SlideShare a Scribd company logo
1 of 4
Download to read offline
1
SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
Research Unit for Modern Architecture Studies in Southeast Asia
Foundation of Natural Build Environment (FNBE)
CONSTRUCTED LANDSCAPE [ARC30203]
Prerequisite: None
Lecturer: Shazreene Nurjanna Samsudin, Noorul Iffa Mohd Nayan
Project 3 (Final)
Residential Landscape Project
40% Individual
Submission: 31st July 2015, Friday (Week 16)
Introduction
Projects in landscape architecture progress through stages, from the very first contact with the client
and awareness of the site, through to the realization, construction and maturation of the finished design.
It is important to remember that the design process, unlike a timeline, is often completely non-linear.
The phrase “back to the drawing board” refers to the continual process of testing and retesting that is
characteristic of the architectures.
In the planning of a residence, there are not only the space is matters but also to integrate the natural
site component with its landscape environs. Since the area to be developed is small scale, the design
will take into account all positive qualities of the site – the ground forms, cover, exposures, views, and
all other natural or architectural features – and bring them into harmony.
“The earth is our home and the ways of nature our paths to understanding”.
[Simonds, J. O.]
Objectives of Project
The objectives of this project:
 To acquire knowledge about design process, planning and development of project.
 To proffer exposure of small scale landscape project to the students.
 To familiarize students about the design stages and how to visualize their ideas onto
presentation boards.
Learning Outcomes of this Project
On successful completion of this subject, students will be able to demonstrate the following:
1. A design process involved in landscape project development and the representation of ideas
for every stage taken.
2. Understanding on landscape design components and how it works and have been applied into
the field.
2
Tasks - Methodology
This is a continuous assignment of Project 2 and an individual project. From the same site that you
were doing for previous Project 2, you are required to design the landscape for the residence/house.
You have to imagine that you are going to present the landscape proposal to the client (who is the
house owner) by preparing ALL drawings needed for every development stages. The development
stages shall include as following;
A. PROJECT DESCRIPTION
A short paragraph of your design statement which explaining about the ideas, rationale of the
design and the concept of the design. The narration should briefly describe, constructive and
informative.
*note: It is advisable to complete at the end of the process
B. CONCEPTUAL DIAGRAM
From the site synthesis (refer to previous individual component of project 2), develop a bubble
diagram. Bubble diagram is used as a means to show what spaces and activities that you want
to propose at the site. Subsequently, you need to come out with a conceptual diagram.
Conceptual diagram is a breakdown (more detailed) of your synthesis (design solutions) and
bubble diagram which related to the site.
C. SCHEMATIC PLAN
From the conceptual plan, you need to develop a schematic plan. It is also known as
preliminary master plan. In schematic plan, you are to compose all of elements that you intend
to put into the design. It should have form composition, shape and pattern of the design
elements. You may provide sketches/illustrations (sections/elevations) to better represent your
ideas.
D. MASTER PLAN
After the schematic plan has been approved by your tutor, you should produce a master plan
set of drawings. The set of drawings include;
- Master Plan
- Elevation & Section
- Hardscape Palette
- Softscape Palette
E. COST ESTIMATION & MAINTENANCE PLAN
A brief cost estimation or budget allocation of the landscape project that you proposed.. The
cost estimation is regarded to be as preliminary bill of quantities (BQ). Additionally, you are
also to include a brief maintenance plan of the project.
(These two topics will be taught by guest lecturer (QS Lecturer) in Week 14).
**Note:
A self-independent study is required on graphic communication particularly on architectural lettering,
sketching,colouring & presentation layout. Do save images from internet or scan from books for ideas
collection and inspirations.
3
Submission Requirement
Each student is required to submit ALL of the following:
1. A3 presentation boards. You can use any type of paper and colour materials as long as it is
pasted on the board. You are advisable to use spray mount to stick your paper onto the board.
2. You need to provide ALL of the following;
- Project Description
- Location Plan & Key Plan
- Bubble Diagram
- Conceptual Plan
- Schematic Plan
- Master Plan
- 1 Section & 1 Elevation Drawings
- Hardscape & Softscape Palette
- Cost Estimation & Maintenance Plan
3. All presentation board must be in landscape/potrait layout (FRONT AND BACK) with title
block in every page. The title block will be provided by the lecturer a week before submission.
The overall layout template will be prepared by the lecturer.
4. You are to show your progress of drawing every week during tutorial sessions to your
respective tutors. The progress drawing must be on butter paper, signed by the tutor with
date, to be compiled in A4 plastic cover and to submit together with presentation
boards.
5. All drawings need to be completed manually (hand drawn & hand written) by using
architectural graphic communication. Images can be printed out.
6. All drawings must be coloured. You may choose any medium of colouring technique that
you are master in. It is not compulsory to colour all, it can be a portion or part of the overall
drawings only.
7. Your A3 boards must be binded.
8. You need to submit the complete binded presentation boards with a set of progression drawing
on 31st July 2015 (Friday). Time and venue of submission will be informed.
9. Any work submitted late will yield 10% mark deduction. For works submitted later than 2 days,
no assessment will be done.
10. You are encouraged to take photo or scan your work for e-portfolio purposes.
4
Assessment Criteria
The assessment criteria for this assignment will be based on:
 Demonstrated understanding of brief
 Relevance, appropriateness and depth of research exhibited in the assignment
 Creative application of graphic communication skills, originality and quality of the work
 Design ideas and constructive representation the ideas.
Marking Criteria
Marks shall be distributed as follows:
Work will be assessed based on:
1. CONTENT:
i. Project Description 2 %
ii. Conceptual Plan 4%
iii. Schematic Plan 4%
iv. Master Plan 10%
v. Cost & Maintenance Plan 5%
TOTAL: 25%
2. Originality, creativity & quality of workmanship 10%
3. Progress Drawings 5%
GRAND TOTAL: 40%

