Introduction
Projects in landscape architecture progress through stages, from the very first contact with the client
and awareness of the site, through to the realization, construction and maturation of the finished design.
It is important to remember that the design process, unlike a timeline, is often completely non-linear.
The phrase “back to the drawing board” refers to the continual process of testing and retesting that is
characteristic of the architectures.
In the planning of a residence, there are not only the space is matters but also to integrate the natural
site component with its landscape environs. Since the area to be developed is small scale, the design
will take into account all positive qualities of the site – the ground forms, cover, exposures, views, and
all other natural or architectural features – and bring them into harmony.
“The earth is our home and the ways of nature our paths to understanding”.
[Simonds, J. O.]
Objectives of Project
The objectives of this project:
 To acquire knowledge about design process, planning and development of project.
 To proffer exposure of small scale landscape project to the students.
 To familiarize students about the design stages and how to visualize their ideas onto
presentation boards.
Learning Outcomes of this Project
On successful completion of this subject, students will be able to demonstrate the following:
1. A design process involved in landscape project development and the representation of ideas
for every stage taken.
2. Understanding on landscape design components and how it works and have been applied into
the field.
Tasks - Methodology
This is a continuous assignment of Project 2A and an individual project. From the same site that you
were doing for previous Project 2A, you are required to propose a landscape design for the
residence/house. You have to imagine that you are going to present the landscape proposal to the
client (who is the house owner) by preparing ALL drawings needed for every development stages.
The development stages shall include as following;
A. PROJECT DESCRIPTION
A short paragraph of your design statement which explaining about the ideas, rationale of the
design and the concept of the design. The narration should briefly describe, constructive and
informative.
*note: It is advisable to complete at the end of the process
B. CONCEPTUAL DIAGRAM
From the site synthesis (refer to your previous project 2A), develop a bubble diagram. Bubble
diagram is used as a means to show what spaces and activities that you want to propose.
Subsequently, you need to come out with a conceptual diagram. Conceptual diagram is a
breakdown (more detailed) of your synthesis (design solutions) and bubble diagram which is
more related to the site.
C. SCHEMATIC PLAN
From the conceptual plan, you need to develop a schematic plan. It is also known as
preliminary master plan. In schematic plan, you are to compose all of elements that you intend
to put into the design. It should have form composition, shape and pattern of the design
elements. You may provide sketches/illustrations (sections/elevations) to better represent your
ideas.
D. MASTER PLAN
After the schematic plan has been approved by your tutor only you can then proceed to master
plan set of drawings. The set of drawings include;
- Master Plan
- Elevation & Section
- Hardscape Palette
- Softscape Palette
E. COST ESTIMATION & MAINTENANCE PLAN
A brief cost estimation or budget allocation of the landscape project that you proposed. The
cost estimation is regarded to be as preliminary bill of quantities (BQ). Additionally, you are
also to include a brief maintenance plan of the project.
**Note:
A self-independent study is required for presentation layout. Do save images from internet or scan from
books for ideas collection and inspirations. As supportive references, do follow Instagram account;
if_nay13 for info sharing and interactive online consultation.
Submission Requirement
Each student is required to submit ALL of the following:
1. It must be on 2 A2 presentation boards. You can use any type of paper and colour materials
as long as it is pasted on the board. You are advisable to use spray mount to stick your paper
onto the board.
2. You need to provide ALL of the following;
- Project Description
- Bubble Diagram
- Conceptual Plan
- Schematic Plan
- Location Plan & Key Plan
- Master Plan
- 1 Section & 1 Elevation Drawings
- Hardscape & Softscape Palette
- Cost Estimation & Maintenance Plan
3. The presentation boards must have title block at the bottom which contains; tittle of the project,
“Proposed Landscape For [the name of residence or owner’s name], complete address”,
student name, student ID, FNBE (write in full), Semester 1, January 2015.
*Example:
PROPOSED LANDSCAPE FOR MICASA RESIDENCE NOORUL IFFA MOHD NAYAN, LOT 10,
JALAN TAYLOR’S, 47500 BANDAR SUNWAY, SELANGOR DARUL EHSAN
PREPARED BY TAYLOR SWIFT (STUDENT ID),
FOUNDATION IN NATURAL AND BUILT ENVIRONMENT (FNBE), SEMESTER 1 JANUARY 2015
4. You are to show your progression drawing in every tutorial session to your respective tutors.
The progression drawing must be on butter paper, signed by the tutor with date, to be
compiled in A4/A3 plastic cover and to submit together with presentation boards. It is
compulsory to ensure that you are going through the process before completing the final work.
Without that, it could be proclaimed as plagiarism.
5. All drawings need to be completed manually (hand drawn & hand written) by using a proper
architectural (landscape) graphic communication. However, images for softscape and
hardscape can be printed.
6. Drawings must be coloured. You may choose any medium of colouring techniques that you
are master in. You are given a freedom to choose whether to colour it all or a portion of the
drawing (make sure the portion coloured explains something) and have to be proper and
presentable.
7. You need to submit the completed presentation boards with a set of progression drawing on
1 JUNE 2015 (MONDAY), between 3.00 - 3.30 PM at DISCUSSION ROOM C5 (academic
suites, block C, level 5). Late submission after that time will be held outside of the venue.
8. You are encouraged to take photo or scan your work for e-portfolio purposes.
*Gentle reminder;
Any work submitted late will yield 10% mark deduction. For works submitted later than 2 days, no
assessment will be done.
If you are sick on the submission day, you have to provide MC with an official letter signed by
parents/guardian explaining about your health condition. A formal email should be written to the module
coordinator a day before/or before submission time.
Assessment Criteria
The assessment criteria for this assignment will be based on:
 Demonstrated understanding of brief
 Relevance, appropriateness and depth of research exhibited in the assignment
 Creative application of graphic communication skills, originality and quality of the work
 Design ideas and constructive representation the ideas.
Marking Criteria
Marks shall be distributed as follows:
Work will be assessed based on:
1. CONTENT:
i. Project Description 2 %
ii. Conceptual Plan 4%
iii. Schematic Plan 4%
iv. Master Plan 10%
v. Cost & Maintenance Plan 5%
TOTAL: 25%
2. Originality, creativity & quality of workmanship 10%
3. Progression Drawings 5%
GRAND TOTAL: 40%
Suggested References
Lin, M. W., 1993, Drawing and Designing with Confidence, John Wiley & Sons.
J. Hopper, L.2007, Landscape Architectural Graphic Standards, John Wiley & Sons.
Treib, M., 2008, Representing Landscape Architecture, Taylor & Francis, USA and Canada.
http://land8.com/photo/portfolio-page-3-worsley/prev?context=user

