Asset Mapping Exercise - Meeting #3 - May 17, 2011
                                                                   Group #1 - Paper Mapping

Dot #   Category            Asset Name              Comment(s)
 1      Preserve   Green Space along Mystic River   Existing greenway along river provides walking space and many recreational uses
 2      Preserve            Affordability           Maintain affordability of the housing stock in the area
 3      Preserve    West Medford Affordability      Maintain affordability of the housing stock in West Medford/African American Community
 4      Preserve           Walkling Court           Preserve Walkling Court, need affordable senior housing option
 5      Preserve            Whole Foods             Preserve Whole Foods, great neighborhood amenity, local access to a grocery store
 6      Preserve        200 Boston Avenue           Preserve the building, provides many jobs
 7      Preserve            Local Business          Preserve local businesses along Boston Avenue, provides neighborhood level business and jobs
 8      Preserve       Existing Traffic Levels      No increases in traffic along Route 16, keep same or decrease traffic
 9      Preserve         Trees Along Tracks         Preserve the greenery along the existing commuter rail right of way, avoid barrier walls

Dot #   Category            Asset Name              Comment(s)
 1       Change           Station Location          The proposed Green Line station location should be moved north of the river
 2       Change           Station Location          The proposed Green Line station location should be moved to the West Medford commuter rail station
 3       Change                Zoning               The existing zoning needs to change in order to enable transit oriented development
 4       Change        Pedestrian Connectivity      Improve pedestrian connectivity to the station area, connect to existing commercial areas, improve safety for pedestrians
 5       Change            Boston Avenue            Some buildings along Boston Avenue could be improved, possibly add a mixed-use component for housing above businesses
 6       Change           Public Investment         New transit station could be used to leverage new public investment in sidewalks or streetscape
 7       Change             Whole Foods             Infill could take place in vacant areas around the Whole Foods or on the parking lot
 8       Change          New Development            If the commercial buildings are redeveloped, I would like to see it replaced with single-family residential
 9       Change               Parking               Need to develop parking associated with the proposed Green Line station
Asset Mapping Exercise - Meeting #3 - May 17, 2011
                                                               Group #2 - Online Asset Mapping

Dot # Category              Asset Name                 Comment(s)
 1    Preserve         West Medford Center             Keep the mix of small local businesses, no chain stores
 2    Preserve        Residential Neighborhood         Preserve residential neighborhood with 1-3 unit buildings
 3    Preserve            Work Out World               Important to have a fitness facility in Medford
 4    Preserve             U-Haul Building             Potential historic building, former mattress factory, provides needed storage and U-Haul services
 5    Preserve       200 Boston Avenue Building        Professional office building, high income jobs, provides tax base
 6    Preserve             Walkling Court              Preserve senior housing and access to transportation
 7    Preserve              Whole Foods                Walkable, convenient distance, accessible for seniors, quality food, provides support to the community
 8    Preserve        Mystic River Open Space          Veterans Park is important
 9    Preserve             Veteran's Park              Preserve all open space and parks, including Veteran's Park

Dot # Category               Asset Name                Comment(s)
 1     Change     Mystic Valley Parkway Crosswalks     Improve pedestrian access and crosswalks
 2     Change               Canoe Launch               Need a place to launch a canoe, and canoe rentals
 3     Change               River Pathway              Improve pathway
 4     Change    Mystic Valley Parkway Open Space      Maintenance of sidewalks, snow clearning, connections to Mystic River paths
 5     Change         Bike Access to the Station       Need a way to secure bikes at the proposed station, and improve bike access to station
 6     Change    200 Boston Avenue Parking Structure   Eyesore, move parking to another location
 7     Change              U-Haul Building             U-Haul business is not important to the community, poor property upkeepk, no local U-Haul is needed here
 8     Change     Sidewalk Under Route 16 Bridge       Improve safety, lighting, plowing, pruning, maintenance, street drainage, and keep bikes off the sidewalk
 9     Change       Route 16 and Auburn Street         Improve pedestrian safety features, signaling and traffic lights
 10    Change               Veteran's Park             Improve pedestrian access to existing parks, path network, make it contiguous
 11    Change         Route 16 and I-93 Ramp           Improve safety, signalization, and traffic
Asset Mapping Exercise - Meeting #3 - May 17, 2011
                                                                            Group #3 - Paper Mapping

