Larsen & Toubro, a leading Indian
engineering and construction contractor,
were commissioned to build a nuclear
containment building at Kakrapar Atomic
Power Plant. As part of the project they
needed to lift and position a 47 metre
LCM SYSTEMS
Solutions in Load Cell TechnologySolutions in Load Cell Technology
LCM4670 55te Telemetry Load Shackles
APPLICATION NOTE
Application
Heavy lift load distribution
monitoring
LCM Systems Ltd
Unit 15, Newport Business Park
Barry Way, Newport
Isle of Wight PO30 5GY UK
Tel: +44 (0)1983 249264
Fax: +44 (0)1983 249266
sales@lcmsystems.com
www.lcmsystems.com
Design Brief
Features
Manufacatured using a Crosby G2130
bow shackle
Existing load shackle pin used for
added traceability
Supplied with load centralising
bobbin for optimal accuracy
Transmission distance of 500m
(clear line of sight)
Supplied with free T24LOG100
software for viewing and logging
of load shackle data
Complete system supplied fully
calibrated and issued with certificates
traceable to UKAS Standards
Environmentally sealed to IP67
diameter and 8.25 metre high inner containment dome liner, which had been built as a
single unit. Because of the unique geometry of the dome and its 365 tonne weight, a
balanced lift with equally distributed loads was vital to ensure a safe and successful lift.
Eighteen lifting lugs were integrated into the dome liner, which were each fitted with
Main Criteria
The load shackle must utilise the
Crosby G2130 shackle series
Data from each load cell to be
displayed on a laptop PC
The system must be completely
wireless
Load shackle construction robust
enough for heavy lifting
environment
Full material traceability required
Load shackles to be calibrated to
traceable standards
loaded throughout the lift. With only 200mm clearance to work with, the Larsen &
Toubro team lifted and placed the dome into position on top of the inner containment
wall in just two hours, with alignment and anchoring taking a further three hours, after
which the crane was released.
Larsen & Toubro commented “During test runs the turnbuckles where rotated according
to the load displayed on all 18 load shackles to distribute the loads equally. This test was
demonstrated to our client and the regulatory board, who were then happy to give
their permission to lift the dome on the very next day.”
a 55te wireless load shackle. At the
customers request, a Crosby G2130
was used, rather than the smaller
standard TELSHACK-B 55te, as it
afforded a better fit within the lifting
lugs.
LCM Systems also supplied a telemetry
base station that detected the
telemetry signals from the load
shackles and transmitted them to a
laptop, where engineers were able to
view the loads on each lifting lug to
ensure they remained uniformly
www.lcmsystems.com
LCM SYSTEMS
Solutions in Load Cell TechnologySolutions in Load Cell Technology
AP112
Issue date: 14/09/2016
APPROVED
(unapproved if printed)
LCM4670 55te Telemetry Load Shackles
APPLICATION NOTE
Specification
Rated load (tonnes)
Proof load
Ultimate breaking load
Non-linearity
Non-repeatablity
Transmission distance
Battery life
Battery
Operating temperature range
Environmental protection level
55te
200% of rated load
>300% of rated load
<±1% of rated load (typically)
<±0.1% of rated load
Up to 500 metres (clear line of sight)
200 hours typically (continuous use)
AAA Alkaline x 2
-20 to +60°C
IP67
Ø327
Ø184
66.5 105 66.540
50
79.5
267 454
Ø70
Ø127
Battery Housing
Optional
n145
66.5
Dimensions
Bobbin

More Related Content

What's hot

ERTMS Solutions TVMLifeCheck - Technical presentation
ERTMS Solutions TVMLifeCheck - Technical presentationERTMS Solutions TVMLifeCheck - Technical presentation
ERTMS Solutions TVMLifeCheck - Technical presentationERTMS Solutions
 
SWIFT_Drilling_Brochure_2013
SWIFT_Drilling_Brochure_2013SWIFT_Drilling_Brochure_2013
SWIFT_Drilling_Brochure_2013Hans Holkenborg
 
Fundamentals of Intelligent Compaction
Fundamentals of Intelligent CompactionFundamentals of Intelligent Compaction
Fundamentals of Intelligent Compactiongkchang
 
FHWA/TPF Intelligent Compaction and Recent Findings
FHWA/TPF Intelligent Compaction and Recent FindingsFHWA/TPF Intelligent Compaction and Recent Findings
FHWA/TPF Intelligent Compaction and Recent Findingsgkchang
 
ga-gae system
ga-gae systemga-gae system
ga-gae systemOrmazabal
 
Case study_Walney_rev1
Case study_Walney_rev1Case study_Walney_rev1
Case study_Walney_rev1Rune Kaltoft
 