More Related Content

Viewers also liked

Project 1 experiential landscape(1)
Project 1 experiential landscape(1)Project 1 experiential landscape(1)
Project 1 experiential landscape(1)Louise Foong
 
CL Project 1
CL Project 1CL Project 1
CL Project 1chimz12
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysisLouise Foong
 
Enbe.project one jan 2015
Enbe.project one jan 2015Enbe.project one jan 2015
Enbe.project one jan 2015Louise Foong
 
20150625211505522SUNRISE CITY PAMPHLET
20150625211505522SUNRISE CITY PAMPHLET20150625211505522SUNRISE CITY PAMPHLET
20150625211505522SUNRISE CITY PAMPHLETLouise Foong
 
Drawing project 2 january 2015
Drawing project 2 january 2015Drawing project 2 january 2015
Drawing project 2 january 2015Louise Foong
 
Steps involved in producing an attractive mural art3(1)
Steps involved in producing an attractive mural art3(1)Steps involved in producing an attractive mural art3(1)
Steps involved in producing an attractive mural art3(1)Louise Foong
 
Project 1 musical performance january 2015
Project 1 musical performance january 2015Project 1 musical performance january 2015
Project 1 musical performance january 2015Louise Foong
 
Enbe kuala selangor trip
Enbe   kuala selangor tripEnbe   kuala selangor trip
Enbe kuala selangor tripLouise Foong
 
ITD Presentation 1
ITD Presentation 1ITD Presentation 1
ITD Presentation 1Louise Foong
 
Itd project brief 2
Itd project brief 2Itd project brief 2
Itd project brief 2zerkai
 

Viewers also liked (16)

