Lamp m 32

  1. 1. MINGGU KE : 32 (TIGA PULUH DUA) PERSIAPAN 1 Trial Mix 1.00 ls 0.027 100.00% 0.00% 100.00% 0.027 2 Design,Shop Drawing & As Built Drawing 1.00 LS 0.305 54.00% 10.00% 64.00% 0.195 3 Direksi Keet , Kantor Lapangan, Barak Kerja dan Gudang + Toilet 169.40 M2 0.569 100.00% 0.00% 100.00% 0.569 4 Shelter Sementara Keluarga Pasien RST M2 0.000 0.00% 0.000 5 Listrik Kerja 14.00 bln 0.256 54.00% 5.00% 59.00% 0.151 6 Penyediaan air kerja 14.00 Bln 0.085 54.00% 5.00% 59.00% 0.050 7 Laporan & Photo Proyek 1.00 LS 0.028 54.00% 5.00% 59.00% 0.016 8 Pagar Sementara Proyek 318.00 M1 0.320 100.00% 0.00% 100.00% 0.320 9 Papan Nama Proyek 1.00 Unit 0.003 100.00% 0.00% 100.00% 0.003 10 Perlengkapan Safety ( K3 ) 1.00 LS 0.244 85.00% 9.00% 94.00% 0.230 11 Mobilisasi - Demobilisasi material, tenaga kerja dan alat bantu. 1.00 LS 0.275 62.00% 10.00% 72.00% 0.198 12 Biaya keamanan dan kebersihan proyek 14.00 Bln 1.333 54.00% 5.00% 59.00% 0.787 13 Site Supervision 14.00 LS 0.983 50.00% 10.00% 60.00% 0.590 14 Sewa Crane LS 0.000 0.00% 0.000 15 CAR 1.00 LS 0.073 0.00% 50.00% 50.00% 0.037 16 BPJS 1.00 LS 0.153 100.00% 0.00% 100.00% 0.153 Sub Total : 3.325 I PEKERJAAN PONDASI TIANG PANCANG - JACKING PILE A Pekerjaan Persiapan 1 Pekerjaan mobilisasi dan demobilisasi alat jacking pile 1.00 Ls 0.336 100.00% 0.00% 100.00% 0.336 B Pekerjaan Pemancangan Tiang 1 Pengadaan tiang pile - uk □ 25 x 25 cm (6 + 3) m 2727.00 M' 3.800 100.00% 0.00% 100.00% 3.800 2 Plat sambungan dan jasa pengelasan 606.00 set 0.305 100.00% 0.00% 100.00% 0.305 3 Jasa pemancangan - rata - rata 9 m / s.d tanah keras 2727.00 M' 1.149 100.00% 0.00% 100.00% 1.149 4 Bobokan tiang pancang 303.00 ttk 0.509 100.00% 0.00% 100.00% 0.509 5 PDA Test 3.00 ttk 0.121 100.00% 0.00% 100.00% 0.121 Sub Total : 6.220 II PEKERJAAN GALIAN TANAH DAN URUGAN PASIR BAWAH PONDASI A Pekerjaan Galian Tanah - Galian Pile Cap a Galian Pondasi type - 60 x 60 cm 34.02 M3 0.023 100.00% 0.00% 100.00% 0.023 b Galian Pondasi type - 135 x 70 cm 15.59 M3 0.010 100.00% 0.00% 100.00% 0.010 c Galian Pondasi type - 135 x 125 cm 11.47 M3 0.008 100.00% 0.00% 100.00% 0.008 d Galian Pondasi type - 135 x 135 cm 106.45 M3 0.071 100.00% 0.00% 100.00% 0.071 e Galian Pondasi type - 210 x 135 cm 48.30 M3 0.032 100.00% 0.00% 100.00% 0.032 - Galian Sloof a Galian Pondasi type TB1 - uk 30 x 70 cm 24.48 M3 0.016 100.00% 0.00% 100.00% 0.016 b Galian Pondasi type TB1A - uk 30 x 70 cm 29.83 M3 0.020 100.00% 0.00% 100.00% 0.020 c Galian Pondasi type TB2 - uk 30 x 60 cm 108.00 M3 0.073 100.00% 0.00% 100.00% 0.073 d Galian Pondasi type TB3 - uk 25 x 50 cm 24.57 M3 0.017 100.00% 0.00% 100.00% 0.017 e Galian Pondasi type TB4 - uk 30 x 60 cm 38.47 M3 0.026 100.00% 0.00% 100.00% 0.026 f Galian Pondasi type TB5 - uk 20 x 50 cm 39.88 M3 0.027 100.00% 0.00% 100.00% 0.027 g Galian Pondasi type TB6 - uk 20 x 50 cm 28.80 M3 0.019 100.00% 0.00% 100.00% 0.019 h Galian Pondasi type TB7 - uk 20 x 40 cm 12.70 