SlideShare a Scribd company logo
1 of 4
Job Experience
1. Manager Grade-2 – Design & Planning,
Department : Production (R&D),
Division : Manufacturing, Continue from 01/02/2016
Job Responsibilities:
1. Design & Develop of Transformer for CPRI
(Central Power Research Institute, India) to take the
biggest market of power distribution section.
2. Newly Design & Develop of Electrical Sub-
Station ( Three Phase Transformer, Low Tension
Switchgear, High Tension Switchgear, Power Factor
Improvement Plant, etc) including Single Phase
Transformer.
3. Prepare the total industry as per ISO 9001: 2008
i. Prepare the Document for ISO
Certificate
ii. QMS Manual
iii. SOP
iv. Quality control Policy
4. Preparing tender supported documents like
guaranteed technical particular sheets and tender
drawings for both tenders.
5. Make the relationship with REB, DESCO,
WZPDCL, BPDB, BMDA and BADC.
2. Assistant Manager – Design & Quality
control, Department : Production (R&D),
Division : Manufacturing, 28/01/2016 from 12/04/2015
Job Responsibilities:
1. Design & Develop of Electrical Sub-
Station ( Three Phase Transformer, Low Tension
Switchgear, High Tension Switchgear, Power Factor
Improvement Plant, etc) including Single Phase
Transformer.
2. Design of Industrial Voltage Stabilizer
(IVS), UPS, IPS, AVR, Inverter, Battery Charger and
Single layer Printed Circuit Board (PCB) etc, may be
considered as additional responsibility.
3. Preparing tender supported documents
like guaranteed technical particular sheets and tender
drawings for both tenders.
4. Produce calculations, drawings, sketches,
instructions, bills of materials (BOM) etc, for drafters and
others to follow to satisfy the requirements of the
marketing and sales team and customers specifications.
M. A. Masud Khan
Member of IEB:- 37085
S/O. M. A. Mansur Ali Khan
64/73, Nasirabad I/A, Bayazid Bostami Road,
Chittagong – 4210
Cell Phone: +8801719306383
E-mail: khan_bangladesh@yahoo.com
Career Objectives
To take up a challenging
Career grows with honesty,
loyalty, good relationship
and best performance, and
translate my experience,
knowledge, skills and
abilities into value for an
Organization especially in
the Sub-station Company.
Career Summary
After passing B.Sc Engineer
(Electronics &
Communication) I have
joined in Sena Kalyan
Electric Industries a project
of Sena Kalyan Sangstha as
an Assistant Engineer. Just
after two years basing on my
performance, honesty and
loyalty authority has given
promotion as Deputy
Manager (electric engineer).
I have been serving in Sena
Kalyan Electric Industries
since two years six months.
After that Navana
Electronics Ltd has selected
me as Assistant Manager (as
per Company organ gram) at
the design and planning. But
after about ten months Sena
Kalyan Sangstha (Deputy
Director - Business 4) again
called me because their
CPRI work and factory
extension with new project
considering my previous
record. Now-a-days I am
working at Sena Kalyan
Sanstha's Project Sena
Kalyan Electric Industries
(SKEI) as the Manager
Grade-2 from 1st February
2016.
Contribution to SKEI:
1. SKEI has achieved
the CPRI Certificate -
2016 and make total
plan for large
production
2. Through optimum
design and
processing, first time
Sena Kalyan Electric
Industries has
supplied 100 Pieces
of 200KVA three
phase distribution
transformers to West
Zone Power
Distribution
Company Ltd.
(WZPDCL) Khulna
in FY 2012/2013 and
150 Pcs of 200 KVA
three phase
distribution
transformer to BPDB
in FY 2013/2014.
Whole activities like
conduction of factory
inspection by BPDB
Engineer, preparation
of tender documents
and optimized design
has been prepared by
me with the help of
Project head.
3. 1200 KVA & 2000
KVA distribution
transformer of steel
re-rolling mills has
been repaired under
my guideline and
supervision.
5. Routine tests of Single and Three Phase Power Transformer
of different capacity such as winding Insulation Resistance test, Power
Frequency Withstand Test.
6. Conducting over voltage test, Vector Group Test, Ratio Test,
No Load Test and Short Circuit Test with separate source power system.
7. Type tests such as Temperature Rise Test and Impulse test
use by separate source power system and routine test of Lighting Arrestor and
Drop Out Fuse.
8. Develop design specifications, manufacturing documentation
and prepare report about improvement of product Design, Development,
Keeping the documents and records of all analysis.
9. Working with Quality Compliance and production
department regarding compliance issues.
10. Execute the product development process for consumer
Activation’s new product initiatives.
11. Must evaluate customer requirements and integrate
requirements in to the production schedule.
12. Implement special engineering projects related to design
improvements, cost reductions, new materials, new components or new
design techniques.
13. Provide daily/weekly/monthly/ half yearly and annual report
to the management for decision making.
14. Prepare the total industry as per ISO 9001: 2008
i. Prepare the Document for ISO Certificate
ii. QMS Manual
iii. SOP
iv. Quality control Policy
3. Deputy Manager (Electric engineer) 07/04/2015 from 01/05/2014
Sena Kalyan Electric Industries (SKEI) (A project of Sena Kalyan
Sangstha) 64/73, Nasirabad I/A, Bayazid Bostami Road, Chittagong – 4210.
My responsibilities were as follows:
A. Product Design
1. Single and Three Phase Distribution Transformer Design &
