AIR RETURN 300X300mm
SQUARE AIR SUPPLY 300X300mm
SQUARE AIR RETURN 600X600mm
SQUARE AIR SUPPLY 600X600mm
SPRINKLER - PENDENT FULLY RECESSED
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A
As
indicated
05/15/16
A-RCP-008
SEVENTHFLOOR - REFLECTEDCEILING
PLAN
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
SEVENTH FLOOR - REFLECTED CEILING PLAN
1
1 : 50
RCP - LEGEND
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
1
A-SEC-002
1
A-SEC-001
RECESSED LIGHT
FLAT ROUND LIGHT 60 / 100 W
DOWN LIGHT RECESSED CAN INCANDESCENT
DOWN LIGHT RECESSED CAN FLOURESCENT
TOFFER LIGHT 600X600mm
SQUARE AIR RETURN 300X300mm
SQUARE AIR SUPPLY 300X300mm
SQUARE AIR RETURN 600X600mm
SQUARE AIR SUPPLY 600X600mm
SPRINKLER - PENDENT FULLY RECESSED
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A
As
indicated
05/15/16
A-RCP-009
EIGHTHFLOOR - REFLECTEDCEILING
PLAN
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
EIGHTH FLOOR - REFLECTED CEILING PLAN
1
1 : 50
RCP - LEGEND
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
1
A-SEC-002
1
A-SEC-001
RECESSED LIGHT
FLAT ROUND LIGHT 60 / 100 W
DOWN LIGHT RECESSED CAN INCANDESCENT
DOWN LIGHT RECESSED CAN FLOURESCENT
TOFFER LIGHT 600X600mm
SQUARE AIR RETURN 300X300mm
SQUARE AIR SUPPLY 300X300mm
SQUARE AIR RETURN 600X600mm
SQUARE AIR SUPPLY 600X600mm
SPRINKLER - PENDENT FULLY RECESSED
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A
As
indicated
05/15/16
A-RCP-010
NINTHFLOOR - REFLECTEDCEILINGPLAN
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
NINTH FLOOR - REFLECTED CEILING PLAN
1
1 : 50
RCP - LEGEND
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
1 3 5 11972 4 86 10
A
C
E
L
J
G
B
D
H
F
K
1
A-SEC-002
1
A-SEC-001
RECESSED LIGHT
FLAT ROUND LIGHT 60 / 100 W
DOWN LIGHT RECESSED CAN INCANDESCENT
DOWN LIGHT RECESSED CAN FLOURESCENT
TOFFER LIGHT 600X600mm
SQUARE AIR RETURN 300X300mm
SQUARE AIR SUPPLY 300X300mm
SQUARE AIR RETURN 600X600mm
SQUARE AIR SUPPLY 600X600mm
SPRINKLER - PENDENT FULLY RECESSED
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A
As
indicated
05/15/16
A-RCP-011
PENT HOUSE FLOOR - REFLECTEDCEILING
PLAN
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
PENTHOUSE FLOOR - REFLECTED CEILING PLAN
1
1 : 50
RCP - LEGEND
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
00-EGL
0
GROUND FLOOR
1500
FIRST FLOOR - PLAN
6500
SECOND FLOOR
11500
THIRD FLOOR
16500
FOURTH FLOOR
21500
FIFTH FLOOR - PLAN
26500
SIXTH FLOOR
31500
SEVENTH FLOOR
36500
EIGHTH FLOOR - PLAN
41500
NINTH FLOOR
46500
PENTHOUSE FLOOR
51500
PENTHOUSE ROOF
56500
PENTHOUSE ROOF PARAPET
58500
A C E LJGB D HF K
BASEMENT FLOOR
-3500
1
A-SEC-002
WATER STORAGE
B-13
SERVICE AREA - 4
B-08
ELEVATOR
EL-01
BASEMENT LOBBY
B-01
SREVICE AREA - 1
B-02
SERVER ROOM
B-05
ENTRANCE LOBBY - 1
0001
ELEVATOR & STAIR
LOBBY
0002
ENTRANCE LOBBY - 2
0003
OFFICE SPACE
0105
LOBBY
0101
OFFICE SPACE
0102
OFFICE SPACE
0205
OFFICE SPACE
0305
OFFICE SPACE
0405
OFFICE SPACE
0505
OFFICE SPACE
0605
OFFICE SPACE
0705
OFFICE SPACE
0805
OFFICE SPACE
0905
MEP SERVICE ROOM
MEP-07
LOBBY
0201
LOBBY
0301
LOBBY
0401
LOBBY
0501
LOBBY
0601
LOBBY
0701
LOBBY
0801
LOBBY
0901
LOBBY
10001
OPEN TERRACE
T2-01
OFFICE SPACE
0202
OFFICE SPACE
0302
OFFICE SPACE
0402
OFFICE SPACE
0502
OFFICE SPACE
0602
OFFICE SPACE
0702
OFFICE SPACE
0802
OFFICE SPACE
0902
MEP SERVICE ROOM
MEP-05
RAFT SLAB
FLOOR FINISH OVER
CEMENSCREED
RC RETAINING WALL
RC BEAM
600 X 600
CEILING TILES
FLOOR FINISH OVER
CEMENSCREEDSTRUCTURAL SLAB
600 X 600
CEILING TILES
FLOOR FINISH OVER
CEMENSCREEDSTRUCTURAL SLAB
600 X 600
CEILING TILES
FLOOR FINISH OVER
CEMENSCREEDSTRUCTURAL SLAB
600 X 600
CEILING TILES
FLOOR FINISH OVER
CEMENSCREEDSTRUCTURAL SLAB
600 X 600
CEILING TILES
FLOOR FINISH OVER
CEMENSCREEDSTRUCTURAL SLAB
600 X 600
CEILING TILES
FLOOR FINISH OVER
CEMENSCREEDSTRUCTURAL SLAB
600 X 600
CEILING TILES
FLOOR FINISH OVER
CEMENSCREEDSTRUCTURAL SLAB
600 X 600
CEILING TILES
FLOOR FINISH OVER
CEMENSCREEDSTRUCTURAL SLAB
600 X 600
CEILING TILES
FLOOR FINISH OVER
CEMENSCREEDSTRUCTURAL SLAB
600 X 600
CEILING TILES
FLOOR FINISH OVER
CEMENSCREEDSTRUCTURAL SLAB
FLOOR FINISH OVER
CEMENSCREEDSTRUCTURAL SLAB
CONC. TILES
OVER WATER PROOFING
CM PARAPET WALL
LIFT PIT
RAFT SLAB
1
A-DET-001
2
A-DET-001
3
A-DET-001
Sim
3
A-DET-001
Sim
2
A-DET-001
4
A-DET-001
5
A-DET-001
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A1 : 100 05/17/16
A-SEC-001
SECTION
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
SECTION NORTH-SOUTH
1
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
00-EGL
0
GROUND FLOOR
1500
FIRST FLOOR - PLAN
6500
SECOND FLOOR
11500
THIRD FLOOR
16500
FOURTH FLOOR
21500
FIFTH FLOOR - PLAN
26500
SIXTH FLOOR
31500
SEVENTH FLOOR
36500
EIGHTH FLOOR - PLAN
41500
NINTH FLOOR
46500
PENTHOUSE FLOOR
51500
PENTHOUSE ROOF
56500
PENTHOUSE ROOF PARAPET
58500
13511 9 7 248 610
BASEMENT FLOOR
-3500
1
A-SEC-001
35001500500050005000500050005000500050005000500050002000
4650
3500
30003000300030003000300030003000300030004650
STORE
B-06
STAIR-01
ST-01
BASEMENT LOBBY
B-01
STORE
B-07
STAIR-02
ST-02
OFFICE SPACE
0009
ELEVATOR & STAIR
LOBBY
0002
OFFICE SPACE
0004
OFFICE SPACE
0102
LOBBY
0101
OFFICE SPACE
0110
OFFICE SPACE
0210
LOBBY
0201
OFFICE SPACE
0202
OFFICE SPACE
0302
LOBBY
0301
OFFICE SPACE
0310
OFFICE SPACE
0410
LOBBY
0401
OFFICE SPACE
0402
OFFICE SPACE
0502
LOBBY
0501
OFFICE SPACE
0510
OFFICE SPACE
0610
LOBBY
0601
OFFICE SPACE
0602
OFFICE SPACE
0702
LOBBY
0701
OFFICE SPACE
0710
OFFICE SPACE
0810
LOBBY
0801
OFFICE SPACE
0802
OFFICE SPACE
0902
LOBBY
0901
OFFICE SPACE
0910
MEP SERVICE ROOM
MEP-08
LOBBY
10001
MEP SERVICE ROOM
MEP-06
OPEN TERRACE
T2-01
RAFT SLAB
FLOOR FINISH OVER
CEMENSCREED
GLASS & STEEL
HAND RAIL
GLASS & STEEL
HAND RAIL
600 X 600
CEILING TILES
FLOOR FINISH OVER
CEMENSCREED STRUCTURAL SLAB
RC RETAINING WALL
RC BEAM
600 X 600
CEILING TILES
FLOOR FINISH OVER
CEMENSCREED STRUCTURAL SLAB
600 X 600
CEILING TILES
FLOOR FINISH OVER
CEMENSCREED STRUCTURAL SLAB
600 X 600
CEILING TILES
FLOOR FINISH OVER
CEMENSCREED STRUCTURAL SLAB
600 X 600
CEILING TILES
FLOOR FINISH OVER
CEMENSCREED STRUCTURAL SLAB
600 X 600
CEILING TILES
FLOOR FINISH OVER
CEMENSCREED STRUCTURAL SLAB
600 X 600
CEILING TILES
FLOOR FINISH OVER
CEMENSCREED STRUCTURAL SLAB
600 X 600
CEILING TILES
FLOOR FINISH OVER
CEMENSCREED STRUCTURAL SLAB
600 X 600
CEILING TILES
FLOOR FINISH OVER
CEMENSCREED STRUCTURAL SLAB
600 X 600
CEILING TILES
FLOOR FINISH OVER
CEMENSCREED STRUCTURAL SLAB
FLOOR FINISH OVER
CEMENSCREED STRUCTURAL SLAB
CM WALL
CM PARAPET WALL
EXTERIOR CLADDING
CONC. TILES
OVER WATER PROOFING
Sim
4
A-DET-001
Sim
4
A-DET-001
Sim
4
A-DET-001
Sim
4
A-DET-001
Sim
4
A-DET-001
Sim
4
A-DET-001
Sim
2
A-DET-001
Sim
2
A-DET-001
Sim
2
A-DET-001
Sim
2
A-DET-001
Sim
2
A-DET-001
Sim
3
A-DET-001
Sim
2
A-DET-001
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A1 : 100 05/15/16
A-SEC-002
SECTION
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 100
SECTION EAST-WEST
1
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
GROUND FLOOR
1500
FIRST FLOOR - PLAN
6500
SECOND FLOOR
11500
THIRD FLOOR
16500
FOURTH FLOOR
21500
FIFTH FLOOR - PLAN
26500
5 4
BASEMENT FLOOR
-3500
32RISERS@156mm
5000
32RISERS@156mm
5000
32RISERS@156mm
5000
32RISERS@156mm
5000
32RISERS@156mm
5000
32RISERS@156mm
5000
3
A-SEC-003
Sim
3
A-SEC-003
Sim
3
A-SEC-003
FIFTH FLOOR - PLAN
26500
SIXTH FLOOR
31500
SEVENTH FLOOR
36500
EIGHTH FLOOR - PLAN
41500
NINTH FLOOR
46500
PENTHOUSE FLOOR
51500
PENTHOUSE ROOF
56500
5 4
32RISERS@156mm
5000
32RISERS@156mm
5000
32RISERS@156mm
5000
32RISERS@156mm
5000
32RISERS@156mm
5000
32RISERS@156mm
5000
Sim
3
A-SEC-003
Sim
3
A-SEC-003
Sim
3
A-SEC-003
156
25 300
325
156
25
Marble Tread
25mm Thick
Wooden Riser
12.5mm Thick
Structural Concrete
Bottom of
HaindRail
Cement Plastering
with Paint Finish
4
A-SEC-003
13
10 15
25
520
25
Marble Tread
25mm Thick
Wooden Riser
12.5mm Thick
Structural Concrete
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A
As
indicated
05/17/16
A-SEC-003
STAIR-01 SECTION
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 50
STAIR-01 SECTION
1
1 : 50
STAIR-01 SECTION - CONTINUOUS
2
1 : 5
STAIR - TREAD & RISER DETAIL
3
1 : 2
STAIR - NOSING DETAIL
4
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
T ectonicCop yright2007
T ectonicCop yright2007
T ectonicCop yright2007
T ectonicCop yright2007
T ectonicCop yright2007
T ectonicCop yright2007
T ectonicCop yright2007
T ectonicCop yright2007
T ectonicCop yright2007
T ectonicCop yright2007
T ectonicCop yright2007
T ectonicCop yright2007
T ectonicCop yright2007
GROUND FLOOR
1500
FIRST FLOOR - PLAN
6500
SECOND FLOOR
11500
THIRD FLOOR
16500
FOURTH FLOOR
21500
FIFTH FLOOR - PLAN
26500
78
00-EGL-TOS
150
BASEMENT FLOOR
-3500
32RISERS@156mm
5000
32RISERS@156mm
5000
32RISERS@156mm
5000
32RISERS@156mm
5000
32RISERS@156mm
5000
32RISERS@156mm
5000
-2094
225
2906
5225
7906
10225
12906
15225
17906
20225
22906
25225
27906
Sim
3
A-SEC-003
Sim
3
A-SEC-003
FIFTH FLOOR - PLAN
26500
SIXTH FLOOR
31500
SEVENTH FLOOR
36500
EIGHTH FLOOR - PLAN
41500
NINTH FLOOR
46500
PENTHOUSE FLOOR
51500
PENTHOUSE ROOF
56500
78
32RISERS@156mm
5000
32RISERS@156mm
5000
32RISERS@156mm
5000
32RISERS@156mm
5000
32RISERS@156mm
5000
32RISERS@156mm
5000
27906
30230
32906
35225
37906
40225
42906
45225
47906
50225
Sim
3
A-SEC-003
Sim
3
A-SEC-003
Sim
3
A-SEC-003
00-EGL
0
GROUND FLOOR
1500
FIRST FLOOR - PLAN
6500
SECOND FLOOR
11500
THIRD FLOOR
16500
FOURTH FLOOR
21500
FIFTH FLOOR - PLAN
26500
E
BASEMENT FLOOR
-3500
500050005000500050005000
-4800
FIFTH FLOOR - PLAN
26500
SIXTH FLOOR
31500
SEVENTH FLOOR
36500
EIGHTH FLOOR - PLAN
41500
NINTH FLOOR
46500
PENTHOUSE FLOOR
51500
PENTHOUSE ROOF
56500
E
500050005000500050005000
2550
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A1 : 50 06/10/16
A-SEC-004
STAIR-02 &ELEVATORSECTION
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
1 : 50
STAIR-02 SECTION
1 1 : 50
STAIR-02 SECTION - CONTINUOUS
2 1 : 50
ELEVATOR - SECTION
3 1 : 50
ELEVATOR - SECTION - CONTINUOUS
4
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A06/10/16
A-SHD-001
ROOMSCHEDULE
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
ROOM SCHEDULE - BASEMENT TO FIFTH FLOOR
Name Number Area Floor Finish Base Finish Wall Finish Ceiling Finish Occupancy Level
W.C 0306B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
W.C 0306C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
W.C 0307A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
W.C 0307B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
W.C 0307C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
W.C 0308A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
W.C 0308B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
W.C 0308C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
W.C 0309A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
W.C 0309B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
W.C 0309C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
LOBBY 0401 84 m² GRANITE+MA
RBLE TILE
BURGANDY-GRANI
TE
GYPSUM LOBBY FOURTH
FLOOR
OFFICE SPACE 0402 288 m² WOOD+GRANI
TE
BURGANDY-GRANI
TE
PAINT GYPSUM OFFICE FOURTH
FLOOR
TOILET 0403 5 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
TOILET 0404 5 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
OFFICE SPACE 0405 302 m² WOOD+GRANI
TE
BURGANDY-GRANI
TE
PAINT GYPSUM OFFICE FOURTH
FLOOR
TOILET 0406 5 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
TOILET 0407 5 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
TOILET 0408 5 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
TOILET 0409 5 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
OFFICE SPACE 0410 288 m² WOOD+GRANI
TE
BURGANDY-GRANI
TE
PAINT GYPSUM OFFICE FOURTH
FLOOR
TOILET 0411 5 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
TOILET 0412 5 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
W.C 0403A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
W.C 0403B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
W.C 0403C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
W.C 0404A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
W.C 0404B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
W.C 0404C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
W.C 0407A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
W.C 0407B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
W.C 0407C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
W.C 0406A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
W.C 0406B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
W.C 0406C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
W.C 0408A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
W.C 0408B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
W.C 0408C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
W.C 0409A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
W.C 0409B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
W.C 0409C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
W.C 0411A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
W.C 0411B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
W.C 0411C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
W.C 0412A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
W.C 0412B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
W.C 0412C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FOURTH
FLOOR
LOBBY 0501 84 m² GRANITE+MA
RBLE TILE
BURGANDY-GRANI
TE
GYPSUM LOBBY FIFTH FLOOR
- PLAN
OFFICE SPACE 0502 295 m² WOOD+GRANI
TE
BURGANDY-GRANI
TE
PAINT GYPSUM OFFICE FIFTH FLOOR
- PLAN
TOILET 0503 5 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
TOILET 0504 5 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
OFFICE SPACE 0505 317 m² WOOD+GRANI
TE
BURGANDY-GRANI
TE
PAINT GYPSUM OFFICE FIFTH FLOOR
- PLAN
TOILET 0506 5 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
TOILET 0507 5 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
TOILET 0508 5 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
TOILET 0509 5 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
OFFICE SPACE 0510 295 m² WOOD+GRANI
TE
BURGANDY-GRANI
TE
PAINT GYPSUM OFFICE FIFTH FLOOR
- PLAN
TOILET 0511 5 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
TOILET 0512 5 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
W.C 0503A 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
W.C 0503B 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
W.C 0503C 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
W.C 0504A 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
W.C 0504B 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
W.C 0504C 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
W.C 0506A 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
W.C 0506B 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
W.C 0506C 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
W.C 0507A 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
W.C 0507B 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
W.C 0507C 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
W.C 0508A 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
W.C 0508B 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
W.C 0508C 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
W.C 0509A 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
W.C 0509B 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
W.C 0509C 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
W.C 0511A 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
W.C 0511B 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
W.C 0511C 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
W.C 0512A 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
W.C 0512B 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
W.C 0512C 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET FIFTH FLOOR
- PLAN
ROOM SCHEDULE - BASEMENT TO FIFTH FLOOR
Name Number Area Floor Finish Base Finish Wall Finish Ceiling Finish Occupancy Level
W.C 0106A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
W.C 0106B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
W.C 0106C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
TOILET 0107 5 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
W.C 0107A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
W.C 0107B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
W.C 0107C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
OFFICE SPACE 0110 284 m² WOOD+GRANI
TE
BURGANDY-GRANI
TE
PAINT GYPSUM OFFICE FIRST FLOOR
- PLAN
TOILET 0111 5 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
TOILET 0112 5 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
TOILET 0108 5 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
TOILET 0109 5 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
W.C 0108A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
W.C 0108B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
W.C 0108C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
W.C 0109A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
W.C 0109B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
W.C 0109C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
W.C 0111A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
W.C 0111B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
W.C 0111C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
W.C 0112A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
W.C 0112B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
W.C 0112C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
LOBBY 0201 84 m² GRANITE+MA
RBLE TILE
BURGANDY-GRANI
TE
GYPSUM LOBBY SECOND
FLOOR
OFFICE SPACE 0202 284 m² WOOD+GRANI
TE
BURGANDY-GRANI
TE
PAINT GYPSUM OFFICE SECOND
FLOOR
TOILET 0203 5 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
TOILET 0204 5 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
OFFICE SPACE 0205 294 m² WOOD+GRANI
TE
BURGANDY-GRANI
TE
PAINT GYPSUM OFFICE SECOND
FLOOR
TOILET 0206 5 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
TOILET 0207 5 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
TOILET 0208 5 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
TOILET 0209 5 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
OFFICE SPACE 0210 284 m² WOOD+GRANI
TE
BURGANDY-GRANI
TE
PAINT GYPSUM OFFICE SECOND
FLOOR
TOILET 0211 5 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
TOILET 0212 5 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
W.C 0203A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
W.C 0203B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
W.C 0203C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
W.C 0204A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
W.C 0204B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
W.C 0204C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
W.C 0206A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
W.C 0206B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
W.C 0206C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
W.C 0207A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
W.C 0207B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
Room 0207C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
W.C 0208A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
W.C 0208B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
W.C 0208C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
