SlideShare a Scribd company logo
1 of 1
Download to read offline
GSPublisherEngine 0.0.100.100
+0.00
38 5
17.56
-0,16
-0,56
50
-1,55
±0.00
30
±0.00
-0,56
-0,16
38 5
10
4
±0.00
30 5
50
-1,55
±0.00
6 38 6
50
6 38 6 3.54 2.10 3.76 6 38 66 38 6
10.90
2.24
17.066386
1.746386
23506 5 H= 1,40 m
(the same as the existing building floor plan level)
20
100
4012 1 H= 4,02 m
10040122H=2,00m
60123H=17,44m
20
22
22
Drawing Number:
Scale:
Date:
M= 1:50
march 2011
M= 1:25
2 cm parqet. / glazed ceramic
6 cm gravel fill
8 cm step proof instulation
2 layer DP (damp proof course)
6 cm floor slab
10 cm gravel fill
soil
1%
32 32
28 28
20
New foundations
New foundations
A A
A A
B B
B
B
-1,55
-1,55
-1,55
-1,55
-1,55
-1,55
-1,55
6 cm concrete decorative stone
3 cm sand
15 cm gravel fill
8506 4 H= 0,98 m
Sk-1
A-A Section:
M=1:25
B-B Section:
M=1:25
Bulkhead foundations:
M=1:25
Community house.
Working Drawing.
Foundation.
Establishment location:
3355 Kápolna, Kossuth street 11. HRSZ.: 428/2
Proprietor:
Kápolna Council.
3355 Kápolna, Kossuth street 12.
Engineer:
Sallak Ltd.
Kegyes S. Árpád OKI. engineer
Erdőtelek,
József A. street. 17/A
T-1-10-0106
Drawn by:
Laszlo Kapas
Zele-Bau Ltd.
3350 Kal Fo ut street 1
www.zelebau.hu
2 cm parqet. / glazed ceramic
6 cm gravel fill
8 cm step proof instulation
2 layer DP (damp proof course)
6 cm floor slab
10 cm gravel fill
soil
2 cm parqet. / glazed ceramic
6 cm gravel fill
8 cm step proof instulation
2 layer DP (damp proof course)
6 cm floor slab
10 cm gravel fill
soil
(the same as the existing building floor plan level)

More Related Content

What's hot

What's hot (15)

1CO3
1CO3 1CO3
1CO3
 
BQ
BQBQ
BQ
 
SMM7 Bill of Quantities
SMM7 Bill of QuantitiesSMM7 Bill of Quantities
SMM7 Bill of Quantities
 
Kabaddi
KabaddiKabaddi
Kabaddi
 
Hcj brosura cosinus
Hcj brosura cosinusHcj brosura cosinus
Hcj brosura cosinus
 
RE-CG-07_WAITER-STATION-GA-WM
RE-CG-07_WAITER-STATION-GA-WMRE-CG-07_WAITER-STATION-GA-WM
RE-CG-07_WAITER-STATION-GA-WM
 
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
Programme Sync with BOQ from contract, Cost & ResEqp Loaded (Initial Stage)
 
MEKA WET PROCESSING EQUIPMENT FLYER
MEKA WET PROCESSING EQUIPMENT FLYERMEKA WET PROCESSING EQUIPMENT FLYER
MEKA WET PROCESSING EQUIPMENT FLYER
 
Control Chart for Attributes U
Control Chart for Attributes UControl Chart for Attributes U
Control Chart for Attributes U
 
Fsvn
FsvnFsvn
Fsvn
 
CL Final Assignment Report Part B
CL Final Assignment Report Part BCL Final Assignment Report Part B
CL Final Assignment Report Part B
 
Projects
ProjectsProjects
Projects
 
MISSION STATMENT 2015
MISSION STATMENT 2015MISSION STATMENT 2015
MISSION STATMENT 2015
 
1972 CHEVY P/U WIRING A DIGITAL DASH
1972 CHEVY P/U WIRING A DIGITAL DASH1972 CHEVY P/U WIRING A DIGITAL DASH
1972 CHEVY P/U WIRING A DIGITAL DASH
 
Ir extraco
Ir extracoIr extraco
Ir extraco
 

Viewers also liked

Mapa conceptual gerencia de proyectos
Mapa conceptual gerencia de proyectosMapa conceptual gerencia de proyectos
Mapa conceptual gerencia de proyectosRamosnavarro
 