M3 0.009 100.00% 0.00% 100.00% 0.009 B Pekerjaan Urugan Pasir - Urugan pasir bawah pile cap a Urugan Pasir Pondasi type - 60 x 60 cm 3.26 M3 0.006 100.00% 0.00% 100.00% 0.006 b Urugan Pasir Pondasi type - 135 x 70 cm 1.26 M3 0.002 100.00% 0.00% 100.00% 0.002 c Urugan Pasir Pondasi type - 135 x 125 cm 0.75 M3 0.001 100.00% 0.00% 100.00% 0.001 d Urugan Pasir Pondasi type - 135 x 135 cm 6.93 M3 0.013 100.00% 0.00% 100.00% 0.013 e Urugan Pasir Pondasi type - 210 x 135 cm 32.60 M3 0.063 100.00% 0.00% 100.00% 0.063 - Urugan pasir bawah sloof a Urugan pasir type TB1 - uk 30 x 70 cm 2.40 M3 0.005 100.00% 0.00% 100.00% 0.005 b Urugan pasir type TB1A - uk 30 x 70 cm 2.48 M3 0.005 100.00% 0.00% 100.00% 0.005 c Urugan pasir type TB2 - uk 30 x 60 cm 9.89 M3 0.019 100.00% 0.00% 100.00% 0.019 d Urugan pasir type TB3 - uk 25 x 50 cm 3.78 M3 0.007 100.00% 0.00% 100.00% 0.007 e Urugan pasir type TB4 - uk 30 x 60 cm 3.83 M3 0.007 100.00% 0.00% 100.00% 0.007 f Urugan pasir type TB5 - uk 20 x 50 cm 6.26 M3 0.012 100.00% 0.00% 100.00% 0.012 g Urugan pasir type TB6 - uk 20 x 50 cm 6.05 M3 0.012 100.00% 0.00% 100.00% 0.012 h Urugan pasir type TB7 - uk 20 x 40 cm 2.84 M3 0.006 100.00% 0.00% 100.00% 0.006 - Urugan tanah peninggian elevasi a Urugan tanah + campur puing, peninggian elevasi lantai 1482.54 m3 1.277 100.00% 0.00% 100.00% 1.277 b Pemadatan tanah ex Urugan 1040.90 m3 0.218 100.00% 0.00% 100.00% 0.218 Urugan tanah tangga utama 284.20 m3 0.245 0.00% 100.00% 100.00% 0.245 - Lantai Kerja Bawah Pondasi Pile Cap a Lantai Kerja Pondasi type - 60 x 60 cm 1.64 M3 0.008 100.00% 0.00% 100.00% 0.008 b Lantai Kerja Pondasi type - 135 x 70 cm 0.63 M3 0.003 100.00% 0.00% 100.00% 0.003 c Lantai Kerja Pondasi type - 135 x 125 cm 0.39 M3 0.002 100.00% 0.00% 100.00% 0.002 d Lantai Kerja Pondasi type - 135 x 135 cm 3.46 M3 0.018 100.00% 0.00% 100.00% 0.018 e Lantai Kerja Pondasi type - 210 x 135 cm 1.42 M3 0.007 100.00% 0.00% 100.00% 0.007 - Lantai Kerja Bawah Sloof a Lantai Kerjatype TB1 - uk 30 x 70 cm 1.20 M3 0.006 100.00% 0.00% 100.00% 0.006 b Lantai Kerjatype TB1A - uk 30 x 70 cm 1.24 M3 0.006 100.00% 0.00% 100.00% 0.006 c Lantai Kerjatype TB2 - uk 30 x 60 cm 4.95 M3 0.025 100.00% 0.00% 100.00% 0.025 d Lantai Kerjatype TB3 - uk 25 x 50 cm 1.89 M3 0.010 100.00% 0.00% 100.00% 0.010 e Lantai Kerjatype TB4 - uk 30 x 60 cm 1.91 M3 0.010 100.00% 0.00% 100.00% 0.010 f Lantai Kerjatype TB5 - uk 20 x 50 cm 3.13 M3 0.016 100.00% 0.00% 100.00% 0.016 g Lantai Kerjatype TB6 - uk 20 x 50 cm 3.02 M3 0.015 100.00% 0.00% 100.00% 0.015 h Lantai Kerjatype TB7 - uk 20 x 40 cm 1.42 M3 0.007 100.00% 0.00% 100.00% 0.007 Lantai Kerja Bawah Plat Lantai a Lantai Kerja tebal 5 cm 71.40 M3 0.365 100.00% 0.00% 100.00% 0.365 Sub Total : 2.751 s/d Minggu Ini (%) PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015 NO URAIAN VOLUME UNIT BOBOT (%) Progres thd Jenis Pekerjaan Prestasi thd Bobot Kerja (%) Minggu Lalu (%) Minggu Ini (%) Page 1