Dot #   Category                 Asset Name                 Comment(s)
  1     Preserve                 Whole Foods                It's a walkable grocery store, they contribute to the community, they host the farmers market.
  2     Preserve                  Mystic River              Provides entertainment (walking, boating, wildlife), preserve nature close to homes, acts as an urban respite
  3     Preserve            Path along Mystic River         Provides connectivity to destinations, opportunity for recreation and health benefits, air quality benefit, kids can use it
  4     Preserve                 Capen Court                Senior housing in Somerville
  5     Preserve      Brick Bldg in front of Capen Court    Has historical character (old pump house), unique building in the area
  6     Preserve                  U-Haul Bldg               Should be preserved, but feels out of character as viewed from the surrounding neighborhoods
  7     Preserve                Alewife Brook               Neglected asset
  8     Preserve                      Tufts                 Athletic fields, arts, concerts, students "keep it young"
  9     Preserve                Cummings Park               Park space in the area
 10     Preserve              Capen Street Park             Park space in the area
 11     Preserve                   Band Shell               Concerts, green space, City recently rehabbed space, currently under-used, only band shell in the area
 12     Preserve                 Dudley Field               Local sports teams play here
 13     Preserve          Pool near Dudley Stadium          Family recreational use, safe place for kids to recreate
 14     Preserve                 Housing Stock              Keep single family and two-family character to the neighborhood
 15     Preserve                      Trees                 Adds greenery to the area
Dot #   Category                 Asset Name                 Comment(s)
  1      Change                    Bike Path                Bike path along Green Line tracks to connect to Minuteman Path, need better connectivity and network or paths
  2      Change       Brick Bldg in front of Capen Court    Preserve the building but reuse it for artist space
  3      Change                 Walkling Court              Careful redevelopment effort, consistent with adjacent neighborhood
  4      Change                    Route 16                 Go down to 3 lanes because current lanes are too narrow, improve Route 16/Boston Avenue intersection
  5      Change                 Boat Launches               Repair launches, add more launches, need boathouse along river
  6
        Change              Urban Neighborhood              3-story building, higher density, include housing along Boston Avenue
  7
  8     Change                     Benches                  Add benches along Mystic River, respect the existing slopes
  9
 10                Pedstrian Access, Bridge Crossings, Safe Need to develop good access for bikes and pedestrians from the station area to the proposed station itself. Crossing Route 16 needs to
        Change
 11                           Bike/Ped Access               become safer to access the proposed station. The existing bridges are also dangerous for pedestrians.
 12
 13     Change               Green Line Station             Really just need the station to be constructed
 14     Change                 Whole Foods                  Keep the store, need higher density, go 3-4 stories above existing store
Asset Mapping Exercise - Meeting #3 - May 17, 2011
                                                                   Group #4 - Paper Mapping

Dot # Category        Asset Name           Comment(s)
 1    Preserve         River Access        Preserve the access to the Mystic River
 2    Preserve         Scenic Vista        Preserve scenic vistas (or views) of the river from a driving and walking perspective
 3    Preserve         Open Space          People and families use existing open space for recreating with pets, could use more open space too
 4    Preserve             River           Preserve the fauna, waterfowl, and wildlife associated with the river
 5    Preserve     Scenic Water Vistas     Preserve the scenic water vistas for pedestrians and drivers
 6    Preserve         Boat Access         Preserve the existing boat docks and access along the river
 7    Preserve        Whole Foods          Preserve Whole Foods store, asset to the community
 8    Preserve       Walkling Court        Acts as the center of community life for seniors, is handicap accessible, acts as a voting location
 9    Preserve         Open Space          Preserve playgrounds at Capen Street, along the Mystic, and Walkling Court
 10   Preserve   Neighborhood Character    Preserve existing neighborhood fabric, including existing single family housing
 11   Preserve         Connectivity        Preserve existing non-vehicle connectivity to the proposed transit station
 12   Preserve       Bus Connections       Want to preserve the existing bus connections throughout the community
 13   Preserve   Neighborhood Character    We have a non-urban fabric to this neighborhood, we feel we are a suburban community
 14   Preserve        Housing Stock        Preserve affordable nature of existing housing stock
 15   Preserve            Traffic          Preserve existing levels of traffic, don't add more traffic as a result of new development
 16   Preserve   Neighborhood Character    Neighborhood is quiet at night, will the proposed station change that, we don't want it to change
 17   Preserve     Noise/Light Pollution   Preserve existing noise and light levels, don't want new station to change that
 18   Preserve   Neighborhood Character    Preserve small retail shops and walkable atmosphere that currently exists