2015.02.15 SDSU CFA Research Challenge Report
2015.02.15 SDSU CFA Research Challenge Report2015.02.15 SDSU CFA Research Challenge Report
2015.02.15 SDSU CFA Research Challenge ReportThomaz Cardoso de Almeida
 
Amy jingyi sun project manager business system analyst
Amy jingyi sun project manager business system analystAmy jingyi sun project manager business system analyst
Amy jingyi sun project manager business system analystamyjingyi
 
Call sheet 1-1
Call sheet 1-1Call sheet 1-1
Call sheet 1-1laolu720
 
MRINALINI - CV latest
MRINALINI - CV latestMRINALINI - CV latest
MRINALINI - CV latestMrinalini Bit
 
Instituto domingo savio
Instituto domingo savioInstituto domingo savio
Instituto domingo saviopedroviruez
 
Kindergarten
KindergartenKindergarten
Kindergartensusan70
 
Price list Gulshan Bellina .Call 9891199409
Price list Gulshan Bellina .Call 9891199409Price list Gulshan Bellina .Call 9891199409
Price list Gulshan Bellina .Call 9891199409Puneet Jain
 
HCAS - SURFACE MOUNT RESISTORS CERAMIC ENCASED TYPE
HCAS - SURFACE MOUNT RESISTORS CERAMIC ENCASED TYPEHCAS - SURFACE MOUNT RESISTORS CERAMIC ENCASED TYPE
HCAS - SURFACE MOUNT RESISTORS CERAMIC ENCASED TYPEhtrindia
 

Viewers also liked (14)

Jennymoda
JennymodaJennymoda
Jennymoda
 
Mapa conceptual gerencia de proyectos
Mapa conceptual gerencia de proyectosMapa conceptual gerencia de proyectos
Mapa conceptual gerencia de proyectos
 
TER
TERTER
TER
 
2015.02.15 SDSU CFA Research Challenge Report
2015.02.15 SDSU CFA Research Challenge Report2015.02.15 SDSU CFA Research Challenge Report
2015.02.15 SDSU CFA Research Challenge Report
 
Amy jingyi sun project manager business system analyst
Amy jingyi sun project manager business system analystAmy jingyi sun project manager business system analyst
Amy jingyi sun project manager business system analyst
 
Call sheet 1-1
Call sheet 1-1Call sheet 1-1
Call sheet 1-1
 
MRINALINI - CV latest
MRINALINI - CV latestMRINALINI - CV latest
MRINALINI - CV latest
 
Proyect
ProyectProyect
Proyect
 
Origen de la internet
Origen de la internetOrigen de la internet
Origen de la internet
 
Instituto domingo savio
Instituto domingo savioInstituto domingo savio
Instituto domingo savio
 
Kindergarten
KindergartenKindergarten
Kindergarten
 
Tomasz graj
Tomasz grajTomasz graj
Tomasz graj
 
Price list Gulshan Bellina .Call 9891199409
Price list Gulshan Bellina .Call 9891199409Price list Gulshan Bellina .Call 9891199409
Price list Gulshan Bellina .Call 9891199409
 
HCAS - SURFACE MOUNT RESISTORS CERAMIC ENCASED TYPE
HCAS - SURFACE MOUNT RESISTORS CERAMIC ENCASED TYPEHCAS - SURFACE MOUNT RESISTORS CERAMIC ENCASED TYPE
HCAS - SURFACE MOUNT RESISTORS CERAMIC ENCASED TYPE
 

Similar to 49. Kapolna commonity centerSk-1 foundations

72747160 estimation
72747160 estimation72747160 estimation
72747160 estimationimaduddin91
 
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdfTender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdfssuserd43de8
 
SMM7 Cost Summary Report
SMM7 Cost Summary ReportSMM7 Cost Summary Report
SMM7 Cost Summary ReportNatalie Reid
 
211053940 mechanisms-for-projects-drawings-pr-pdf
211053940 mechanisms-for-projects-drawings-pr-pdf211053940 mechanisms-for-projects-drawings-pr-pdf
211053940 mechanisms-for-projects-drawings-pr-pdfTrung Quoc Le
 
M-ANM-3E4DS0-CBPC-SDR-12_IT_301-Model
M-ANM-3E4DS0-CBPC-SDR-12_IT_301-ModelM-ANM-3E4DS0-CBPC-SDR-12_IT_301-Model
M-ANM-3E4DS0-CBPC-SDR-12_IT_301-ModelStefano Zambelli
 

Similar to 49. Kapolna commonity centerSk-1 foundations (9)