  2. 2. MINGGU KE : 32 (TIGA PULUH DUA) s/d Minggu Ini (%) PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015 NO URAIAN VOLUME UNIT BOBOT (%) Progres thd Jenis Pekerjaan Prestasi thd Bobot Kerja (%) Minggu Lalu (%) Minggu Ini (%) IV PEKERJAAN STRUKTUR BETON A PEKERJAAN BEKISTING STRUKTUR BETON Bekisting Pile Cap 1 Bekisting Pondasi type - 60 x 60 cm 122.72 M2 0.072 100.00% 0.00% 100.00% 0.072 2 Bekisting Pondasi type - 135 x 70 cm 47.70 M2 0.028 100.00% 0.00% 100.00% 0.028 3 Bekisting Pondasi type - 135 x 125 cm 56.07 M2 0.033 100.00% 0.00% 100.00% 0.033 4 Bekisting Pondasi type - 135 x 135 cm 237.80 M2 0.140 100.00% 0.00% 100.00% 0.140 5 Bekisting Pondasi type - 210 x 135 cm 82.19 M2 0.048 100.00% 0.00% 100.00% 0.048 6 Bekisting Pondasi Menara - 170 x 170 cm 10.71 M2 0.006 100.00% 0.00% 100.00% 0.006 Bekisting Sloof 1 Bekisting batako type TB1 - uk 30 x 70 cm 81.60 M2 0.051 100.00% 0.00% 100.00% 0.051 2 Bekisting batako type TB1A - uk 30 x 70 cm 84.15 M2 0.053 100.00% 0.00% 100.00% 0.053 3 Bekisting batako type TB2 - uk 30 x 60 cm 296.70 M2 0.187 100.00% 0.00% 100.00% 0.187 4 Bekisting batako type TB3 - uk 25 x 50 cm 105.00 M2 0.066 100.00% 0.00% 100.00% 0.066 5 Bekisting batako type TB4 - uk 30 x 60 cm 114.83 M2 0.072 100.00% 0.00% 100.00% 0.072 6 Bekisting batako type TB5 - uk 20 x 50 cm 187.92 M2 0.118 100.00% 0.00% 100.00% 0.118 7 Bekisting batako type TB6 - uk 20 x 50 cm 181.39 M2 0.114 100.00% 0.00% 100.00% 0.114 8 Bekisting batako type TB7 - uk 20 x 40 cm 71.06 M2 0.045 100.00% 0.00% 100.00% 0.045 Bekisting DPT - Tangga 1 Bekisting Batako DPT tangga 80.55 M2 0.051 0.00% 0.00% 0.00% 0.051 2 Bekisting Batako DPT Peninggian Lantai 138.40 M2 0.087 100.00% 0.00% 100.00% 0.087 Bekisting Lantai Dasar Bekisting DPT / Retaining Wall 1 Bekisting Kayu DPT tangga Luar as 14-15/C-H 80.55 M2 0.083 100.00% 0.00% 100.00% 0.083 2 Bekisting Kayu DPT Peninggian Lantai - 80 cm 138.40 M2 0.143 100.00% 0.00% 100.00% 0.143 Bekisting Kolom 1 Bekisting Kayu Kolom Type K1 - uk 60 x 60 cm 126.00 M2 0.159 100.00% 0.00% 100.00% 0.159 2 Bekisting Kayu Kolom Type K1A - uk 60 x 60 cm 50.40 M2 0.063 100.00% 0.00% 100.00% 0.063 3 Bekisting Kayu Kolom Type K2 - uk 30 x 30 cm 207.90 M2 0.214 100.00% 0.00% 100.00% 0.214 4 Bekisting Kayu Kolom Type K2A - uk 40 x 40 cm 134.40 M2 0.139 100.00% 0.00% 100.00% 0.139 5 Bekisting Kayu Kolom Type K3 - uk 20 x 20 cm 8.40 M2 0.009 100.00% 0.00% 100.00% 0.009 6 Bekisting Kayu Kolom Type K4 - uk 17 x 20 cm 31.08 M2 0.032 100.00% 0.00% 100.00% 0.032 7 Bekisting Kayu Kolom Type K5 - uk 15 x 47,5 cm 13.12 M2 0.014 100.00% 0.00% 100.00% 0.014 Bekisting Tangga 1 Bekisting Tangga Utama As C/9 27.25 M2 0.028 100.00% 0.00% 100.00% 0.028 2 Bekisting Tangga Utama As F/9 27.25 M2 0.028 100.00% 0.00% 100.00% 0.028 3 Bekisting Kayu Tangga Entrance Outdoor 288.48 M2 0.298 100.00% 0.00% 100.00% 0.298 4 Bekisting Balok Tangga - Type B4 - 20 x 50 cm 54.00 M2 0.056 100.00% 0.00% 100.00% 