Dot # Category         Asset Name          Comment(s)
 1     Change          Boat Access         Enhance the boat access to the river
 2     Change        River Pathway         The pathway along the river is underutilized because of poor infrastructure and few connections to neighborhoods
 3     Change         Condon Shell         Has a wastewater management issue that causes offensive odors
 4     Change        Geese Problem         Need to deal with goose excrement issue, bad for health of citizens and children
 5     Change    Commercial Development    Improve the commercial node at the intersection of Boston Avenue and Winthrop Street. Want a nice commercial area nearby.
 6     Change          Truck Traffic       Keep truck traffic off Mystic Valley Parkway
 7     Change            Parking           Identify and develop and enforcement policy for parking, need a strategy for enforcement, zoned residential parking
 8     Change           Dog Park           Park area near Boston Avenue bridge is troubled by dog feces, could solve this by adding a dog park
 9     Change      New Development         Bring in development around the proposed station that is appropriate scale and appropriate to our market
 10    Change         Transit Access       Bringing in a new station will help create access to transit
 11    Change       Pedestrian Access      Need a larger plan that addresses pedestrian connectivity to the new station from existing neighborhoods
 12    Change      Pedestrian Safety       Study area is a dangerous place for pedestrians, need safer facilities

More Related Content

What's hot

SPP Loch Ryan Case Study
SPP Loch Ryan Case StudySPP Loch Ryan Case Study
SPP Loch Ryan Case StudyJimmy Fisher
 
Whitby Feasibility Study final final 555 final final
Whitby Feasibility Study final final 555 final finalWhitby Feasibility Study final final 555 final final
Whitby Feasibility Study final final 555 final finalEdison Mugoya
 
Jefferson County Historical High School
Jefferson County Historical High SchoolJefferson County Historical High School
Jefferson County Historical High SchoolMason Frascona
 
Walk on Wall
Walk on Wall Walk on Wall
Walk on Wall kvon15
 
Luis sotelo architectural portfolio
Luis sotelo   architectural portfolioLuis sotelo   architectural portfolio
Luis sotelo architectural portfolioLuis Antonio Sotelo
 
Lecture04 AASHTO girder bridge ( Highway Engineering )
Lecture04   AASHTO girder bridge ( Highway Engineering )Lecture04   AASHTO girder bridge ( Highway Engineering )
Lecture04 AASHTO girder bridge ( Highway Engineering )Hossam Shafiq I
 
Waterbury Downtown October 29 2009
Waterbury Downtown October 29 2009Waterbury Downtown October 29 2009
Waterbury Downtown October 29 2009lizschlegel
 
Selectmen meeting 021014 final
Selectmen meeting 021014 finalSelectmen meeting 021014 final
Selectmen meeting 021014 finalKristi Armstrong
 
Revitalizing The Figueroa Corridor
Revitalizing The Figueroa CorridorRevitalizing The Figueroa Corridor
Revitalizing The Figueroa Corridorkvon15
 
Rural Economic Action Plan in Central Oklahoma | 2010
Rural Economic Action Plan in Central Oklahoma | 2010Rural Economic Action Plan in Central Oklahoma | 2010
Rural Economic Action Plan in Central Oklahoma | 2010reapoklahoma
 
Corrosion club rebarimages
Corrosion club rebarimagesCorrosion club rebarimages
Corrosion club rebarimagesAdam Papworth
 
2010 Marina Bay Sands
2010 Marina Bay Sands2010 Marina Bay Sands
2010 Marina Bay SandsNatare Corp
 
Marine_Brochure_For_Web
Marine_Brochure_For_WebMarine_Brochure_For_Web
Marine_Brochure_For_WebMike Bisland
 
PPD 531 Council for Watershed
PPD 531 Council for WatershedPPD 531 Council for Watershed
PPD 531 Council for Watershedkvon15
 
Clifton Ave Streetscape Report- Spring 2015.compressed
Clifton Ave Streetscape Report- Spring 2015.compressedClifton Ave Streetscape Report- Spring 2015.compressed
Clifton Ave Streetscape Report- Spring 2015.compressedJake Henderson
 

What's hot (19)

SPP Loch Ryan Case Study
SPP Loch Ryan Case StudySPP Loch Ryan Case Study
SPP Loch Ryan Case Study
 
Whitby Feasibility Study final final 555 final final
Whitby Feasibility Study final final 555 final finalWhitby Feasibility Study final final 555 final final
Whitby Feasibility Study final final 555 final final
 
Jefferson County Historical High School
Jefferson County Historical High SchoolJefferson County Historical High School
Jefferson County Historical High School
 
Walk on Wall
Walk on Wall Walk on Wall
Walk on Wall
 
Luis sotelo architectural portfolio
Luis sotelo   architectural portfolioLuis sotelo   architectural portfolio
Luis sotelo architectural portfolio
 