Diagrams
DiagramsDiagrams
Diagrams
 
Project 1 experiential landscape(1)
Project 1 experiential landscape(1)Project 1 experiential landscape(1)
Project 1 experiential landscape(1)
 
CL Project 1
CL Project 1CL Project 1
CL Project 1
 
Project 2 design process research analysis
Project 2 design process research  analysisProject 2 design process research  analysis
Project 2 design process research analysis
 
Enbe.project one jan 2015
Enbe.project one jan 2015Enbe.project one jan 2015
Enbe.project one jan 2015
 
20150625211505522SUNRISE CITY PAMPHLET
20150625211505522SUNRISE CITY PAMPHLET20150625211505522SUNRISE CITY PAMPHLET
20150625211505522SUNRISE CITY PAMPHLET
 
Drawing project 2 january 2015
Drawing project 2 january 2015Drawing project 2 january 2015
Drawing project 2 january 2015
 
Bbbbbbbb
BbbbbbbbBbbbbbbb
Bbbbbbbb
 
Steps involved in producing an attractive mural art3(1)
Steps involved in producing an attractive mural art3(1)Steps involved in producing an attractive mural art3(1)
Steps involved in producing an attractive mural art3(1)
 
Project 1 musical performance january 2015
Project 1 musical performance january 2015Project 1 musical performance january 2015
Project 1 musical performance january 2015
 
Boards p2
Boards p2Boards p2
Boards p2
 
Iciassignment 1b
Iciassignment 1bIciassignment 1b
Iciassignment 1b
 
SUNRISE CITY
SUNRISE CITYSUNRISE CITY
SUNRISE CITY
 
Enbe kuala selangor trip
Enbe   kuala selangor tripEnbe   kuala selangor trip
Enbe kuala selangor trip
 
ITD Presentation 1
ITD Presentation 1ITD Presentation 1
ITD Presentation 1
 
Itd project brief 2
Itd project brief 2Itd project brief 2
Itd project brief 2
 

Similar to Project 3 residential landscape project

Resubmission (1)
Resubmission (1)Resubmission (1)
Resubmission (1)Hassan Azri
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Dana Kan
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015LY97
 
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...Kenneth Tan
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015温 庄壁
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Joeylau97
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015ALISON TANG
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015siewhui28
 
Project 3 residential landscape
Project 3 residential landscape Project 3 residential landscape
Project 3 residential landscape Crystal Chia
 
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...teohziwei12
 

Similar to Project 3 residential landscape project (10)

Resubmission (1)
Resubmission (1)Resubmission (1)
Resubmission (1)
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 
Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015Project 3 residential landscape project march 2015
Project 3 residential landscape project march 2015
 
Project 3 residential landscape
Project 3 residential landscape Project 3 residential landscape
Project 3 residential landscape
 
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
Clproject3residentiallandscapeprojectmarch2015 150719124632-lva1-app6891-1508...
 

More from Louise Foong

Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Louise Foong
 
Charity drive report 2
Charity drive report 2Charity drive report 2
Charity drive report 2Louise Foong
 
Bus30104 intro to biz final project aug 2015
Bus30104 intro to biz final project   aug 2015Bus30104 intro to biz final project   aug 2015
Bus30104 intro to biz final project aug 2015Louise Foong
 
Bus30104 intro to biz assignment business plan aug 2015
Bus30104 intro to biz assignment   business plan aug 2015Bus30104 intro to biz assignment   business plan aug 2015
Bus30104 intro to biz assignment business plan aug 2015Louise Foong
 
Bus30104 new course outline august 2015 semester
Bus30104  new course outline   august 2015 semesterBus30104  new course outline   august 2015 semester
Bus30104 new course outline august 2015 semesterLouise Foong
 
ECONOMICS ASSIGNMENT
ECONOMICS ASSIGNMENTECONOMICS ASSIGNMENT
ECONOMICS ASSIGNMENTLouise Foong
 
Ecn30205 course outline august 2015 semester
Ecn30205 course outline   august 2015 semesterEcn30205 course outline   august 2015 semester
Ecn30205 course outline august 2015 semesterLouise Foong
 
Pshcology assignment 1 .
Pshcology assignment 1 .Pshcology assignment 1 .
Pshcology assignment 1 .Louise Foong
 