Balise LifeCheck: the preventive balise maintenance tool
Balise LifeCheck: the preventive balise maintenance toolBalise LifeCheck: the preventive balise maintenance tool
Balise LifeCheck: the preventive balise maintenance toolERTMS Solutions
 
Ricardo DC-DC Converter Presentation for NMI
Ricardo DC-DC Converter Presentation for NMIRicardo DC-DC Converter Presentation for NMI
Ricardo DC-DC Converter Presentation for NMIFrank Warnes
 
Cable Laying Pulling Equipment Low High Voltage Cables - Catalogue
Cable Laying Pulling Equipment Low High Voltage Cables - CatalogueCable Laying Pulling Equipment Low High Voltage Cables - Catalogue
Cable Laying Pulling Equipment Low High Voltage Cables - CatalogueThorne & Derrick International
 
ERTMS Solutions : TrackCircuit LifeCheck
ERTMS Solutions : TrackCircuit LifeCheckERTMS Solutions : TrackCircuit LifeCheck
ERTMS Solutions : TrackCircuit LifeCheckERTMS Solutions
 
MGJ3andMGJ6Presentationversion2c.PDF
MGJ3andMGJ6Presentationversion2c.PDFMGJ3andMGJ6Presentationversion2c.PDF
MGJ3andMGJ6Presentationversion2c.PDFFrank Warnes
 

What's hot (18)

ERTMS Solutions TVMLifeCheck - Technical presentation
ERTMS Solutions TVMLifeCheck - Technical presentationERTMS Solutions TVMLifeCheck - Technical presentation
ERTMS Solutions TVMLifeCheck - Technical presentation
 
Intelligent Compaction
Intelligent CompactionIntelligent Compaction
Intelligent Compaction
 
SWIFT_Drilling_Brochure_2013
SWIFT_Drilling_Brochure_2013SWIFT_Drilling_Brochure_2013
SWIFT_Drilling_Brochure_2013
 
Fundamentals of Intelligent Compaction
Fundamentals of Intelligent CompactionFundamentals of Intelligent Compaction
Fundamentals of Intelligent Compaction
 
FHWA/TPF Intelligent Compaction and Recent Findings
FHWA/TPF Intelligent Compaction and Recent FindingsFHWA/TPF Intelligent Compaction and Recent Findings
FHWA/TPF Intelligent Compaction and Recent Findings
 
Intelligent Compaction (IC) for Cold In-Place Recycling
Intelligent Compaction (IC) for Cold In-Place RecyclingIntelligent Compaction (IC) for Cold In-Place Recycling
Intelligent Compaction (IC) for Cold In-Place Recycling
 
ga-gae system
ga-gae systemga-gae system
ga-gae system
 
Case study_Walney_rev1
Case study_Walney_rev1Case study_Walney_rev1
Case study_Walney_rev1
 
Rtca proximity detection gavin white
Rtca proximity detection   gavin whiteRtca proximity detection   gavin white
Rtca proximity detection gavin white
 
Balise LifeCheck: the preventive balise maintenance tool
Balise LifeCheck: the preventive balise maintenance toolBalise LifeCheck: the preventive balise maintenance tool
Balise LifeCheck: the preventive balise maintenance tool
 
Ricardo DC-DC Converter Presentation for NMI
Ricardo DC-DC Converter Presentation for NMIRicardo DC-DC Converter Presentation for NMI
Ricardo DC-DC Converter Presentation for NMI
 
Cable Laying Pulling Equipment Low High Voltage Cables - Catalogue
Cable Laying Pulling Equipment Low High Voltage Cables - CatalogueCable Laying Pulling Equipment Low High Voltage Cables - Catalogue
Cable Laying Pulling Equipment Low High Voltage Cables - Catalogue
 
Cable Pulling & Laying Equipment for Street Lighting
Cable Pulling & Laying Equipment for Street LightingCable Pulling & Laying Equipment for Street Lighting
Cable Pulling & Laying Equipment for Street Lighting
 
ERTMS Solutions : TrackCircuit LifeCheck
ERTMS Solutions : TrackCircuit LifeCheckERTMS Solutions : TrackCircuit LifeCheck
ERTMS Solutions : TrackCircuit LifeCheck
 
Lee Gallivan
Lee GallivanLee Gallivan
Lee Gallivan
 
Lasstec Weighing System
Lasstec Weighing SystemLasstec Weighing System
Lasstec Weighing System
 
N-Viro Motive (GenSet Advantages)
N-Viro Motive (GenSet Advantages)N-Viro Motive (GenSet Advantages)
N-Viro Motive (GenSet Advantages)
 