W.C 0209A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
W.C 0209B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
W.C 0209C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
W.C 0211A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
W.C 0211B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
W.C 0211C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
W.C 0212A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
W.C 0212B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
W.C 0212C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SECOND
FLOOR
LOBBY 0301 84 m² GRANITE+MA
RBLE TILE
BURGANDY-GRANI
TE
GYPSUM LOBBY THIRD FLOOR
OFFICE SPACE 0302 285 m² WOOD+GRANI
TE
BURGANDY-GRANI
TE
PAINT GYPSUM OFFICE THIRD FLOOR
TOILET 0303 5 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
TOILET 0304 5 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
OFFICE SPACE 0305 295 m² WOOD+GRANI
TE
BURGANDY-GRANI
TE
PAINT GYPSUM OFFICE THIRD FLOOR
TOILET 0306 5 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
TOILET 0307 5 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
TOILET 0308 5 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
TOILET 0309 5 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
OFFICE SPACE 0310 285 m² WOOD+GRANI
TE
BURGANDY-GRANI
TE
PAINT GYPSUM OFFICE THIRD FLOOR
TOILET 0311 5 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
W.C 0311A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
W.C 0311B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
W.C 0311C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
TOILET 0312 5 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
W.C 0312A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
W.C 0312B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
W.C 0312C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
W.C 0303A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
W.C 0303B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
W.C 0303C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
W.C 0304A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
W.C 0304B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
W.C 0304C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
W.C 0306A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET THIRD FLOOR
ROOM SCHEDULE - BASEMENT TO FIFTH FLOOR
Name Number Area Floor Finish Base Finish Wall Finish Ceiling Finish Occupancy Level
GENERATOR - 1 B-10 37 m² EPXOY - PAINT PAINT SERVICES BASEMENT
FLOOR
FUEL - 1 B-11 24 m² - - - - SERVICES BASEMENT
FLOOR
ELECTRICAL ROOM -
1
B-09 13 m² EPOXY - PAINT PAINT SERVICES BASEMENT
FLOOR
STORE B-06 476 m² EPOXY - - PAINT STORAGE BASEMENT
FLOOR
SERVER ROOM B-05 84 m² EPOXY - PAINT PAINT SERVICES BASEMENT
FLOOR
MEP SERVICE ROOM MEP-01 23 m² EPXOY - PAINT PAINT SERVICES BASEMENT
FLOOR
MEP SERVICE ROOM MEP-04 23 m² EPOXY - PAINT PAINT SERVICES BASEMENT
FLOOR
STORE B-07 476 m² EPOXY - PAINT PAINT STORAGE BASEMENT
FLOOR
MEP SERVICE ROOM MEP-03 23 m² EPOXY - PAINT PAINT SERVICES BASEMENT
FLOOR
ELEVATOR EL-02 6 m² ELEVATOR BASEMENT
FLOOR
ELEVATOR EL-01 6 m² ELEVATOR BASEMENT
FLOOR
MEP SERVICE ROOM MEP-02 23 m² EPOXY - PAINT PAINT SERVICES BASEMENT
FLOOR
WATER STORAGE B-13 82 m² SERVICES BASEMENT
FLOOR
PUMP ROOM B-12 24 m² EPOXY - PAINT PAINT SERVICES BASEMENT
FLOOR
FUEL - 2 B-14 24 m² SERVICES BASEMENT
FLOOR
GENERATOR - 2 B-15 37 m² EPOXY - PAINT PAINT SERVICES BASEMENT
FLOOR
ELECTRICAL ROOM B-16 13 m² EPOXY - PAINT PAINT SERVICES BASEMENT
FLOOR
BASEMENT LOBBY B-01 65 m² EPOXY - PAINT - LOBBY BASEMENT
FLOOR
STAIR-01 ST-01 41 m² BEIGE
MARBLE
BEIGE MARBLE PAINT - STAIR BASEMENT
FLOOR
STAIR-02 ST-02 41 m² BEIGE
MARBLE
BEIGE MARBLE PAINT STAIR BASEMENT
FLOOR
SERVICE AREA - 4 B-08 316 m² EPOXY - PAINT PAINT SERVICES BASEMENT
FLOOR
SREVICE AREA - 1 B-02 78 m² EPOXY - PAINT PAINT SERVICES BASEMENT
FLOOR
SREVICE AREA - 2 B-03 144 m² EPOXY - PAINT PAINT SERVICES BASEMENT
FLOOR
SREVICE AREA - 3 B-04 144 m² EPOXY - PAINT PAINT SERVICES BASEMENT
FLOOR
Room B-17 6 m² GROUND
FLOOR
Room B-18 6 m² GROUND
FLOOR
ENTRANCE LOBBY -
2
0003 160 m² BEIGE
MARBLE
BEIGE MARBLE - GYPSUM LOBBY GROUND
FLOOR
ELEVATOR & STAIR
LOBBY
0002 86 m² BEIGE
MARBLE
BEIGE MARBLE PAINT GYPSUM LOBBY GROUND
FLOOR
RECEPTION 0001A 6 m² BEIGE
MARBLE
BEIGE MARBLE PAINT GYPSUM LOBBY GROUND
FLOOR
FILES 0001B 6 m² BEIGE
MARBLE
BEIGE MARBLE PAINT GYPSUM LOBBY GROUND
FLOOR
ENTRANCE LOBBY -
1
0001 176 m² BEIGE
MARBLE
BEIGE MARBLE GYPSUM LOBBY GROUND
FLOOR
OFFICE SPACE 0009 261 m² WOOD+BEIGE
MARBLE
BEIGE MARBLE PAINT GYPSUM OFFICE GROUND
FLOOR
TOILET 0013 5 m² WOOD+BEIGE
MARBLE
- WALL TILES PVC TOILET GROUND
FLOOR
W.C 0013C 1 m² WOOD+BEIGE
MARBLE
- WALL TILES PVC TOILET GROUND
FLOOR
W.C 0013B 1 m² WOOD+BEIGE
MARBLE
- WALL TILES PVC TOILET GROUND
FLOOR
W.C 0013A 1 m² WOOD+BEIGE
MARBLE
- WALL TILES PVC TOILET GROUND
FLOOR
W.C 0012A 1 m² WOOD+BEIGE
MARBLE
- WALL TILES PVC TOILET GROUND
FLOOR
W.C 0012B 1 m² WOOD+BEIGE
MARBLE
- WALL TILES PVC TOILET GROUND
FLOOR
W.C 0012C 1 m² WOOD+BEIGE
MARBLE
- WALL TILES PVC TOILET GROUND
FLOOR
TOILET 0012 5 m² WOOD+BEIGE
MARBLE
- WALL TILES PVC TOILET GROUND
FLOOR
Room B-33 31 m² GROUND
FLOOR
Room B-34 31 m² GROUND
FLOOR
TOILET 0007 5 m² MOSAIC
TILING
WALL TILES PVC TOILET GROUND
FLOOR
Room B-36 1 m² GROUND
FLOOR
TOILET 0008 5 m² MOSAIC
TILING
WALL TILES PVC TOILET GROUND
FLOOR
W.C 0007A 1 m² GROUND
FLOOR
W.C 0008A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET GROUND
FLOOR
W.C 0007B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET GROUND
FLOOR
W.C 0008B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET GROUND
FLOOR
W.C 0007C 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET GROUND
FLOOR
W.C 0008C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET GROUND
FLOOR
Room B-44 0 m² GROUND
FLOOR
Room B-45 0 m² GROUND
FLOOR
Room B-46 0 m² GROUND
FLOOR
W.C 0010C 1 m² WOOD+BEIGE
MARBLE
- WALL TILES PVC TOILET GROUND
FLOOR
W.C 0010B 1 m² WOOD+BEIGE
MARBLE
- WALL TILES PVC TOILET GROUND
FLOOR
W.C 0010A 1 m² WOOD+BEIGE
MARBLE
- WALL TILES PVC TOILET GROUND
FLOOR
TOILET 0010 5 m² WOOD+BEIGE
MARBLE
- WALL TILES PVC TOILET GROUND
FLOOR
Room B-51 1 m² GROUND
FLOOR
TOILET 0011 5 m² WOOD+BEIGE
MARBLE
- WALL TILES PVC TOILET GROUND
FLOOR
W.C 0011A 1 m² WOOD+BEIGE
MARBLE
- WALL TILES PVC TOILET GROUND
FLOOR
W.C 0011B 1 m² WOOD+BEIGE
MARBLE
- WALL TILES PVC TOILET GROUND
FLOOR
W.C 0011C 1 m² WOOD+BEIGE
MARBLE
- WALL TILES PVC TOILET GROUND
FLOOR
OFFICE SPACE 0004 276 m² WOOD+BEIGE
MARBLE
BEIGE MARBLE PAINT GYPSUM OFFICE GROUND
FLOOR
TOILET 0006 5 m² MOSAIC
TILING
- WALL TILES PVC TOILET GROUND
FLOOR
TOILET 0005 5 m² MOSAIC
TILING
- WALL TILES PVC TOILET GROUND
FLOOR
SHAFT MSH-01 1 m² GROUND
FLOOR
W.C 0005A 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET GROUND
FLOOR
W.C 0005B 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET GROUND
FLOOR
W.C 0005C 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET GROUND
FLOOR
W.C 0006C 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET GROUND
FLOOR
W.C 0006B 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET GROUND
FLOOR
W.C 0006A 1 m² MOSAIC
TILING
- WALL TILES PVC TOILET GROUND
FLOOR
LOBBY 0101 84 m² GRANITE+MA
RBLE TILE
BURGANDY-GRANI
TE
GYPSUM LOBBY FIRST FLOOR
- PLAN
OFFICE SPACE 0102 284 m² WOOD+GRANI
TE
BURGANDY-GRANI
TE
PAINT GYPSUM OFFICE FIRST FLOOR
- PLAN
TOILET 0103 5 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
W.C 0103A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
W.C 0103B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
W.C 0103C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
TOILET 0104 5 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
W.C 0104A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
W.C 0104B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
W.C 0104C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
OFFICE SPACE 0105 294 m² WOOD+GRANI
TE
BURGANDY-GRANI
TE
PAINT GYPSUM OFFICE FIRST FLOOR
- PLAN
TOILET 0106 5 m² MOSAIC
TILING
WALL TILES PVC TOILET FIRST FLOOR
- PLAN
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
REVISIONSCALE DATE
SHEET NUMBER
SHEET NAME
PROJECT NUMBER
DESIGNED
PROJECT NAME
PROJECT VIEW
KEY PLAN
NOTES &LEGENDS
SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY
DRAWN
THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY.
THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION
OF DESIGNER.
ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED.
A06/10/16
A-SHD-002
ROOMSCHEDULE
0001
Jobin Jobin
REVIT PROJECT # 1
REVITPROJECT#10001
ROOM SCHEDULE - SIXTH TO PENTHOUSE LEVEL
Name Number Area Floor Finish Base Finish Wall Finish Ceiling Finish Occupancy Level
W.C 0803A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
W.C 0803B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
W.C 0803C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
W.C 0804A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
W.C 0804B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
W.C 0804C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
W.C 0806A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
W.C 0806B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
W.C 0806C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
W.C 0807A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
W.C 0807B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
W.C 0807C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
W.C 0808A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
W.C 0808B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
W.C 0808C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
W.C 0809A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
W.C 0809B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
W.C 0809C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
W.C 0811A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
W.C 0811B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
W.C 0811C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
Room 0812A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
W.C 0812B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
W.C 0812C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
LOBBY 0901 85 m² GRANITE+MA
RBLE TILE
GYPSUM LOBBY NINTH FLOOR
OFFICE SPACE 0902 369 m² WOOD+GRANI
TE
PAINT GYPSUM OFFICE NINTH FLOOR
TOILET 0903 5 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
TOILET 0904 5 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
OFFICE SPACE 0905 465 m² WOOD+GRANI
TE
PAINT GYPSUM OFFICE NINTH FLOOR
TOILET 0906 5 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
TOILET 0907 5 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
TOILET 0908 5 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
TOILET 0909 5 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
OFFICE SPACE 0910 369 m² WOOD+GRANI
TE
PAINT GYPSUM OFFICE NINTH FLOOR
TOILET 0911 5 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
TOILET 0912 5 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
W.C 0903A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
W.C 0903B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
W.C 0903C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
W.C 0904A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
W.C 0904B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
W.C 0904C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
W.C 0906A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
W.C 0906B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
W.C 0906C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
W.C 0907A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
W.C 0907B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
W.C 0907C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
W.C 0908A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
W.C 0908B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
W.C 0908C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
W.C 0909A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
W.C 0909B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
W.C 0909C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
W.C 0911A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
W.C 0911B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
W.C 0911C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
W.C 0912A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
W.C 0912B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
W.C 0912C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET NINTH FLOOR
LOBBY 10001 86 m² GRANITE+MA
RBLE TILE
GYPSUM LOBBY PENTHOUSE FLOOR
MEP SERVICE ROOM MEP-05 169 m² EPOXY PAINT PAINT SERVICES PENTHOUSE FLOOR
MEP SERVICE ROOM MEP-06 127 m² EPOXY PAINT PAINT SERVICES PENTHOUSE FLOOR
MEP SERVICE ROOM MEP-07 154 m² EPOXY PAINT PAINT SERVICES PENTHOUSE FLOOR
MEP SERVICE ROOM MEP-08 127 m² EPOXY PAINT PAINT SERVICES PENTHOUSE FLOOR
OPEN TERRACE T1-01 216 m² PAVER TILE PAINT TERRACE PENTHOUSE FLOOR
OPEN TERRACE T1-02 216 m² PAVER TILE PAINT TERRACE PENTHOUSE FLOOR
OPEN TERRACE T1-03 216 m² PAVER TILE PAINT TERRACE PENTHOUSE FLOOR
OPEN TERRACE T1-04 216 m² PAVER TILE PAINT TERRACE PENTHOUSE FLOOR
OPEN TERRACE T2-01 821 m² PAVER TILE PAINT TERRACE PENTHOUSE ROOF
ROOM SCHEDULE - SIXTH TO PENTHOUSE LEVEL
Name Number Area Floor Finish Base Finish Wall Finish Ceiling Finish Occupancy Level
LOBBY 0601 84 m² GRANITE+MA
RBLE TILE
BURGANDY-GRANI
TE
GYPSUM LOBBY SIXTH FLOOR
OFFICE SPACE 0602 306 m² WOOD+GRANI
TE
BURGANDY-GRANI
TE
PAINT GYPSUM OFFICE SIXTH FLOOR
TOILET 0603 5 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
TOILET 0604 5 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
OFFICE SPACE 0605 339 m² WOOD+GRANI
TE
BURGANDY-GRANI
TE
PAINT GYPSUM OFFICE SIXTH FLOOR
TOILET 0606 5 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
TOILET 0607 5 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
TOILET 0608 5 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
TOILET 0609 5 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
OFFICE SPACE 0610 306 m² WOOD+GRANI
TE
BURGANDY-GRANI
TE
PAINT GYPSUM OFFICE SIXTH FLOOR
TOILET 0611 5 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
TOILET 0612 5 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
W.C 0603A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
W.C 0603B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
W.C 0603C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
W.C 0604A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
W.C 0604B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
W.C 0604C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
W.C 0606A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
W.C 0606B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
W.C 0606C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
W.C 0607A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
W.C 0607B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
W.C 0607C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
W.C 0608A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
W.C 0608B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
W.C 0608C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
W.C 0609A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
W.C 0609B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
W.C 0609C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
W.C 06011A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
W.C 06011B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
W.C 06011C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
W.C 06012A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
W.C 06012B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
W.C 06012C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SIXTH FLOOR
LOBBY 0701 84 m² GRANITE+MA
RBLE TILE
BURGANDY-GRANI
TE
GYPSUM LOBBY SEVENTH FLOOR
OFFICE SPACE 0702 322 m² WOOD+GRANI
TE
BURGANDY-GRANI
TE
PAINT GYPSUM OFFICE SEVENTH FLOOR
TOILET 0703 5 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
TOILET 0704 5 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
OFFICE SPACE 0705 370 m² WOOD+GRANI
TE
BURGANDY-GRANI
TE
PAINT GYPSUM OFFICE SEVENTH FLOOR
TOILET 0706 5 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
TOILET 0707 5 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
TOILET 0708 5 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
TOILET 0709 5 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
OFFICE SPACE 0710 322 m² WOOD+GRANI
TE
BURGANDY-GRANI
TE
PAINT GYPSUM OFFICE SEVENTH FLOOR
TOILET 0711 5 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
TOILET 0712 5 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
W.C 0703A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
W.C 0703B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
W.C 0703C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
W.C 0704A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
W.C 0704B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
W.C 0704C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
W.C 0706A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
W.C 0706B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
W.C 0706C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
W.C 0707A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
W.C 0707B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
W.C 0707C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
W.C 0708A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
W.C 0708B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
W.C 0708C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
W.C 0709A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
W.C 0709B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
W.C 0709C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
W.C 0711A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
W.C 0711B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
W.C 0711C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
Room 0712A 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
W.C 0712B 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
W.C 0712C 1 m² MOSAIC
TILING
WALL TILES PVC TOILET SEVENTH FLOOR
OFFICE SPACE T2-02 Not Enclosed WOOD+GRANI
TE
BURGANDY-GRANI
TE
PAINT GYPSUM OFFICE SEVENTH FLOOR
LOBBY 0801 84 m² GRANITE+MA
RBLE TILE
GYPSUM LOBBY EIGHTH FLOOR -
PLAN
OFFICE SPACE 0802 342 m² WOOD+GRANI
TE
BURGANDY-GRANI
TE
PAINT GYPSUM OFFICE EIGHTH FLOOR -
PLAN
TOILET 0803 5 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
TOILET 0804 5 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
OFFICE SPACE 0805 411 m² WOOD+GRANI
TE
BURGANDY-GRANI
TE
PAINT GYPSUM OFFICE EIGHTH FLOOR -
PLAN
TOILET 0806 5 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
TOILET 0807 5 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
TOILET 0808 5 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
TOILET 0809 5 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
OFFICE SPACE 0810 342 m² WOOD+GRANI
TE
BURGANDY-GRANI
TE
PAINT GYPSUM OFFICE EIGHTH FLOOR -
PLAN
TOILET 0811 5 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
TOILET 0812 5 m² MOSAIC
TILING
WALL TILES PVC TOILET EIGHTH FLOOR -
PLAN
Revision Schedule
Revision Number Revision Description Revision Date
A Schematic Design 01/01/2016
Revi Project # 1_1
Revi Project # 1_1
Revi Project # 1_1