0.056 Bekisting Lantai Atas Bekiting plywood 9 mm + rangka kayu kaso + Perancah scafolding Bekisting Balok Lantai Atas 1 Bekisting Balok Type B1 - 45 x 90 cm 162.00 M2 0.167 100.00% 0.00% 100.00% 0.167 2 Bekisting Balok Type B2 - 40 x 80 cm 120.00 M2 0.124 100.00% 0.00% 100.00% 0.124 3 Bekisting Balok Type B3 - 40 x 90 cm 70.40 M2 0.073 100.00% 0.00% 100.00% 0.073 4 Bekisting Balok Type B4 - 20 x 50 cm 396.98 M2 0.409 100.00% 0.00% 100.00% 0.409 5 Bekisting Balok Type B5 - 25 x 50 cm 95.06 M2 0.098 100.00% 0.00% 100.00% 0.098 6 Bekisting Balok Type B5A - 25 x 50 cm 25.00 M2 0.026 100.00% 0.00% 100.00% 0.026 7 Bekisting Balok Type B6 - 30 x 70 cm 55.48 M2 0.057 100.00% 0.00% 100.00% 0.057 8 Bekisting Balok Type B7 - 30 x 60 cm 126.00 M2 0.130 100.00% 0.00% 100.00% 0.130 9 Bekisting Balok Type B8 - 30 x 60 cm 48.00 M2 0.050 100.00% 0.00% 100.00% 0.050 10 Bekisting Balok Type B9 - 30 x 70 cm 20.40 M2 0.021 100.00% 0.00% 100.00% 0.021 11 Bekisting Balok Type B10 - 20 x 40 cm 55.00 M2 0.057 100.00% 0.00% 100.00% 0.057 12 Bekisting Balok Type B16 - 20 x 40 cm - Incld Balok Ramp 17.18 M2 0.018 100.00% 0.00% 100.00% 0.018 13 Bekisting Balok Type B18 - 30 x 60 cm 13.50 M2 0.014 100.00% 0.00% 100.00% 0.014 14 Bekisting Balok Type CB3 - 25 x 50 cm 7.50 M2 0.008 100.00% 0.00% 100.00% 0.008 15 Bekisting Balok Type CB5 - 20 x 40 cm 6.00 M2 0.006 100.00% 0.00% 100.00% 0.006 Bekisting PLat Lantai Atas 1 Bekisting Plat Lantai Type S1 - Tebal 120 mm 746.94 M2 0.770 100.00% 0.00% 100.00% 0.770 2 Bekisting Plat Lantai Type S2 - Tebal 130 mm 153.70 M2 0.159 100.00% 0.00% 100.00% 0.159 3 Bekisting Plat Lantai Type S3 dirubah menjadi S2 (Area Dak Samping) - Tebal 130 mm - Sesuai email per 24.11.14181.54 M2 0.187 100.00% 0.00% 100.00% 0.187 4 Bekisting Plat Lantai Ramp type S1 54.11 M2 0.056 100.00% 0.00% 100.00% 0.056 Bekisting Kolom 1 Bekisting Kayu Kolom Type K1 - uk 60 x 60 cm 96.00 M2 0.121 100.00% 0.00% 100.00% 0.121 2 Bekisting Kayu Kolom Type KA1 - uk 30 x 30 cm 114.00 M2 0.118 100.00% 0.00% 100.00% 0.118 3 Bekisting Kayu Kolom Type KA2 - uk 14 x 40 cm 139.86 M2 0.144 100.00% 0.00% 100.00% 0.144 4 Bekisting Kayu Kolom Type KA3 - uk 13 x 30 cm 7.65 M2 0.008 100.00% 0.00% 100.00% 0.008 5 Bekisting Kayu Kolom Type KT1 - uk 13 x 40 cm 16.96 M2 0.017 100.00% 0.00% 100.00% 0.017 Bekisting Tangga 1 Bekisting Tangga Utama As C/8 26.28 M2 0.027 100.00% 0.00% 100.00% 0.027 2 Bekisting Tangga Utama As F/8 26.28 M2 0.027 100.00% 0.00% 100.00% 0.027 Bekisting Lantai Mezzanine Bekiting plywood 9 mm + rangka kayu kaso + Perancah scafolding Bekisting Balok Lantai Mezanine 1 Bekisting Balok Type B1 - 45 x 90 cm 108.00 M2 0.111 100.00% 0.00% 100.00% 0.111 2 Bekisting Balok Type B2 - 40 x 80 cm 24.00 M2 0.025 100.00% 0.00% 100.00% 0.025 3 Bekisting Balok Type B4 - 20 x 50 cm 15.78 M2 0.016 100.00% 0.00% 100.00% 0.016 4 Bekisting Balok Type B5 - 25 x 50 cm 55.31 M2 0.057 100.00% 0.00% 100.00% 0.057 5 Bekisting Balok Type