1. GSPublisherEngine 0.0.100.100
+0.00
38 5
17.56
-0,16
-0,56
50
-1,55
±0.00
30
±0.00
-0,56
-0,16
38 5
10
4
±0.00
30 5
50
-1,55
±0.00
6 38 6
50
6 38 6 3.54 2.10 3.76 6 38 66 38 6
10.90
2.24
17.066386
1.746386
23506 5 H= 1,40 m
(the same as the existing building floor plan level)
20
100
4012 1 H= 4,02 m
10040122H=2,00m
60123H=17,44m
20
22
22
Drawing Number:
Scale:
Date:
M= 1:50
march 2011
M= 1:25
2 cm parqet. / glazed ceramic
6 cm gravel fill
8 cm step proof instulation
2 layer DP (damp proof course)
6 cm floor slab
10 cm gravel fill
soil
1%
32 32
28 28
20
New foundations
New foundations
A A
A A
B B
B
B
-1,55
-1,55
-1,55
-1,55
-1,55
-1,55
-1,55
6 cm concrete decorative stone
3 cm sand
15 cm gravel fill
8506 4 H= 0,98 m
Sk-1
A-A Section:
M=1:25
B-B Section:
M=1:25
Bulkhead foundations:
M=1:25
Community house.
Working Drawing.
Foundation.
Establishment location:
3355 Kápolna, Kossuth street 11. HRSZ.: 428/2
Proprietor:
Kápolna Council.
3355 Kápolna, Kossuth street 12.
Engineer:
Sallak Ltd.
Kegyes S. Árpád OKI. engineer
Erdőtelek,
József A. street. 17/A
T-1-10-0106
Drawn by:
Laszlo Kapas
Zele-Bau Ltd.
3350 Kal Fo ut street 1
www.zelebau.hu
2 cm parqet. / glazed ceramic
6 cm gravel fill
8 cm step proof instulation
2 layer DP (damp proof course)
6 cm floor slab
10 cm gravel fill
soil
2 cm parqet. / glazed ceramic
6 cm gravel fill
8 cm step proof instulation
2 layer DP (damp proof course)
6 cm floor slab
10 cm gravel fill
soil
(the same as the existing building floor plan level)