More Related Content

Viewers also liked

Конференция «валютные контракты в новых экономических реалиях. последнее обно...
Конференция «валютные контракты в новых экономических реалиях. последнее обно...Конференция «валютные контракты в новых экономических реалиях. последнее обно...
Конференция «валютные контракты в новых экономических реалиях. последнее обно...Василий Прохоревич
 
Trabajo de informatica diana y angie
Trabajo de informatica diana y angieTrabajo de informatica diana y angie
Trabajo de informatica diana y angieangiepao96
 
switch statement
switch statementswitch statement
switch statementmuniryaseen
 
жер жөнүндөгү илимдер жана
жер жөнүндөгү илимдер жанажер жөнүндөгү илимдер жана
жер жөнүндөгү илимдер жанаatay99AA
 
Estrategias de aprendizaje
Estrategias de aprendizajeEstrategias de aprendizaje
Estrategias de aprendizajeAlma Olivares
 
An Architecture of Panopticism
An Architecture of PanopticismAn Architecture of Panopticism
An Architecture of PanopticismKaren McMillan
 
Actividadmodulo2 120309171445-phpapp02
Actividadmodulo2 120309171445-phpapp02Actividadmodulo2 120309171445-phpapp02
Actividadmodulo2 120309171445-phpapp02Oshin Mendoza Guarrniz
 
Cts aug2016 outline v1
Cts aug2016 outline v1Cts aug2016 outline v1
Cts aug2016 outline v1Ling Fung Chia
 
Twtter Strategic Analysis
Twtter Strategic AnalysisTwtter Strategic Analysis
Twtter Strategic AnalysisKody Davis
 
Application of differential systems in global navigation satellite systems
Application of differential systems in global navigation satellite systemsApplication of differential systems in global navigation satellite systems
Application of differential systems in global navigation satellite systemsAli N.Khojasteh
 
over all view programming to computer
over all view programming to computer over all view programming to computer
over all view programming to computer muniryaseen
 

Viewers also liked (16)

Конференция «валютные контракты в новых экономических реалиях. последнее обно...
Конференция «валютные контракты в новых экономических реалиях. последнее обно...Конференция «валютные контракты в новых экономических реалиях. последнее обно...
Конференция «валютные контракты в новых экономических реалиях. последнее обно...
 
Trabajo de informatica diana y angie
Trabajo de informatica diana y angieTrabajo de informatica diana y angie
Trabajo de informatica diana y angie
 
switch statement
switch statementswitch statement
switch statement
 
жер жөнүндөгү илимдер жана
жер жөнүндөгү илимдер жанажер жөнүндөгү илимдер жана
жер жөнүндөгү илимдер жана
 
Mele sebastian
Mele sebastianMele sebastian
Mele sebastian
 
Estrategias de aprendizaje
Estrategias de aprendizajeEstrategias de aprendizaje
Estrategias de aprendizaje
 
An Architecture of Panopticism
An Architecture of PanopticismAn Architecture of Panopticism
An Architecture of Panopticism
 
Actividadmodulo2 120309171445-phpapp02
Actividadmodulo2 120309171445-phpapp02Actividadmodulo2 120309171445-phpapp02
Actividadmodulo2 120309171445-phpapp02
 
Cts aug2016 outline v1
Cts aug2016 outline v1Cts aug2016 outline v1
Cts aug2016 outline v1
 
Necesidades Educativas
Necesidades EducativasNecesidades Educativas
Necesidades Educativas
 
Twtter Strategic Analysis
Twtter Strategic AnalysisTwtter Strategic Analysis
Twtter Strategic Analysis
 
Application of differential systems in global navigation satellite systems
Application of differential systems in global navigation satellite systemsApplication of differential systems in global navigation satellite systems
Application of differential systems in global navigation satellite systems
 
Richard CV Dec 2016
Richard CV Dec 2016Richard CV Dec 2016
Richard CV Dec 2016
 
over all view programming to computer
over all view programming to computer over all view programming to computer
over all view programming to computer
 
Voleibol
VoleibolVoleibol
Voleibol
 
біоіндикація повітря за листками берези .Docx
біоіндикація повітря за листками берези .Docxбіоіндикація повітря за листками берези .Docx
біоіндикація повітря за листками берези .Docx
 

Similar to Revi Project # 1_1

Istana Bandar Jugrah Elevations
Istana Bandar Jugrah ElevationsIstana Bandar Jugrah Elevations
Istana Bandar Jugrah ElevationsClaire Zhuangg
 
At of modern building which create abvolated view
At of modern building which create abvolated viewAt of modern building which create abvolated view
At of modern building which create abvolated viewdreem073
 
Istana Bandar Jugrah Sections
Istana Bandar Jugrah SectionsIstana Bandar Jugrah Sections
Istana Bandar Jugrah SectionsClaire Zhuangg
 
TP-2170-M-00003
TP-2170-M-00003TP-2170-M-00003
TP-2170-M-00003Mark Ryder
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITASAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITASunit Dhingra
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology ProjectTomcully18
 
Amaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan DesignAmaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan DesignKathleenFaithMamuad
 
Red Design Group - Commercial Credentials
Red Design Group - Commercial CredentialsRed Design Group - Commercial Credentials
Red Design Group - Commercial CredentialsRhys Mullarvey
 
PLF-1408-AT-SD-CO-011 - REV 00
PLF-1408-AT-SD-CO-011 - REV 00PLF-1408-AT-SD-CO-011 - REV 00
PLF-1408-AT-SD-CO-011 - REV 00Mansoor Sakharkar
 
SAP T-Accounts Posting Simulation - Example
SAP T-Accounts Posting Simulation - ExampleSAP T-Accounts Posting Simulation - Example
SAP T-Accounts Posting Simulation - ExampleMichael Knowles
 
Execution Coordination Concerns - HVAC.pptx
Execution Coordination Concerns - HVAC.pptxExecution Coordination Concerns - HVAC.pptx
Execution Coordination Concerns - HVAC.pptxB. Joshua
 
15-129_DANONE_WD2_ELEVATNS.PDF
15-129_DANONE_WD2_ELEVATNS.PDF15-129_DANONE_WD2_ELEVATNS.PDF
15-129_DANONE_WD2_ELEVATNS.PDFMATHIAS MAZURURA
 
Ck21 presentation team 3
Ck21 presentation team 3Ck21 presentation team 3
Ck21 presentation team 3Campus
 
3d home exterior rendering
3d home exterior rendering 3d home exterior rendering
3d home exterior rendering Mohamed Mostafa
 

Similar to Revi Project # 1_1 (20)

Measure drawing
Measure drawing Measure drawing
Measure drawing
 
Istana Bandar Jugrah Elevations
Istana Bandar Jugrah ElevationsIstana Bandar Jugrah Elevations
Istana Bandar Jugrah Elevations
 
At of modern building which create abvolated view
At of modern building which create abvolated viewAt of modern building which create abvolated view
At of modern building which create abvolated view
 
Istana Bandar Jugrah Sections
Istana Bandar Jugrah SectionsIstana Bandar Jugrah Sections
Istana Bandar Jugrah Sections
 
TP-2170-M-00003
TP-2170-M-00003TP-2170-M-00003
TP-2170-M-00003
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITASAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - CAPITA
 
Architectural Technology Project
Architectural Technology ProjectArchitectural Technology Project
Architectural Technology Project
 
Amaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan DesignAmaia Scapes Twin Pod Housing Plan Design
Amaia Scapes Twin Pod Housing Plan Design
 
Dick Smith
Dick SmithDick Smith
Dick Smith
 
Red Design Group - Commercial Credentials
Red Design Group - Commercial CredentialsRed Design Group - Commercial Credentials
Red Design Group - Commercial Credentials
 
PLF-1408-AT-SD-CO-011 - REV 00
PLF-1408-AT-SD-CO-011 - REV 00PLF-1408-AT-SD-CO-011 - REV 00
PLF-1408-AT-SD-CO-011 - REV 00
 
SAP T-Accounts Posting Simulation - Example
SAP T-Accounts Posting Simulation - ExampleSAP T-Accounts Posting Simulation - Example
SAP T-Accounts Posting Simulation - Example
 
RED AEROSPACE TDP
RED AEROSPACE TDPRED AEROSPACE TDP
RED AEROSPACE TDP
 
Execution Coordination Concerns - HVAC.pptx
Execution Coordination Concerns - HVAC.pptxExecution Coordination Concerns - HVAC.pptx
Execution Coordination Concerns - HVAC.pptx
 
may-lanh
may-lanhmay-lanh
may-lanh
 
15-129_DANONE_WD2_ELEVATNS.PDF
15-129_DANONE_WD2_ELEVATNS.PDF15-129_DANONE_WD2_ELEVATNS.PDF
15-129_DANONE_WD2_ELEVATNS.PDF
 
ID-101b
ID-101bID-101b
ID-101b
 
Ck21 presentation team 3
Ck21 presentation team 3Ck21 presentation team 3
Ck21 presentation team 3
 
3d home exterior rendering
3d home exterior rendering 3d home exterior rendering
3d home exterior rendering
 
Maintenance report of Debris Filter
Maintenance report of Debris Filter Maintenance report of Debris Filter
Maintenance report of Debris Filter
 