More Related Content

Viewers also liked

Architecture design studio 1 project 3 brief march2016
Architecture design studio 1 project 3 brief march2016Architecture design studio 1 project 3 brief march2016
Architecture design studio 1 project 3 brief march2016Joeylau97
 
Design communication. assignment 2c 2016
Design communication. assignment 2c 2016Design communication. assignment 2c 2016
Design communication. assignment 2c 2016Joeylau97
 
Australian 6 Assessment Sample
Australian 6 Assessment SampleAustralian 6 Assessment Sample
Australian 6 Assessment SampleTeejay Maths
 
Resume-Sherry Holly
Resume-Sherry HollyResume-Sherry Holly
Resume-Sherry HollySherry Holly
 
Project 1 brief cts mac 2015
Project 1 brief cts mac 2015Project 1 brief cts mac 2015
Project 1 brief cts mac 2015Joeylau97
 

Viewers also liked (7)

Architecture design studio 1 project 3 brief march2016
Architecture design studio 1 project 3 brief march2016Architecture design studio 1 project 3 brief march2016
Architecture design studio 1 project 3 brief march2016
 
Eng
EngEng
Eng
 
Design communication. assignment 2c 2016
Design communication. assignment 2c 2016Design communication. assignment 2c 2016
Design communication. assignment 2c 2016
 
Australian 6 Assessment Sample
Australian 6 Assessment SampleAustralian 6 Assessment Sample
Australian 6 Assessment Sample
 
Resume-Sherry Holly
Resume-Sherry HollyResume-Sherry Holly
Resume-Sherry Holly
 
Project 1 brief cts mac 2015
Project 1 brief cts mac 2015Project 1 brief cts mac 2015
Project 1 brief cts mac 2015
 
Polaroid History
Polaroid HistoryPolaroid History
Polaroid History
 

Similar to Project 3 residential landscape project march 2015

CL Project 3 residential landscape project
CL Project 3 residential landscape projectCL Project 3 residential landscape project
CL Project 3 residential landscape projectchristinelee1996
 
Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)
Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)
Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)KY Quah
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape projectstactixzz97
 
Project3residentiallandscapeproject 150624135442-lva1-app6891
Project3residentiallandscapeproject 150624135442-lva1-app6891Project3residentiallandscapeproject 150624135442-lva1-app6891
Project3residentiallandscapeproject 150624135442-lva1-app6891yongzsoh
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape projectchuenmin
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape projectLeon Lim
 
Project 2B residential landscape project
Project 2B residential landscape projectProject 2B residential landscape project
Project 2B residential landscape projectGynie
 
Project3residentiallandscapeproject 150624025952-lva1-app6892
Project3residentiallandscapeproject 150624025952-lva1-app6892Project3residentiallandscapeproject 150624025952-lva1-app6892
Project3residentiallandscapeproject 150624025952-lva1-app6892KY Quah
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape projectZheng Chee Cham
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape projectLee Fong Yen
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape projectJian Leo
 
CL Project 2B Brief
CL Project 2B BriefCL Project 2B Brief
CL Project 2B BriefTamZhaoWei
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape projectSolomonTangerine
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape projectstactixzz97
 
Project 3 Residential Landscape Project Brief
Project 3 Residential Landscape Project BriefProject 3 Residential Landscape Project Brief
Project 3 Residential Landscape Project BriefJunXiang97
 
Cl project2 b residential landscape project
Cl project2 b residential landscape projectCl project2 b residential landscape project
Cl project2 b residential landscape projectCherilyn Chia
 

Similar to Project 3 residential landscape project march 2015 (16)