Drawing.
B. Production& Service
1. Planning of cost effect product.
2. Monitoring and Super vision of Production Process.
3. Quality Control (Raw material and Finish Product)
4. Maintenance of Machineries and all the Electric system.
5. Make relationship with REB, DESCO, WZPDCL, BPDB,
BMDA and BADC.
6. Prepare Tender documents
7. Supervising Post Sales Customer Service
4. Assistant Engineer 01/09/2012 to 30/04/2014.
Sena Kalyan Electric Industries (SKEI) (A project of Sena Kalyan
Sangstha) 64/73, Nasirabad I/A, Bayazid Bostami Road, Chittagong – 4210.
Job responsibilities follows: As per Deputy Manager at SKEI
Training Experience
Current Project
At present I start a research
project to build up a FUEL
LESS BIKE, I have already
designed all of the process
and procedure and waiting
for some of device and then
practical work will be
started.
Practical Working
Knowledge on:
A- Total 33KV Sub – Station
work.
B- Auto-CAD Drawing.
C- Generator Operation and
Maintenance (Mechanical
and Electrical);
D- ICX system of Tele-
communication
E- Computer Networking
F- Machine Drive PLC and
Inverter
G- Define the fault of
Generator.
H- Basic Auto- mobile System
Extra Curriculum
 Heavy motivational power.
 Auto Gear Car Driving.
 Obtained Management and
Leadership skill by holding
the post of General
Secretary in own
Department at third year in
University.
 Performed overall scout
Leadership during study at
school and college and
finally have gone through
training on different
activities during SAARC
Gamburiy in 2006.
 Active participation in
various seminars and
cultural activities and sports
events at school, college and
university level in various
occasions as well as in
religious activities.
Baizid Group (Baizid Steel Industries Ltd, CSS Power Plant, CSS Corporation Ltd) on Power
Generation, Total Power System, Control System and Production Process.
Educational Background
Degree Department Institute CGPA
Passing
Year
B.Sc. Engg.
Electronics and Communication
Engineering
Khulna University of
Engineering & Technology
CGPA 3.21 out
of 4.00
2012
H.S.C Science Nehalpur School & College
GPA 4.90 out
of 5.00
2007
S.S.C Science Nehalpur School & College
GPA 4.94 out
of 5.00
2005
Personal Particulars
Date of Birth : 30th
December, 1990.
Father’s Name : M. A. Mansur Ali Khan.
Mother’s Name : Shahida Begum.
Nationality : Bangladeshi (by birth)
Gender : Male
Marital Status : Single
Religion : Islam
Cell Phone : +8801719306383
E-mail: khan_bangladesh@yahoo.com
Associate Member of IEB-00078
Passport No: AF4184402
Permanent Residence: Vill+P.O:- Nehalpur,
P.S:- Monirampur, Dis:-Jessore, Dhaka,
Bangladesh
Present Address : 64/73, Nasirabad I/A,
Bayazid Bostami Road,
Chittagong – 4210
Strong Computer Skills
 Operating Systems : Windows XP,
Windows Vista, Windows 7, Windows 8
 Programming Languages : C, C++.
 Hardware Programming :Intel 8085,
8086 Microprocessors, Micro- controller 8051
and ATMEL 32, verilog.
 Engineering Analytical Tools :
MATLAB, PSpice, Circuit Maker, Proteus 7.7
SP2, Microwind, Packet Tracer 5.5, Electronic
Workbench and Super NEC, Multi-sim.
 Computer Networking :Completed course on
CCNA exploration 4.0at 2nd
semester
Foreign Tour:
 Country and Duration: China – 18/11/2015
to 28/11/2015 – VISA – J0663507
a. Trading Company: Shanghai orinno International
Business Co. Ltd
Contact Person : Titan Ding
Designation of Contact Person: Managing Director.
Mail: titanding@163.com
Phone: +8613585993310
Manufacturer: -
i. 1. Suzhou LangGong Vacuum Technology Co. Ltd.
ii. 2. Yangzhou Jiangdu Huayu High Voltage Electric
Co. Ltd
iii. 3. Mingwan Machinery – CNC Plasma cutter
iv. 4. Shenyang Liaoning – Around the city and
electrical equipment factory
v. 5. Canzhoun Kenuo Manufacturing Co. Ltd.
vi. 6. Shenfa Machinery - Jiangsu Province Changzhou
City Shenfa Electrical Appliance Co. Ltd
vii. 7. Wujiang Transformer Co.,Ltd. (Suzhou – China)
b. Trading Company: Nantong Zhenhuan Trade co.
Limited. Contact Person : FranksCao
Designation of Contact Person: Managing
Director.
Mail: sales@transformer-machine.com
Phone: +8613962724758
 Country and Duration: India, CPRI,
Bangalore – 28/08/2015 to 20/09/2016 –
VISA – VK 2851936
Others Skills
 Self-motivated, energetic and reliable
 Excellent interpersonal and
communication Skills
 Friendly and co-operative personality
 Mix and communicate naturally with
all age group
 Ability to work independently as we
as in a team
 Honesty and sincerity
 Creative and initiative
 Speed in action
 Instant Decision Maker
 Can work under pressure
Language Proficiency
Good Spoken and Writing Proficiency in English and Bengali as well as read Arabic
Reference
Declaration
I, M. A. Masud Khan, certify that above information are right to the best of my knowledge. These
data correctly describe my qualifications and me.
Date:6-Oct-16 M. A. Masud Khan
Dr. MD. Foisal Hossain,
Phd, MSc Engg. BSc Engg. EEE
Designation: Assistant Professor
Department of Electronics and Communication
Engineering
Khulna University of Engineering and Technology
Khulna - 9203.
Phone: - +8801714087375
E-mail:- foisalkuet@yahoo.com
Relation: Academic
Major Md. Iqbal Hossain (Retd),Engr.
BSc Engg. (EEE)
Designation: Project Head (DGM)
Organization: Sena Kalyan Electric Industries
Address: 27 No Flat, 2 no Road Mirpur – DHOS,
Dhaka, Bangladesh.
Mobile No.: +8801912151558,
E-mail: iqbal3775@yahoo.com
Relation: Professional

