Mabey’s shoring system stabilized
cofferdam on Loch Ryan harbor for
new pipeline to protect Scotland’s
only natural oyster bed.
LOCATION Port Rodie, Stranraer, Scotland
SPECS Twin-level bracing and bracing struts
PURPOSE Wastewater system replacement
CASE STUDY
MABEY SYSTEM:
Super Powerbrace Plus
Bracing System
CASE STUDY: Port Rodie, Stranraer, Scotland
To find a depot near you, visit mabey.com. (800) 956-2239 | info@mabey.com
The Challenge
Stranraer is the second largest town in the rural landscape of Dumfries
and Galloway and it sits on the bank of Loch Ryan, a sea loch humming
with Scotland’s only natural oyster bed. In 2012, the wastewater system
for Stranraer and the surrounding areas was deemed outdated and in
need of replacement. Situated at Port Rodie on the harbour front, the
wastewater treatment works (WwTW) for Stranraer is a primary treat-
ment facility with underground settlement tanks and no sludge treatment
facilities, which led to water being discharged into Loch Ryan.
The Solution
In one of the final operations of Scottish Water’s project, they were to
construct a new pipe to transfer final effluent to the Irish Sea, removing
completely the discharge to Loch Ryan. Mabey was contacted by sub-
contractor George Leslie/MWH JV to design a frame for the cofferdam,
located in the sea close to the harbor wall. The frame was required
to withstand a customer calculated loading of 14,458 lbs/ft; this was
achieved by using Mabey’s Super PowerBracePlus. Twin level bracing
was installed at 105’ long by 17’ wide, along with eight bracing struts
over five days.
The Result
Mabey and ABCO Maine Ltd. worked day and night to complete the
installation around the flow of the tide. A 32” diameter pipe was bored
from the harbor out under the railway and then into the cofferdam. The
pipe was approximately 3’ below the finished level in the cofferdam and
it was then turned 45 degrees and out in to the loch.
The contract period experienced some bad weather conditions, causing
crews to stand down when it was too dangerous to work. However, the
project remained on course and was removed within two months.
For more case studies or information, please visit mabey.com.
Mabey Inc.
A Leader In Shoring, Bridging
and Construction Rentals
800-956-2239
www.mabey.com
info@mabey.com
“The Customer Product Special-
ist provided not only useful but
invaluable design input to install
the frame to what was a revised
cofferdam. Very impressed and
would recommend in future.”
– Stevan Foster,
Project Manager
ABCO Marine Ltd

More Related Content

What's hot

The New I 64 December 2008
The New I 64 December 2008The New I 64 December 2008
The New I 64 December 2008WhitneyWilson
 
Shipping container water storage
Shipping container water storageShipping container water storage
Shipping container water storageLiquid Containment
 
Abg basal drainage_and_slope_veneer_retention_pozidrain_and_erosaweb_shetland...
Abg basal drainage_and_slope_veneer_retention_pozidrain_and_erosaweb_shetland...Abg basal drainage_and_slope_veneer_retention_pozidrain_and_erosaweb_shetland...
Abg basal drainage_and_slope_veneer_retention_pozidrain_and_erosaweb_shetland...ssuser8a213e1
 
The Valletta Waterfront Experience: Back to the Future
The Valletta Waterfront Experience: Back to the FutureThe Valletta Waterfront Experience: Back to the Future
The Valletta Waterfront Experience: Back to the FutureValletta Cruise Port
 
East Java Gas Pipeline
East Java Gas PipelineEast Java Gas Pipeline
East Java Gas PipelineBoudewijn Baan
 
Zego 2065 steel fixer
Zego 2065 steel fixerZego 2065 steel fixer
Zego 2065 steel fixersimonjohn2
 
Terraforce Terracrete hardlawn paver
Terraforce Terracrete hardlawn paverTerraforce Terracrete hardlawn paver
Terraforce Terracrete hardlawn paverTerraforce
 
Mat12 for sale
Mat12 for saleMat12 for sale
Mat12 for salebkoning
 
CEMATRIX Corporation - Product Overview
CEMATRIX Corporation - Product OverviewCEMATRIX Corporation - Product Overview
CEMATRIX Corporation - Product OverviewThe Howard Group Inc.
 
O day cruisers originial brochure
O day cruisers originial brochureO day cruisers originial brochure
O day cruisers originial brochuremodernimage
 
Apc euro slate_121102
Apc euro slate_121102Apc euro slate_121102
Apc euro slate_121102kristenjames
 

What's hot (17)

The New I 64 December 2008
The New I 64 December 2008The New I 64 December 2008
The New I 64 December 2008
 
Shipping container water storage
Shipping container water storageShipping container water storage
Shipping container water storage
 
Abg basal drainage_and_slope_veneer_retention_pozidrain_and_erosaweb_shetland...
Abg basal drainage_and_slope_veneer_retention_pozidrain_and_erosaweb_shetland...Abg basal drainage_and_slope_veneer_retention_pozidrain_and_erosaweb_shetland...
Abg basal drainage_and_slope_veneer_retention_pozidrain_and_erosaweb_shetland...
 