Revi Project # 1_1

  • 1. REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. D06/11/16 A-CVR-001 COVERSHEET 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 GROUND FLOOR - ENTRANCE LOOBY VIEW - 1 3 GROUND FLOOR - ENTRANCE LOOBY VIEW - 2 2 GROUND FLOOR - STAIRCASE & ELEVATOR LOOBY VIEW 5 NINTH FLOOR - OFFICE VIEW 4 ISOMETRIC CUT VIEW - 2 8 ISOMETRIC CUT VIEW - 1 7 DRAWING LIST Sheet Number Sheet Name Current Revision Drawn By A-CVR-001 COVER SHEET D Jobin A-DET-001 TYPICAL DETAILS A Jobin A-FP-001 BASEMENT FLOOR - PLAN A Jobin A-FP-002 GROUND FLOOR - PLAN A Jobin A-FP-003 FIRST FLOOR - PLAN A Jobin A-FP-004 SECOND FLOOR - PLAN A Jobin A-FP-005 THIRD FLOOR - PLAN A Jobin A-FP-006 FOURTH FLOOR - PLAN A Jobin A-FP-007 FIFTH FLOOR - PLAN A Jobin A-FP-008 SIXTH FLOOR A Jobin A-FP-009 SEVENTH FLOOR A Jobin A-FP-010 EIGHTH FLOOR A Jobin A-FP-011 NINTH FLOOR - PLAN A Jobin A-FP-012 PENTHHOUSE FLOOR - PLAN A Jobin A-FP-013 PENTHOUSE ROOF - PLAN A Jobin A-FPD-001 STAIR-01 FLOOR PLANS A Jobin A-FPD-002 STAIR-02 FLOOR PLANS A Jobin A-FPD-003 ELEVATOR FLOOR PLANS A Jobin A-FPD-004 TOILET DETAILS A Jobin A-FPD-005 TOILET DETAILS A Jobin A-OCP-001 BASEMENT FLOOR - OCCUPANCY PLAN A Jobin A-OCP-002 GROUND FLOOR - OCCUPANCY PLAN A Jobin A-OCP-003 FIRST TO NINTH FLOOR -TYPICAL OCCUPANCY PLAN A Jobin A-OCP-004 PENTHOUSE FLOOR - OCCUPANCY PLAN A Jobin A-RCP-001 GOUND FLOOR - REFLECTED CEILING PLAN A Jobin A-RCP-002 FIRST FLOOR - REFLECTED CEILING PLAN A Jobin A-RCP-003 SECOND FLOOR - REFLECTED CEILING PLAN A Jobin A-RCP-004 THIRD FLOOR - REFLECTED CEILING PLAN A Jobin A-RCP-005 FOURTH FLOOR - REFLECTED CEILING PLAN A Jobin A-RCP-006 FIFTH FLOOR - REFLECTED CEILING PLAN A Jobin A-RCP-007 SIXTH FLOOR - REFLECTED CEILING PLAN A Jobin A-RCP-008 SEVENTH FLOOR - REFLECTED CEILING PLAN A Jobin A-RCP-009 EIGHTH FLOOR - REFLECTED CEILING PLAN A Jobin A-RCP-010 NINTH FLOOR - REFLECTED CEILING PLAN A Jobin A-RCP-011 PENT HOUSE FLOOR - REFLECTED CEILING PLAN A Jobin A-SEC-001 SECTION A Jobin A-SEC-002 SECTION A Jobin A-SEC-003 STAIR-01 SECTION A Jobin A-SEC-004 STAIR-02 & ELEVATOR SECTION A Jobin A-SHD-001 ROOM SCHEDULE A Jobin A-SHD-002 ROOM SCHEDULE A Jobin A-SHD-003 DOOR SCHEDULE A Jobin A-SHD-004 DOOR SCHEDULE A Jobin A-SP-001 SITE PLAN A Jobin Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016 B Schematic Design 1 07/01/2016 C Design Drawing 14/01/2016 D Issued For tender 21/01/2016
  • 2. 10793 COVE LIGHT GYPSUM CEILING 12mm THICK LIGHT FIXTURE CEILING HANGER CEILING SUPPORT 175 GYPSUM WALL WITH INSULATION CONCRETE UPSTAND EXTERIOR CLADDING FLOOR FINISH CEMENT SCREED BASE STRUCTURAL SLAB 7550 25 13 25 113 75 150 CLADDING SUPPORT INTERIOR 26500FFL EXTERIOR PENTHOUSE ROOF 56500 PENTHOUSE ROOF PARAPET 58500 EXTERIOR CLADDING CLADDING SUPPORT METAL COPING FOR PARAPET PLASTERING INSULATION PAVER BLOCKS ON SUPPORT STRUCT. SLAB 200 15 WATER PROOFING SCREED TO SLOPE CONCRETE MASONRY 10793 175 LIGHTING FIXTURE CEILING SUPPORT GYPSUM CEILING 12mm THICK CELING HANGER COVE LIGHT STRUCTURAL SLAB STRUC. SLAB GYPSUM WALL WITH INSULATION CLADDING SUPPORT EXTERIOR CLADDING CMU WALL FLOOR FINISH CEMENT SCREED BASE 13 25 113 75 200 15 PLASTERING INTERIOR REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A As indicated 06/10/16 A-DET-001 TYPICAL DETAILS 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 5 CEILING DETAIL - 1 1 1 : 10 FLOOR & WALL SECTION - 1 2 1 : 20 PARAPET DETAIL 3 1 : 5 CEILING DETAIL - 2 4 1 : 10 FLOOR & WALL SECTION - 2 5 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 3. UP 1 3 5 11972 4 86 10 A C E L J G B D H F K 5300 5050 4650 5000 4250 4250 5000 4650 5050 5300 5300505046505000425042505000465050505300 BASEMENT LOBBY B-01 STAIR-01 ST-01 STAIR-02 ST-02 ELEVATOR EL-01 ELEVATOR EL-02 MEP SERVICE ROOM MEP-02 MEP SERVICE ROOM MEP-03 MEP SERVICE ROOM MEP-01 MEP SERVICE ROOM MEP-04 SREVICE AREA - 1 B-02 SREVICE AREA - 2 B-03 SREVICE AREA - 3 B-04 SERVER ROOM B-05 STORE B-06 STORE B-07 SERVICE AREA - 4 B-08 ELECTRICAL ROOM - 1 B-09 GENERATOR - 1 B-10 FUEL - 1 B-11 PUMP ROOM B-12 WATER STORAGE B-13 FUEL - 2 B-14 GENERATOR - 2 B-15 ELECTRICAL ROOM B-16 ? 7335 4985 4750 4350 5000 5020 4771 8200 10050 9320 4750 4970 5000 7320 2571 5070 32623 14770 4871 4770 4968 19670 8385 10270 19670 4968 14770 32638 4870 4770 4770 4770 5070 2586 4770 4770 2500 2200 2500 2200 4720 14370 5300 9420 8170 7863 2445 7863 5000 8170 5000 4650 4650 14670 4720 5100 10350 9700 5315 5065 1 A-FPD-001 1 A-FPD-002 1 A-FPD-003 1 A-SEC-002 1 A-SEC-001 Flooring 150mmFlooring 150mmFlooring 150mmFlooring 150mmFlooring 150mmFlooring 150mmFlooring 150mm REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A1 : 100 05/14/16 A-FP-001 BASEMENT FLOOR - PLAN 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 BASEMENT FLOOR - PLAN 1 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 4. DN DN 1 3 5 11972 4 86 10 A C E L J G B D H F K 5300 5050 4650 5000 4250 4250 5000 4650 5050 5300 5300505046505000425042505000465050505300 ELEVATOR & STAIR LOBBY 0002 ENTRANCE LOBBY - 1 0001 ENTRANCE LOBBY - 2 0003 OFFICE SPACE 0004 TOILET 0005 W.C 0005A W.C 0005B W.C 0005C TOILET 0006 W.C 0006A W.C 0006B W.C 0006C TOILET 0007 W.C 0007A W.C 0007B W.C 0007C TOILET 0008 W.C 0008A W.C 0008B W.C 0008C RECEPTION 0001A FILES 0001B OFFICE SPACE 0009 TOILET 0010 W.C 0010A W.C 0010B W.C 0010C TOILET 0011 W.C 0011A W.C 0011B W.C 0011C TOILET 0012 TOILET 0013 W.C 0012C W.C 0012B W.C 0012A W.C 0013C W.C 0013B W.C 0013A 103738045 9300 8050 3735 4128 2445 4128 3735 2500 2200 2500 2200 9300 10373 628 8045 628 4761 9861 4761 5100 956193009561 10439 4761 5100 9861 2518 2095 2624 4761 500089005000170030744761 8170 8170 50008900500048484761 9861 957493009561 4761 10439 5000 1 A-FPD-004 3 A-FPD-004 2 A-FPD-005 1 A-FPD-005 2 A-FPD-001 2 A-FPD-002 2 A-FPD-003 1 A-SEC-002 1 A-SEC-001 Flooring 150mmFlooring 150mm 28002800 2450 REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A1 : 100 05/14/16 A-FP-002 GROUNDFLOOR - PLAN 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 GROUND FLOOR - PLAN 1 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 5. UP 1 3 5 11972 4 86 10 A C E L J G B D H F K 5300 5050 4650 5000 4250 4250 5000 4650 5050 5300 5300505046505000425042505000465050505300 LOBBY 0101 OFFICE SPACE 0102 TOILET 0103 W.C 0103A W.C 0103B W.C 0103C TOILET 0104 W.C 0104A W.C 0104B W.C 0104C OFFICE SPACE 0105 TOILET 0106 W.C 0106A W.C 0106B W.C 0106C TOILET 0107 W.C 0107A W.C 0107B W.C 0107C TOILET 0108 TOILET 0109 W.C 0108A W.C 0108B W.C 0108C W.C 0109A W.C 0109B W.C 0109C OFFICE SPACE 0110 TOILET 0111 TOILET 0112 W.C 0111A W.C 0111B W.C 0111C W.C 0112A W.C 0112B W.C 0112C LOBBY 0101 TOILET 0103 TOILET 0104 OFFICE SPACE 0105 TOILET 0106 TOILET 0107 TOILET 0108 TOILET 0109 OFFICE SPACE 0110 TOILET 0111 TOILET 0112 14135 4035 8170 2600 2800 2500 2800 2650 2650 5400 50004615 4615 11050 9300 92659265 9600 5400 50004615 4615 3900 5100 54004615 20300 4500 10900 9265 92658950 4150 9300 10900 4300 53658235 3900 5100 540020300 4500 10900 8950 4150 9300 109004300 53658235 9265 9265 465 465465 465 Sim 1 A-FPD-005 Sim 2 A-FPD-005 2 A-FPD-004 4 A-FPD-0043 A-FPD-001 3 A-FPD-002 3 A-FPD-003 1 A-SEC-002 1 A-SEC-001 REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A1 : 100 05/14/16 A-FP-003 FIRST FLOOR - PLAN 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 FIRST FLOOR - PLAN 1 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 6. UP 1 3 5 11972 4 86 10 A C E L J G B D H F K 5300 5050 4650 5000 4250 4250 5000 4650 5050 5300 5300505046505000425042505000465050505300 LOBBY 0201 OFFICE SPACE 0202 TOILET 0203 TOILET 0204 OFFICE SPACE 0205 TOILET 0206 TOILET 0207 TOILET 0208 TOILET 0209 OFFICE SPACE 0210 TOILET 0211 TOILET 0212 W.C 0203A W.C 0203B W.C 0203C W.C 0204A W.C 0204B W.C 0204C W.C 0206A W.C 0206B W.C 0206C W.C 0207A W.C 0207B Room 0207C W.C 0208A W.C 0208B W.C 0208C W.C 0209A W.C 0209B W.C 0209C W.C 0211A W.C 0211B W.C 0211C W.C 0212A W.C 0212B W.C 0212C 18170 8170 2800 2500 2800 2650 2650 5400 5000 11050 9300 9600 5400 5000 5100 5400 4500 8950 4150 9300 53658235 5400 20300 8950 4150 9300 15200 53658235 4150465 4615 3509265 9265 4150 350 465 4615 9265 9265 9615 1090010900 20300 4500 9265 9265 9265 4650 4650 9265 3900 3900 5100 465 465 465 465 465 465 Sim 1 A-FP-003 Sim 2 A-FPD-004 Sim 4 A-FPD-004 4 A-FPD-001 4 A-FPD-002 4 A-FPD-003 1 A-SEC-002 1 A-SEC-001 REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A1 : 100 05/14/16 A-FP-004 SECONDFLOOR - PLAN 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 SECOND FLOOR - PLAN 1 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 7. UP 1 3 5 11972 4 86 10 A C E L J G B D H F K 5300 5050 4650 5000 4250 4250 5000 4650 5050 5300 5300505046505000425042505000465050505300 LOBBY 0301 OFFICE SPACE 0302 TOILET 0303 TOILET 0304 OFFICE SPACE 0305 TOILET 0306 TOILET 0307 TOILET 0308 TOILET 0309 OFFICE SPACE 0310 TOILET 0311 TOILET 0312 W.C 0303A W.C 0303B W.C 0303C W.C 0304A W.C 0304B W.C 0304C W.C 0306A W.C 0306B W.C 0306C W.C 0307A W.C 0307B W.C 0307C W.C 0308A W.C 0308B W.C 0308C W.C 0309A W.C 0309B W.C 0309C W.C 0311A W.C 0311B W.C 0311C W.C 0312A W.C 0312B W.C 0312C 5300 5050 4650 5000 4250 4250 5000 4650 5050 5300 5300505046505000425042505000465050505300 5300 5050 4650 5000 4250 4250 5000 4650 5050 5300 5300505046505000425042505000465050505300 18170 8170 2800 2500 2800 2650 2650 5400 5000 11050 9300 9600 5400 5000 5100 5400 4500 8950 4150 9300 53658235 5400 20300 8950 4150 9300 15200 53658235 4150 350 4150 350 10900 10900 20300 4500 4650 4650 3900 3900 5100 4639 4639 15200 15200 4639 4639 4639 4639 15050 4639 4639 9289 9289 9289 9289 9289 9289 109004300 430010900 489 489 489 489 9289 9289 489 489 489 489 Sim 1 A-FP-004 Sim 1 A-FP-004 5 A-FPD-001 5 A-FPD-002 1 A-SEC-002 1 A-SEC-001 REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A1 : 100 05/14/16 A-FP-005 THIRDFLOOR - PLAN 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 THIRD FLOOR - PLAN 1 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 8. UP 1 3 5 11972 4 86 10 A C E L J G B D H F K 5300 5050 4650 5000 4250 4250 5000 4650 5050 5300 5300505046505000425042505000465050505300 LOBBY 0401 OFFICE SPACE 0402 TOILET 0403 TOILET 0404 OFFICE SPACE 0405 TOILET 0406 TOILET 0407 TOILET 0408 TOILET 0409 OFFICE SPACE 0410 TOILET 0411 TOILET 0412 W.C 0403A W.C 0403B W.C 0403C W.C 0404A W.C 0404B W.C 0404C W.C 0407A W.C 0407B W.C 0407C W.C 0406A W.C 0406B W.C 0406C W.C 0408A W.C 0408B W.C 0408C W.C 0409A W.C 0409B W.C 0409C W.C 0411A W.C 0411B W.C 0411C W.C 0412A W.C 0412B W.C 0412C 18170 8170 2800 2500 2800 2650 2650 5400 5000 11050 9300 9600 5400 5000 5100 5400 4500 8950 4150 9300 53658235 5400 20300 8950 4150 9300 15200 53658235 4150 350 4150 350 20300 4650 3900 5100 15200 15200 15050 9484 9484 9484 9834 9484 9834 9484 9484 3900 4650 9484 9484 4500 684 684 684 684 684 684 684 684 Sim 1 A-FP-005 Sim 1 A-FP-005 6 A-FPD-001 6 A-FPD-002 5 A-FPD-003 1 A-SEC-002 1 A-SEC-001 REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A1 : 100 05/14/16 A-FP-006 FOURTHFLOOR - PLAN 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 FOURTH FLOOR - PLAN 1 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 9. UP 1 3 5 11972 4 86 10 A C E L J G B D H F K 5300 5050 4650 5000 4250 4250 5000 4650 5050 5300 5300505046505000425042505000465050505300 LOBBY 0501 OFFICE SPACE 0502 TOILET 0503 TOILET 0504 OFFICE SPACE 0505 TOILET 0506 TOILET 0507 TOILET 0508 TOILET 0509 OFFICE SPACE 0510 TOILET 0511 TOILET 0512 W.C 0503A W.C 0503B W.C 0503C W.C 0504A W.C 0504B W.C 0504C W.C 0506A W.C 0506B W.C 0506C W.C 0507A W.C 0507B W.C 0507C W.C 0508A W.C 0508B W.C 0508C W.C 0509A W.C 0509B W.C 0509C W.C 0511A W.C 0511B W.C 0511C W.C 0512A W.C 0512B W.C 0512C 18170 8170 2800 2500 2800 2650 2650 5400 5000 11050 9300 9600 5400 5000 5100 5400 4500 8950 4150 9300 53658235 5400 20300 8950 4150 9300 15200 53658235 4150 350 4150 350 10900 10900 20300 4650 3900 5100 15200 15200 15050 3900 4650 4500 9850 9850 9850 9850 9850 9850 9850 9850 1050 1050 1050 1050 1050 1050 1050 1050 Sim 1 A-FP-006 Sim 1 A-FP-006 7 A-FPD-001 7 A-FPD-002 6 A-FPD-003 1 A-SEC-002 1 A-SEC-001 REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A1 : 100 05/14/16 A-FP-007 FIFTHFLOOR - PLAN 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 FIFTH FLOOR - PLAN 1 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 10. UP 1 3 5 11972 4 86 10 A C E L J G B D H F K 5300 5050 4650 5000 4250 4250 5000 4650 5050 5300 5300505046505000425042505000465050505300 LOBBY 0601 OFFICE SPACE 0602 TOILET 0603 TOILET 0604 OFFICE SPACE 0605 TOILET 0606 TOILET 0607 TOILET 0608 TOILET 0609 OFFICE SPACE 0610 TOILET 0611 TOILET 0612 W.C 0603A W.C 0603B W.C 0603C W.C 0604A W.C 0604B W.C 0604C W.C 0606A W.C 0606B W.C 0606C W.C 0607A W.C 0607B W.C 0607C W.C 0608A W.C 0608B W.C 0608C W.C 0609A W.C 0609B W.C 0609C W.C 06011A W.C 06011B W.C 06011C W.C 06012A W.C 06012B W.C 06012C 18170 8170 2800 2500 2800 2650 2650 5400 5000 11050 9300 9600 5400 5000 5100 5400 4500 8950 4150 9300 53658235 5400 20300 8950 4150 9300 15200 53658235 4150 350 4150 350 10900 10900 20300 4650 3900 5100 15200 15200 15050 3900 4650 4500 10389 1589 1589 10389 1589 10389 10389 1589 1038910389 10389 10389 1589 1589 1589 1589 Sim 1 A-FP-007 Sim 1 A-FP-007 8 A-FPD-001 8 A-FPD-002 7 A-FPD-003 1 A-SEC-002 1 A-SEC-001 REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A1 : 100 05/14/16 A-FP-008 SIXTHFLOOR 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 SIXTH FLOOR - PLAN 1 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 11. UP 1 3 5 11972 4 86 10 A C E L J G B D H F K 5300 5050 4650 5000 4250 4250 5000 4650 5050 5300 5300505046505000425042505000465050505300 LOBBY 0701 OFFICE SPACE 0702 TOILET 0703 TOILET 0704 OFFICE SPACE 0705 TOILET 0706 TOILET 0707 TOILET 0708 TOILET 0709 OFFICE SPACE 0710 TOILET 0711 TOILET 0712 W.C 0703A W.C 0703B W.C 0703C W.C 0704A W.C 0704B W.C 0704C W.C 0706A W.C 0706B W.C 0706C W.C 0707A W.C 0707B W.C 0707C W.C 0708A W.C 0708B W.C 0708C W.C 0709A W.C 0709B W.C 0709C W.C 0711A W.C 0711B W.C 0711C Room 0712A W.C 0712B W.C 0712C 18170 8170 2800 2500 2800 2650 2650 5400 5000 11050 9300 9600 5400 5000 5100 5400 4500 8950 4150 9300 53658235 540020300 8950 4150 9300 15200 53658235 4150 350 4150 350 10900 10900 20300 4650 3900 5100 15200 15200 15050 3900 4650 4500 2303 11103 2303 2303 6453 6453 11103 11103 11103 2303 11103 11103 2303 41502303 23034150 2303 11103 11103 Sim 1 A-FP-008 Sim 1 A-FP-008 9 A-FPD-001 9 A-FPD-002 8 A-FPD-003 1 A-SEC-002 1 A-SEC-001 REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A1 : 100 05/14/16 A-FP-009 SEVENTHFLOOR 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 SEVENTH FLOOR - PLAN 1 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 12. UP 1 3 5 11972 4 86 10 A C E L J G B D H F K 5300 5050 4650 5000 4250 4250 5000 4650 5050 5300 5300505046505000425042505000465050505300 LOBBY 0801 OFFICE SPACE 0802 TOILET 0803 TOILET 0804 OFFICE SPACE 0805 TOILET 0806 TOILET 0807 TOILET 0808 TOILET 0809 OFFICE SPACE 0810 TOILET 0811 TOILET 0812 W.C 0803A W.C 0803B W.C 0803C W.C 0804A W.C 0804B W.C 0804C W.C 0806A W.C 0806B W.C 0806C W.C 0807A W.C 0807B W.C 0807C W.C 0808A W.C 0808B W.C 0808C W.C 0809A W.C 0809B W.C 0809C W.C 0811A W.C 0811B W.C 0811C Room 0812A W.C 0812B W.C 0812C 18170 8170 2800 2500 2800 2650 2650 5400 5000 11050 9300 9600 5400 5000 5100 5400 4500 8950 4150 9300 53658235 5400 20300 8950 4150 9300 15200 53658235 4150 350 4150 350 10900 10900 20300 4650 3900 5100 15200 15200 15050 3900 4650 4500 4150 4150 11992 11992 3192 3192 3192 3192 3192 3192 11992 11992 11992 11992 319211992 11992 Sim 1 A-FP-009 Sim 1 A-FP-009 10 A-FPD-001 10 A-FPD-002 9 A-FPD-003 1 A-SEC-002 1 A-SEC-001 REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A1 : 100 05/14/16 A-FP-010 EIGHTHFLOOR 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 EIGHTH FLOOR - PLAN 1 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 13. UP 1 3 5 11972 4 86 10 A C E L J G B D H F K 5300 5050 4650 5000 4250 4250 5000 4650 5050 5300 5300505046505000425042505000465050505300 LOBBY 0901 OFFICE SPACE 0902 TOILET 0903 TOILET 0904 OFFICE SPACE 0905 TOILET 0906 TOILET 0907 TOILET 0908 TOILET 0909 OFFICE SPACE 0910 TOILET 0911 TOILET 0912 W.C 0903A W.C 0903B W.C 0903C W.C 0904A W.C 0904B W.C 0904C W.C 0906A W.C 0906B W.C 0906C W.C 0907A W.C 0907B W.C 0907C W.C 0908A W.C 0908B W.C 0908C W.C 0909A W.C 0909B W.C 0909C W.C 0911A W.C 0911B W.C 0911C W.C 0912A W.C 0912B W.C 0912C 18170 8170 2800 2500 2800 2650 2650 5400 5000 11050 9300 9600 5400 5000 5100 5400 4500 8950 4150 9300 53658235 5400 20300 8950 4150 9300 15200 53658235 4150 350 4150 350 10900 10900 20300 4650 3900 5100 15200 15200 15050 3900 4650 4500 4150 4150 4258 13058 13058 4258 4258 13058 13058 4258 4258 13058 13058 4258 4258 13058 13058 4258 Sim 1 A-FP-010 Sim 1 A-FP-010 11 A-FPD-001 11 A-FPD-002 10 A-FPD-003 1 A-SEC-002 1 A-SEC-001 REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A1 : 100 05/14/16 A-FP-011 NINTHFLOOR - PLAN 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 NINTH FLOOR - PLAN 1 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 14. 