Acc30205 new course outline jan 2015 semester
Acc30205 new course outline   jan 2015 semesterAcc30205 new course outline   jan 2015 semester
Acc30205 new course outline jan 2015 semesterLouise Foong
 
Enbe final project r ev b
Enbe final project r ev bEnbe final project r ev b
Enbe final project r ev bLouise Foong
 

More from Louise Foong (20)

Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016
 
abcreport
abcreportabcreport
abcreport
 
Presentation1
Presentation1Presentation1
Presentation1
 
Charity drive report 2
Charity drive report 2Charity drive report 2
Charity drive report 2
 
Bus30104 intro to biz final project aug 2015
Bus30104 intro to biz final project   aug 2015Bus30104 intro to biz final project   aug 2015
Bus30104 intro to biz final project aug 2015
 
Business plan
Business planBusiness plan
Business plan
 
Bus30104 intro to biz assignment business plan aug 2015
Bus30104 intro to biz assignment   business plan aug 2015Bus30104 intro to biz assignment   business plan aug 2015
Bus30104 intro to biz assignment business plan aug 2015
 
Bus30104 new course outline august 2015 semester
Bus30104  new course outline   august 2015 semesterBus30104  new course outline   august 2015 semester
Bus30104 new course outline august 2015 semester
 
ECONOMICS ASSIGNMENT
ECONOMICS ASSIGNMENTECONOMICS ASSIGNMENT
ECONOMICS ASSIGNMENT
 
Ecn30205 course outline august 2015 semester
Ecn30205 course outline   august 2015 semesterEcn30205 course outline   august 2015 semester
Ecn30205 course outline august 2015 semester
 
Video report
Video reportVideo report
Video report
 
Video slides
Video slidesVideo slides
Video slides
 
Psycho comic
Psycho comicPsycho comic
Psycho comic
 
Assessment
AssessmentAssessment
Assessment
 
Pshcology assignment 1 .
Pshcology assignment 1 .Pshcology assignment 1 .
Pshcology assignment 1 .
 
Acc30205 new course outline jan 2015 semester
Acc30205 new course outline   jan 2015 semesterAcc30205 new course outline   jan 2015 semester
Acc30205 new course outline jan 2015 semester
 
Mural art 1
Mural art 1Mural art 1
Mural art 1
 
Mural art
Mural artMural art
Mural art
 
Blog.august2015
Blog.august2015Blog.august2015
Blog.august2015
 
Enbe final project r ev b
Enbe final project r ev bEnbe final project r ev b
Enbe final project r ev b
 

Recently uploaded

Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Nightssuser7cb4ff
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVAAnastasiya Kudinova
 
Introduction-to-Canva-and-Graphic-Design-Basics.pptx
Introduction-to-Canva-and-Graphic-Design-Basics.pptxIntroduction-to-Canva-and-Graphic-Design-Basics.pptx
Introduction-to-Canva-and-Graphic-Design-Basics.pptxnewslab143
 
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...narwatsonia7
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130Suhani Kapoor
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024CristobalHeraud
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一Fi L
 
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,bhuyansuprit
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Sitegalleryaagency
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`dajasot375
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一F dds
 
Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdfvaibhavkanaujia
 
Kindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpKindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpmainac1
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 

Recently uploaded (20)

young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
young call girls in Pandav nagar 🔝 9953056974 🔝 Delhi escort Service
 
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full NightCall Girls Aslali 7397865700 Ridhima Hire Me Full Night
Call Girls Aslali 7397865700 Ridhima Hire Me Full Night
 
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance  VVIP 🍎 SER...
Call Girls Service Mukherjee Nagar @9999965857 Delhi 🫦 No Advance VVIP 🍎 SER...
 
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
PORTAFOLIO   2024_  ANASTASIYA  KUDINOVAPORTAFOLIO   2024_  ANASTASIYA  KUDINOVA
PORTAFOLIO 2024_ ANASTASIYA KUDINOVA
 
Call Girls in Pratap Nagar, 9953056974 Escort Service
Call Girls in Pratap Nagar,  9953056974 Escort ServiceCall Girls in Pratap Nagar,  9953056974 Escort Service
Call Girls in Pratap Nagar, 9953056974 Escort Service
 
Introduction-to-Canva-and-Graphic-Design-Basics.pptx
Introduction-to-Canva-and-Graphic-Design-Basics.pptxIntroduction-to-Canva-and-Graphic-Design-Basics.pptx
Introduction-to-Canva-and-Graphic-Design-Basics.pptx
 
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
Housewife Call Girls NRI Layout - Call 7001305949 Rs-3500 with A/C Room Cash ...
 