Lecture04 AASHTO girder bridge ( Highway Engineering )
Lecture04   AASHTO girder bridge ( Highway Engineering )Lecture04   AASHTO girder bridge ( Highway Engineering )
Lecture04 AASHTO girder bridge ( Highway Engineering )
 
Abergeldie Brochure
Abergeldie BrochureAbergeldie Brochure
Abergeldie Brochure
 
Waterbury Downtown October 29 2009
Waterbury Downtown October 29 2009Waterbury Downtown October 29 2009
Waterbury Downtown October 29 2009
 
Selectmen meeting 021014 final
Selectmen meeting 021014 finalSelectmen meeting 021014 final
Selectmen meeting 021014 final
 
Revitalizing The Figueroa Corridor
Revitalizing The Figueroa CorridorRevitalizing The Figueroa Corridor
Revitalizing The Figueroa Corridor
 
Item #9 ppt trolley stop
Item #9   ppt trolley stopItem #9   ppt trolley stop
Item #9 ppt trolley stop
 
Via
ViaVia
Via
 
Rural Economic Action Plan in Central Oklahoma | 2010
Rural Economic Action Plan in Central Oklahoma | 2010Rural Economic Action Plan in Central Oklahoma | 2010
Rural Economic Action Plan in Central Oklahoma | 2010
 
Corrosion club rebarimages
Corrosion club rebarimagesCorrosion club rebarimages
Corrosion club rebarimages
 
2010 Marina Bay Sands
2010 Marina Bay Sands2010 Marina Bay Sands
2010 Marina Bay Sands
 
AM undertaken projects
AM undertaken projectsAM undertaken projects
AM undertaken projects
 
Marine_Brochure_For_Web
Marine_Brochure_For_WebMarine_Brochure_For_Web
Marine_Brochure_For_Web
 
PPD 531 Council for Watershed
PPD 531 Council for WatershedPPD 531 Council for Watershed
PPD 531 Council for Watershed
 
Clifton Ave Streetscape Report- Spring 2015.compressed
Clifton Ave Streetscape Report- Spring 2015.compressedClifton Ave Streetscape Report- Spring 2015.compressed
Clifton Ave Streetscape Report- Spring 2015.compressed
 

Similar to GLX meeting 3-Summary of asset mapping

CHBOSP Nov 30 session harvest digest
CHBOSP Nov 30 session harvest digestCHBOSP Nov 30 session harvest digest
CHBOSP Nov 30 session harvest digestPlan TheBasin
 
CM10 Values to Actions Jane Lafleur
CM10 Values to Actions Jane LafleurCM10 Values to Actions Jane Lafleur
CM10 Values to Actions Jane LafleurCommunityMatters
 
Final Jasper Country Club presentation from CityVisions and Gamble and Associ...
Final Jasper Country Club presentation from CityVisions and Gamble and Associ...Final Jasper Country Club presentation from CityVisions and Gamble and Associ...
Final Jasper Country Club presentation from CityVisions and Gamble and Associ...Matthew Crane
 
Portfolio_RobinMassingill_2015
Portfolio_RobinMassingill_2015Portfolio_RobinMassingill_2015
Portfolio_RobinMassingill_2015Robin Massingill
 
Table Top notes Oct 22 Gathering
Table Top notes Oct 22 GatheringTable Top notes Oct 22 Gathering
Table Top notes Oct 22 GatheringPlan TheBasin
 
Kaitlyn_Fulton_Portfolio
Kaitlyn_Fulton_PortfolioKaitlyn_Fulton_Portfolio
Kaitlyn_Fulton_PortfolioKaitlyn Fulton
 
Brigham City, UT SDAT Presentation
Brigham City, UT SDAT PresentationBrigham City, UT SDAT Presentation
Brigham City, UT SDAT PresentationCommunitiesbyDesign
 
Final presentation for The Parklands
Final presentation for The Parklands Final presentation for The Parklands
Final presentation for The Parklands Matthew Crane
 
View Royal Open House Boards Final
View Royal Open House Boards FinalView Royal Open House Boards Final
View Royal Open House Boards FinalKeltie Chamberlain
 
RiverFIRST site design and analysis-book
RiverFIRST site design and analysis-bookRiverFIRST site design and analysis-book
RiverFIRST site design and analysis-bookRiverFirst Initiative
 
Dubois county park master plan final
Dubois county park master plan   finalDubois county park master plan   final
Dubois county park master plan finalMatthew Crane
 