MGJ3andMGJ6Presentationversion2c.PDF
MGJ3andMGJ6Presentationversion2c.PDFMGJ3andMGJ6Presentationversion2c.PDF
MGJ3andMGJ6Presentationversion2c.PDF
 

Similar to [Application Case] Heavy Lift Load Distribution Monitoring

Snw ht-sea-trial-paper-rev2
Snw ht-sea-trial-paper-rev2Snw ht-sea-trial-paper-rev2
Snw ht-sea-trial-paper-rev2Jerry Brown
 
Robotics applied to power line
Robotics applied to power line Robotics applied to power line
Robotics applied to power line RTE
 
Infrastructure Preservation Advanced Bridge inspection & Infrastructure Inspe...
Infrastructure Preservation Advanced Bridge inspection & Infrastructure Inspe...Infrastructure Preservation Advanced Bridge inspection & Infrastructure Inspe...
Infrastructure Preservation Advanced Bridge inspection & Infrastructure Inspe...Infrastructure Preservation Corporation
 
Infrastructure preservation infrastructure and bridge inspection technology
Infrastructure preservation infrastructure and bridge inspection technology Infrastructure preservation infrastructure and bridge inspection technology
Infrastructure preservation infrastructure and bridge inspection technology Infrastructure Preservation Corporation
 
Rogers_Jupiter_CDOT_May16
Rogers_Jupiter_CDOT_May16Rogers_Jupiter_CDOT_May16
Rogers_Jupiter_CDOT_May16Pam Crowley
 
HIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case StudyHIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case Studyknowledge stuff
 
Oim presentation rev tt nov 2010 vsersion
 Oim presentation  rev tt nov 2010 vsersion Oim presentation  rev tt nov 2010 vsersion
Oim presentation rev tt nov 2010 vsersiontom_toth
 
Inuktun Robotic Crawlers and Cameras
Inuktun Robotic Crawlers and CamerasInuktun Robotic Crawlers and Cameras
Inuktun Robotic Crawlers and CamerasBill Tarant
 
Case study_BKR1_rev1
Case study_BKR1_rev1Case study_BKR1_rev1
Case study_BKR1_rev1Rune Kaltoft
 
33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)Pablo Miguel Jurado
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18Rajesh Prasad
 

Similar to [Application Case] Heavy Lift Load Distribution Monitoring (20)

Ap111 lcm4660 container weighing system
Ap111   lcm4660 container weighing systemAp111   lcm4660 container weighing system
Ap111 lcm4660 container weighing system
 
2. Rail Infrastructure - December 2014
2. Rail Infrastructure - December 20142. Rail Infrastructure - December 2014
2. Rail Infrastructure - December 2014
 
Snw ht-sea-trial-paper-rev2
Snw ht-sea-trial-paper-rev2Snw ht-sea-trial-paper-rev2
Snw ht-sea-trial-paper-rev2
 
Robotics applied to power line
Robotics applied to power line Robotics applied to power line
Robotics applied to power line
 
Infrastructure Preservation Advanced Bridge inspection & Infrastructure Inspe...
Infrastructure Preservation Advanced Bridge inspection & Infrastructure Inspe...Infrastructure Preservation Advanced Bridge inspection & Infrastructure Inspe...
Infrastructure Preservation Advanced Bridge inspection & Infrastructure Inspe...
 
Ap118 lcm4487 diving bell lifting system
Ap118   lcm4487 diving bell lifting systemAp118   lcm4487 diving bell lifting system
Ap118 lcm4487 diving bell lifting system
 
Infrastructure preservation infrastructure and bridge inspection technology
Infrastructure preservation infrastructure and bridge inspection technology Infrastructure preservation infrastructure and bridge inspection technology
Infrastructure preservation infrastructure and bridge inspection technology
 
Rogers_Jupiter_CDOT_May16
Rogers_Jupiter_CDOT_May16Rogers_Jupiter_CDOT_May16
Rogers_Jupiter_CDOT_May16
 
HIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case StudyHIGH WALL MINING at SCCL - A Case Study
HIGH WALL MINING at SCCL - A Case Study
 
Oim presentation rev tt nov 2010 vsersion
 Oim presentation  rev tt nov 2010 vsersion Oim presentation  rev tt nov 2010 vsersion
Oim presentation rev tt nov 2010 vsersion
 
Inuktun Robotic Crawlers and Cameras
Inuktun Robotic Crawlers and CamerasInuktun Robotic Crawlers and Cameras
Inuktun Robotic Crawlers and Cameras
 
National bridge inventory inspections go robotic
National bridge inventory inspections go roboticNational bridge inventory inspections go robotic
National bridge inventory inspections go robotic
 
