SlideShare a Scribd company logo
1 of 2
SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
Research Unit for Modern Architecture Studies in Southeast Asia
Foundation in Natural and Build Environment (FNBE)
Introduction to the Construction Industry [QSB30105]
Prerequisite: None
Lecturers: Hasmanira Mokhtar, Jaqurliyn Ann See Peng
_____________________________________________________________________
FINAL PROJECT
The Project Brief
40% of final marks (10% Group and 30% Individual)
Submission date: 9th
June 2015
__________________________________________________________________
Introduction
“Trying to manage a project without project management is like trying to play a football game without a
game plan”. K. Tate
Objectives of Project
The objectives of this project are as follows:
1. To enable students to develop an understanding of the building team, its organization, duties and
inter-relations within which they will seek employment, career progression or further study.
2. To develop an awareness of their professional responsibilities and to appreciate their profession in
the construction industry.
Learning Outcomes of this Project
On successful completion of this assignment, students will be able to demonstrate the following:
1. Explain the need to coordinate and develop an understanding of coherent working relations among
various industry players and to improve the communication channels.
2. Ability to document their observations and understanding from interview session and research
resources as well as to communicate their findings in a systematic and convincing presentation
and reports.
3. Ability to justify the feasibility of a development and improve the proposal to serve the purpose of
the development.
Tasks - Methodology
In a group of 3 students, you need to find a specific empty land to initiate a small construction project. The size of
the land shall between 50m x 50m (2500m2) – 50m x 70m(3500m2). Individually, you are to propose ONE project
that serves on any ONE (1) or combination of TWO (2) of the following purposes.
1. Recreation area
2. Commercial area
3. Industrial area
4. Agricultural area
5. Tourism area
6. Residential area
In your Project Brief report you are to include (but not limited to):
- Your suggestion and proposal
- The rationale, benefits and impacts of your project to the client and the surrounding community/end
user
- Introduction to the site
- Site plan
- Site analysis and observation
- Sketch plan of your proposal
- Sketches of your concept/ideas; images of your ideas.
- Diagram ie bubble diagram, flow chart etc.
- Optional:
o some basic information of the authority procedures or flow that you need to encounter/deal
with in order to get the project done from the inception to the completion i.e the building
plan approval process and procedures.
o costing
Submission Requirement
A4 sized bounded report (min 20 pages); you are also required to submit soft copy of your Project Brief via
email to your respective tutor on the same day of the submission date.
Assessment criteria
The assessment for this assignment will be based on your
- demonstrated understanding and intention of the brief
- quality and clarity of content
- method of documenting and composition of the report
- overall compilation and presentation

More Related Content

Similar to Icifinalprojectjan2015

Icifinalprojectnov2015
Icifinalprojectnov2015Icifinalprojectnov2015
Icifinalprojectnov2015Ong Ke Qi
 
Icifinalprojectnov2015 (1)
Icifinalprojectnov2015 (1)Icifinalprojectnov2015 (1)
Icifinalprojectnov2015 (1)Flenny Wong
 
Icifinalprojectnov2015
Icifinalprojectnov2015Icifinalprojectnov2015
Icifinalprojectnov2015Lam Yu
 
ICI Final Project Brief
ICI Final Project Brief ICI Final Project Brief
ICI Final Project Brief Jamie Lee
 
Icifinalprojectnov2015
Icifinalprojectnov2015Icifinalprojectnov2015
Icifinalprojectnov2015瑞田 吳
 
FNBE AUGUST 2014 ICI FINAL PROJECT
FNBE AUGUST 2014 ICI FINAL PROJECTFNBE AUGUST 2014 ICI FINAL PROJECT
FNBE AUGUST 2014 ICI FINAL PROJECTLucasssong
 
Final project brief
Final project briefFinal project brief
Final project briefJoeylau97
 
ICI Final Project March 2015.pdf
ICI Final Project March 2015.pdfICI Final Project March 2015.pdf
ICI Final Project March 2015.pdf温 庄壁
 
Final project march 2015
Final project march 2015Final project march 2015
Final project march 2015LY97
 
ICI Final project march 2015
ICI Final project march 2015ICI Final project march 2015
ICI Final project march 2015Carol Tang
 
Final project march 2015
Final project march 2015Final project march 2015
Final project march 2015ALISON TANG
 