1 3 5 11972 4 86 10 A C E L J G B D H F K 5300 5050 4650 5000 4250 4250 5000 4650 5050 5300 5300505046505000425042505000465050505300 LOBBY 10001 MEP SERVICE ROOM MEP-05 MEP SERVICE ROOM MEP-06 MEP SERVICE ROOM MEP-07 MEP SERVICE ROOM MEP-08 OPEN TERRACE T1-01 OPEN TERRACE T1-02 OPEN TERRACE T1-03 OPEN TERRACE T1-04 9170 154004870 827114702 14702 14702 14702 9170 4870 8271 10300 487110300 9171 8270 14652 14702 14652 14702 2835 2570 2835 8270 2600 2600 128004870 128004870 9170 18170 8170 12 A-FPD-001 12 A-FPD-002 11 A-FPD-003 1 A-SEC-002 1 A-SEC-001 REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A1 : 100 05/14/16 A-FP-012 PENTHHOUSE FLOOR - PLAN 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 PENTHOUSE FLOOR - PLAN 1 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 15. 1 3 5 11972 4 86 10 A C E L J G B D H F K 5300 5050 4650 5000 4250 4250 5000 4650 5050 5300 5300505046505000425042505000465050505300 OPEN TERRACE T2-01 20000 9200 20000 20000920020000 1 A-SEC-002 1 A-SEC-001 REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A1 : 100 05/14/16 A-FP-013 PENTHOUSE ROOF - PLAN 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 PENTHOUSE ROOF - PLAN 1 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 16. UP UP UP UP UP UP UP UP UP UP UP 54 E G F 1 A-SEC-00314851485500 14TREADS@300mm 4200501 8 TREADS @ 300mm 24001501485 1485 150 7 TREADS @ 300mm 2100 -3500 STAIR-01 ST-01 54 E G F 1 A-SEC-003 8 TREADS @ 300mm 24001501485 1485501 14TREADS@300mm 42005001485 1485 150 7 TREADS @ 300mm 2100 1500 ELEVATOR & STAIR LOBBY 0002 54 E G F 1 A-SEC-003 8 TREADS @ 300mm 24001501485 1485501 14TREADS@300mm 42005001485 1485 150 7 TREADS @ 300mm 2100 6500 LOBBY 0101 54 E G F 1 A-SEC-003 8 TREADS @ 300mm 24001501485 1485501 14TREADS@300mm 42005001485 1485 150 7 TREADS @ 300mm 2100 11500 LOBBY 0201 54 E G F 1 A-SEC-003 8 TREADS @ 300mm 24001501485 1485501 14TREADS@300mm 42005001485 1485 150 7 TREADS @ 300mm 2100 1650016500 LOBBY 0301 54 E G F 1 A-SEC-003 8 TREADS @ 300mm 24001501485 1485501 14TREADS@300mm 42005001485 1485 150 7 TREADS @ 300mm 2100 21500 LOBBY 0401 54 E G F 1 A-SEC-003 8 TREADS @ 300mm 24001501485 1485501 14TREADS@300mm 42005001485 1485 150 7 TREADS @ 300mm 2100 26500 LOBBY 0501 2 A-SEC-003 54 E G F 8 TREADS @ 300mm 24001501485 1485501 14TREADS@300mm 42005001485 1485 150 7 TREADS @ 300mm 2100 31500 LOBBY 0601 2 A-SEC-003 54 E G F 8 TREADS @ 300mm 2400150 501 14TREADS@300mm 4200500 150 1485 1485 7 TREADS @ 300mm 2100 14851485 36500 LOBBY 0701 2 A-SEC-003 54 E G F 8 TREADS @ 300mm 2400150 501 14TREADS@300mm 4200500 150 1485 1485 1485 7 TREADS @ 300mm 2100 1485 41500 LOBBY 0801 2 A-SEC-003 54 E G F 8 TREADS @ 300mm 2400150 501 14TREADS@300mm 4200500 150 1485 14851485 1485 7 TREADS @ 300mm 2100 46500 LOBBY 0901 2 A-SEC-003 54 E G F 150 501 14TREADS@300mm 4200500 150 8 TREADS @ 300mm 21001485 14851485 1485 7 TREADS @ 300mm 2100 51500 LOBBY 10001 2 A-SEC-003 REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A1 : 50 05/17/16 A-FPD-001 STAIR-01 FLOOR PLANS 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 50 STAIR-01 PLAN - BASEMENT LEVEL 1 1 : 50 STAIR-01 PLAN - GROUND FLOOR 2 1 : 50 STAIR-01 PLAN - LEVEL 01 3 1 : 50 STAIR-01 PLAN - LEVEL 02 4 1 : 50 STAIR-01 PLAN - LEVEL 03 5 1 : 50 STAIR-01 PLAN - LEVEL 04 6 1 : 50 STAIR-01 PLAN - LEVEL 05 7 1 : 50 STAIR-01 PLAN - LEVEL 06 8 1 : 50 STAIR-01 PLAN - LEVEL 07 9 1 : 50 STAIR-01 PLAN - LEVEL 08 10 1 : 50 STAIR-01 PLAN - LEVEL 09 11 1 : 50 STAIR-01 PLAN - LEVEL 10 12 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 17. UP UP UP UP UP UP UP UP UP UP UP 7 8 E G F 1 A-SEC-004 -3500 8 TREADS @ 300mm 2400 150 1485 1485501 14TREADS@300mm 42005001485 7 TREADS @ 300mm 2100 150 1485 STAIR-02 ST-02 7 8 E G F 1 A-SEC-004 8 TREADS @ 300mm 2400 150 1485 1485501 14TREADS@300mm 42005001485 7 TREADS @ 300mm 2100 150 1485 1500 ELEVATOR & STAIR LOBBY 0002 7 8 E G F 1 A-SEC-004 8 TREADS @ 300mm 2400 150 1485 1485501 14TREADS@300mm 42005001485 7 TREADS @ 300mm 2100 150 1485 6500 LOBBY 0101 7 8 E G F 1 A-SEC-004 11500 8 TREADS @ 300mm 2400 150 1485 1485501 14TREADS@300mm 42005001485 7 TREADS @ 300mm 2100 150 1485 LOBBY 0201 7 8 E G F 1 A-SEC-004 16500 8 TREADS @ 300mm 2400 150 1485 1485501 14TREADS@300mm 42005001485 7 TREADS @ 300mm 2100 150 1485 LOBBY 0301 7 8 E G F 1 A-SEC-004 21500 8 TREADS @ 300mm 2400 150 1485 1485501 14TREADS@300mm 42005001485 7 TREADS @ 300mm 2100 150 1485 LOBBY 0401 7 8 E G F 1 A-SEC-004 26500 8 TREADS @ 300mm 2400 150 1485 1485501 14TREADS@300mm 42005001485 7 TREADS @ 300mm 2100 150 1485 LOBBY 0501 2 A-SEC-004 7 8 E G F 31500 8 TREADS @ 300mm 2400 150 1485 1485501 14TREADS@300mm 42005001485 2100 150 1485 LOBBY 0601 2 A-SEC-004 7 8 E G F 36500 8 TREADS @ 300mm 2400 150 1485 1485501 14TREADS@300mm 42005001485 7 TREADS @ 300mm 2100 150 1485 LOBBY 0701 2 A-SEC-004 7 8 E G F 41500 8 TREADS @ 300mm 2400 150 1485 1485501 14TREADS@300mm 42005001485 7 TREADS @ 300mm 2100 150 1485 LOBBY 0801 2 A-SEC-004 7 8 E G F 46500 8 TREADS @ 300mm 2400 150 1485 1485501 14TREADS@300mm 42005001485 7 TREADS @ 300mm 2100 150 1485 LOBBY 0901 2 A-SEC-004 7 8 E G F 51500 8 TREADS @ 300mm 2400 150 1485 1485501 14TREADS@300mm 42005001485 7 TREADS @ 300mm 2100 150 1485 LOBBY 10001 2 A-SEC-004 REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A1 : 50 05/17/16 A-FPD-002 STAIR-02 FLOOR PLANS 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 50 STAIR-02 PLAN - BASEMENT LEVEL 1 1 : 50 STAIR-02 PLAN - GROUND FLOOR PLAN 2 1 : 50 STAIR-02 PLAN - LEVEL 01 3 1 : 50 STAIR-02 PLAN - LEVEL 02 4 1 : 50 STAIR-02 PLAN - LEVEL 03 5 1 : 50 STAIR-02 PLAN - LEVEL 04 6 1 : 50 STAIR-02 PLAN - LEVEL 05 7 1 : 50 STAIR-02 PLAN - LEVEL 06 8 1 : 50 STAIR-02 PLAN - LEVEL 07 9 1 : 50 STAIR-02 PLAN - LEVEL 08 10 1 : 50 STAIR-02 PLAN - LEVEL 09 11 1 : 50 STAIR-02 PLAN - LEVEL 10 12 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 18. 5 76 E 3 A-SEC-004 2500 2200 2200 750 1000 750 750 1000 750 2500 -3500 SERVICE AREA - 4 B-08 5 76 E 3 A-SEC-004 2500 2200 2200 750 1000 750 1500 2500 2200 2200 750 1000 750 1500 ENTRANCE LOBBY - 2 0003 ELEVATOR & STAIR LOBBY 0002 750 1000 750 2500 5 76 E 3 A-SEC-004 6500 OFFICE SPACE 0105 LOBBY 0101 750 1000 750 2500 2200 2200 750 1000 750 2500 5 76 E 3 A-SEC-004 11500 OFFICE SPACE 0205 LOBBY 0201 2200 2200 750 1000 750 2500 750 1000 750 2500 5 76 E 3 A-SEC-004 21500 OFFICE SPACE 0405 LOBBY 0401 750 1000 750 7501000750 2500 2500 2200 2200 5 76 E 3 A-SEC-004 26500 OFFICE SPACE 0505 LOBBY 0501 2200 750 1000 750 2500 750 1000 750 2500 2200 4 A-SEC-004 5 76 E 31500 OFFICE SPACE 0605 LOBBY 0601 750 1000 750 2500 2200 750 1000 750 2500 2200 4 A-SEC-004 5 76 E 36500 OFFICE SPACE 0705 LOBBY 0701 750 1000 750 2500 750 1000 750 2500 2200 2200 4 A-SEC-004 5 76 E 2200 2200 41500 OFFICE SPACE 0805 LOBBY 0801 750 1000 750 2500 750 1000 750 2500 2200 2200 4 A-SEC-004 5 76 E 46500 OFFICE SPACE 0905 LOBBY 0901 750 1000 750 2500 750 1000 750 2500 2200 2200 4 A-SEC-004 5 76 E 51500 MEP SERVICE ROOM MEP-07 LOBBY 10001 750 1000 750 2500 750 1000 750 2500 2200 2200 4 A-SEC-004 REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A1 : 50 05/17/16 A-FPD-003 ELEVATOR FLOOR PLANS 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 50 ELEVATORS FLOOR PLAN - BASEMENT LEVEL 1 1 : 50 ELEVATORS FLOOR PLAN - GROUND FLOOR 2 1 : 50 ELEVATORS FLOOR PLAN - LEVEL 01 3 1 : 50 ELEVATORS FLOOR PLAN - LEVEL 02 4 1 : 50 ELEVATORS FLOOR PLAN - LEVEL 04 5 1 : 50 ELEVATORS FLOOR PLAN - LEVEL 05 6 1 : 50 ELEVATORS FLOOR PLAN - LEVEL 06 7 1 : 50 ELEVATORS FLOOR PLAN - LEVEL 07 8 1 : 50 ELEVATORS FLOOR PLAN - LEVEL 08 9 1 : 50 ELEVATORS FLOOR PLAN - LEVEL 09 10 1 : 50 ELEVATORS FLOOR PLAN - LEVEL 10 11 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 19. 54 E D TOILET 0007 W.C 0007B W.C 0007C TOILET 0008W.C 0008A W.C 0008B W.C 0008C 1625 1200 4360 980 1175 980 1175 1090 950 150 1175 1050 1250 1625 1200 4360 980 1175 980 1175 1090 1175 150 850 100 W.C 0007A 775 775 390 850 950 GWC1 CMW1 GW1 GW1 GWC1 CMW2 GW1 CMW2 GW1 GWC1 GW1 GW1 GW1 GW1 GW1 GW1 GW1 GWC1 CMW1 GW1 GW1 GW1 CMW2 CMW2 GWC1 CMW2 GWC1 GW1 GW1 GWC1 CMW1 GWC1 240 1000 900 240 WB1 WB1 WB1 WB1 WC1 WC1 WC1 WC1 WC1 WC1 GW1 PTD1 PTD1 PTD1PTD1 PTD1 PTD1 A-FPD-005 3 A-FPD-005 7 9 A-FPD-005 7 Sim A-FPD-005 7 Sim 9 Sim 9 Sim A-FPD-0054 A-FPD-0058 10 A-FPD-0058 Sim 10Sim A-FPD-0058 Sim 10Sim 5 6 54 E D TOILET 0107 W.C 0107A W.C 0107B W.C 0107C TOILET 0106 W.C 0106A W.C 0106B W.C 0106C 1625 1200 9809801090 1175 1175 1175 950 4360 1625 1200 980 1175 1175 4360 100850 950 CMW1 CMW1 GW1 GW1 GW1 CMW1 CMW1 GW1 GWC1 GW1 GW1 GWC1 GWC1 GWC1 GWC1 GWC1 1090980 GWC1 GW1 GW1 WC1 WC1 WC1 WC1 WC1 WC1 WB1 WB1 775 WB1 WB1 775 GW1 GW1 GW1 CMW1 GW1 GW1 GWC1 A-FPD-005 3 Sim 5 Sim A-FPD-0054 Sim 6 Sim A-FPD-005 7 Sim 9 Sim A-FPD-005 7 Sim 9 Sim A-FPD-005 7 Sim 9 Sim A-FPD-0058 Sim 6 Sim A-FPD-0058 Sim 6 Sim A-FPD-0058 Sim 6 Sim PTD1 PTD1 PTD1 PTD1 PTD1 PTD1 GWC1 1175 7 8 E D TOILET 0010 W.C 0010A W.C 0010B W.C 0010C TOILET 0011 W.C 0011A W.C 0011B W.C 0011C 1630 775 1200 100 850 21602200 1175 980 1175 980 1175 1175 1090 1175 1050 1250 1625 1200 775 980980 1175 1175 1090 1175 950 4360 900 240 240 1000 GW1 GWC1 GWC1 CMW1 GWC1 GW1 GW1 GW1 GW1 GW1 GWC1 GWC1 GWC1 CMW1 GW1 GW1 GW1 GW1 GWC1GW1 GW1 CMW1 GW1 GW1 GW1 GWC1WB1 WB1 WC1 WC1 WC1 PTD1 PTD1 PTD1 PTD1 PTD1PTD1 WB1 WB1 WC1 WC1 WC1 CMW2 A-FPD-005 7 Sim 9 Sim A-FPD-005 7 Sim 9 Sim A-FPD-005 7 Sim 9 Sim A-FPD-0058 Sim 10Sim A-FPD-0058 Sim 10Sim A-FPD-0058 Sim 10Sim A-FPD-005 3 Sim A-FPD-0054 Sim 5 Sim 6 Sim 7 8 E D TOILET 0108 W.C 0108A W.C 0108B W.C 0108C TOILET 0109 W.C 0109A W.C 0109B W.C 0109C 1200 725 775950 9809801090 1175 1175 4360 850100 950 16251050 1250 CMW1 CMW1 CMW1 GW1 GWC1 GWC1 GW1 GW1 CMW2 GWC1 GWC1 GWC1 GWC1 GW1 GW1 GW1 GW1 GW1 PTD1 PTD1 PTD1 PTD1 PTD1 PTD1 WC1 WC1 WC1 WC1 WC1 WC1 WB1 WB1 WB1 WB1 A-FPD-005 3 Sim 5 Sim A-FPD-005 7 Sim 9 Sim A-FPD-005 7 Sim 9 Sim A-FPD-005 7 Sim 9 Sim A-FPD-0054 Sim 6 Sim A-FPD-0058 Sim 9 Sim A-FPD-0058 Sim 9 Sim A-FPD-0058 Sim 9 Sim 775 950 1200 1175 1090980980 11751175 1175 REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A1 : 20 06/10/16 A-FPD-004 TOILET DETAILS 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 20 ENLARGED PLAN - TOILET-TYPE A 1 1 : 20 ENLARGED PLAN - TOILET-TYPE A1 2 1 : 20 ENLARGED PLAN - TOILET-TYPE B 3 1 : 20 ENLARGED PLAN - TOILET-TYPE B1 4 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 20. 7 8 G H TOILET 0012 W.C 0012A W.C 0012B W.C 0012C TOILET 0013 W.C 0013A W.C 0013B W.C 0013C 1200 1025 4800 8501225 1060 1045 1045 1200 1025 4800 8501225 1060 1045 1045 650 1200 CMW1 CMW1 CMW1 GW1 GW1 GWC1 GW1 CMW1 GW1 GW1 GWC1 GW1 CMW1 GW1GW1 GW1 GWC1 GWC1 CMW2 GWC1 GW1 GW1 GW1GW1GW1 GW1 GWC1 GWC1 GW1 GW1 WC1 WC1 WC1 WC1WC1WC1 PTD1 PTD1 PTD1 PTD1PTD1PTD1 WB1 WB1 WB1WB1 A-FPD-005 3 Sim 5 Sim A-FPD-005 8 Sim 6 Sim A-FPD-005 7 Sim 9 Sim A-FPD-005 7 Sim 9 Sim A-FPD-005 7 Sim 9 Sim A-FPD-005 8 Sim 10 Sim A-FPD-005 8 Sim 10 Sim A-FPD-005 8 Sim 10 Sim 54 G H TOILET 0005 TOILET 0006 W.C 0005A W.C 0005B W.C 0005C W.C 0006A W.C 0006B W.C 0006C 1200 1025 1225 1045 1045 1225 1060 1225 4800 8508501225 1225 1045 1045 1225 1060 1200 1025 4800 850 1200 650 CMW1 GWC1 GW1 GW1 GW1 CMW1 GWC1 GWC1GW1GW1 GW1GW1 GW1 GWC1GW1GW1 GW1GW1 GW1 GWC1GW1GW1 CMW1 GWC1GW1GW1 GWC1 GWC1 GWC1 WB1 WB1 WC1 WC1 WC1 PTD1 PTD1 PTD1 PTD1 PTD1 PTD1 WB1 WB1 A-FPD-005 3 Sim 5 Sim A-FPD-005 7 Sim 9 Sim A-FPD-005 7 Sim 9 Sim A-FPD-005 7 Sim 9 Sim A-FPD-005 8 Sim 6 Sim A-FPD-005 8 Sim 10 Sim A-FPD-005 8 Sim 10 Sim A-FPD-005 8 Sim 10 Sim GROUND FLOOR 1500 00-GFL-RCP-LOW 4200 800100700 MIR-01MIR-01 WB1 WB1 2700 GROUND FLOOR 1500 00-GFL-RCP-LOW 4200 800100700 2700 WB1 WB1 MIR-01 MIR-01 GROUND FLOOR 1500 00-GFL-RCP-LOW 4200 800100700 2700 MIR-01 WB1 GROUND FLOOR 1500 00-GFL-RCP-LOW 4200 800100700 2700 WB1 MIR-01 GROUND FLOOR 1500 00-GFL-RCP-LOW 4200 450 WC1 2700 GROUND FLOOR 1500 00-GFL-RCP-LOW 4200 450 WC1 2700 GROUND FLOOR 1500 00-GFL-RCP-LOW 4200 WC1 PTD1 700 2700 GROUND FLOOR 1500 00-GFL-RCP-LOW 4200 WC1 PTD1 700 2700 REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A1 : 20 06/10/16 A-FPD-005 TOILET DETAILS 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 20 ENLARGED PLAN - TOILET-TYPE C 1 1 : 20 ENLARGED PLAN - TOILET-TYPE D 2 1 : 20 WASH BASIN ELEVATION - 1 (TYPICAL) 3 1 : 20 WASH BASIN ELEVATION - 1M (TYPICAL) 4 1 : 20 WASH BASIN ELEVATION - 2 (TYPICAL) 5 1 : 20 WASH BASIN ELEVATION - 2M (TYPICAL) 6 1 : 20 WC ELEVATION - 1 (TYPICAL) 7 1 : 20 WC ELEVATION - 1M (TYPICAL) 8 1 : 20 WC ELEVATION - 2 (TYPICAL) 9 1 : 20 WC ELEVATION - 2M (TYPICAL) 10 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 21. UP 1 3 5 11972 4 86 10 A C E L J G B D H F K BASEMENT LOBBY B-01 STAIR-01 ST-01 STAIR-02 ST-02 ELEVATOR EL-01 ELEVATOR EL-02 MEP SERVICE ROOM MEP-02 MEP SERVICE ROOM MEP-03 MEP SERVICE ROOM MEP-01 MEP SERVICE ROOM MEP-04 SREVICE AREA - 1 B-02 SREVICE AREA - 2 B-03 SREVICE AREA - 3 B-04 SERVER ROOM B-05 STORE B-06 STORE B-07 SERVICE AREA - 4 B-08 ELECTRICAL ROOM - 1 B-09 GENERATOR - 1 B-10 FUEL - 1 B-11 PUMP ROOM B-12 WATER STORAGE B-13 FUEL - 2 B-14 GENERATOR - 2 B-15 ELECTRICAL ROOM B-16 ? Room Legend ELEVATOR LOBBY SERVICES STAIR STORAGE REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A1 : 100 05/15/16 A-OCP-001 BASEMENT FLOOR - OCCUPANCY PLAN 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 BASEMENT FLOOR - OCCUPANCY PLAN 1 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 22. DN DN 1 3 5 11972 4 86 10 A C E L J G B D H F K ELEVATOR & STAIR LOBBY 0002 ENTRANCE LOBBY - 1 0001 ENTRANCE LOBBY - 2 0003 OFFICE SPACE 0004 TOILET 0005 W.C 0005A W.C 0005B W.C 0005C TOILET 0006 W.C 0006A W.C 0006B W.C 0006C TOILET 0007 W.C 0007A W.C 0007B W.C 0007C TOILET 0008 W.C 0008A W.C 0008B W.C 0008C RECEPTION 0001A FILES 0001B OFFICE SPACE 0009 TOILET 0010 W.C 0010A W.C 0010B W.C 0010C TOILET 0011 W.C 0011A W.C 0011B W.C 0011C TOILET 0012 TOILET 0013 W.C 0012C W.C 0012B W.C 0012A W.C 0013C W.C 0013B W.C 0013A Room Legend LOBBY OFFICE TOILET REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A1 : 100 05/15/16 A-OCP-002 GROUNDFLOOR - OCCUPANCY PLAN 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 GROUND FLOOR - OCCUPANCY PLAN 1 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 23. UP 1 3 5 11972 4 86 10 A C E L J G B D H F K LOBBY 0101 OFFICE SPACE 0102 TOILET 0103 W.C 0103A W.C 0103B W.C 0103C TOILET 0104 W.C 0104A W.C 0104B W.C 0104C OFFICE SPACE 0105 TOILET 0106 W.C 0106A W.C 0106B W.C 0106C TOILET 0107 W.C 0107A W.C 0107B W.C 0107C TOILET 0108 TOILET 0109 W.C 0108A W.C 0108B W.C 0108C W.C 0109A W.C 0109B W.C 0109C OFFICE SPACE 0110 TOILET 0111 TOILET 0112 W.C 0111A W.C 0111B W.C 0111C W.C 0112A W.C 0112B W.C 0112C LOBBY 0101 TOILET 0103 TOILET 0104 OFFICE SPACE 0105 TOILET 0106 TOILET 0107 TOILET 0108 TOILET 0109 OFFICE SPACE 0110 TOILET 0111 TOILET 0112 Room Legend LOBBY OFFICE TOILET REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A1 : 100 05/15/16 A-OCP-003 FIRST TONINTHFLOOR -TYPICAL OCCUPANCY PLAN 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 FIRST FLOOR - OCCUPANCY PLAN 1 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 24. 