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
VIP Call Girls Service Mehdipatnam Hyderabad Call +91-8250192130
 
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
 
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
办理学位证(NUS证书)新加坡国立大学毕业证成绩单原版一比一
 
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
Bus tracking.pptx ,,,,,,,,,,,,,,,,,,,,,,,,,,
 
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 night
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 nightCheap Rate Call girls Kalkaji 9205541914 shot 1500 night
Cheap Rate Call girls Kalkaji 9205541914 shot 1500 night
 
How to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our SiteHow to Be Famous in your Field just visit our Site
How to Be Famous in your Field just visit our Site
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
Abu Dhabi Call Girls O58993O4O2 Call Girls in Abu Dhabi`
 
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
办理学位证(SFU证书)西蒙菲莎大学毕业证成绩单原版一比一
 
Passbook project document_april_21__.pdf
Passbook project document_april_21__.pdfPassbook project document_april_21__.pdf
Passbook project document_april_21__.pdf
 
Kindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUpKindergarten Assessment Questions Via LessonUp
Kindergarten Assessment Questions Via LessonUp
 
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
young call girls in Vivek Vihar🔝 9953056974 🔝 Delhi escort Service
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 

Project 3 residential landscape project

  • 1. SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Research Unit for Modern Architecture Studies in Southeast Asia Foundation of Natural Build Environment (FNBE) CONSTRUCTED LANDSCAPE [ARC30203] Prerequisite: None Lecturer: Noorul Iffa Mohd Nayan & Shazrene Nurjanna Samsudin Final Project (2B) Residential Landscape Project 40% Individual Submission: 1st June 2015 (Week 16) Introduction Projects in landscape architecture progress through stages, from the very first contact with the client and awareness of the site, through to the realization, construction and maturation of the finished design. It is important to remember that the design process, unlike a timeline, is often completely non-linear. The phrase “back to the drawing board” refers to the continual process of testing and retesting that is characteristic of the architectures. In the planning of a residence, there are not only the space is matters but also to integrate the natural site component with its landscape environs. Since the area to be developed is small scale, the design will take into account all positive qualities of the site – the ground forms, cover, exposures, views, and all other natural or architectural features – and bring them into harmony. “The earth is our home and the ways of nature our paths to understanding”. [Simonds, J. O.] Objectives of Project The objectives of this project:  To acquire knowledge about design process, planning and development of project.  To proffer exposure of small scale landscape project to the students.  To familiarize students about the design stages and how to visualize their ideas onto presentation boards. Learning Outcomes of this Project On successful completion of this subject, students will be able to demonstrate the following: 1. A design process involved in landscape project development and the representation of ideas for every stage taken. 2. Understanding on landscape design components and how it works and have been applied into the field.
  • 2. Tasks - Methodology This is a continuous assignment of Project 2A and an individual project. From the same site that you were doing for previous Project 2A, you are required to propose a landscape design for the residence/house. You have to imagine that you are going to present the landscape proposal to the client (who is the house owner) by preparing ALL drawings needed for every development stages. The development stages shall include as following; A. PROJECT DESCRIPTION A short paragraph of your design statement which explaining about the ideas, rationale of the design and the concept of the design. The narration should briefly describe, constructive and informative. *note: It is advisable to complete at the end of the process B. CONCEPTUAL DIAGRAM From the site synthesis (refer to your previous project 2A), develop a bubble diagram. Bubble diagram is used as a means to show what spaces and activities that you want to propose. Subsequently, you need to come out with a conceptual diagram. Conceptual diagram is a breakdown (more detailed) of your synthesis (design solutions) and bubble diagram which is more related to the site. C. SCHEMATIC PLAN From the conceptual plan, you need to develop a schematic plan. It is also known as preliminary master