The Valletta Waterfront Experience: Back to the Future
The Valletta Waterfront Experience: Back to the FutureThe Valletta Waterfront Experience: Back to the Future
The Valletta Waterfront Experience: Back to the Future
 
Ec smx cs_va_roanoke
Ec smx cs_va_roanokeEc smx cs_va_roanoke
Ec smx cs_va_roanoke
 
East Java Gas Pipeline
East Java Gas PipelineEast Java Gas Pipeline
East Java Gas Pipeline
 
Zego 2065 steel fixer
Zego 2065 steel fixerZego 2065 steel fixer
Zego 2065 steel fixer
 
Terraforce Terracrete hardlawn paver
Terraforce Terracrete hardlawn paverTerraforce Terracrete hardlawn paver
Terraforce Terracrete hardlawn paver
 
Const-Gardens
Const-GardensConst-Gardens
Const-Gardens
 
Mat12 for sale
Mat12 for saleMat12 for sale
Mat12 for sale
 
Apc flagpav
Apc flagpav Apc flagpav
Apc flagpav
 
CEMATRIX Corporation - Product Overview
CEMATRIX Corporation - Product OverviewCEMATRIX Corporation - Product Overview
CEMATRIX Corporation - Product Overview
 
linked in PPT
linked in PPTlinked in PPT
linked in PPT
 
Soil cement
Soil cementSoil cement
Soil cement
 
Ess 01 & ess-02 closing meeting
Ess 01 & ess-02 closing meetingEss 01 & ess-02 closing meeting
Ess 01 & ess-02 closing meeting
 
O day cruisers originial brochure
O day cruisers originial brochureO day cruisers originial brochure
O day cruisers originial brochure
 
Apc euro slate_121102
Apc euro slate_121102Apc euro slate_121102
Apc euro slate_121102
 

Viewers also liked (7)

SPP M1 Case Study
SPP M1 Case StudySPP M1 Case Study
SPP M1 Case Study
 
Lesson4
Lesson4Lesson4
Lesson4
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
Coffer Dams and Caissons
Coffer Dams and CaissonsCoffer Dams and Caissons
Coffer Dams and Caissons
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
Coffer dam and its type
Coffer dam and its typeCoffer dam and its type
Coffer dam and its type
 
Cofferdam
CofferdamCofferdam
Cofferdam
 

Similar to SPP Loch Ryan Case Study

Marine_Brochure_For_Web
Marine_Brochure_For_WebMarine_Brochure_For_Web
Marine_Brochure_For_WebMike Bisland
 
NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012Mike Vernon
 
infrastructure_ad_new
infrastructure_ad_newinfrastructure_ad_new
infrastructure_ad_newAlexandra Dix
 
profix portfolio 2016
profix portfolio 2016profix portfolio 2016
profix portfolio 2016Phil Syers
 
Pipex Pumping Stations, Chambers & Catchpits
Pipex Pumping Stations, Chambers & CatchpitsPipex Pumping Stations, Chambers & Catchpits
Pipex Pumping Stations, Chambers & Catchpitseddiebradbrook
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen PowerpointMay Begum
 
931b50e6-4a9d-4b54-8552-683e3282e2a5-150409034912-conversion-gate01
931b50e6-4a9d-4b54-8552-683e3282e2a5-150409034912-conversion-gate01931b50e6-4a9d-4b54-8552-683e3282e2a5-150409034912-conversion-gate01
931b50e6-4a9d-4b54-8552-683e3282e2a5-150409034912-conversion-gate01Pavitter Virdi
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen PowerpointHayley Sharp
 
Marine applications
Marine applicationsMarine applications
Marine applicationsRobin Wright
 
MPC Capability Brochure_V6_2016_Digital
MPC Capability Brochure_V6_2016_DigitalMPC Capability Brochure_V6_2016_Digital
MPC Capability Brochure_V6_2016_DigitalDave Machin
 
Thames Perry Oaks-Iver South 2005
Thames Perry Oaks-Iver South 2005Thames Perry Oaks-Iver South 2005
Thames Perry Oaks-Iver South 2005Robert Sharpe
 
Rapidshor - notable projects
Rapidshor - notable projects Rapidshor - notable projects
Rapidshor - notable projects RMD Kwikform Ltd
 
CC Mining Applications
CC Mining ApplicationsCC Mining Applications
CC Mining ApplicationsChristiane Cyr
 
BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015Blase Townsing
 
Scottish_Forth_Crossing_2011
Scottish_Forth_Crossing_2011Scottish_Forth_Crossing_2011
Scottish_Forth_Crossing_2011Mike Bisland
 

Similar to SPP Loch Ryan Case Study (20)

BPClairRidge
BPClairRidgeBPClairRidge
BPClairRidge
 
Marine_Brochure_For_Web
Marine_Brochure_For_WebMarine_Brochure_For_Web
Marine_Brochure_For_Web
 