1 3 5 11972 4 86 10 A C E L J G B D H F K LOBBY 10001 MEP SERVICE ROOM MEP-05 MEP SERVICE ROOM MEP-06 MEP SERVICE ROOM MEP-07 MEP SERVICE ROOM MEP-08 OPEN TERRACE T1-01 OPEN TERRACE T1-02 OPEN TERRACE T1-03 OPEN TERRACE T1-04 Room Legend LOBBY SERVICES TERRACE REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A1 : 100 05/15/16 A-OCP-004 PENTHOUSE FLOOR - OCCUPANCY PLAN 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 PENTH HOUSE FLOOR - OCCUPANCY PLAN 1 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 25. 1 3 5 11972 4 86 10 A C E L J G B D H F K 425 300 7508873750655375029507506550750102507508875750 750 7800 750 750 6550 750 9199 300 1845 300 750 6550 750 7503261750 750 8361 750 75026921750 750 13700 750 7507800750 750 3261 750 1 A-SEC-002 1 A-SEC-001 RECESSED LIGHT FLAT ROUND LIGHT 60 / 100 W DOWN LIGHT RECESSED CAN INCANDESCENT DOWN LIGHT RECESSED CAN FLOURESCENT TOFFER LIGHT 600X600mm SQUARE AIR RETURN 300X300mm SQUARE AIR SUPPLY 300X300mm SQUARE AIR RETURN 600X600mm SQUARE AIR SUPPLY 600X600mm SPRINKLER - PENDENT FULLY RECESSED REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A As indicated 05/15/16 A-RCP-001 GOUNDFLOOR - REFLECTEDCEILING PLAN 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 GROUND FLOOR - REFLECTED CEILING PLAN 1 1 : 50 RCP - LEGEND Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 26. 1 3 5 11972 4 86 10 A C E L J G B D H F K 1 A-SEC-002 1 A-SEC-001 RECESSED LIGHT FLAT ROUND LIGHT 60 / 100 W DOWN LIGHT RECESSED CAN INCANDESCENT DOWN LIGHT RECESSED CAN FLOURESCENT TOFFER LIGHT 600X600mm SQUARE AIR RETURN 300X300mm SQUARE AIR SUPPLY 300X300mm SQUARE AIR RETURN 600X600mm SQUARE AIR SUPPLY 600X600mm SPRINKLER - PENDENT FULLY RECESSED REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A As indicated 05/15/16 A-RCP-002 FIRST FLOOR - REFLECTEDCEILINGPLAN 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 FIRST FLOOR - REFLCTED CEILING PLAN 1 1 : 50 RCP - LEGEND Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 27. 1 3 5 11972 4 86 10 A C E L J G B D H F K 1 A-SEC-002 1 A-SEC-001 RECESSED LIGHT FLAT ROUND LIGHT 60 / 100 W DOWN LIGHT RECESSED CAN INCANDESCENT DOWN LIGHT RECESSED CAN FLOURESCENT TOFFER LIGHT 600X600mm SQUARE AIR RETURN 300X300mm SQUARE AIR SUPPLY 300X300mm SQUARE AIR RETURN 600X600mm SQUARE AIR SUPPLY 600X600mm SPRINKLER - PENDENT FULLY RECESSED REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A As indicated 05/15/16 A-RCP-003 SECONDFLOOR - REFLECTEDCEILING PLAN 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 SECOND FLOOR - REFLECTED CEILING PLAN 1 1 : 50 RCP - LEGEND Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 28. 1 3 5 11972 4 86 10 A C E L J G B D H F K 1 A-SEC-002 1 A-SEC-001 RECESSED LIGHT FLAT ROUND LIGHT 60 / 100 W DOWN LIGHT RECESSED CAN INCANDESCENT DOWN LIGHT RECESSED CAN FLOURESCENT TOFFER LIGHT 600X600mm SQUARE AIR RETURN 300X300mm SQUARE AIR SUPPLY 300X300mm SQUARE AIR RETURN 600X600mm SQUARE AIR SUPPLY 600X600mm SPRINKLER - PENDENT FULLY RECESSED REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A As indicated 05/15/16 A-RCP-004 THIRDFLOOR - REFLECTEDCEILINGPLAN 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 THIRD FLOOR - REFLECTED CEILING PLAN 1 1 : 50 RCP - LEGEND Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 29. 1 3 5 11972 4 86 10 A C E L J G B D H F K 1 A-SEC-002 1 A-SEC-001 RECESSED LIGHT FLAT ROUND LIGHT 60 / 100 W DOWN LIGHT RECESSED CAN INCANDESCENT DOWN LIGHT RECESSED CAN FLOURESCENT TOFFER LIGHT 600X600mm SQUARE AIR RETURN 300X300mm SQUARE AIR SUPPLY 300X300mm SQUARE AIR RETURN 600X600mm SQUARE AIR SUPPLY 600X600mm SPRINKLER - PENDENT FULLY RECESSED REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A As indicated 05/15/16 A-RCP-005 FOURTHFLOOR - REFLECTEDCEILING PLAN 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 FOURTH FLOOR - REFLECTED CEILING PLAN 1 1 : 50 RCP - LEGEND Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 30. 1 3 5 11972 4 86 10 A C E L J G B D H F K 1 A-SEC-002 1 A-SEC-001 RECESSED LIGHT FLAT ROUND LIGHT 60 / 100 W DOWN LIGHT RECESSED CAN INCANDESCENT DOWN LIGHT RECESSED CAN FLOURESCENT TOFFER LIGHT 600X600mm SQUARE AIR RETURN 300X300mm SQUARE AIR SUPPLY 300X300mm SQUARE AIR RETURN 600X600mm SQUARE AIR SUPPLY 600X600mm SPRINKLER - PENDENT FULLY RECESSED REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A As indicated 05/15/16 A-RCP-006 FIFTHFLOOR - REFLECTEDCEILINGPLAN 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 FIFTH FLOOR - REFLECTED CEILING PLAN 1 1 : 50 RCP - LEGEND Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 31. 1 3 5 11972 4 86 10 A C E L J G B D H F K 1 A-SEC-002 1 A-SEC-001 RECESSED LIGHT FLAT ROUND LIGHT 60 / 100 W DOWN LIGHT RECESSED CAN INCANDESCENT DOWN LIGHT RECESSED CAN FLOURESCENT TOFFER LIGHT 600X600mm SQUARE AIR RETURN 300X300mm SQUARE AIR SUPPLY 300X300mm SQUARE AIR RETURN 600X600mm SQUARE AIR SUPPLY 600X600mm SPRINKLER - PENDENT FULLY RECESSED REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A As indicated 05/15/16 A-RCP-007 SIXTHFLOOR - REFLECTEDCEILINGPLAN 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 SIXTH FLOOR - REFLECTED CEILING PLAN 1 1 : 50 RCP - LEGEND Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 32. 1 3 5 11972 4 86 10 A C E L J G B D H F K 1 A-SEC-002 1 A-SEC-001 RECESSED LIGHT FLAT ROUND LIGHT 60 / 100 W DOWN LIGHT RECESSED CAN INCANDESCENT DOWN LIGHT RECESSED CAN FLOURESCENT TOFFER LIGHT 600X600mm SQUARE AIR RETURN 300X300mm SQUARE AIR SUPPLY 300X300mm SQUARE AIR RETURN 600X600mm SQUARE AIR SUPPLY 600X600mm SPRINKLER - PENDENT FULLY RECESSED REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A As indicated 05/15/16 A-RCP-008 SEVENTHFLOOR - REFLECTEDCEILING PLAN 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 SEVENTH FLOOR - REFLECTED CEILING PLAN 1 1 : 50 RCP - LEGEND Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 33. 1 3 5 11972 4 86 10 A C E L J G B D H F K 1 A-SEC-002 1 A-SEC-001 RECESSED LIGHT FLAT ROUND LIGHT 60 / 100 W DOWN LIGHT RECESSED CAN INCANDESCENT DOWN LIGHT RECESSED CAN FLOURESCENT TOFFER LIGHT 600X600mm SQUARE AIR RETURN 300X300mm SQUARE AIR SUPPLY 300X300mm SQUARE AIR RETURN 600X600mm SQUARE AIR SUPPLY 600X600mm SPRINKLER - PENDENT FULLY RECESSED REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A As indicated 05/15/16 A-RCP-009 EIGHTHFLOOR - REFLECTEDCEILING PLAN 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 EIGHTH FLOOR - REFLECTED CEILING PLAN 1 1 : 50 RCP - LEGEND Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 34. 1 3 5 11972 4 86 10 A C E L J G B D H F K 1 A-SEC-002 1 A-SEC-001 RECESSED LIGHT FLAT ROUND LIGHT 60 / 100 W DOWN LIGHT RECESSED CAN INCANDESCENT DOWN LIGHT RECESSED CAN FLOURESCENT TOFFER LIGHT 600X600mm SQUARE AIR RETURN 300X300mm SQUARE AIR SUPPLY 300X300mm SQUARE AIR RETURN 600X600mm SQUARE AIR SUPPLY 600X600mm SPRINKLER - PENDENT FULLY RECESSED REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A As indicated 05/15/16 A-RCP-010 NINTHFLOOR - REFLECTEDCEILINGPLAN 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 NINTH FLOOR - REFLECTED CEILING PLAN 1 1 : 50 RCP - LEGEND Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 35. 1 3 5 11972 4 86 10 A C E L J G B D H F K 1 A-SEC-002 1 A-SEC-001 RECESSED LIGHT FLAT ROUND LIGHT 60 / 100 W DOWN LIGHT RECESSED CAN INCANDESCENT DOWN LIGHT RECESSED CAN FLOURESCENT TOFFER LIGHT 600X600mm SQUARE AIR RETURN 300X300mm SQUARE AIR SUPPLY 300X300mm SQUARE AIR RETURN 600X600mm SQUARE AIR SUPPLY 600X600mm SPRINKLER - PENDENT FULLY RECESSED REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A As indicated 05/15/16 A-RCP-011 PENT HOUSE FLOOR - REFLECTEDCEILING PLAN 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 PENTHOUSE FLOOR - REFLECTED CEILING PLAN 1 1 : 50 RCP - LEGEND Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 36. 00-EGL 0 GROUND FLOOR 1500 FIRST FLOOR - PLAN 6500 SECOND FLOOR 11500 THIRD FLOOR 16500 FOURTH FLOOR 21500 FIFTH FLOOR - PLAN 26500 SIXTH FLOOR 31500 SEVENTH FLOOR 36500 EIGHTH FLOOR - PLAN 41500 NINTH FLOOR 46500 PENTHOUSE FLOOR 51500 PENTHOUSE ROOF 56500 PENTHOUSE ROOF PARAPET 58500 A C E LJGB D HF K BASEMENT FLOOR -3500 1 A-SEC-002 WATER STORAGE B-13 SERVICE AREA - 4 B-08 ELEVATOR EL-01 BASEMENT LOBBY B-01 SREVICE AREA - 1 B-02 SERVER ROOM B-05 ENTRANCE LOBBY - 1 0001 ELEVATOR & STAIR LOBBY 0002 ENTRANCE LOBBY - 2 0003 OFFICE SPACE 0105 LOBBY 0101 OFFICE SPACE 0102 OFFICE SPACE 0205 OFFICE SPACE 0305 OFFICE SPACE 0405 OFFICE SPACE 0505 OFFICE SPACE 0605 OFFICE SPACE 0705 OFFICE SPACE 0805 OFFICE SPACE 0905 MEP SERVICE ROOM MEP-07 LOBBY 0201 LOBBY 0301 LOBBY 0401 LOBBY 0501 LOBBY 0601 LOBBY 0701 LOBBY 0801 LOBBY 0901 LOBBY 10001 OPEN TERRACE T2-01 OFFICE SPACE 0202 OFFICE SPACE 0302 OFFICE SPACE 0402 OFFICE SPACE 0502 OFFICE SPACE 0602 OFFICE SPACE 0702 OFFICE SPACE 0802 OFFICE SPACE 0902 MEP SERVICE ROOM MEP-05 RAFT SLAB FLOOR FINISH OVER CEMENSCREED RC RETAINING WALL RC BEAM 600 X 600 CEILING TILES FLOOR FINISH OVER CEMENSCREEDSTRUCTURAL SLAB 600 X 600 CEILING TILES FLOOR FINISH OVER CEMENSCREEDSTRUCTURAL SLAB 600 X 600 CEILING TILES FLOOR FINISH OVER CEMENSCREEDSTRUCTURAL SLAB 600 X 600 CEILING TILES FLOOR FINISH OVER CEMENSCREEDSTRUCTURAL SLAB 600 X 600 CEILING TILES FLOOR FINISH OVER CEMENSCREEDSTRUCTURAL SLAB 600 X 600 CEILING TILES FLOOR FINISH OVER CEMENSCREEDSTRUCTURAL SLAB 600 X 600 CEILING TILES FLOOR FINISH OVER CEMENSCREEDSTRUCTURAL SLAB 600 X 600 CEILING TILES FLOOR FINISH OVER CEMENSCREEDSTRUCTURAL SLAB 600 X 600 CEILING TILES FLOOR FINISH OVER CEMENSCREEDSTRUCTURAL SLAB 600 X 600 CEILING TILES FLOOR FINISH OVER CEMENSCREEDSTRUCTURAL SLAB FLOOR FINISH OVER CEMENSCREEDSTRUCTURAL SLAB CONC. TILES OVER WATER PROOFING CM PARAPET WALL LIFT PIT RAFT SLAB 1 A-DET-001 2 A-DET-001 3 A-DET-001 Sim 3 A-DET-001 Sim 2 A-DET-001 4 A-DET-001 5 A-DET-001 REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A1 : 100 05/17/16 A-SEC-001 SECTION 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 SECTION NORTH-SOUTH 1 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 37. 00-EGL 0 GROUND FLOOR 1500 FIRST FLOOR - PLAN 6500 SECOND FLOOR 11500 THIRD FLOOR 16500 FOURTH FLOOR 21500 FIFTH FLOOR - PLAN 26500 SIXTH FLOOR 31500 SEVENTH FLOOR 36500 EIGHTH FLOOR - PLAN 41500 NINTH FLOOR 46500 PENTHOUSE FLOOR 51500 PENTHOUSE ROOF 56500 PENTHOUSE ROOF PARAPET 58500 13511 9 7 248 610 BASEMENT FLOOR -3500 1 A-SEC-001 35001500500050005000500050005000500050005000500050002000 4650 3500 30003000300030003000300030003000300030004650 STORE B-06 STAIR-01 ST-01 BASEMENT LOBBY B-01 STORE B-07 STAIR-02 ST-02 OFFICE SPACE 0009 ELEVATOR & STAIR LOBBY 0002 OFFICE SPACE 0004 OFFICE SPACE 0102 LOBBY 0101 OFFICE SPACE 0110 OFFICE SPACE 0210 LOBBY 0201 OFFICE SPACE 0202 OFFICE SPACE 0302 LOBBY 0301 OFFICE SPACE 0310 OFFICE SPACE 0410 LOBBY 0401 OFFICE SPACE 0402 OFFICE SPACE 0502 LOBBY 0501 OFFICE SPACE 0510 OFFICE SPACE 0610 LOBBY 0601 OFFICE SPACE 0602 OFFICE SPACE 0702 LOBBY 0701 OFFICE SPACE 0710 OFFICE SPACE 0810 LOBBY 0801 OFFICE SPACE 0802 OFFICE SPACE 0902 LOBBY 0901 OFFICE SPACE 0910 MEP SERVICE ROOM MEP-08 LOBBY 10001 MEP SERVICE ROOM MEP-06 OPEN TERRACE T2-01 RAFT SLAB FLOOR FINISH OVER CEMENSCREED GLASS & STEEL HAND RAIL GLASS & STEEL HAND RAIL 600 X 600 CEILING TILES FLOOR FINISH OVER CEMENSCREED STRUCTURAL SLAB RC RETAINING WALL RC BEAM 600 X 600 CEILING TILES FLOOR FINISH OVER CEMENSCREED STRUCTURAL SLAB 600 X 600 CEILING TILES FLOOR FINISH OVER CEMENSCREED STRUCTURAL SLAB 600 X 600 CEILING TILES FLOOR FINISH OVER CEMENSCREED STRUCTURAL SLAB 600 X 600 CEILING TILES FLOOR FINISH OVER CEMENSCREED STRUCTURAL SLAB 600 X 600 CEILING TILES FLOOR FINISH OVER CEMENSCREED STRUCTURAL SLAB 600 X 600 CEILING TILES FLOOR FINISH OVER CEMENSCREED STRUCTURAL SLAB 600 X 600 CEILING TILES FLOOR FINISH OVER CEMENSCREED STRUCTURAL SLAB 600 X 600 CEILING TILES FLOOR FINISH OVER CEMENSCREED STRUCTURAL SLAB 600 X 600 CEILING TILES FLOOR FINISH OVER CEMENSCREED STRUCTURAL SLAB FLOOR FINISH OVER CEMENSCREED STRUCTURAL SLAB CM WALL CM PARAPET WALL EXTERIOR CLADDING CONC. TILES OVER WATER PROOFING Sim 4 A-DET-001 Sim 4 A-DET-001 Sim 4 A-DET-001 Sim 4 A-DET-001 Sim 4 A-DET-001 Sim 4 A-DET-001 Sim 2 A-DET-001 Sim 2 A-DET-001 Sim 2 A-DET-001 Sim 2 A-DET-001 Sim 2 A-DET-001 Sim 3 A-DET-001 Sim 2 A-DET-001 REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A1 : 100 05/15/16 A-SEC-002 SECTION 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 100 SECTION EAST-WEST 1 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 38. GROUND FLOOR 1500 FIRST FLOOR - PLAN 6500 SECOND FLOOR 11500 THIRD FLOOR 16500 FOURTH FLOOR 21500 FIFTH FLOOR - PLAN 26500 5 4 BASEMENT FLOOR -3500 32RISERS@156mm 5000 32RISERS@156mm 5000 32RISERS@156mm 5000 32RISERS@156mm 5000 32RISERS@156mm 5000 32RISERS@156mm 5000 3 A-SEC-003 Sim 3 A-SEC-003 Sim 3 A-SEC-003 FIFTH FLOOR - PLAN 26500 SIXTH FLOOR 31500 SEVENTH FLOOR 36500 EIGHTH FLOOR - PLAN 41500 NINTH FLOOR 46500 PENTHOUSE FLOOR 51500 PENTHOUSE ROOF 56500 5 4 32RISERS@156mm 5000 32RISERS@156mm 5000 32RISERS@156mm 5000 32RISERS@156mm 5000 32RISERS@156mm 5000 32RISERS@156mm 5000 Sim 3 A-SEC-003 Sim 3 A-SEC-003 Sim 3 A-SEC-003 156 25 300 325 156 25 Marble Tread 25mm Thick Wooden Riser 12.5mm Thick Structural Concrete Bottom of HaindRail Cement Plastering with Paint Finish 4 A-SEC-003 13 10 15 25 520 25 Marble Tread 25mm Thick Wooden Riser 12.5mm Thick Structural Concrete REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A As indicated 05/17/16 A-SEC-003 STAIR-01 SECTION 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 50 STAIR-01 SECTION 1 1 : 50 STAIR-01 SECTION - CONTINUOUS 2 1 : 5 STAIR - TREAD & RISER DETAIL 3 1 : 2 STAIR - NOSING DETAIL 4 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 39. T ectonicCop yright2007 T ectonicCop yright2007 T ectonicCop yright2007 T ectonicCop yright2007 T ectonicCop yright2007 T ectonicCop yright2007 T ectonicCop yright2007 T ectonicCop yright2007 T ectonicCop yright2007 T ectonicCop yright2007 T ectonicCop yright2007 T ectonicCop yright2007 T ectonicCop yright2007 GROUND FLOOR 1500 FIRST FLOOR - PLAN 6500 SECOND FLOOR 