“Working Smarter to Maximize Impact” by Danielle Crumrine, Executive Director...
“Working Smarter to Maximize Impact” by Danielle Crumrine, Executive Director...“Working Smarter to Maximize Impact” by Danielle Crumrine, Executive Director...
“Working Smarter to Maximize Impact” by Danielle Crumrine, Executive Director...Rails-To-Trails Conservancy
 
Mitigated Parcels
Mitigated ParcelsMitigated Parcels
Mitigated Parcelsabakerj
 
作品集-王珏 Portfolio of Jue Wang
作品集-王珏 Portfolio of Jue Wang作品集-王珏 Portfolio of Jue Wang
作品集-王珏 Portfolio of Jue WangJue Wang
 
April 12 Planning Public Forum
April 12 Planning Public ForumApril 12 Planning Public Forum
April 12 Planning Public Forumpublicinvolvement
 
A Permaculture Design for a York PA Old Farmstead
A Permaculture Design for a York PA Old FarmsteadA Permaculture Design for a York PA Old Farmstead
A Permaculture Design for a York PA Old FarmsteadCHEARS
 
GBF2007 Industrial Revitalization Joe Lobko
GBF2007 Industrial Revitalization Joe LobkoGBF2007 Industrial Revitalization Joe Lobko
GBF2007 Industrial Revitalization Joe LobkoToronto 2030 District
 

Similar to GLX meeting 3-Summary of asset mapping (20)

CHBOSP Nov 30 session harvest digest
CHBOSP Nov 30 session harvest digestCHBOSP Nov 30 session harvest digest
CHBOSP Nov 30 session harvest digest
 
Cox.CutSheets2015
Cox.CutSheets2015Cox.CutSheets2015
Cox.CutSheets2015
 
CM10 Values to Actions Jane Lafleur
CM10 Values to Actions Jane LafleurCM10 Values to Actions Jane Lafleur
CM10 Values to Actions Jane Lafleur
 
Final Jasper Country Club presentation from CityVisions and Gamble and Associ...
Final Jasper Country Club presentation from CityVisions and Gamble and Associ...Final Jasper Country Club presentation from CityVisions and Gamble and Associ...
Final Jasper Country Club presentation from CityVisions and Gamble and Associ...
 
Open Space Strategy
Open Space StrategyOpen Space Strategy
Open Space Strategy
 
Portfolio_RobinMassingill_2015
Portfolio_RobinMassingill_2015Portfolio_RobinMassingill_2015
Portfolio_RobinMassingill_2015
 
Table Top notes Oct 22 Gathering
Table Top notes Oct 22 GatheringTable Top notes Oct 22 Gathering
Table Top notes Oct 22 Gathering
 
Kaitlyn_Fulton_Portfolio
Kaitlyn_Fulton_PortfolioKaitlyn_Fulton_Portfolio
Kaitlyn_Fulton_Portfolio
 
Brigham City, UT SDAT Presentation
Brigham City, UT SDAT PresentationBrigham City, UT SDAT Presentation
Brigham City, UT SDAT Presentation
 
Final presentation for The Parklands
Final presentation for The Parklands Final presentation for The Parklands
Final presentation for The Parklands
 
View Royal Open House Boards Final
View Royal Open House Boards FinalView Royal Open House Boards Final
View Royal Open House Boards Final
 
RiverFIRST site design and analysis-book
RiverFIRST site design and analysis-bookRiverFIRST site design and analysis-book
RiverFIRST site design and analysis-book
 
Dubois county park master plan final
Dubois county park master plan   finalDubois county park master plan   final
Dubois county park master plan final
 
“Working Smarter to Maximize Impact” by Danielle Crumrine, Executive Director...
“Working Smarter to Maximize Impact” by Danielle Crumrine, Executive Director...“Working Smarter to Maximize Impact” by Danielle Crumrine, Executive Director...
“Working Smarter to Maximize Impact” by Danielle Crumrine, Executive Director...
 
Mitigated Parcels
Mitigated ParcelsMitigated Parcels
Mitigated Parcels
 
作品集-王珏 Portfolio of Jue Wang
作品集-王珏 Portfolio of Jue Wang作品集-王珏 Portfolio of Jue Wang
作品集-王珏 Portfolio of Jue Wang
 
April 12 Planning Public Forum
April 12 Planning Public ForumApril 12 Planning Public Forum
April 12 Planning Public Forum
 
Comment summary from 2.16.11
Comment summary from 2.16.11Comment summary from 2.16.11
Comment summary from 2.16.11
 
A Permaculture Design for a York PA Old Farmstead
A Permaculture Design for a York PA Old FarmsteadA Permaculture Design for a York PA Old Farmstead
A Permaculture Design for a York PA Old Farmstead
 