CL Project 3 residential landscape project
CL Project 3 residential landscape projectCL Project 3 residential landscape project
CL Project 3 residential landscape project
 
Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)
Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)
Project3residentiallandscapeproject 150624025952-lva1-app6892 (1)
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project3residentiallandscapeproject 150624135442-lva1-app6891
Project3residentiallandscapeproject 150624135442-lva1-app6891Project3residentiallandscapeproject 150624135442-lva1-app6891
Project3residentiallandscapeproject 150624135442-lva1-app6891
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 2B residential landscape project
Project 2B residential landscape projectProject 2B residential landscape project
Project 2B residential landscape project
 
Project3residentiallandscapeproject 150624025952-lva1-app6892
Project3residentiallandscapeproject 150624025952-lva1-app6892Project3residentiallandscapeproject 150624025952-lva1-app6892
Project3residentiallandscapeproject 150624025952-lva1-app6892
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
CL Project 2B Brief
CL Project 2B BriefCL Project 2B Brief
CL Project 2B Brief
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 3 residential landscape project
Project 3 residential landscape projectProject 3 residential landscape project
Project 3 residential landscape project
 
Project 3 Residential Landscape Project Brief
Project 3 Residential Landscape Project BriefProject 3 Residential Landscape Project Brief
Project 3 Residential Landscape Project Brief
 
Cl project2 b residential landscape project
Cl project2 b residential landscape projectCl project2 b residential landscape project
Cl project2 b residential landscape project
 

Recently uploaded

Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentInMediaRes1
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17Celine George
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Celine George
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxthorishapillay1
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfakmcokerachita
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Celine George
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxOH TEIK BIN
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxsocialsciencegdgrohi
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonJericReyAuditor
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsKarinaGenton
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerunnathinaik
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTiammrhaywood
 

Recently uploaded (20)

Alper Gobel In Media Res Media Component
Alper Gobel In Media Res Media ComponentAlper Gobel In Media Res Media Component
Alper Gobel In Media Res Media Component
 
How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17How to Configure Email Server in Odoo 17
How to Configure Email Server in Odoo 17
 
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
Incoming and Outgoing Shipments in 1 STEP Using Odoo 17
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
Proudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptxProudly South Africa powerpoint Thorisha.pptx
Proudly South Africa powerpoint Thorisha.pptx
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
call girls in Kamla Market (DELHI) 🔝 >༒9953330565🔝 genuine Escort Service 🔝✔️✔️
 
Class 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdfClass 11 Legal Studies Ch-1 Concept of State .pdf
Class 11 Legal Studies Ch-1 Concept of State .pdf
 
Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17Computed Fields and api Depends in the Odoo 17
Computed Fields and api Depends in the Odoo 17
 
Solving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptxSolving Puzzles Benefits Everyone (English).pptx
Solving Puzzles Benefits Everyone (English).pptx
 
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
Model Call Girl in Tilak Nagar Delhi reach out to us at 🔝9953056974🔝
 
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptxHistory Class XII Ch. 3 Kinship, Caste and Class (1).pptx
History Class XII Ch. 3 Kinship, Caste and Class (1).pptx
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Science lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lessonScience lesson Moon for 4th quarter lesson
Science lesson Moon for 4th quarter lesson
 
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdfTataKelola dan KamSiber Kecerdasan Buatan v022.pdf
TataKelola dan KamSiber Kecerdasan Buatan v022.pdf
 
Science 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its CharacteristicsScience 7 - LAND and SEA BREEZE and its Characteristics
Science 7 - LAND and SEA BREEZE and its Characteristics
 
internship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developerinternship ppt on smartinternz platform as salesforce developer
internship ppt on smartinternz platform as salesforce developer
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPTECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
ECONOMIC CONTEXT - LONG FORM TV DRAMA - PPT
 

