Before and After projects presentation
1. Acton
Elementary School
Playground Construction
2003
Before I was elected on the School
Board I served as the Chairman of the
Playground Committee in my
hometown. The project consisted of
removing a gravel bank, consolidating
two playgrounds, adding new play
structures and a basketball court.
2. Kennebunk Parks
& Recreation
Rogers Pond Park
2004
The project was funded through a
LWCF grant and consisted of
paving the park entrance and
parking lot, renovating the park
grounds and constructing a large
picnic pavilion.
3. Saco Parks
& Recreation
Community Center Grounds
Renovation
2009
In 2005 SPR moved into what was
a National Guard Armory. In
2007 the City Council authorized
a 1.5 million dollar renovation to
the building and grounds allowing
us to build the community asset
which is now the Community
Center.
4. The gym renovation included the installation of a brand
new floor with rubber subsurface mounts, 6 adjustable
basketball hoops, retractable batting cage, new windows,
LED lighting and HVAC system
Saco Parks & Recreation
Gym Renovation
2008
5. Saco Parks
& Recreation
Phoenix Field Construction
2009
We transformed the old landfill site that was
capped and used as a hay field into 7 acres of
multi purpose athletic fields. This project was
completed in conjunction with Saco DPW and a
great example of how a City can save money
when departments work together.
6. Saco Parks & Recreation
Burns School Playground
2013
The Burns School Playground project was the second renovation project undertaken by the Playground
Committee. This project entailed replacing a 21 yr. old wood structure while addressing site use issues such
as inadequate drainage and lack of safety zone separating the playground from vehicle traffic.
7. Saco Parks & Recreation
Parks Maintenance Building
Construction 2009
Previous to 2009 Parks vehicles
and equipment were all stored
offsite at 3 separate locations, each
of which had issues such as no
heat, flooding and no storage.
With the new building everything
was consolidated onsite with
ample storage, a heated workshop,
parks office and vehicle wash bay.