More Related Content

What's hot

Khalid -cv_electrical_engineer (1)
Khalid  -cv_electrical_engineer (1)Khalid  -cv_electrical_engineer (1)
Khalid -cv_electrical_engineer (1)Khalid Eltahir
 
CURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEPCURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEPsureshrenu1996
 
Ahmed Mohammed Riziq- Electrical Power Engineer CV
Ahmed Mohammed Riziq- Electrical Power Engineer CVAhmed Mohammed Riziq- Electrical Power Engineer CV
Ahmed Mohammed Riziq- Electrical Power Engineer CVAhmed Riziq
 
Mohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CVMohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CVMohamed Diab
 
Narender Kumar resume1
Narender Kumar  resume1Narender Kumar  resume1
Narender Kumar resume1Narender Kumar
 
Electrical Engineer-Abid1
Electrical Engineer-Abid1Electrical Engineer-Abid1
Electrical Engineer-Abid1abidullah ullah
 
Joydip jana resume
Joydip jana resumeJoydip jana resume
Joydip jana resumeJoydip Jana
 
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...sudhakar k
 
Zuber Ahamed Resume _2016
Zuber Ahamed Resume _2016Zuber Ahamed Resume _2016
Zuber Ahamed Resume _2016ZUBER AHAMED
 
Electrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, ElectricianElectrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, Electricianjesegbue
 