plan. In schematic plan, you are to compose all of elements that you intend to put into the design. It should have form composition, shape and pattern of the design elements. You may provide sketches/illustrations (sections/elevations) to better represent your ideas. D. MASTER PLAN After the schematic plan has been approved by your tutor only you can then proceed to master plan set of drawings. The set of drawings include; - Master Plan - Elevation & Section - Hardscape Palette - Softscape Palette E. COST ESTIMATION & MAINTENANCE PLAN A brief cost estimation or budget allocation of the landscape project that you proposed. The cost estimation is regarded to be as preliminary bill of quantities (BQ). Additionally, you are also to include a brief maintenance plan of the project. **Note: A self-independent study is required for presentation layout. Do save images from internet or scan from books for ideas collection and inspirations. As supportive references, do follow Instagram account; if_nay13 for info sharing and interactive online consultation. Submission Requirement Each student is required to submit ALL of the following: 1. It must be on 2 A2 presentation boards. You can use any type of paper and colour materials as long as it is pasted on the board. You are advisable to use spray mount to stick your paper onto the board.
  • 3. 2. You need to provide ALL of the following; - Project Description - Bubble Diagram - Conceptual Plan - Schematic Plan - Location Plan & Key Plan - Master Plan - 1 Section & 1 Elevation Drawings - Hardscape & Softscape Palette - Cost Estimation & Maintenance Plan 3. The presentation boards must have title block at the bottom which contains; tittle of the project, “Proposed Landscape For [the name of residence or owner’s name], complete address”, student name, student ID, FNBE (write in full), Semester 1, January 2015. *Example: PROPOSED LANDSCAPE FOR MICASA RESIDENCE NOORUL IFFA MOHD NAYAN, LOT 10, JALAN TAYLOR’S, 47500 BANDAR SUNWAY, SELANGOR DARUL EHSAN PREPARED BY TAYLOR SWIFT (STUDENT ID), FOUNDATION IN NATURAL AND BUILT ENVIRONMENT (FNBE), SEMESTER 1 JANUARY 2015 4. You are to show your progression drawing in every tutorial session to your respective tutors. The progression drawing must be on butter paper, signed by the tutor with date, to be compiled in A4/A3 plastic cover and to submit together with presentation boards. It is compulsory to ensure that you are going through the process before completing the final work. Without that, it could be proclaimed as plagiarism. 5. All drawings need to be completed manually (hand drawn & hand written) by using a proper architectural (landscape) graphic communication. However, images for softscape and hardscape can be printed. 6. Drawings must be coloured. You may choose any medium of colouring techniques that you are master in. You are given a freedom to choose whether to colour it all or a portion of the drawing (make sure the portion coloured explains something) and have to be proper and presentable. 7. You need to submit the completed presentation boards with a set of progression drawing on 1 JUNE 2015 (MONDAY), between 3.00 - 3.30 PM at DISCUSSION ROOM C5 (academic suites, block C, level 5). Late submission after that time will be held outside of the venue. 8. You are encouraged to take photo or scan your work for e-portfolio purposes. *Gentle reminder; Any work submitted late will yield 10% mark deduction. For works submitted later than 2 days, no assessment will be done. If you are sick on the submission day, you have to provide MC with an official letter signed by parents/guardian explaining about your health condition. A formal email should be written to the module coordinator a day before/or before submission time.
  • 4. Assessment Criteria The assessment criteria for this assignment will be based on:  Demonstrated understanding of brief  Relevance, appropriateness and depth of research exhibited in the assignment  Creative application of graphic communication skills, originality and quality of the work  Design ideas and constructive representation the ideas. Marking Criteria Marks shall be distributed as follows: Work will be assessed based on: 1. CONTENT: i. Project Description 2 % ii. Conceptual Plan 4% iii. Schematic Plan 4% iv. Master Plan 10% v. Cost & Maintenance Plan 5% TOTAL: 25% 2. Originality, creativity & quality of workmanship 10% 3. Progression Drawings 5% GRAND TOTAL: 40% Suggested References Lin, M. W., 1993, Drawing and Designing with Confidence, John Wiley & Sons. J. Hopper, L.2007, Landscape Architectural Graphic Standards, John Wiley & Sons. Treib, M., 2008, Representing Landscape Architecture, Taylor & Francis, USA and Canada. http://land8.com/photo/portfolio-page-3-worsley/prev?context=user