Ici final porject
Ici final porjectIci final porject
Ici final porject温 庄壁
 
ICI Final Project March 2015.pdf
ICI Final Project March 2015.pdfICI Final Project March 2015.pdf
ICI Final Project March 2015.pdf温 庄壁
 
Final project march 2015
Final project march 2015Final project march 2015
Final project march 2015kellyxc
 

Similar to Icifinalprojectjan2015 (15)

Icifinalprojectnov2015
Icifinalprojectnov2015Icifinalprojectnov2015
Icifinalprojectnov2015
 
Icifinalprojectnov2015 (1)
Icifinalprojectnov2015 (1)Icifinalprojectnov2015 (1)
Icifinalprojectnov2015 (1)
 
Icifinalprojectnov2015
Icifinalprojectnov2015Icifinalprojectnov2015
Icifinalprojectnov2015
 
ICI Final Project Brief
ICI Final Project Brief ICI Final Project Brief
ICI Final Project Brief
 
Icifinalprojectnov2015
Icifinalprojectnov2015Icifinalprojectnov2015
Icifinalprojectnov2015
 
FNBE AUGUST 2014 ICI FINAL PROJECT
FNBE AUGUST 2014 ICI FINAL PROJECTFNBE AUGUST 2014 ICI FINAL PROJECT
FNBE AUGUST 2014 ICI FINAL PROJECT
 
Final project brief
Final project briefFinal project brief
Final project brief
 
ICI Final Project 2015
ICI Final Project 2015ICI Final Project 2015
ICI Final Project 2015
 
ICI Final Project March 2015.pdf
ICI Final Project March 2015.pdfICI Final Project March 2015.pdf
ICI Final Project March 2015.pdf
 
Final project march 2015
Final project march 2015Final project march 2015
Final project march 2015
 
ICI Final project march 2015
ICI Final project march 2015ICI Final project march 2015
ICI Final project march 2015
 
Final project march 2015
Final project march 2015Final project march 2015
Final project march 2015
 
Ici final porject
Ici final porjectIci final porject
Ici final porject
 
ICI Final Project March 2015.pdf
ICI Final Project March 2015.pdfICI Final Project March 2015.pdf
ICI Final Project March 2015.pdf
 
Final project march 2015
Final project march 2015Final project march 2015
Final project march 2015
 

More from Louise Foong

Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Louise Foong
 
Charity drive report 2
Charity drive report 2Charity drive report 2
Charity drive report 2Louise Foong
 
Bus30104 intro to biz final project aug 2015
Bus30104 intro to biz final project   aug 2015Bus30104 intro to biz final project   aug 2015
Bus30104 intro to biz final project aug 2015Louise Foong
 
Bus30104 intro to biz assignment business plan aug 2015
Bus30104 intro to biz assignment   business plan aug 2015Bus30104 intro to biz assignment   business plan aug 2015
Bus30104 intro to biz assignment business plan aug 2015Louise Foong
 
Bus30104 new course outline august 2015 semester
Bus30104  new course outline   august 2015 semesterBus30104  new course outline   august 2015 semester
Bus30104 new course outline august 2015 semesterLouise Foong
 
ECONOMICS ASSIGNMENT
ECONOMICS ASSIGNMENTECONOMICS ASSIGNMENT
ECONOMICS ASSIGNMENTLouise Foong
 
Ecn30205 course outline august 2015 semester
Ecn30205 course outline   august 2015 semesterEcn30205 course outline   august 2015 semester
Ecn30205 course outline august 2015 semesterLouise Foong
 
Pshcology assignment 1 .
Pshcology assignment 1 .Pshcology assignment 1 .
Pshcology assignment 1 .Louise Foong
 
Acc30205 new course outline jan 2015 semester
Acc30205 new course outline   jan 2015 semesterAcc30205 new course outline   jan 2015 semester
Acc30205 new course outline jan 2015 semesterLouise Foong
 
Enbe final project r ev b
Enbe final project r ev bEnbe final project r ev b
Enbe final project r ev bLouise Foong
 

More from Louise Foong (20)

Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment m1 ct1 and bm mac 2016
 
abcreport
abcreportabcreport
abcreport
 
Presentation1
Presentation1Presentation1
Presentation1
 
Charity drive report 2
Charity drive report 2Charity drive report 2
Charity drive report 2
 