Electrical engineer rikshit
Electrical engineer rikshitElectrical engineer rikshit
Electrical engineer rikshitRixit Patel
 
Electronics Engineer
Electronics EngineerElectronics Engineer
Electronics EngineerParthiban M
 

What's hot (20)

my cv govind 1(1)
my cv govind 1(1)my cv govind 1(1)
my cv govind 1(1)
 
Khalid -cv_electrical_engineer (1)
Khalid  -cv_electrical_engineer (1)Khalid  -cv_electrical_engineer (1)
Khalid -cv_electrical_engineer (1)
 
HASSAN CV
HASSAN CVHASSAN CV
HASSAN CV
 
CURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEPCURRICULAM_VITAE_2016 _ SSH_original MEP
CURRICULAM_VITAE_2016 _ SSH_original MEP
 
Ahmed Mohammed Riziq- Electrical Power Engineer CV
Ahmed Mohammed Riziq- Electrical Power Engineer CVAhmed Mohammed Riziq- Electrical Power Engineer CV
Ahmed Mohammed Riziq- Electrical Power Engineer CV
 
Mohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CVMohamed Diab-Electrical Engineer CV
Mohamed Diab-Electrical Engineer CV
 
Narender Kumar resume1
Narender Kumar  resume1Narender Kumar  resume1
Narender Kumar resume1
 
QA QC Engineer CV
QA QC Engineer CVQA QC Engineer CV
QA QC Engineer CV
 
Resume
ResumeResume
Resume
 
Resume_Sunil kumar Singh
Resume_Sunil kumar SinghResume_Sunil kumar Singh
Resume_Sunil kumar Singh
 
Muthu Profile
Muthu ProfileMuthu Profile
Muthu Profile
 
Electrical engineer
Electrical engineerElectrical engineer
Electrical engineer
 
Electrical Engineer-Abid1
Electrical Engineer-Abid1Electrical Engineer-Abid1
Electrical Engineer-Abid1
 
Joydip jana resume
Joydip jana resumeJoydip jana resume
Joydip jana resume
 
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
CV of Electrical Engineer - Projects with 7+ years experience in Project mana...
 
Zuber Ahamed Resume _2016
Zuber Ahamed Resume _2016Zuber Ahamed Resume _2016
Zuber Ahamed Resume _2016
 
JEEWAN KUMAR
JEEWAN KUMARJEEWAN KUMAR
JEEWAN KUMAR
 
Electrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, ElectricianElectrical Supervisor, Technician, Electrician
Electrical Supervisor, Technician, Electrician
 
Electrical engineer rikshit
Electrical engineer rikshitElectrical engineer rikshit
Electrical engineer rikshit
 
Electronics Engineer
Electronics EngineerElectronics Engineer
Electronics Engineer
 

Viewers also liked

Action Research for Personal Professional Development
Action Research for Personal Professional DevelopmentAction Research for Personal Professional Development
Action Research for Personal Professional DevelopmentDavid Petrie
 
Gold quest corporate presentation September 2016
Gold quest corporate presentation September 2016Gold quest corporate presentation September 2016
Gold quest corporate presentation September 2016GoldQuest Mining Corp.
 
CalAmp's FleetOutlook For Construction
CalAmp's FleetOutlook For ConstructionCalAmp's FleetOutlook For Construction
CalAmp's FleetOutlook For ConstructionCalAmp
 
Reporte semanal VUD del 26 al 30 de septiembre 2016
Reporte semanal VUD del 26 al 30 de septiembre 2016 Reporte semanal VUD del 26 al 30 de septiembre 2016
Reporte semanal VUD del 26 al 30 de septiembre 2016 Delegación Miguel Hidalgo
 
Sustaining quality approaches for locally embedded community health services ...
Sustaining quality approaches for locally embedded community health services ...Sustaining quality approaches for locally embedded community health services ...
Sustaining quality approaches for locally embedded community health services ...REACHOUTCONSORTIUMSLIDES
 
Food Summit 2016_Book FINAL
Food Summit 2016_Book FINALFood Summit 2016_Book FINAL
Food Summit 2016_Book FINALAbhinab Das
 
Hortonworks Data in Motion Webinar Series - Part 1
Hortonworks Data in Motion Webinar Series - Part 1Hortonworks Data in Motion Webinar Series - Part 1
Hortonworks Data in Motion Webinar Series - Part 1Hortonworks
 