Project 3 residential landscape project march 2015

  • 1. 1 SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Research Unit for Modern Architecture Studies in Southeast Asia Foundation of Natural Build Environment (FNBE) CONSTRUCTED LANDSCAPE [ARC30203] Prerequisite: None Lecturer: Shazreene Nurjanna Samsudin, Noorul Iffa Mohd Nayan Project 3 (Final) Residential Landscape Project 40% Individual Submission: 31st July 2015, Friday (Week 16) Introduction Projects in landscape architecture progress through stages, from the very first contact with the client and awareness of the site, through to the realization, construction and maturation of the finished design. It is important to remember that the design process, unlike a timeline, is often completely non-linear. The phrase “back to the drawing board” refers to the continual process of testing and retesting that is characteristic of the architectures. In the planning of a residence, there are not only the space is matters but also to integrate the natural site component with its landscape environs. Since the area to be developed is small scale, the design will take into account all positive qualities of the site – the ground forms, cover, exposures, views, and all other natural or architectural features – and bring them into harmony. “The earth is our home and the ways of nature our paths to understanding”. [Simonds, J. O.] Objectives of Project The objectives of this project:  To acquire knowledge about design process, planning and development of project.  To proffer exposure of small scale landscape project to the students.  To familiarize students about the design stages and how to visualize their ideas onto presentation boards. Learning Outcomes of this Project On successful completion of this subject, students will be able to demonstrate the following: 1. A design process involved in landscape project development and the representation of ideas for every stage taken. 2. Understanding on landscape design components and how it works and have been applied into the field.
  • 2. 2 Tasks - Methodology This is a continuous assignment of Project 2 and an individual project. From the same site that you were doing for previous Project 2, you are required to design the landscape for the residence/house. You have to imagine that you are going to present the landscape proposal to the client (who is the house owner) by preparing ALL drawings needed for every development stages. The development stages shall include as following; A. PROJECT DESCRIPTION A short paragraph of your design statement which explaining about the ideas, rationale of the design and the concept of the design. The narration should briefly describe, constructive and informative. *note: It is advisable to complete at the end of the process B. CONCEPTUAL DIAGRAM From the site synthesis (refer to previous individual component of project 2), develop a bubble diagram. Bubble diagram is used as a means to show what spaces and activities that you want to propose at the site. Subsequently, you need to come out with a conceptual diagram. Conceptual diagram is a breakdown (more detailed) of your synthesis (design solutions) and bubble diagram which related to the site. C. SCHEMATIC PLAN From the conceptual plan, you need to develop a schematic plan. It is also known as preliminary master plan. In schematic plan, you are to compose all of elements that you intend to put into the design. It should have form composition, shape and pattern of the design elements. You may provide sketches/illustrations (sections/elevations) to better represent your ideas. D. MASTER PLAN After the schematic plan has been approved by your tutor, you should produce a master plan set of drawings. The set of drawings include; - Master Plan - Elevation & Section - Hardscape Palette - Softscape Palette E. COST ESTIMATION & MAINTENANCE PLAN A brief cost estimation or budget allocation of the landscape project that you proposed.. The cost estimation is regarded to be as preliminary bill of quantities (BQ). Additionally, you are also to include a brief maintenance plan of the project. (These two topics will be taught by guest lecturer (QS Lecturer) in Week 14). **Note: A self-independent study is required on graphic communication particularly on architectural lettering, sketching,colouring & presentation layout. Do save images from internet or scan from books for ideas collection and inspirations.
  • 3. 3 Submission Requirement Each student is required to submit ALL of the following: 1. A3 presentation boards. You can use any type of paper and colour materials as long as it is pasted on the board. You are advisable to use spray mount to stick your paper onto the board. 2. You need to provide ALL of the following; - Project Description - Location Plan & Key Plan - Bubble Diagram - Conceptual Plan - Schematic Plan - Master Plan - 1 Section & 1 Elevation Drawings - Hardscape & Softscape Palette - Cost Estimation & Maintenance Plan 3. All presentation board must be in landscape/potrait layout (FRONT AND BACK) with title block in every page. The title block will be provided by the lecturer a week before submission. The overall layout template will be prepared by the lecturer. 4. You are to show your progress of drawing every week during tutorial sessions to your respective tutors. The progress drawing must be on butter paper, signed by the tutor with date, to be compiled in A4 plastic cover and to submit together with presentation boards. 5. All drawings need to be completed manually (hand drawn & hand written) by using architectural graphic communication. Images can be printed out. 6. All drawings must be coloured. You may choose any medium of colouring technique that you are master in. It is not compulsory to colour all, it can be a portion or part of the overall drawings only. 7. Your A3 boards must be binded. 8. You need to submit the complete binded presentation boards with a set of progression drawing on 31st July 2015 (Friday). Time and venue of submission will be informed. 9. Any work submitted late will yield 10% mark deduction. For works submitted later than 2 days, no assessment will be done. 10. You are encouraged to take photo or scan your work for e-portfolio purposes.
  • 4. 4 Assessment Criteria The assessment criteria for this assignment will be based on:  Demonstrated understanding of brief  Relevance, appropriateness and depth of research exhibited in the assignment  Creative application of graphic communication skills, originality and quality of the work  Design ideas and constructive representation the ideas. Marking Criteria Marks shall be distributed as follows: Work will be assessed based on: 1. CONTENT: i. Project Description 2 % ii. Conceptual Plan 4% iii. Schematic Plan 4% iv. Master Plan 10% v. Cost & Maintenance Plan 5% TOTAL: 25% 2. Originality, creativity & quality of workmanship 10% 3. Progress Drawings 5% GRAND TOTAL: 40%