B8 - 30 x 60 cm 15.75 M2 0.016 100.00% 0.00% 100.00% 0.016 6 Bekisting Balok Type B10 - 20 x 40 cm 10.50 M2 0.011 100.00% 0.00% 100.00% 0.011 7 Bekisting Balok Type B11 - 25 x 50 cm 3.75 M2 0.004 100.00% 0.00% 100.00% 0.004 8 Bekisting Balok Type B13 - 20 x 40 cm 47.00 M2 0.048 100.00% 0.00% 100.00% 0.048 9 Bekisting Balok Type B14 - 20 x 40 cm 176.90 M2 0.182 100.00% 0.00% 100.00% 0.182 10 Bekisting Balok Type B19 - 15 x 30 cm 12.23 M2 0.013 100.00% 0.00% 100.00% 0.013 11 Bekisting Balok Type CB1 - 20 x 50 cm 9.36 M2 0.010 100.00% 0.00% 100.00% 0.010 Page 2
  3. 3. MINGGU KE : 32 (TIGA PULUH DUA) s/d Minggu Ini (%) PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015 NO URAIAN VOLUME UNIT BOBOT (%) Progres thd Jenis Pekerjaan Prestasi thd Bobot Kerja (%) Minggu Lalu (%) Minggu Ini (%) 12 Bekisting Balok Type CB2 - 20 x 50 cm 8.32 M2 0.009 100.00% 0.00% 100.00% 0.009 13 Bekisting Balok Type CB5 - 20 x 50 cm 5.78 M2 0.006 100.00% 0.00% 100.00% 0.006 14 Bekisting Balok Type L1 - 15 x 60 cm 20.25 M2 0.021 100.00% 0.00% 100.00% 0.021 Bekisting PLat Lantai Mazaninne 1 Bekisting Plat Lantai Type S1 - Tebal 120 mm 354.00 M2 0.365 100.00% 0.00% 100.00% 0.365 2 Bekisting Plat Lantai Type S3 - Tebal 100 mm 188.00 M2 0.194 100.00% 0.00% 100.00% 0.194 Bekisting Kolom 1 Bekisting Kayu Kolom Type K1 - uk 40 x 40 cm 60.00 M2 0.062 100.00% 0.00% 100.00% 0.062 Bekisting Lantai Atap Bekiting plywood 9 mm + rangka kayu kaso + Perancah scafolding Bekisting Balok Lantai Atap 1 Bekisting Balok Type B2 - 40 x 80 cm 24.00 M2 0.026 100.00% 0.00% 100.00% 0.026 2 Bekisting Balok Type B1A - 30 x 70 cm 25.50 M2 0.027 100.00% 0.00% 100.00% 0.027 3 Bekisting Balok Type B4 - 20 x 50 cm 46.60 M2 0.050 100.00% 0.00% 100.00% 0.050 4 Bekisting Balok Type B13 - 20 x 40 cm 39.00 M2 0.042 100.00% 0.00% 100.00% 0.042 5 Bekisting Balok Type B15 - 30 x 70 cm 134.73 M2 0.143 100.00% 0.00% 100.00% 0.143 6 Bekisting Balok Type B17 - 40 x 30 cm 15.00 M2 0.016 100.00% 0.00% 100.00% 0.016 7 Bekisting Balok Type B19 - 15 x 30 cm 6.11 M2 0.007 100.00% 0.00% 100.00% 0.007 8 Bekisting Balok Type CB3 - 25 x 50 cm 52.50 M2 0.056 100.00% 0.00% 100.00% 0.056 9 Bekisting Balok Type CB6 - 30 x 70 cm 18.62 M2 0.020 100.00% 0.00% 100.00% 0.020 10 Bekisting Balok Daguan/Dudukan Kuda - kuda baja 9.60 M2 0.010 100.00% 0.00% 100.00% 0.010 Bekisting PLat Lantai Atas 1 Bekisting Plat Lantai Type S2 - Tebal 100 mm 185.76 M2 0.198 100.00% 0.00% 100.00% 0.198 2 Bekisting Plat Lantai Type S3 - Tebal 150 mm 48.51 M2 0.052 100.00% 0.00% 100.00% 0.052 Bekisting Kolom 1 Bekisting Kayu Kolom Type KA4 - uk 20 x 20 cm 21.76 M2 0.023 100.00% 0.00% 100.00% 0.023 Bekisting Lantai Kubah Bekiting plywood 9 mm + rangka kayu kaso + Perancah scafolding Bekisting Balok Lantai Atap 1 Bekisting Balok Type B16 - 20 x 40 cm 27.60 M2 0.029 0.00% 100.00% 100.00% 0.029 2 Bekisting Balok Type B10 - 20 x 40 cm 32.90 M2 0.035 0.00% 100.00% 100.00% 0.035 3 Bekisting Balok Type