Overview of hazardous waste management
Overview of hazardous waste managementOverview of hazardous waste management
Overview of hazardous waste managementkaran gulshan
 
China caas 20161015 v5
China caas 20161015 v5China caas 20161015 v5
China caas 20161015 v5ISSIP
 
Moving Forward with Network Virtualization (VMware NSX)
Moving Forward with Network Virtualization (VMware NSX)Moving Forward with Network Virtualization (VMware NSX)
Moving Forward with Network Virtualization (VMware NSX)VMware
 
Etude Métiers et Compétences du marketing et de la communication dans un cont...
Etude Métiers et Compétences du marketing et de la communication dans un cont...Etude Métiers et Compétences du marketing et de la communication dans un cont...
Etude Métiers et Compétences du marketing et de la communication dans un cont...FrenchWeb.fr
 
Curriculum Vitae newest adams 15-04-2014
Curriculum Vitae newest adams 15-04-2014Curriculum Vitae newest adams 15-04-2014
Curriculum Vitae newest adams 15-04-2014adam garner
 
Kalp damarhistolojisi
Kalp damarhistolojisiKalp damarhistolojisi
Kalp damarhistolojisiFurkan Ulusoy
 

Viewers also liked (15)

Action Research for Personal Professional Development
Action Research for Personal Professional DevelopmentAction Research for Personal Professional Development
Action Research for Personal Professional Development
 
Gold quest corporate presentation September 2016
Gold quest corporate presentation September 2016Gold quest corporate presentation September 2016
Gold quest corporate presentation September 2016
 
CalAmp's FleetOutlook For Construction
CalAmp's FleetOutlook For ConstructionCalAmp's FleetOutlook For Construction
CalAmp's FleetOutlook For Construction
 
Reporte semanal VUD del 26 al 30 de septiembre 2016
Reporte semanal VUD del 26 al 30 de septiembre 2016 Reporte semanal VUD del 26 al 30 de septiembre 2016
Reporte semanal VUD del 26 al 30 de septiembre 2016
 
Sustaining quality approaches for locally embedded community health services ...
Sustaining quality approaches for locally embedded community health services ...Sustaining quality approaches for locally embedded community health services ...
Sustaining quality approaches for locally embedded community health services ...
 
group project
group projectgroup project
group project
 
Food Summit 2016_Book FINAL
Food Summit 2016_Book FINALFood Summit 2016_Book FINAL
Food Summit 2016_Book FINAL
 
Hortonworks Data in Motion Webinar Series - Part 1
Hortonworks Data in Motion Webinar Series - Part 1Hortonworks Data in Motion Webinar Series - Part 1
Hortonworks Data in Motion Webinar Series - Part 1
 
Overview of hazardous waste management
Overview of hazardous waste managementOverview of hazardous waste management
Overview of hazardous waste management
 
China caas 20161015 v5
China caas 20161015 v5China caas 20161015 v5
China caas 20161015 v5
 
Moving Forward with Network Virtualization (VMware NSX)
Moving Forward with Network Virtualization (VMware NSX)Moving Forward with Network Virtualization (VMware NSX)
Moving Forward with Network Virtualization (VMware NSX)
 
Etude Métiers et Compétences du marketing et de la communication dans un cont...
Etude Métiers et Compétences du marketing et de la communication dans un cont...Etude Métiers et Compétences du marketing et de la communication dans un cont...
Etude Métiers et Compétences du marketing et de la communication dans un cont...
 
Fwafasfa
FwafasfaFwafasfa
Fwafasfa
 
Curriculum Vitae newest adams 15-04-2014
Curriculum Vitae newest adams 15-04-2014Curriculum Vitae newest adams 15-04-2014
Curriculum Vitae newest adams 15-04-2014
 
Kalp damarhistolojisi
Kalp damarhistolojisiKalp damarhistolojisi
Kalp damarhistolojisi
 

Similar to Manager Masud Khan CV New

Similar to Manager Masud Khan CV New (20)

Cv
CvCv
Cv
 
Prasanna09_CV_BE_Electronics
Prasanna09_CV_BE_ElectronicsPrasanna09_CV_BE_Electronics
Prasanna09_CV_BE_Electronics
 