Bus30104 intro to biz final project aug 2015
Bus30104 intro to biz final project   aug 2015Bus30104 intro to biz final project   aug 2015
Bus30104 intro to biz final project aug 2015
 
Business plan
Business planBusiness plan
Business plan
 
Bus30104 intro to biz assignment business plan aug 2015
Bus30104 intro to biz assignment   business plan aug 2015Bus30104 intro to biz assignment   business plan aug 2015
Bus30104 intro to biz assignment business plan aug 2015
 
Bus30104 new course outline august 2015 semester
Bus30104  new course outline   august 2015 semesterBus30104  new course outline   august 2015 semester
Bus30104 new course outline august 2015 semester
 
ECONOMICS ASSIGNMENT
ECONOMICS ASSIGNMENTECONOMICS ASSIGNMENT
ECONOMICS ASSIGNMENT
 
Ecn30205 course outline august 2015 semester
Ecn30205 course outline   august 2015 semesterEcn30205 course outline   august 2015 semester
Ecn30205 course outline august 2015 semester
 
Video report
Video reportVideo report
Video report
 
Video slides
Video slidesVideo slides
Video slides
 
Psycho comic
Psycho comicPsycho comic
Psycho comic
 
Assessment
AssessmentAssessment
Assessment
 
Pshcology assignment 1 .
Pshcology assignment 1 .Pshcology assignment 1 .
Pshcology assignment 1 .
 
Acc30205 new course outline jan 2015 semester
Acc30205 new course outline   jan 2015 semesterAcc30205 new course outline   jan 2015 semester
Acc30205 new course outline jan 2015 semester
 
Mural art 1
Mural art 1Mural art 1
Mural art 1
 
Mural art
Mural artMural art
Mural art
 
Blog.august2015
Blog.august2015Blog.august2015
Blog.august2015
 
Enbe final project r ev b
Enbe final project r ev bEnbe final project r ev b
Enbe final project r ev b
 

Icifinalprojectjan2015

  • 1. SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Research Unit for Modern Architecture Studies in Southeast Asia Foundation in Natural and Build Environment (FNBE) Introduction to the Construction Industry [QSB30105] Prerequisite: None Lecturers: Hasmanira Mokhtar, Jaqurliyn Ann See Peng _____________________________________________________________________ FINAL PROJECT The Project Brief 40% of final marks (10% Group and 30% Individual) Submission date: 9th June 2015 __________________________________________________________________ Introduction “Trying to manage a project without project management is like trying to play a football game without a game plan”. K. Tate Objectives of Project The objectives of this project are as follows: 1. To enable students to develop an understanding of the building team, its organization, duties and inter-relations within which they will seek employment, career progression or further study. 2. To develop an awareness of their professional responsibilities and to appreciate their profession in the construction industry. Learning Outcomes of this Project On successful completion of this assignment, students will be able to demonstrate the following: 1. Explain the need to coordinate and develop an understanding of coherent working relations among various industry players and to improve the communication channels. 2. Ability to document their observations and understanding from interview session and research resources as well as to communicate their findings in a systematic and convincing presentation and reports. 3. Ability to justify the feasibility of a development and improve the proposal to serve the purpose of the development.
  • 2. Tasks - Methodology In a group of 3 students, you need to find a specific empty land to initiate a small construction project. The size of the land shall between 50m x 50m (2500m2) – 50m x 70m(3500m2). Individually, you are to propose ONE project that serves on any ONE (1) or combination of TWO (2) of the following purposes. 1. Recreation area 2. Commercial area 3. Industrial area 4. Agricultural area 5. Tourism area 6. Residential area In your Project Brief report you are to include (but not limited to): - Your suggestion and proposal - The rationale, benefits and impacts of your project to the client and the surrounding community/end user - Introduction to the site - Site plan - Site analysis and observation - Sketch plan of your proposal - Sketches of your concept/ideas; images of your ideas. - Diagram ie bubble diagram, flow chart etc. - Optional: o some basic information of the authority procedures or flow that you need to encounter/deal with in order to get the project done from the inception to the completion i.e the building plan approval process and procedures. o costing Submission Requirement A4 sized bounded report (min 20 pages); you are also required to submit soft copy of your Project Brief via email to your respective tutor on the same day of the submission date. Assessment criteria The assessment for this assignment will be based on your - demonstrated understanding and intention of the brief - quality and clarity of content - method of documenting and composition of the report - overall compilation and presentation