GBF2007 Industrial Revitalization Joe Lobko
GBF2007 Industrial Revitalization Joe LobkoGBF2007 Industrial Revitalization Joe Lobko
GBF2007 Industrial Revitalization Joe Lobko
 

More from Metropolitan Area Planning Council

Presentation by Gregory Miao, Esq., Metropolitan Area Planning Council Munici...
Presentation by Gregory Miao, Esq., Metropolitan Area Planning Council Munici...Presentation by Gregory Miao, Esq., Metropolitan Area Planning Council Munici...
Presentation by Gregory Miao, Esq., Metropolitan Area Planning Council Munici...Metropolitan Area Planning Council
 
Presentation by Jeff Bagg, Central Massachusetts Regional Planning Commission...
Presentation by Jeff Bagg, Central Massachusetts Regional Planning Commission...Presentation by Jeff Bagg, Central Massachusetts Regional Planning Commission...
Presentation by Jeff Bagg, Central Massachusetts Regional Planning Commission...Metropolitan Area Planning Council
 

More from Metropolitan Area Planning Council (20)

Autonomous Vehicles
Autonomous Vehicles Autonomous Vehicles
Autonomous Vehicles
 
EV Ride and Drive Event
EV Ride and Drive Event EV Ride and Drive Event
EV Ride and Drive Event
 
Autonomous Vehicles: Boston’s approach
Autonomous Vehicles: Boston’s approachAutonomous Vehicles: Boston’s approach
Autonomous Vehicles: Boston’s approach
 
Electric Vehicles
Electric VehiclesElectric Vehicles
Electric Vehicles
 
Opening Remarks and Introduction of Panelists
Opening Remarks and Introduction of PanelistsOpening Remarks and Introduction of Panelists
Opening Remarks and Introduction of Panelists
 
State of Equity Five-Year Update
State of Equity Five-Year UpdateState of Equity Five-Year Update
State of Equity Five-Year Update
 
Presentation by Gregory Miao, Esq., Metropolitan Area Planning Council Munici...
Presentation by Gregory Miao, Esq., Metropolitan Area Planning Council Munici...Presentation by Gregory Miao, Esq., Metropolitan Area Planning Council Munici...
Presentation by Gregory Miao, Esq., Metropolitan Area Planning Council Munici...
 
Presentation by Jeff Bagg, Central Massachusetts Regional Planning Commission...
Presentation by Jeff Bagg, Central Massachusetts Regional Planning Commission...Presentation by Jeff Bagg, Central Massachusetts Regional Planning Commission...
Presentation by Jeff Bagg, Central Massachusetts Regional Planning Commission...
 
Municipal IT Collaboration
Municipal IT CollaborationMunicipal IT Collaboration
Municipal IT Collaboration
 
IT Strategic Planning Arlington's Approach
IT Strategic Planning Arlington's ApproachIT Strategic Planning Arlington's Approach
IT Strategic Planning Arlington's Approach
 
MassIT: Activating IT Resources at the State Level
MassIT: Activating IT Resources at the State LevelMassIT: Activating IT Resources at the State Level
MassIT: Activating IT Resources at the State Level
 
I.T. Regionalization
I.T. RegionalizationI.T. Regionalization
I.T. Regionalization
 
Natick Center Plan Forum #2
Natick Center Plan Forum #2Natick Center Plan Forum #2
Natick Center Plan Forum #2
 
Vision board
Vision boardVision board
Vision board
 
Vision board
Vision boardVision board
Vision board
 
Feedback boards from PlanAshland December 7, 2015 Forum
Feedback boards from PlanAshland December 7, 2015 ForumFeedback boards from PlanAshland December 7, 2015 Forum
Feedback boards from PlanAshland December 7, 2015 Forum
 
PlanAshland Forum 12/7/2015
PlanAshland Forum 12/7/2015 PlanAshland Forum 12/7/2015
PlanAshland Forum 12/7/2015
 
Natick Center Plan
Natick Center Plan Natick Center Plan
Natick Center Plan
 
Natick Center Plan Forum 1 Presentation 12.8.15
Natick Center Plan Forum 1 Presentation 12.8.15Natick Center Plan Forum 1 Presentation 12.8.15
Natick Center Plan Forum 1 Presentation 12.8.15
 
Presentations from the MAPC Fall Council Meeting
Presentations from the MAPC Fall Council MeetingPresentations from the MAPC Fall Council Meeting
Presentations from the MAPC Fall Council Meeting
 