Resume for job
Resume for jobResume for job
Resume for job
 
Resume_Saikat Bose
Resume_Saikat BoseResume_Saikat Bose
Resume_Saikat Bose
 
Resume_Saikat Bose
Resume_Saikat BoseResume_Saikat Bose
Resume_Saikat Bose
 
kusum_1_gs
kusum_1_gskusum_1_gs
kusum_1_gs
 
SUDARSAN BOOPATHI CV_04-11
SUDARSAN BOOPATHI CV_04-11SUDARSAN BOOPATHI CV_04-11
SUDARSAN BOOPATHI CV_04-11
 
Navnath_Electrical_Engg_CV
Navnath_Electrical_Engg_CVNavnath_Electrical_Engg_CV
Navnath_Electrical_Engg_CV
 
ashi new
ashi newashi new
ashi new
 
dhanaraj
dhanarajdhanaraj
dhanaraj
 
Manvendra_Jain_2.5_Years_Electrical_Apr_2016
Manvendra_Jain_2.5_Years_Electrical_Apr_2016Manvendra_Jain_2.5_Years_Electrical_Apr_2016
Manvendra_Jain_2.5_Years_Electrical_Apr_2016
 
Chetan Patil_CV
Chetan Patil_CVChetan Patil_CV
Chetan Patil_CV
 
resume_Ravi Kumar_
resume_Ravi Kumar_resume_Ravi Kumar_
resume_Ravi Kumar_
 
Electrical Engineer
Electrical EngineerElectrical Engineer
Electrical Engineer
 
Brony Electrical Engineer INDIA
Brony Electrical Engineer INDIABrony Electrical Engineer INDIA
Brony Electrical Engineer INDIA
 
Updated CV
Updated CVUpdated CV
Updated CV
 
yogesh resume
yogesh resumeyogesh resume
yogesh resume
 
Vijai CV
Vijai CVVijai CV
Vijai CV
 
CV
CVCV
CV
 
Furqan Resume 2023.pdf
Furqan Resume 2023.pdfFurqan Resume 2023.pdf
Furqan Resume 2023.pdf
 