11500 THIRD FLOOR 16500 FOURTH FLOOR 21500 FIFTH FLOOR - PLAN 26500 78 00-EGL-TOS 150 BASEMENT FLOOR -3500 32RISERS@156mm 5000 32RISERS@156mm 5000 32RISERS@156mm 5000 32RISERS@156mm 5000 32RISERS@156mm 5000 32RISERS@156mm 5000 -2094 225 2906 5225 7906 10225 12906 15225 17906 20225 22906 25225 27906 Sim 3 A-SEC-003 Sim 3 A-SEC-003 FIFTH FLOOR - PLAN 26500 SIXTH FLOOR 31500 SEVENTH FLOOR 36500 EIGHTH FLOOR - PLAN 41500 NINTH FLOOR 46500 PENTHOUSE FLOOR 51500 PENTHOUSE ROOF 56500 78 32RISERS@156mm 5000 32RISERS@156mm 5000 32RISERS@156mm 5000 32RISERS@156mm 5000 32RISERS@156mm 5000 32RISERS@156mm 5000 27906 30230 32906 35225 37906 40225 42906 45225 47906 50225 Sim 3 A-SEC-003 Sim 3 A-SEC-003 Sim 3 A-SEC-003 00-EGL 0 GROUND FLOOR 1500 FIRST FLOOR - PLAN 6500 SECOND FLOOR 11500 THIRD FLOOR 16500 FOURTH FLOOR 21500 FIFTH FLOOR - PLAN 26500 E BASEMENT FLOOR -3500 500050005000500050005000 -4800 FIFTH FLOOR - PLAN 26500 SIXTH FLOOR 31500 SEVENTH FLOOR 36500 EIGHTH FLOOR - PLAN 41500 NINTH FLOOR 46500 PENTHOUSE FLOOR 51500 PENTHOUSE ROOF 56500 E 500050005000500050005000 2550 REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A1 : 50 06/10/16 A-SEC-004 STAIR-02 &ELEVATORSECTION 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 1 : 50 STAIR-02 SECTION 1 1 : 50 STAIR-02 SECTION - CONTINUOUS 2 1 : 50 ELEVATOR - SECTION 3 1 : 50 ELEVATOR - SECTION - CONTINUOUS 4 Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 40. REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A06/10/16 A-SHD-001 ROOMSCHEDULE 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 ROOM SCHEDULE - BASEMENT TO FIFTH FLOOR Name Number Area Floor Finish Base Finish Wall Finish Ceiling Finish Occupancy Level W.C 0306B 1 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR W.C 0306C 1 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR W.C 0307A 1 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR W.C 0307B 1 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR W.C 0307C 1 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR W.C 0308A 1 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR W.C 0308B 1 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR W.C 0308C 1 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR W.C 0309A 1 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR W.C 0309B 1 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR W.C 0309C 1 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR LOBBY 0401 84 m² GRANITE+MA RBLE TILE BURGANDY-GRANI TE GYPSUM LOBBY FOURTH FLOOR OFFICE SPACE 0402 288 m² WOOD+GRANI TE BURGANDY-GRANI TE PAINT GYPSUM OFFICE FOURTH FLOOR TOILET 0403 5 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR TOILET 0404 5 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR OFFICE SPACE 0405 302 m² WOOD+GRANI TE BURGANDY-GRANI TE PAINT GYPSUM OFFICE FOURTH FLOOR TOILET 0406 5 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR TOILET 0407 5 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR TOILET 0408 5 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR TOILET 0409 5 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR OFFICE SPACE 0410 288 m² WOOD+GRANI TE BURGANDY-GRANI TE PAINT GYPSUM OFFICE FOURTH FLOOR TOILET 0411 5 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR TOILET 0412 5 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR W.C 0403A 1 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR W.C 0403B 1 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR W.C 0403C 1 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR W.C 0404A 1 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR W.C 0404B 1 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR W.C 0404C 1 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR W.C 0407A 1 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR W.C 0407B 1 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR W.C 0407C 1 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR W.C 0406A 1 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR W.C 0406B 1 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR W.C 0406C 1 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR W.C 0408A 1 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR W.C 0408B 1 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR W.C 0408C 1 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR W.C 0409A 1 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR W.C 0409B 1 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR W.C 0409C 1 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR W.C 0411A 1 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR W.C 0411B 1 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR W.C 0411C 1 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR W.C 0412A 1 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR W.C 0412B 1 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR W.C 0412C 1 m² MOSAIC TILING WALL TILES PVC TOILET FOURTH FLOOR LOBBY 0501 84 m² GRANITE+MA RBLE TILE BURGANDY-GRANI TE GYPSUM LOBBY FIFTH FLOOR - PLAN OFFICE SPACE 0502 295 m² WOOD+GRANI TE BURGANDY-GRANI TE PAINT GYPSUM OFFICE FIFTH FLOOR - PLAN TOILET 0503 5 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN TOILET 0504 5 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN OFFICE SPACE 0505 317 m² WOOD+GRANI TE BURGANDY-GRANI TE PAINT GYPSUM OFFICE FIFTH FLOOR - PLAN TOILET 0506 5 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN TOILET 0507 5 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN TOILET 0508 5 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN TOILET 0509 5 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN OFFICE SPACE 0510 295 m² WOOD+GRANI TE BURGANDY-GRANI TE PAINT GYPSUM OFFICE FIFTH FLOOR - PLAN TOILET 0511 5 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN TOILET 0512 5 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN W.C 0503A 1 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN W.C 0503B 1 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN W.C 0503C 1 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN W.C 0504A 1 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN W.C 0504B 1 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN W.C 0504C 1 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN W.C 0506A 1 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN W.C 0506B 1 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN W.C 0506C 1 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN W.C 0507A 1 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN W.C 0507B 1 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN W.C 0507C 1 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN W.C 0508A 1 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN W.C 0508B 1 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN W.C 0508C 1 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN W.C 0509A 1 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN W.C 0509B 1 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN W.C 0509C 1 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN W.C 0511A 1 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN W.C 0511B 1 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN W.C 0511C 1 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN W.C 0512A 1 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN W.C 0512B 1 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN W.C 0512C 1 m² MOSAIC TILING - WALL TILES PVC TOILET FIFTH FLOOR - PLAN ROOM SCHEDULE - BASEMENT TO FIFTH FLOOR Name Number Area Floor Finish Base Finish Wall Finish Ceiling Finish Occupancy Level W.C 0106A 1 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN W.C 0106B 1 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN W.C 0106C 1 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN TOILET 0107 5 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN W.C 0107A 1 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN W.C 0107B 1 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN W.C 0107C 1 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN OFFICE SPACE 0110 284 m² WOOD+GRANI TE BURGANDY-GRANI TE PAINT GYPSUM OFFICE FIRST FLOOR - PLAN TOILET 0111 5 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN TOILET 0112 5 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN TOILET 0108 5 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN TOILET 0109 5 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN W.C 0108A 1 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN W.C 0108B 1 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN W.C 0108C 1 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN W.C 0109A 1 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN W.C 0109B 1 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN W.C 0109C 1 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN W.C 0111A 1 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN W.C 0111B 1 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN W.C 0111C 1 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN W.C 0112A 1 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN W.C 0112B 1 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN W.C 0112C 1 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN LOBBY 0201 84 m² GRANITE+MA RBLE TILE BURGANDY-GRANI TE GYPSUM LOBBY SECOND FLOOR OFFICE SPACE 0202 284 m² WOOD+GRANI TE BURGANDY-GRANI TE PAINT GYPSUM OFFICE SECOND FLOOR TOILET 0203 5 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR TOILET 0204 5 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR OFFICE SPACE 0205 294 m² WOOD+GRANI TE BURGANDY-GRANI TE PAINT GYPSUM OFFICE SECOND FLOOR TOILET 0206 5 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR TOILET 0207 5 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR TOILET 0208 5 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR TOILET 0209 5 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR OFFICE SPACE 0210 284 m² WOOD+GRANI TE BURGANDY-GRANI TE PAINT GYPSUM OFFICE SECOND FLOOR TOILET 0211 5 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR TOILET 0212 5 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR W.C 0203A 1 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR W.C 0203B 1 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR W.C 0203C 1 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR W.C 0204A 1 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR W.C 0204B 1 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR W.C 0204C 1 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR W.C 0206A 1 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR W.C 0206B 1 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR W.C 0206C 1 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR W.C 0207A 1 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR W.C 0207B 1 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR Room 0207C 1 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR W.C 0208A 1 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR W.C 0208B 1 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR W.C 0208C 1 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR W.C 0209A 1 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR W.C 0209B 1 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR W.C 0209C 1 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR W.C 0211A 1 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR W.C 0211B 1 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR W.C 0211C 1 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR W.C 0212A 1 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR W.C 0212B 1 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR W.C 0212C 1 m² MOSAIC TILING WALL TILES PVC TOILET SECOND FLOOR LOBBY 0301 84 m² GRANITE+MA RBLE TILE BURGANDY-GRANI TE GYPSUM LOBBY THIRD FLOOR OFFICE SPACE 0302 285 m² WOOD+GRANI TE BURGANDY-GRANI TE PAINT GYPSUM OFFICE THIRD FLOOR TOILET 0303 5 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR TOILET 0304 5 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR OFFICE SPACE 0305 295 m² WOOD+GRANI TE BURGANDY-GRANI TE PAINT GYPSUM OFFICE THIRD FLOOR TOILET 0306 5 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR TOILET 0307 5 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR TOILET 0308 5 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR TOILET 0309 5 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR OFFICE SPACE 0310 285 m² WOOD+GRANI TE BURGANDY-GRANI TE PAINT GYPSUM OFFICE THIRD FLOOR TOILET 0311 5 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR W.C 0311A 1 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR W.C 0311B 1 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR W.C 0311C 1 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR TOILET 0312 5 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR W.C 0312A 1 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR W.C 0312B 1 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR W.C 0312C 1 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR W.C 0303A 1 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR W.C 0303B 1 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR W.C 0303C 1 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR W.C 0304A 1 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR W.C 0304B 1 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR W.C 0304C 1 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR W.C 0306A 1 m² MOSAIC TILING WALL TILES PVC TOILET THIRD FLOOR ROOM SCHEDULE - BASEMENT TO FIFTH FLOOR Name Number Area Floor Finish Base Finish Wall Finish Ceiling Finish Occupancy Level GENERATOR - 1 B-10 37 m² EPXOY - PAINT PAINT SERVICES BASEMENT FLOOR FUEL - 1 B-11 24 m² - - - - SERVICES BASEMENT FLOOR ELECTRICAL ROOM - 1 B-09 13 m² EPOXY - PAINT PAINT SERVICES BASEMENT FLOOR STORE B-06 476 m² EPOXY - - PAINT STORAGE BASEMENT FLOOR SERVER ROOM B-05 84 m² EPOXY - PAINT PAINT SERVICES BASEMENT FLOOR MEP SERVICE ROOM MEP-01 23 m² EPXOY - PAINT PAINT SERVICES BASEMENT FLOOR MEP SERVICE ROOM MEP-04 23 m² EPOXY - PAINT PAINT SERVICES BASEMENT FLOOR STORE B-07 476 m² EPOXY - PAINT PAINT STORAGE BASEMENT FLOOR MEP SERVICE ROOM MEP-03 23 m² EPOXY - PAINT PAINT SERVICES BASEMENT FLOOR ELEVATOR EL-02 6 m² ELEVATOR BASEMENT FLOOR ELEVATOR EL-01 6 m² ELEVATOR BASEMENT FLOOR MEP SERVICE ROOM MEP-02 23 m² EPOXY - PAINT PAINT SERVICES BASEMENT FLOOR WATER STORAGE B-13 82 m² SERVICES BASEMENT FLOOR PUMP ROOM B-12 24 m² EPOXY - PAINT PAINT SERVICES BASEMENT FLOOR FUEL - 2 B-14 24 m² SERVICES BASEMENT FLOOR GENERATOR - 2 B-15 37 m² EPOXY - PAINT PAINT SERVICES BASEMENT FLOOR ELECTRICAL ROOM B-16 13 m² EPOXY - PAINT PAINT SERVICES BASEMENT FLOOR BASEMENT LOBBY B-01 65 m² EPOXY - PAINT - LOBBY BASEMENT FLOOR STAIR-01 ST-01 41 m² BEIGE MARBLE BEIGE MARBLE PAINT - STAIR BASEMENT FLOOR STAIR-02 ST-02 41 m² BEIGE MARBLE BEIGE MARBLE PAINT STAIR BASEMENT FLOOR SERVICE AREA - 4 B-08 316 m² EPOXY - PAINT PAINT SERVICES BASEMENT FLOOR SREVICE AREA - 1 B-02 78 m² EPOXY - PAINT PAINT SERVICES BASEMENT FLOOR SREVICE AREA - 2 B-03 144 m² EPOXY - PAINT PAINT SERVICES BASEMENT FLOOR SREVICE AREA - 3 B-04 144 m² EPOXY - PAINT PAINT SERVICES BASEMENT FLOOR Room B-17 6 m² GROUND FLOOR Room B-18 6 m² GROUND FLOOR ENTRANCE LOBBY - 2 0003 160 m² BEIGE MARBLE BEIGE MARBLE - GYPSUM LOBBY GROUND FLOOR ELEVATOR & STAIR LOBBY 0002 86 m² BEIGE MARBLE BEIGE