B19 - 15 x 30 cm 33.56 M2 0.036 0.00% 100.00% 100.00% 0.036 4 Bekisting Balok Type CB5 - 20 x 40 cm 9.48 M2 0.010 0.00% 100.00% 100.00% 0.010 Bekisting PLat Lantai Atas 1 Bekisting Plat Lantai Type S2 - Tebal 100 mm 15.80 M2 0.017 0.00% 100.00% 100.00% 0.017 Bekisting Ramp 1 Kolom type KR 15 x 40 cm 60.72 M2 0.065 100.00% 0.00% 100.00% 0.065 2 Kolom type KR1 15 x 40 cm 85.10 M2 0.091 100.00% 0.00% 100.00% 0.091 3 Balok type B16 20 x 40 cm 93.22 M2 0.099 100.00% 0.00% 100.00% 0.099 4 CB 240 2.40 M2 0.003 100.00% 0.00% 100.00% 0.003 5 Plat tebal 12 cm 116.79 M2 0.124 100.00% 0.00% 100.00% 0.124 B PEKERJAAN TULANGAN PEMBESIAN Pembesian Pile Cap 1 Pembesian Pondasi type - 60 x 60 cm 1469.66 Kg 0.109 71.26% 0.00% 71.26% 0.109 2 Pembesian Pondasi type - 135 x 70 cm 875.5 Kg 0.065 100.00% 0.00% 100.00% 0.065 3 Pembesian Pondasi type - 135 x 125 cm 837.39 Kg 0.062 100.00% 0.00% 100.00% 0.062 4 Pembesian Pondasi type - 135 x 135 cm 7212.69 Kg 0.535 100.00% 0.00% 100.00% 0.535 5 Pembesian Pondasi type - 210 x 135 cm 3515.4 Kg 0.261 100.00% 0.00% 100.00% 0.261 6 Pembesian Pondasi Menara - 170 x 170 cm 263.837761 Kg 0.020 0.00% 0.00% 0.00% 0.020 Pembesian Sloof 1 Pembesian Tulangan type TB1 - uk 30 x 70 cm 2036.32 Kg 0.151 100.00% 0.00% 100.00% 0.151 2 Pembesian Tulangan type TB1A - uk 30 x 70 cm 1670.76 Kg 0.124 100.00% 0.00% 100.00% 0.124 3 Pembesian Tulangan type TB2 - uk 30 x 60 cm 7041.6 Kg 0.523 100.00% 0.00% 100.00% 0.523 4 Pembesian Tulangan type TB3 - uk 25 x 50 cm 1911 Kg 0.142 100.00% 0.00% 100.00% 0.142 5 Pembesian Tulangan type TB4 - uk 30 x 60 cm 1739.07 Kg 0.129 100.00% 0.00% 100.00% 0.129 6 Pembesian Tulangan type TB5 - uk 20 x 50 cm 2791.88 Kg 0.207 100.00% 0.00% 100.00% 0.207 7 Pembesian Tulangan type TB6 - uk 20 x 50 cm 1251.92 Kg 0.093 100.00% 0.00% 100.00% 0.093 8 Pembesian Tulangan type TB7 - uk 20 x 40 cm 830.88 Kg 0.062 100.00% 0.00% 100.00% 0.062 Pembesian DPT Tangga 1 Pembesian Tulangan DPT tangga 1703.56 Kg 0.126 100.00% 0.00% 100.00% 0.126 2 Pembesian DPT Peninggian Lantai 2315.42 Kg 0.172 100.00% 0.00% 100.00% 0.172 Pembesian Kolom 1 Pembesian Tulangan Kolom Type K1 - uk 60 x 60 cm 4290.3 Kg 0.318 100.00% 0.00% 100.00% 0.318 2 Pembesian Tulangan Kolom Type K1A - uk 60 x 60 cm 1716.12 Kg 0.127 100.00% 0.00% 100.00% 0.127 3 Pembesian Tulangan Kolom Type K2 - uk 30 x 30 cm 4163.19 Kg 0.309 100.00% 0.00% 100.00% 0.309 4 Pembesian Tulangan Kolom Type K2A - uk 40 x 40 cm 2956.8 Kg 0.219 100.00% 0.00% 100.00% 0.219 5 Pembesian Tulangan Kolom Type K3 - uk 20 x 20 105.26 Kg 0.008 100.00% 0.00% 100.00% 0.008 6 Pembesian Tulangan Kolom Type K4 - uk 17 x 20 401.26 Kg 0.030 100.00% 0.00% 100.00% 0.030 7 Pembesian Tulangan Kolom Type K5 - uk 15 x 48 175.85 Kg 0.013 100.00% 0.00% 100.00% 0.013 Pembesian Tangga Pembesian Tangga Utama As C/9 548.64 Kg 0.041 0.00% 100.00% 100.00% 0.041 Pembesian Tangga Utama As F/9 548.64 Kg 0.041 0.00% 100.00% 100.00% 0.041 Pembesian Tangga Entrance