GLX meeting 3-Summary of asset mapping

  • 1. Asset Mapping Exercise - Meeting #3 - May 17, 2011 Group #1 - Paper Mapping Dot # Category Asset Name Comment(s) 1 Preserve Green Space along Mystic River Existing greenway along river provides walking space and many recreational uses 2 Preserve Affordability Maintain affordability of the housing stock in the area 3 Preserve West Medford Affordability Maintain affordability of the housing stock in West Medford/African American Community 4 Preserve Walkling Court Preserve Walkling Court, need affordable senior housing option 5 Preserve Whole Foods Preserve Whole Foods, great neighborhood amenity, local access to a grocery store 6 Preserve 200 Boston Avenue Preserve the building, provides many jobs 7 Preserve Local Business Preserve local businesses along Boston Avenue, provides neighborhood level business and jobs 8 Preserve Existing Traffic Levels No increases in traffic along Route 16, keep same or decrease traffic 9 Preserve Trees Along Tracks Preserve the greenery along the existing commuter rail right of way, avoid barrier walls Dot # Category Asset Name Comment(s) 1 Change Station Location The proposed Green Line station location should be moved north of the river 2 Change Station Location The proposed Green Line station location should be moved to the West Medford commuter rail station 3 Change Zoning The existing zoning needs to change in order to enable transit oriented development 4 Change Pedestrian Connectivity Improve pedestrian connectivity to the station area, connect to existing commercial areas, improve safety for pedestrians 5 Change Boston Avenue Some buildings along Boston Avenue could be improved, possibly add a mixed-use component for housing above businesses 6 Change Public Investment New transit station could be used to leverage new public investment in sidewalks or streetscape 7 Change Whole Foods Infill could take place in vacant areas around the Whole Foods or on the parking lot 8 Change New Development If the commercial buildings are redeveloped, I would like to see it replaced with single-family residential 9 Change Parking Need to develop parking associated with the proposed Green Line station
  • 2. Asset Mapping Exercise - Meeting #3 - May 17, 2011 Group #2 - Online Asset Mapping Dot # Category Asset Name Comment(s) 1 Preserve West Medford Center Keep the mix of small local businesses, no chain stores 2 Preserve Residential Neighborhood Preserve residential neighborhood with 1-3 unit buildings 3 Preserve Work Out World Important to have a fitness facility in Medford 4 Preserve U-Haul Building Potential historic building, former mattress factory, provides needed storage and U-Haul services 5 Preserve 200 Boston Avenue Building Professional office building, high income jobs, provides tax base 6 Preserve Walkling Court Preserve senior housing and access to transportation 7 Preserve Whole Foods Walkable, convenient distance, accessible for seniors, quality food, provides support to the community 8 Preserve Mystic River Open Space Veterans Park is important 9 Preserve Veteran's Park Preserve all open space and parks, including Veteran's Park Dot # Category Asset Name Comment(s) 1 Change Mystic Valley Parkway Crosswalks Improve pedestrian access and crosswalks 2 Change Canoe Launch Need a place to launch a canoe, and canoe rentals 3 Change River Pathway Improve pathway 4 Change Mystic Valley Parkway Open Space Maintenance of sidewalks, snow clearning, connections to Mystic River paths 5 Change Bike Access to the Station Need a way to secure bikes at the proposed station, and improve bike access to station 6 Change 200 Boston Avenue Parking Structure Eyesore, move parking to another location 7 Change U-Haul Building U-Haul business is not important to the community, poor property upkeepk, no local U-Haul is needed here 8 Change Sidewalk Under Route 16 Bridge Improve safety, lighting, plowing, pruning, maintenance, street drainage, and keep bikes off the sidewalk 9 Change Route 16 and Auburn Street Improve pedestrian safety features, signaling and traffic lights 10 Change Veteran's Park Improve pedestrian access to existing parks, path network, make it contiguous 11 Change Route 16 and I-93 Ramp Improve safety, signalization, and traffic
  • 3. Asset Mapping Exercise - Meeting #3 - May 17, 2011 Group #3 - Paper Mapping Dot # Category Asset Name Comment(s) 1 Preserve Whole Foods It's a walkable grocery store, they contribute to the community, they host the farmers market. 