Manager Masud Khan CV New

  • 1. Job Experience 1. Manager Grade-2 – Design & Planning, Department : Production (R&D), Division : Manufacturing, Continue from 01/02/2016 Job Responsibilities: 1. Design & Develop of Transformer for CPRI (Central Power Research Institute, India) to take the biggest market of power distribution section. 2. Newly Design & Develop of Electrical Sub- Station ( Three Phase Transformer, Low Tension Switchgear, High Tension Switchgear, Power Factor Improvement Plant, etc) including Single Phase Transformer. 3. Prepare the total industry as per ISO 9001: 2008 i. Prepare the Document for ISO Certificate ii. QMS Manual iii. SOP iv. Quality control Policy 4. Preparing tender supported documents like guaranteed technical particular sheets and tender drawings for both tenders. 5. Make the relationship with REB, DESCO, WZPDCL, BPDB, BMDA and BADC. 2. Assistant Manager – Design & Quality control, Department : Production (R&D), Division : Manufacturing, 28/01/2016 from 12/04/2015 Job Responsibilities: 1. Design & Develop of Electrical Sub- Station ( Three Phase Transformer, Low Tension Switchgear, High Tension Switchgear, Power Factor Improvement Plant, etc) including Single Phase Transformer. 2. Design of Industrial Voltage Stabilizer (IVS), UPS, IPS, AVR, Inverter, Battery Charger and Single layer Printed Circuit Board (PCB) etc, may be considered as additional responsibility. 3. Preparing tender supported documents like guaranteed technical particular sheets and tender drawings for both tenders. 4. Produce calculations, drawings, sketches, instructions, bills of materials (BOM) etc, for drafters and others to follow to satisfy the requirements of the marketing and sales team and customers specifications. M. A. Masud Khan Member of IEB:- 37085 S/O. M. A. Mansur Ali Khan 64/73, Nasirabad I/A, Bayazid Bostami Road, Chittagong – 4210 Cell Phone: +8801719306383 E-mail: khan_bangladesh@yahoo.com Career Objectives To take up a challenging Career grows with honesty, loyalty, good relationship and best performance, and translate my experience, knowledge, skills and abilities into value for an Organization especially in the Sub-station Company. Career Summary After passing B.Sc Engineer (Electronics & Communication) I have joined in Sena Kalyan Electric Industries a project of Sena Kalyan Sangstha as an Assistant Engineer. Just after two years basing on my performance, honesty and loyalty authority has given promotion as Deputy Manager (electric engineer). I have been serving in Sena Kalyan Electric Industries since two years six months. After that Navana Electronics Ltd has selected me as Assistant Manager (as per Company organ gram) at the design and planning. But after about ten months Sena Kalyan Sangstha (Deputy Director - Business 4) again called me because their CPRI work and factory extension with new project considering my previous record. Now-a-days I am working at Sena Kalyan Sanstha's Project Sena Kalyan Electric Industries (SKEI) as the Manager Grade-2 from 1st February 2016. Contribution to SKEI: 1. SKEI has achieved the CPRI Certificate - 2016 and make total plan for large production 2. Through optimum design and processing, first time Sena Kalyan Electric Industries has supplied 100 Pieces of 200KVA three phase distribution transformers to West Zone Power Distribution Company Ltd. (WZPDCL) Khulna in FY 2012/2013 and 150 Pcs of 200 KVA three phase distribution transformer to BPDB in FY 2013/2014. Whole activities like conduction of factory inspection by BPDB Engineer, preparation of tender documents and optimized design has been prepared by me with the help of Project head. 3. 1200 KVA & 2000 KVA distribution transformer of steel re-rolling mills has been repaired under my guideline and supervision.
  • 2. 5. Routine tests of Single and Three Phase Power Transformer of different capacity such as winding Insulation Resistance test, Power Frequency Withstand Test. 6. Conducting over voltage test, Vector Group Test, Ratio Test, No Load Test and Short Circuit Test with separate source power system. 7. Type tests such as Temperature Rise Test and Impulse test use by separate source power system and routine test of Lighting Arrestor and Drop Out Fuse. 8. Develop design specifications, manufacturing documentation and prepare report about improvement of product Design, Development, Keeping the documents and records of all analysis. 9. Working with Quality Compliance and production department regarding compliance issues. 10. Execute the product development process for consumer Activation’s new product initiatives. 11. Must evaluate customer requirements and integrate requirements in to the production schedule. 12. Implement special engineering projects related to design improvements, cost reductions, new materials, new components or new design techniques. 13. Provide daily/weekly/monthly/ half yearly and annual report to the management for decision making. 14. Prepare the total industry as per ISO 9001: 2008 i. Prepare the Document for ISO Certificate ii. QMS Manual iii. SOP iv. Quality control Policy 3. Deputy Manager (Electric engineer) 07/04/2015 from 01/05/2014 Sena Kalyan Electric Industries (SKEI) (A project of Sena Kalyan Sangstha) 64/73, Nasirabad I/A, Bayazid Bostami Road, Chittagong – 4210. My responsibilities were as follows: A. Product Design 1. Single and Three Phase Distribution Transformer Design & Drawing. B. Production& Service 1. Planning of cost effect product. 