Outdoor 7786.13 Kg 0.578 0.00% 100.00% 100.00% 0.578 Pembesian Balok Tangga - Type B4 - 20 x 50 cm 717.96 Kg 0.053 0.00% 100.00% 100.00% 0.053 Pembesian Plat Lantai Dasar Pembesian Plat Lantai Dasar - tebal 12 cm 21,117.8 Kg 1.567 100.00% 0.00% 100.00% 1.567 Pembesian Balok Lantai Atas 1 Pembesian Type B1 - 45 x 90 cm 6735.96 Kg 0.500 100.00% 0.00% 100.00% 0.500 2 Pembesian Type B2 - 40 x 80 cm 4704 Kg 0.349 100.00% 0.00% 100.00% 0.349 3 Pembesian Type B3 - 40 x 90 cm 2960.64 Kg 0.220 100.00% 0.00% 100.00% 0.220 4 Pembesian Balok Type B4 - 20 x 50 cm 5096.2 Kg 0.378 100.00% 0.00% 100.00% 0.378 5 Pembesian Balok Type B5 - 25 x 50 cm 1472.5 Kg 0.109 100.00% 0.00% 100.00% 0.109 6 Pembesian Tulangan Balok Type B5A - 25 x 50 cm 458.64 Kg 0.025 100.00% 0.00% 100.00% 0.025 Page 3
  4. 4. MINGGU KE : 32 (TIGA PULUH DUA) s/d Minggu Ini (%) PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015 NO URAIAN VOLUME UNIT BOBOT (%) Progres thd Jenis Pekerjaan Prestasi thd Bobot Kerja (%) Minggu Lalu (%) Minggu Ini (%) 7 Pembesian Tulangan Balok Type B6 - 30 x 70 cm 153.72 Kg 0.123 100.00% 0.00% 100.00% 0.123 8 Pembesian Tulangan Balok Type B7 - 30 x 60 cm 38.12 Kg 0.172 100.00% 0.00% 100.00% 0.172 9 Pembesian Tulangan Balok Type B8 - 30 x 60 cm 688 Kg 0.000 100.00% 0.00% 100.00% - 10 Pembesian Tulangan Balok Type B9 - 30 x 70 cm 2640.24 Kg 0.021 100.00% 0.00% 100.00% 0.021 11 Pembesian Tulangan Balok Type B10 - 20 x 40 cm 167.67 Kg 0.048 100.00% 0.00% 100.00% 0.048 12 Pembesian Tulangan Balok Type B16 - 20 x 40 cm - Incld Balok Ramp 207.47 Kg 0.009 100.00% 0.00% 100.00% 0.009 13 Pembesian Tulangan Balok Type B18 - 30 x 60 cm 322.1 Kg 0.020 100.00% 0.00% 100.00% 0.020 14 Pembesian Tulangan Balok Type CB3 - 25 x 50 cm 107.52 Kg 0.010 100.00% 0.00% 100.00% 0.010 15 Pembesian Tulangan Balok Type CB5 - 20 x 40 cm 265.35 Kg 0.012 100.00% 0.00% 100.00% 0.012 Pembesian Tulangan PLat Lantai Atas 1 Pembesian Tulangan Plat Lantai Type S1 - Tebal 120 mm 11046.79 Kg 0.820 100.00% 0.00% 100.00% 0.820 2 Pembesian Tulangan Plat Lantai Type S2 - Tebal 130 mm 2273.13 Kg 0.169 100.00% 0.00% 100.00% 0.169 3 Pembesian Plat Lantai Type S3 dirubah menjadi S2 (Area Dak Samping) - Tebal 130 mm - Sesuai email per 24.11.142684.87 Kg 0.199 100.00% 0.00% 100.00% 0.199 4 Pembesian Plat Lantai Ramp type S1 800.25 Kg 0.059 100.00% 0.00% 100.00% 0.059 Pembesian Tulangan Kolom 1 Pembesian Tulangan Kolom Type K1 - uk 60 x 60 cm 2260.61 Kg 0.168 100.00% 0.00% 100.00% 0.168 2 Pembesian Tulangan Kolom Type KA1 - uk 30 x 30 cm 1733.19 Kg 0.129 100.00% 0.00% 100.00% 0.129 3 Pembesian Tulangan Kolom Type KA2 - uk 14 x 40 cm 1895.43 Kg 0.141 100.00% 0.00% 100.00% 0.141 4 Pembesian Tulangan Kolom Type KA3 - uk 13 x 30 cm 60.39 Kg 0.004 100.00% 0.00% 100.00% 0.004 5 Pembesian Tulangan Kolom Type KT1 - uk 13 x 40 cm 99.98 Kg 0.007 100.00% 0.00% 100.00% 0.007 Pembesian Tulangan Tangga 1 Pembesian Tulangan Tangga Utama As C/8 621.35 Kg 0.046 