2 Preserve Mystic River Provides entertainment (walking, boating, wildlife), preserve nature close to homes, acts as an urban respite 3 Preserve Path along Mystic River Provides connectivity to destinations, opportunity for recreation and health benefits, air quality benefit, kids can use it 4 Preserve Capen Court Senior housing in Somerville 5 Preserve Brick Bldg in front of Capen Court Has historical character (old pump house), unique building in the area 6 Preserve U-Haul Bldg Should be preserved, but feels out of character as viewed from the surrounding neighborhoods 7 Preserve Alewife Brook Neglected asset 8 Preserve Tufts Athletic fields, arts, concerts, students "keep it young" 9 Preserve Cummings Park Park space in the area 10 Preserve Capen Street Park Park space in the area 11 Preserve Band Shell Concerts, green space, City recently rehabbed space, currently under-used, only band shell in the area 12 Preserve Dudley Field Local sports teams play here 13 Preserve Pool near Dudley Stadium Family recreational use, safe place for kids to recreate 14 Preserve Housing Stock Keep single family and two-family character to the neighborhood 15 Preserve Trees Adds greenery to the area Dot # Category Asset Name Comment(s) 1 Change Bike Path Bike path along Green Line tracks to connect to Minuteman Path, need better connectivity and network or paths 2 Change Brick Bldg in front of Capen Court Preserve the building but reuse it for artist space 3 Change Walkling Court Careful redevelopment effort, consistent with adjacent neighborhood 4 Change Route 16 Go down to 3 lanes because current lanes are too narrow, improve Route 16/Boston Avenue intersection 5 Change Boat Launches Repair launches, add more launches, need boathouse along river 6 Change Urban Neighborhood 3-story building, higher density, include housing along Boston Avenue 7 8 Change Benches Add benches along Mystic River, respect the existing slopes 9 10 Pedstrian Access, Bridge Crossings, Safe Need to develop good access for bikes and pedestrians from the station area to the proposed station itself. Crossing Route 16 needs to Change 11 Bike/Ped Access become safer to access the proposed station. The existing bridges are also dangerous for pedestrians. 12 13 Change Green Line Station Really just need the station to be constructed 14 Change Whole Foods Keep the store, need higher density, go 3-4 stories above existing store
  • 4. Asset Mapping Exercise - Meeting #3 - May 17, 2011 Group #4 - Paper Mapping Dot # Category Asset Name Comment(s) 1 Preserve River Access Preserve the access to the Mystic River 2 Preserve Scenic Vista Preserve scenic vistas (or views) of the river from a driving and walking perspective 3 Preserve Open Space People and families use existing open space for recreating with pets, could use more open space too 4 Preserve River Preserve the fauna, waterfowl, and wildlife associated with the river 5 Preserve Scenic Water Vistas Preserve the scenic water vistas for pedestrians and drivers 6 Preserve Boat Access Preserve the existing boat docks and access along the river 7 Preserve Whole Foods Preserve Whole Foods store, asset to the community 8 Preserve Walkling Court Acts as the center of community life for seniors, is handicap accessible, acts as a voting location 9 Preserve Open Space Preserve playgrounds at Capen Street, along the Mystic, and Walkling Court 10 Preserve Neighborhood Character Preserve existing neighborhood fabric, including existing single family housing 11 Preserve Connectivity Preserve existing non-vehicle connectivity to the proposed transit station 12 Preserve Bus Connections Want to preserve the existing bus connections throughout the community 13 Preserve Neighborhood Character We have a non-urban fabric to this neighborhood, we feel we are a suburban community 14 Preserve Housing Stock Preserve affordable nature of existing housing stock 15 Preserve Traffic Preserve existing levels of traffic, don't add more traffic as a result of new development 16 Preserve Neighborhood Character Neighborhood is quiet at night, will the proposed station change that, we don't want it to change 17 Preserve Noise/Light Pollution Preserve existing noise and light levels, don't want new station to change that 18 Preserve Neighborhood Character Preserve small retail shops and walkable atmosphere that currently exists Dot # Category Asset Name Comment(s) 1 Change Boat Access Enhance the boat access to the river 2 Change River Pathway The pathway along the river is underutilized because of poor infrastructure and few connections to neighborhoods 3 Change Condon Shell Has a wastewater management issue that causes offensive odors 4 Change Geese Problem Need to deal with goose excrement issue, bad for health of citizens and children 5 Change Commercial Development Improve the commercial node at the intersection of Boston Avenue and Winthrop Street. Want a nice commercial area nearby. 6 Change Truck Traffic Keep truck traffic off Mystic Valley Parkway 7 Change Parking Identify and develop and enforcement policy for parking, need a strategy for enforcement, zoned residential parking 8 Change Dog Park Park area near Boston Avenue bridge is troubled by dog feces, could solve this by adding a dog park 9 Change New Development Bring in development around the proposed station that is appropriate scale and appropriate to our market 10 Change Transit Access Bringing in a new station will help create access to transit 11 Change Pedestrian Access Need a larger plan that addresses pedestrian connectivity to the new station from existing neighborhoods 12 Change Pedestrian Safety Study area is a dangerous place for pedestrians, need safer facilities