2. Monitoring and Super vision of Production Process. 3. Quality Control (Raw material and Finish Product) 4. Maintenance of Machineries and all the Electric system. 5. Make relationship with REB, DESCO, WZPDCL, BPDB, BMDA and BADC. 6. Prepare Tender documents 7. Supervising Post Sales Customer Service 4. Assistant Engineer 01/09/2012 to 30/04/2014. Sena Kalyan Electric Industries (SKEI) (A project of Sena Kalyan Sangstha) 64/73, Nasirabad I/A, Bayazid Bostami Road, Chittagong – 4210. Job responsibilities follows: As per Deputy Manager at SKEI Training Experience Current Project At present I start a research project to build up a FUEL LESS BIKE, I have already designed all of the process and procedure and waiting for some of device and then practical work will be started. Practical Working Knowledge on: A- Total 33KV Sub – Station work. B- Auto-CAD Drawing. C- Generator Operation and Maintenance (Mechanical and Electrical); D- ICX system of Tele- communication E- Computer Networking F- Machine Drive PLC and Inverter G- Define the fault of Generator. H- Basic Auto- mobile System Extra Curriculum  Heavy motivational power.  Auto Gear Car Driving.  Obtained Management and Leadership skill by holding the post of General Secretary in own Department at third year in University.  Performed overall scout Leadership during study at school and college and finally have gone through training on different activities during SAARC Gamburiy in 2006.  Active participation in various seminars and cultural activities and sports events at school, college and university level in various occasions as well as in religious activities.
  • 3. Baizid Group (Baizid Steel Industries Ltd, CSS Power Plant, CSS Corporation Ltd) on Power Generation, Total Power System, Control System and Production Process. Educational Background Degree Department Institute CGPA Passing Year B.Sc. Engg. Electronics and Communication Engineering Khulna University of Engineering & Technology CGPA 3.21 out of 4.00 2012 H.S.C Science Nehalpur School & College GPA 4.90 out of 5.00 2007 S.S.C Science Nehalpur School & College GPA 4.94 out of 5.00 2005 Personal Particulars Date of Birth : 30th December, 1990. Father’s Name : M. A. Mansur Ali Khan. Mother’s Name : Shahida Begum. Nationality : Bangladeshi (by birth) Gender : Male Marital Status : Single Religion : Islam Cell Phone : +8801719306383 E-mail: khan_bangladesh@yahoo.com Associate Member of IEB-00078 Passport No: AF4184402 Permanent Residence: Vill+P.O:- Nehalpur, P.S:- Monirampur, Dis:-Jessore, Dhaka, Bangladesh Present Address : 64/73, Nasirabad I/A, Bayazid Bostami Road, Chittagong – 4210 Strong Computer Skills  Operating Systems : Windows XP, Windows Vista, Windows 7, Windows 8  Programming Languages : C, C++.  Hardware Programming :Intel 8085, 8086 Microprocessors, Micro- controller 8051 and ATMEL 32, verilog.  Engineering Analytical Tools : MATLAB, PSpice, Circuit Maker, Proteus 7.7 SP2, Microwind, Packet Tracer 5.5, Electronic Workbench and Super NEC, Multi-sim.  Computer Networking :Completed course on CCNA exploration 4.0at 2nd semester Foreign Tour:  Country and Duration: China – 18/11/2015 to 28/11/2015 – VISA – J0663507 a. Trading Company: Shanghai orinno International Business Co. Ltd Contact Person : Titan Ding Designation of Contact Person: Managing Director. Mail: titanding@163.com Phone: +8613585993310 Manufacturer: - i. 1. Suzhou LangGong Vacuum Technology Co. Ltd. ii. 2. Yangzhou Jiangdu Huayu High Voltage Electric Co. Ltd iii. 3. Mingwan Machinery – CNC Plasma cutter iv. 4. Shenyang Liaoning – Around the city and electrical equipment factory v. 5. Canzhoun Kenuo Manufacturing Co. Ltd. vi. 6. Shenfa Machinery - Jiangsu Province Changzhou City Shenfa Electrical Appliance Co. Ltd vii. 7. Wujiang Transformer Co.,Ltd. (Suzhou – China) b. Trading Company: Nantong Zhenhuan Trade co. Limited. Contact Person : FranksCao Designation of Contact Person: Managing Director. Mail: sales@transformer-machine.com Phone: +8613962724758  Country and Duration: India, CPRI, Bangalore – 28/08/2015 to 20/09/2016 – VISA – VK 2851936
  • 4. Others Skills  Self-motivated, energetic and reliable  Excellent interpersonal and communication Skills  Friendly and co-operative personality  Mix and communicate naturally with all age group  Ability to work independently as we as in a team  Honesty and sincerity  Creative and initiative  Speed in action  Instant Decision Maker  Can work under pressure Language Proficiency Good Spoken and Writing Proficiency in English and Bengali as well as read Arabic Reference Declaration I, M. A. Masud Khan, certify that above information are right to the best of my knowledge. These data correctly describe my qualifications and me. Date:6-Oct-16 M. A. Masud Khan Dr. MD. Foisal Hossain, Phd, MSc Engg. BSc Engg. EEE Designation: Assistant Professor Department of Electronics and Communication Engineering Khulna University of Engineering and Technology Khulna - 9203. Phone: - +8801714087375 E-mail:- foisalkuet@yahoo.com Relation: Academic Major Md. Iqbal Hossain (Retd),Engr. BSc Engg. (EEE) Designation: Project Head (DGM) Organization: Sena Kalyan Electric Industries Address: 27 No Flat, 2 no Road Mirpur – DHOS, Dhaka, Bangladesh. Mobile No.: +8801912151558, E-mail: iqbal3775@yahoo.com Relation: Professional