Alan sutton
Alan suttonAlan sutton
Alan sutton
 
RA_CV - October 2016
RA_CV - October 2016RA_CV - October 2016
RA_CV - October 2016
 
NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012NI_Water_Dunmurry_2012
NI_Water_Dunmurry_2012
 
infrastructure_ad_new
infrastructure_ad_newinfrastructure_ad_new
infrastructure_ad_new
 
Abergeldie Brochure
Abergeldie BrochureAbergeldie Brochure
Abergeldie Brochure
 
profix portfolio 2016
profix portfolio 2016profix portfolio 2016
profix portfolio 2016
 
Pipex Pumping Stations, Chambers & Catchpits
Pipex Pumping Stations, Chambers & CatchpitsPipex Pumping Stations, Chambers & Catchpits
Pipex Pumping Stations, Chambers & Catchpits
 
Amc floating dock
Amc floating dockAmc floating dock
Amc floating dock
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen Powerpoint
 
931b50e6-4a9d-4b54-8552-683e3282e2a5-150409034912-conversion-gate01
931b50e6-4a9d-4b54-8552-683e3282e2a5-150409034912-conversion-gate01931b50e6-4a9d-4b54-8552-683e3282e2a5-150409034912-conversion-gate01
931b50e6-4a9d-4b54-8552-683e3282e2a5-150409034912-conversion-gate01
 
About Waterman Aspen Powerpoint
About Waterman Aspen PowerpointAbout Waterman Aspen Powerpoint
About Waterman Aspen Powerpoint
 
Marine applications
Marine applicationsMarine applications
Marine applications
 
MPC Capability Brochure_V6_2016_Digital
MPC Capability Brochure_V6_2016_DigitalMPC Capability Brochure_V6_2016_Digital
MPC Capability Brochure_V6_2016_Digital
 
Thames Perry Oaks-Iver South 2005
Thames Perry Oaks-Iver South 2005Thames Perry Oaks-Iver South 2005
Thames Perry Oaks-Iver South 2005
 
Rapidshor - notable projects
Rapidshor - notable projects Rapidshor - notable projects
Rapidshor - notable projects
 
CC Mining Applications
CC Mining ApplicationsCC Mining Applications
CC Mining Applications
 
BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015BLASE TOWNSING CV 2015
BLASE TOWNSING CV 2015
 
Scottish_Forth_Crossing_2011
Scottish_Forth_Crossing_2011Scottish_Forth_Crossing_2011
Scottish_Forth_Crossing_2011
 

SPP Loch Ryan Case Study

  • 1. To find a depot near you, visit mabey.com. (800) 956-2239 | info@mabey.com Mabey’s shoring system stabilized cofferdam on Loch Ryan harbor for new pipeline to protect Scotland’s only natural oyster bed. LOCATION Port Rodie, Stranraer, Scotland SPECS Twin-level bracing and bracing struts PURPOSE Wastewater system replacement CASE STUDY MABEY SYSTEM: Super Powerbrace Plus Bracing System
  • 2. CASE STUDY: Port Rodie, Stranraer, Scotland To find a depot near you, visit mabey.com. (800) 956-2239 | info@mabey.com The Challenge Stranraer is the second largest town in the rural landscape of Dumfries and Galloway and it sits on the bank of Loch Ryan, a sea loch humming with Scotland’s only natural oyster bed. In 2012, the wastewater system for Stranraer and the surrounding areas was deemed outdated and in need of replacement. Situated at Port Rodie on the harbour front, the wastewater treatment works (WwTW) for Stranraer is a primary treat- ment facility with underground settlement tanks and no sludge treatment facilities, which led to water being discharged into Loch Ryan. The Solution In one of the final operations of Scottish Water’s project, they were to construct a new pipe to transfer final effluent to the Irish Sea, removing completely the discharge to Loch Ryan. Mabey was contacted by sub- contractor George Leslie/MWH JV to design a frame for the cofferdam, located in the sea close to the harbor wall. The frame was required to withstand a customer calculated loading of 14,458 lbs/ft; this was achieved by using Mabey’s Super PowerBracePlus. Twin level bracing was installed at 105’ long by 17’ wide, along with eight bracing struts over five days. The Result Mabey and ABCO Maine Ltd. worked day and night to complete the installation around the flow of the tide. A 32” diameter pipe was bored from the harbor out under the railway and then into the cofferdam. The pipe was approximately 3’ below the finished level in the cofferdam and it was then turned 45 degrees and out in to the loch. The contract period experienced some bad weather conditions, causing crews to stand down when it was too dangerous to work. However, the project remained on course and was removed within two months. For more case studies or information, please visit mabey.com. Mabey Inc. A Leader In Shoring, Bridging and Construction Rentals 800-956-2239 www.mabey.com info@mabey.com “The Customer Product Special- ist provided not only useful but invaluable design input to install the frame to what was a revised cofferdam. Very impressed and would recommend in future.” – Stevan Foster, Project Manager ABCO Marine Ltd