IPC Bridge Inspection and Infrastructure Inspection Services
IPC Bridge Inspection and Infrastructure Inspection ServicesIPC Bridge Inspection and Infrastructure Inspection Services
IPC Bridge Inspection and Infrastructure Inspection Services
 
Case study_BKR1_rev1
Case study_BKR1_rev1Case study_BKR1_rev1
Case study_BKR1_rev1
 
Bridge inspection with non-destructive testing and robotic engineering
Bridge inspection with non-destructive testing and robotic engineeringBridge inspection with non-destructive testing and robotic engineering
Bridge inspection with non-destructive testing and robotic engineering
 
33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)33 kV towerline roadcrossing design modification - Final (English)
33 kV towerline roadcrossing design modification - Final (English)
 
E&I Farukh
E&I FarukhE&I Farukh
E&I Farukh
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 
McGrath
McGrath McGrath
McGrath
 
IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18IIBE ppt at Lucknow dt 25.05.18
IIBE ppt at Lucknow dt 25.05.18
 

Recently uploaded

Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...RajaP95
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINESIVASHANKAR N
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 

Recently uploaded (20)

Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur EscortsCall Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
Call Girls Service Nagpur Tanvi Call 7001035870 Meet With Nagpur Escorts
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
IMPLICATIONS OF THE ABOVE HOLISTIC UNDERSTANDING OF HARMONY ON PROFESSIONAL E...
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINEMANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
MANUFACTURING PROCESS-II UNIT-2 LATHE MACHINE
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 

[Application Case] Heavy Lift Load Distribution Monitoring

  • 1. Larsen & Toubro, a leading Indian engineering and construction contractor, were commissioned to build a nuclear containment building at Kakrapar Atomic Power Plant. As part of the project they needed to lift and position a 47 metre LCM SYSTEMS Solutions in Load Cell TechnologySolutions in Load Cell Technology LCM4670 55te Telemetry Load Shackles APPLICATION NOTE Application Heavy lift load distribution monitoring LCM Systems Ltd Unit 15, Newport Business Park Barry Way, Newport Isle of Wight PO30 5GY UK Tel: +44 (0)1983 249264 Fax: +44 (0)1983 249266 sales@lcmsystems.com www.lcmsystems.com Design Brief Features Manufacatured using a Crosby G2130 bow shackle Existing load shackle pin used for added traceability Supplied with load centralising bobbin for optimal accuracy Transmission distance of 500m (clear line of sight) Supplied with free T24LOG100 software for viewing and logging of load shackle data Complete system supplied fully calibrated and issued with certificates traceable to UKAS Standards Environmentally sealed to IP67 diameter and 8.25 metre high inner containment dome liner, which had been built as a single unit. Because of the unique geometry of the dome and its 365 tonne weight, a balanced lift with equally distributed loads was vital to ensure a safe and successful lift. Eighteen lifting lugs were integrated into the dome liner, which were each fitted with Main Criteria The load shackle must utilise the Crosby G2130 shackle series Data from each load cell to be displayed on a laptop PC The system must be completely wireless Load shackle construction robust enough for heavy lifting environment Full material traceability required Load shackles to be calibrated to traceable standards loaded throughout the lift. With only 200mm clearance to work with, the Larsen & Toubro team lifted and placed the dome into position on top of the inner containment wall in just two hours, with alignment and anchoring taking a further three hours, after which the crane was released. Larsen & Toubro commented “During test runs the turnbuckles where rotated according to the load displayed on all 18 load shackles to distribute the loads equally. This test was demonstrated to our client and the regulatory board, who were then happy to give their permission to lift the dome on the very next day.” a 55te wireless load shackle. At the customers request, a Crosby G2130 was used, rather than the smaller standard TELSHACK-B 55te, as it afforded a better fit within the lifting lugs. LCM Systems also supplied a telemetry base station that detected the telemetry signals from the load shackles and transmitted them to a laptop, where engineers were able to view the loads on each lifting lug to ensure they remained uniformly
  • 2. www.lcmsystems.com LCM SYSTEMS Solutions in Load Cell TechnologySolutions in Load Cell Technology AP112 Issue date: 14/09/2016 APPROVED (unapproved if printed) LCM4670 55te Telemetry Load Shackles APPLICATION NOTE Specification Rated load (tonnes) Proof load Ultimate breaking load Non-linearity Non-repeatablity Transmission distance Battery life Battery Operating temperature range Environmental protection level 55te 200% of rated load >300% of rated load <±1% of rated load (typically) <±0.1% of rated load Up to 500 metres (clear line of sight) 200 hours typically (continuous use) AAA Alkaline x 2 -20 to +60°C IP67 Ø327 Ø184 66.5 105 66.540 50 79.5 267 454 Ø70 Ø127 Battery Housing Optional n145 66.5 Dimensions Bobbin