1. Career Objective
To secure challenging and appropriate position in an organization. The role should be
challenging which would enable me to grow higher professionally and to contribute
significantly toward’s company’s growth.
Education
Bachelors in Mechanical Engineering,
Ghulam Ishaq Khan Institute of
Engineering Sciences & Technology (GIKI)
USMAN
RASHEED
RASHEED
CGPA: 2.74 on the scale of 4.00 Candidate of 2015
Higher Secondary School Certificate(Pre-Engineering)
Peak solution college Lahore .
Marks obtained: 77% Candidate of 2011
Contact
Information
Secondary School Certificate(Science)
Lahore progressive highschool
Email address:
Usmanrasheed448@
gmail.com
Phone Numbers
+92321-4839593
Secondary
+92321-4085926
Address
Permanent:
Street no 13, house
no 14 ,Bagh gul
Baigum , Fatah sher
road, new mozang
Lahore. Pakistan
Marks obtained: 65% Candidate of 2008
Professional skills
Solid works, Ansys ,Trnsys, Cad modeling and Matlab.
Having knowledge of C++ , Adobe Photoshop, Mechanical testing,
Conversant with the use and application of MS Office,
Final Year Project
Design and fabrication of Advanced photovoltaic hybrid collector system
integrated with dc to dc converter .
The project is to use the sunlight to heat the water as well as some of
the heat is used for dc to dc converter through which can operate any
electrical appliance. The project allow us to use the softwares solid works ,
Ansys and Trnsys in depth
The parabolic dish reflector attached with solar panel used in order to increase the
intensity of light fall on the PV module. There is a rectangular collector of sides made
up of insulated material and the top is of glass attached above the PVmodule
.
Languages
English: Excellent
Urdu: Native
Water from the storage tank fill the collector. The parabolic concentrator
concentrate the great intensity of sunlight on small patches of PVmodule.
Some part of the heat is used to heat water and the remaining is used for the dc to dc
circuit which is an important electronic circuit in all portable electronic devices .
Semester Projects
Design and fabrication of solarcar.
Fabrication of solarcharger.
Design and fabrication of water wheel that produce electricity.
Design and fabrication of page turner for physically disabledpersons.
Analysis ofcompressed spring used in automobiles
Analysis of I beam on ANSYS.
2. Awards / Achievements
• Got admission in GIK Institute after rigorous competition all over the country.
Received GIKI Admin 1.5 million Pkr scholarship at bachelor level on merit
base.
• Winner of Pak Automation industrial open house project by making Pakistan’s first
ever solar electric car.
• Had been the President of GIKI Chess Club for 2 years.
Major courses studied
Thermodynamics-I, Thermodynamics-II, Fluid mechanics-I, Fluid mechanics-II, Fundamental of
heat and mass transfer, Refrigeration and air conditioning, Power plant, Internal combustion
engine,
Mechanical vibrations, Mechanics of solid, Statics, Dynamics, Theory of machines, Mechanical
engineering design, Manufacturing technology, Stress analysis.
Extra-Curricular activities
• Had been the lead vocalist of naqsh band for 2 years.
• Playing Guitar.
• Playing Squash, badminton and Tennis.
• Reading Novels.
Organizational Experience
1-Internship at Pak Automation (June 2013- Sep 2013)
Worked in the segment of Testing Services where I:
a) Learned various well testing techniques, integration of which helps in proving reservoir
potential, confirming well performance and providing optimum well productivity.
b) Came across various data acquisition and sampling techniques and the way they help us in
proving the reservoir's potential, performance and productivity that allow me to polish my skills
related to Ansys and Trnsys.
2-Internship at Wapda muzaffarabad ( June 2014-Sep 2014)
a) Ensured smooth and trouble free operation of different machinery in shifts.
b) Monitored process and quality parameters. Troubleshooting and corrective action wherever
required.
c) Ensure safety and industrial hygiene in maintenance and production activities.
d) Meet shift crushing targets.
e) Assist in Utility operations and troubleshooting.
f) Worked and operated in 12MW Bagasse fired steam power plant.
3. Current Job
2- Project manager at Multitech-Engineering company
June 2015- onward
The company is the importer , manufacturer and installer of the parts used in
hydroelectric power plant like Compressor, Boiler, Control valve, turbine,
generator, PLC Switches, Pumps, guages and Flow meters.
My task is to do necessary calculations that required to design the equipment
according to specific boundary conditions and then make sure after installation
the equipment run with the greater.
a) Installed differential pressure transmitter on liquid carbon dioxide tank in
Gourmet Beverage plant
b) Installed Flow meters on Diesel Tank in Netsol Technologies
c) Installed digital pressure guage PM82 on hydraulic tank in Coke Plant
d) Manage the team of 20 people during the shift.
e) Worked with other professionals, within and outside the engineering sector.
Refferences
1- Prof.Dr. Javed ahmad chattha
Academic Pro-Rector and Senior Professor
GIKInstitute Topi,Swabi,KPK ,Pakistan
Email:
chattha@giki.edu.pk
2- Engr Atif mehmood
Chief Mechanical Engineer
Multitech Engineering
Email:
multitech_engineering@ymail.com