72747160 estimation
72747160 estimation72747160 estimation
72747160 estimation
 
Lamp m 32
Lamp m 32Lamp m 32
Lamp m 32
 
E-Tender_Aanganvadi SZ 29-10-15
E-Tender_Aanganvadi SZ 29-10-15E-Tender_Aanganvadi SZ 29-10-15
E-Tender_Aanganvadi SZ 29-10-15
 
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdfTender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
Tender_Schedule_Renovation_of_Vadakkechira_Bus_Stand.pdf
 
SMM7 Cost Summary Report
SMM7 Cost Summary ReportSMM7 Cost Summary Report
SMM7 Cost Summary Report
 
211053940 mechanisms-for-projects-drawings-pr-pdf
211053940 mechanisms-for-projects-drawings-pr-pdf211053940 mechanisms-for-projects-drawings-pr-pdf
211053940 mechanisms-for-projects-drawings-pr-pdf
 
Capitulo 02 grupo 01
Capitulo 02 grupo 01Capitulo 02 grupo 01
Capitulo 02 grupo 01
 
Rab
RabRab
Rab
 
M-ANM-3E4DS0-CBPC-SDR-12_IT_301-Model
M-ANM-3E4DS0-CBPC-SDR-12_IT_301-ModelM-ANM-3E4DS0-CBPC-SDR-12_IT_301-Model
M-ANM-3E4DS0-CBPC-SDR-12_IT_301-Model
 

More from Laszlo Kapas

31. Egerbakta nursery South Elevations
31. Egerbakta nursery South Elevations31. Egerbakta nursery South Elevations
31. Egerbakta nursery South ElevationsLaszlo Kapas
 
31. Egerbakta nursery Cross Sections
31. Egerbakta nursery Cross Sections31. Egerbakta nursery Cross Sections
31. Egerbakta nursery Cross SectionsLaszlo Kapas
 
31. Egerbakta nursery Plan
31. Egerbakta nursery Plan31. Egerbakta nursery Plan
31. Egerbakta nursery PlanLaszlo Kapas
 
49. Kapolna commonity center elevetions
49. Kapolna commonity center elevetions49. Kapolna commonity center elevetions
49. Kapolna commonity center elevetionsLaszlo Kapas
 
49. kapolna commonity centerSk-2 Slab Plan
49. kapolna commonity centerSk-2 Slab Plan49. kapolna commonity centerSk-2 Slab Plan
49. kapolna commonity centerSk-2 Slab PlanLaszlo Kapas
 
49. Kapolna Commonity Center
49. Kapolna Commonity Center49. Kapolna Commonity Center
49. Kapolna Commonity CenterLaszlo Kapas
 
29. Hajduszovat S-9 Working Drawing. Layer.
29. Hajduszovat S-9 Working Drawing. Layer.29. Hajduszovat S-9 Working Drawing. Layer.
29. Hajduszovat S-9 Working Drawing. Layer.Laszlo Kapas
 
29. Hajduszovat S-5 Biogas plant rebar layout
29. Hajduszovat S-5 Biogas plant rebar layout29. Hajduszovat S-5 Biogas plant rebar layout
29. Hajduszovat S-5 Biogas plant rebar layoutLaszlo Kapas
 
29. hajduszovat S-4 Biogas Plant. Top layer
29. hajduszovat S-4  Biogas Plant. Top layer29. hajduszovat S-4  Biogas Plant. Top layer
29. hajduszovat S-4 Biogas Plant. Top layerLaszlo Kapas
 
78. Loranr Bozsik scale E-2 elevations
78. Loranr Bozsik scale E-2 elevations78. Loranr Bozsik scale E-2 elevations
78. Loranr Bozsik scale E-2 elevationsLaszlo Kapas
 
78. Lorant Bozsik scaleE-1 plan +section
78. Lorant Bozsik scaleE-1 plan +section78. Lorant Bozsik scaleE-1 plan +section
78. Lorant Bozsik scaleE-1 plan +sectionLaszlo Kapas
 
2008-2012 my drawings english version
2008-2012 my drawings english version2008-2012 my drawings english version
2008-2012 my drawings english versionLaszlo Kapas
 
49. Kapolna Commonity Center
49. Kapolna Commonity Center49. Kapolna Commonity Center
49. Kapolna Commonity CenterLaszlo Kapas
 

More from Laszlo Kapas (13)

31. Egerbakta nursery South Elevations
31. Egerbakta nursery South Elevations31. Egerbakta nursery South Elevations
31. Egerbakta nursery South Elevations
 