MARBLE PAINT GYPSUM LOBBY GROUND FLOOR RECEPTION 0001A 6 m² BEIGE MARBLE BEIGE MARBLE PAINT GYPSUM LOBBY GROUND FLOOR FILES 0001B 6 m² BEIGE MARBLE BEIGE MARBLE PAINT GYPSUM LOBBY GROUND FLOOR ENTRANCE LOBBY - 1 0001 176 m² BEIGE MARBLE BEIGE MARBLE GYPSUM LOBBY GROUND FLOOR OFFICE SPACE 0009 261 m² WOOD+BEIGE MARBLE BEIGE MARBLE PAINT GYPSUM OFFICE GROUND FLOOR TOILET 0013 5 m² WOOD+BEIGE MARBLE - WALL TILES PVC TOILET GROUND FLOOR W.C 0013C 1 m² WOOD+BEIGE MARBLE - WALL TILES PVC TOILET GROUND FLOOR W.C 0013B 1 m² WOOD+BEIGE MARBLE - WALL TILES PVC TOILET GROUND FLOOR W.C 0013A 1 m² WOOD+BEIGE MARBLE - WALL TILES PVC TOILET GROUND FLOOR W.C 0012A 1 m² WOOD+BEIGE MARBLE - WALL TILES PVC TOILET GROUND FLOOR W.C 0012B 1 m² WOOD+BEIGE MARBLE - WALL TILES PVC TOILET GROUND FLOOR W.C 0012C 1 m² WOOD+BEIGE MARBLE - WALL TILES PVC TOILET GROUND FLOOR TOILET 0012 5 m² WOOD+BEIGE MARBLE - WALL TILES PVC TOILET GROUND FLOOR Room B-33 31 m² GROUND FLOOR Room B-34 31 m² GROUND FLOOR TOILET 0007 5 m² MOSAIC TILING WALL TILES PVC TOILET GROUND FLOOR Room B-36 1 m² GROUND FLOOR TOILET 0008 5 m² MOSAIC TILING WALL TILES PVC TOILET GROUND FLOOR W.C 0007A 1 m² GROUND FLOOR W.C 0008A 1 m² MOSAIC TILING WALL TILES PVC TOILET GROUND FLOOR W.C 0007B 1 m² MOSAIC TILING WALL TILES PVC TOILET GROUND FLOOR W.C 0008B 1 m² MOSAIC TILING WALL TILES PVC TOILET GROUND FLOOR W.C 0007C 1 m² MOSAIC TILING - WALL TILES PVC TOILET GROUND FLOOR W.C 0008C 1 m² MOSAIC TILING WALL TILES PVC TOILET GROUND FLOOR Room B-44 0 m² GROUND FLOOR Room B-45 0 m² GROUND FLOOR Room B-46 0 m² GROUND FLOOR W.C 0010C 1 m² WOOD+BEIGE MARBLE - WALL TILES PVC TOILET GROUND FLOOR W.C 0010B 1 m² WOOD+BEIGE MARBLE - WALL TILES PVC TOILET GROUND FLOOR W.C 0010A 1 m² WOOD+BEIGE MARBLE - WALL TILES PVC TOILET GROUND FLOOR TOILET 0010 5 m² WOOD+BEIGE MARBLE - WALL TILES PVC TOILET GROUND FLOOR Room B-51 1 m² GROUND FLOOR TOILET 0011 5 m² WOOD+BEIGE MARBLE - WALL TILES PVC TOILET GROUND FLOOR W.C 0011A 1 m² WOOD+BEIGE MARBLE - WALL TILES PVC TOILET GROUND FLOOR W.C 0011B 1 m² WOOD+BEIGE MARBLE - WALL TILES PVC TOILET GROUND FLOOR W.C 0011C 1 m² WOOD+BEIGE MARBLE - WALL TILES PVC TOILET GROUND FLOOR OFFICE SPACE 0004 276 m² WOOD+BEIGE MARBLE BEIGE MARBLE PAINT GYPSUM OFFICE GROUND FLOOR TOILET 0006 5 m² MOSAIC TILING - WALL TILES PVC TOILET GROUND FLOOR TOILET 0005 5 m² MOSAIC TILING - WALL TILES PVC TOILET GROUND FLOOR SHAFT MSH-01 1 m² GROUND FLOOR W.C 0005A 1 m² MOSAIC TILING - WALL TILES PVC TOILET GROUND FLOOR W.C 0005B 1 m² MOSAIC TILING - WALL TILES PVC TOILET GROUND FLOOR W.C 0005C 1 m² MOSAIC TILING - WALL TILES PVC TOILET GROUND FLOOR W.C 0006C 1 m² MOSAIC TILING - WALL TILES PVC TOILET GROUND FLOOR W.C 0006B 1 m² MOSAIC TILING - WALL TILES PVC TOILET GROUND FLOOR W.C 0006A 1 m² MOSAIC TILING - WALL TILES PVC TOILET GROUND FLOOR LOBBY 0101 84 m² GRANITE+MA RBLE TILE BURGANDY-GRANI TE GYPSUM LOBBY FIRST FLOOR - PLAN OFFICE SPACE 0102 284 m² WOOD+GRANI TE BURGANDY-GRANI TE PAINT GYPSUM OFFICE FIRST FLOOR - PLAN TOILET 0103 5 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN W.C 0103A 1 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN W.C 0103B 1 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN W.C 0103C 1 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN TOILET 0104 5 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN W.C 0104A 1 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN W.C 0104B 1 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN W.C 0104C 1 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN OFFICE SPACE 0105 294 m² WOOD+GRANI TE BURGANDY-GRANI TE PAINT GYPSUM OFFICE FIRST FLOOR - PLAN TOILET 0106 5 m² MOSAIC TILING WALL TILES PVC TOILET FIRST FLOOR - PLAN Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016
  • 41. REVISIONSCALE DATE SHEET NUMBER SHEET NAME PROJECT NUMBER DESIGNED PROJECT NAME PROJECT VIEW KEY PLAN NOTES &LEGENDS SHEET SIZE A0 THIS IS A BIMDRAWINGAND MUST NOT ALTERED MANUALLY DRAWN THIS REVIT DRAWING IS PREPARED FOR THE PURPOSE OF REVIT PORTFOLIO PRESENTATION ONLY. THE DRAWING OR PARTS OF THIS DRAWING SHALL NOT BE REPRODUCED WITHOUT THE PERMISSION OF DESIGNER. ALL DIMENSIONS ARE IN MM UNLESS OTERWISE SPECIFIED. A06/10/16 A-SHD-002 ROOMSCHEDULE 0001 Jobin Jobin REVIT PROJECT # 1 REVITPROJECT#10001 ROOM SCHEDULE - SIXTH TO PENTHOUSE LEVEL Name Number Area Floor Finish Base Finish Wall Finish Ceiling Finish Occupancy Level W.C 0803A 1 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN W.C 0803B 1 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN W.C 0803C 1 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN W.C 0804A 1 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN W.C 0804B 1 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN W.C 0804C 1 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN W.C 0806A 1 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN W.C 0806B 1 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN W.C 0806C 1 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN W.C 0807A 1 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN W.C 0807B 1 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN W.C 0807C 1 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN W.C 0808A 1 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN W.C 0808B 1 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN W.C 0808C 1 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN W.C 0809A 1 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN W.C 0809B 1 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN W.C 0809C 1 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN W.C 0811A 1 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN W.C 0811B 1 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN W.C 0811C 1 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN Room 0812A 1 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN W.C 0812B 1 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN W.C 0812C 1 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN LOBBY 0901 85 m² GRANITE+MA RBLE TILE GYPSUM LOBBY NINTH FLOOR OFFICE SPACE 0902 369 m² WOOD+GRANI TE PAINT GYPSUM OFFICE NINTH FLOOR TOILET 0903 5 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR TOILET 0904 5 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR OFFICE SPACE 0905 465 m² WOOD+GRANI TE PAINT GYPSUM OFFICE NINTH FLOOR TOILET 0906 5 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR TOILET 0907 5 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR TOILET 0908 5 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR TOILET 0909 5 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR OFFICE SPACE 0910 369 m² WOOD+GRANI TE PAINT GYPSUM OFFICE NINTH FLOOR TOILET 0911 5 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR TOILET 0912 5 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR W.C 0903A 1 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR W.C 0903B 1 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR W.C 0903C 1 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR W.C 0904A 1 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR W.C 0904B 1 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR W.C 0904C 1 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR W.C 0906A 1 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR W.C 0906B 1 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR W.C 0906C 1 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR W.C 0907A 1 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR W.C 0907B 1 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR W.C 0907C 1 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR W.C 0908A 1 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR W.C 0908B 1 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR W.C 0908C 1 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR W.C 0909A 1 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR W.C 0909B 1 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR W.C 0909C 1 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR W.C 0911A 1 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR W.C 0911B 1 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR W.C 0911C 1 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR W.C 0912A 1 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR W.C 0912B 1 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR W.C 0912C 1 m² MOSAIC TILING WALL TILES PVC TOILET NINTH FLOOR LOBBY 10001 86 m² GRANITE+MA RBLE TILE GYPSUM LOBBY PENTHOUSE FLOOR MEP SERVICE ROOM MEP-05 169 m² EPOXY PAINT PAINT SERVICES PENTHOUSE FLOOR MEP SERVICE ROOM MEP-06 127 m² EPOXY PAINT PAINT SERVICES PENTHOUSE FLOOR MEP SERVICE ROOM MEP-07 154 m² EPOXY PAINT PAINT SERVICES PENTHOUSE FLOOR MEP SERVICE ROOM MEP-08 127 m² EPOXY PAINT PAINT SERVICES PENTHOUSE FLOOR OPEN TERRACE T1-01 216 m² PAVER TILE PAINT TERRACE PENTHOUSE FLOOR OPEN TERRACE T1-02 216 m² PAVER TILE PAINT TERRACE PENTHOUSE FLOOR OPEN TERRACE T1-03 216 m² PAVER TILE PAINT TERRACE PENTHOUSE FLOOR OPEN TERRACE T1-04 216 m² PAVER TILE PAINT TERRACE PENTHOUSE FLOOR OPEN TERRACE T2-01 821 m² PAVER TILE PAINT TERRACE PENTHOUSE ROOF ROOM SCHEDULE - SIXTH TO PENTHOUSE LEVEL Name Number Area Floor Finish Base Finish Wall Finish Ceiling Finish Occupancy Level LOBBY 0601 84 m² GRANITE+MA RBLE TILE BURGANDY-GRANI TE GYPSUM LOBBY SIXTH FLOOR OFFICE SPACE 0602 306 m² WOOD+GRANI TE BURGANDY-GRANI TE PAINT GYPSUM OFFICE SIXTH FLOOR TOILET 0603 5 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR TOILET 0604 5 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR OFFICE SPACE 0605 339 m² WOOD+GRANI TE BURGANDY-GRANI TE PAINT GYPSUM OFFICE SIXTH FLOOR TOILET 0606 5 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR TOILET 0607 5 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR TOILET 0608 5 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR TOILET 0609 5 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR OFFICE SPACE 0610 306 m² WOOD+GRANI TE BURGANDY-GRANI TE PAINT GYPSUM OFFICE SIXTH FLOOR TOILET 0611 5 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR TOILET 0612 5 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR W.C 0603A 1 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR W.C 0603B 1 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR W.C 0603C 1 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR W.C 0604A 1 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR W.C 0604B 1 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR W.C 0604C 1 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR W.C 0606A 1 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR W.C 0606B 1 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR W.C 0606C 1 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR W.C 0607A 1 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR W.C 0607B 1 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR W.C 0607C 1 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR W.C 0608A 1 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR W.C 0608B 1 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR W.C 0608C 1 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR W.C 0609A 1 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR W.C 0609B 1 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR W.C 0609C 1 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR W.C 06011A 1 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR W.C 06011B 1 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR W.C 06011C 1 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR W.C 06012A 1 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR W.C 06012B 1 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR W.C 06012C 1 m² MOSAIC TILING WALL TILES PVC TOILET SIXTH FLOOR LOBBY 0701 84 m² GRANITE+MA RBLE TILE BURGANDY-GRANI TE GYPSUM LOBBY SEVENTH FLOOR OFFICE SPACE 0702 322 m² WOOD+GRANI TE BURGANDY-GRANI TE PAINT GYPSUM OFFICE SEVENTH FLOOR TOILET 0703 5 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR TOILET 0704 5 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR OFFICE SPACE 0705 370 m² WOOD+GRANI TE BURGANDY-GRANI TE PAINT GYPSUM OFFICE SEVENTH FLOOR TOILET 0706 5 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR TOILET 0707 5 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR TOILET 0708 5 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR TOILET 0709 5 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR OFFICE SPACE 0710 322 m² WOOD+GRANI TE BURGANDY-GRANI TE PAINT GYPSUM OFFICE SEVENTH FLOOR TOILET 0711 5 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR TOILET 0712 5 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR W.C 0703A 1 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR W.C 0703B 1 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR W.C 0703C 1 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR W.C 0704A 1 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR W.C 0704B 1 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR W.C 0704C 1 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR W.C 0706A 1 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR W.C 0706B 1 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR W.C 0706C 1 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR W.C 0707A 1 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR W.C 0707B 1 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR W.C 0707C 1 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR W.C 0708A 1 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR W.C 0708B 1 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR W.C 0708C 1 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR W.C 0709A 1 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR W.C 0709B 1 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR W.C 0709C 1 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR W.C 0711A 1 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR W.C 0711B 1 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR W.C 0711C 1 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR Room 0712A 1 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR W.C 0712B 1 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR W.C 0712C 1 m² MOSAIC TILING WALL TILES PVC TOILET SEVENTH FLOOR OFFICE SPACE T2-02 Not Enclosed WOOD+GRANI TE BURGANDY-GRANI TE PAINT GYPSUM OFFICE SEVENTH FLOOR LOBBY 0801 84 m² GRANITE+MA RBLE TILE GYPSUM LOBBY EIGHTH FLOOR - PLAN OFFICE SPACE 0802 342 m² WOOD+GRANI TE BURGANDY-GRANI TE PAINT GYPSUM OFFICE EIGHTH FLOOR - PLAN TOILET 0803 5 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN TOILET 0804 5 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN OFFICE SPACE 0805 411 m² WOOD+GRANI TE BURGANDY-GRANI TE PAINT GYPSUM OFFICE EIGHTH FLOOR - PLAN TOILET 0806 5 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN TOILET 0807 5 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN TOILET 0808 5 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN TOILET 0809 5 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN OFFICE SPACE 0810 342 m² WOOD+GRANI TE BURGANDY-GRANI TE PAINT GYPSUM OFFICE EIGHTH FLOOR - PLAN TOILET 0811 5 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN TOILET 0812 5 m² MOSAIC TILING WALL TILES PVC TOILET EIGHTH FLOOR - PLAN Revision Schedule Revision Number Revision Description Revision Date A Schematic Design 01/01/2016