31. Egerbakta nursery Cross Sections
31. Egerbakta nursery Cross Sections31. Egerbakta nursery Cross Sections
31. Egerbakta nursery Cross Sections
 
31. Egerbakta nursery Plan
31. Egerbakta nursery Plan31. Egerbakta nursery Plan
31. Egerbakta nursery Plan
 
49. Kapolna commonity center elevetions
49. Kapolna commonity center elevetions49. Kapolna commonity center elevetions
49. Kapolna commonity center elevetions
 
49. kapolna commonity centerSk-2 Slab Plan
49. kapolna commonity centerSk-2 Slab Plan49. kapolna commonity centerSk-2 Slab Plan
49. kapolna commonity centerSk-2 Slab Plan
 
49. Kapolna Commonity Center
49. Kapolna Commonity Center49. Kapolna Commonity Center
49. Kapolna Commonity Center
 
29. Hajduszovat S-9 Working Drawing. Layer.
29. Hajduszovat S-9 Working Drawing. Layer.29. Hajduszovat S-9 Working Drawing. Layer.
29. Hajduszovat S-9 Working Drawing. Layer.
 
29. Hajduszovat S-5 Biogas plant rebar layout
29. Hajduszovat S-5 Biogas plant rebar layout29. Hajduszovat S-5 Biogas plant rebar layout
29. Hajduszovat S-5 Biogas plant rebar layout
 
29. hajduszovat S-4 Biogas Plant. Top layer
29. hajduszovat S-4  Biogas Plant. Top layer29. hajduszovat S-4  Biogas Plant. Top layer
29. hajduszovat S-4 Biogas Plant. Top layer
 
78. Loranr Bozsik scale E-2 elevations
78. Loranr Bozsik scale E-2 elevations78. Loranr Bozsik scale E-2 elevations
78. Loranr Bozsik scale E-2 elevations
 
78. Lorant Bozsik scaleE-1 plan +section
78. Lorant Bozsik scaleE-1 plan +section78. Lorant Bozsik scaleE-1 plan +section
78. Lorant Bozsik scaleE-1 plan +section
 
2008-2012 my drawings english version
2008-2012 my drawings english version2008-2012 my drawings english version
2008-2012 my drawings english version
 
49. Kapolna Commonity Center
49. Kapolna Commonity Center49. Kapolna Commonity Center
49. Kapolna Commonity Center
 

49. Kapolna commonity centerSk-1 foundations

  • 1. GSPublisherEngine 0.0.100.100 +0.00 38 5 17.56 -0,16 -0,56 50 -1,55 ±0.00 30 ±0.00 -0,56 -0,16 38 5 10 4 ±0.00 30 5 50 -1,55 ±0.00 6 38 6 50 6 38 6 3.54 2.10 3.76 6 38 66 38 6 10.90 2.24 17.066386 1.746386 23506 5 H= 1,40 m (the same as the existing building floor plan level) 20 100 4012 1 H= 4,02 m 10040122H=2,00m 60123H=17,44m 20 22 22 Drawing Number: Scale: Date: M= 1:50 march 2011 M= 1:25 2 cm parqet. / glazed ceramic 6 cm gravel fill 8 cm step proof instulation 2 layer DP (damp proof course) 6 cm floor slab 10 cm gravel fill soil 1% 32 32 28 28 20 New foundations New foundations A A A A B B B B -1,55 -1,55 -1,55 -1,55 -1,55 -1,55 -1,55 6 cm concrete decorative stone 3 cm sand 15 cm gravel fill 8506 4 H= 0,98 m Sk-1 A-A Section: M=1:25 B-B Section: M=1:25 Bulkhead foundations: M=1:25 Community house. Working Drawing. Foundation. Establishment location: 3355 Kápolna, Kossuth street 11. HRSZ.: 428/2 Proprietor: Kápolna Council. 3355 Kápolna, Kossuth street 12. Engineer: Sallak Ltd. Kegyes S. Árpád OKI. engineer Erdőtelek, József A. street. 17/A T-1-10-0106 Drawn by: Laszlo Kapas Zele-Bau Ltd. 3350 Kal Fo ut street 1 www.zelebau.hu 2 cm parqet. / glazed ceramic 6 cm gravel fill 8 cm step proof instulation 2 layer DP (damp proof course) 6 cm floor slab 10 cm gravel fill soil 2 cm parqet. / glazed ceramic 6 cm gravel fill 8 cm step proof instulation 2 layer DP (damp proof course) 6 cm floor slab 10 cm gravel fill soil (the same as the existing building floor plan level)