100.00% 0.00% 100.00% 0.046 2 Pembesian Tulangan Tangga Utama As F/8 621.35 Kg 0.046 100.00% 0.00% 100.00% 0.046 Pembesian Lantai Mezzanine Mutu baja tulangan : Ø = BJTP 24 (Polos) dan D = BJTD 40 (Ulir) Pembesian Balok Lantai Mezanine 1 Pembesian Balok Type B1 - 45 x 90 cm 4490.64 Kg 0.333 100.00% 0.00% 100.00% 0.333 2 Pembesian Balok Type B2 - 40 x 80 cm 940.8 Kg 0.070 100.00% 0.00% 100.00% 0.070 3 Pembesian Balok Type B4 - 20 x 50 cm 365.2 Kg 0.027 100.00% 0.00% 100.00% 0.027 4 Pembesian Balok Type B5 - 25 x 50 cm 896.1 Kg 0.066 100.00% 0.00% 100.00% 0.066 5 Pembesian Balok Type B8 - 30 x 60 cm 458.64 Kg 0.034 100.00% 0.00% 100.00% 0.034 6 Pembesian Balok Type B10 - 20 x 40 cm 153.72 Kg 0.011 100.00% 0.00% 100.00% 0.011 7 Pembesian Balok Type B11 - 25 x 50 cm 38.12 Kg 0.003 100.00% 0.00% 100.00% 0.003 8 Pembesian Balok Type B13 - 20 x 40 cm 688 Kg 0.051 100.00% 0.00% 100.00% 0.051 9 Pembesian Balok Type B14 - 20 x 40 cm 2640.24 Kg 0.196 100.00% 0.00% 100.00% 0.196 10 Pembesian Balok Type B19 - 15 x 30 cm 167.67 Kg 0.012 100.00% 0.00% 100.00% 0.012 11 Pembesian Balok Type CB1 - 20 x 50 cm 207.47 Kg 0.015 100.00% 0.00% 100.00% 0.015 12 Pembesian Balok Type CB2 - 20 x 50 cm 322.1 Kg 0.024 100.00% 0.00% 100.00% 0.024 13 Pembesian Balok Type CB5 - 20 x 50 cm 107.52 Kg 0.008 100.00% 0.00% 100.00% 0.008 14 Pembesian Balok Type L1 - 15 x 60 cm 265.35 Kg 0.020 100.00% 0.00% 100.00% 0.020 Pembesian PLat Lantai Mezzanine 1 Pembesian Plat Lantai Type S1 - Tebal 120 mm 3623.84668 Kg 0.269 100.00% 0.00% 100.00% 0.269 2 Pembesian Plat Lantai Type S3 - Tebal 100 mm 2780.4072 Kg 0.206 100.00% 0.00% 100.00% 0.206 Pembesian Kolom 1 Pembesian Kolom Type K1 - uk 40 x 40 cm 1816.05944 Kg 0.135 100.00% 0.00% 100.00% 0.135 Pembesian Lantai Atap Mutu baja tulangan : Ø = BJTP 24 (Polos) dan D = BJTD 40 (Ulir) Pembesian Balok Lantai Atap 1 Pembesian Balok Type B2 - 40 x 80 cm 1003.46079 Kg 0.074 100.00% 0.00% 100.00% 0.074 2 Pembesian Balok Type B1A - 30 x 70 cm 631.322513 Kg 0.047 100.00% 0.00% 100.00% 0.047 3 Pembesian Balok Type B4 - 20 x 50 cm 619.641228 Kg 0.046 100.00% 0.00% 100.00% 0.046 4 Pembesian Balok Type B13 - 20 x 40 cm 524.653965 Kg 0.039 100.00% 0.00% 100.00% 0.039 5 Pembesian Balok Type B15 - 30 x 70 cm 3503.86613 Kg 0.260 100.00% 0.00% 100.00% 0.260 6 Pembesian Balok Type B17 - 40 x 30 cm 225.351018 Kg 0.017 100.00% 0.00% 100.00% 0.017 7 Pembesian Balok Type B19 - 15 x 30 cm 73.478669 Kg 0.005 100.00% 0.00% 100.00% 0.005 8 Pembesian Balok Type CB3 - 25 x 50 cm 786.68516 Kg 0.058 100.00% 0.00% 100.00% 0.058 9 Pembesian Balok Type CB6 - 30 x 70 cm 308.925917 Kg 0.023 100.00% 0.00% 100.00% 0.023 10 Pembesian Balok Daguan/Dudukan Kuda - kuda baja 105.300528 Kg 0.008 100.00% 0.00% 100.00% 0.008 Pembesian PLat Lantai Atap 1 Pembesian Plat Lantai Type S2 - Tebal 100 mm 2747.27894 Kg 0.204 0.00% 100.00% 100.00% 0.204 2 Pembesian Plat Lantai Type S3 - Tebal 150 mm 717.433794 Kg 0.053 0.00% 100.00% 100.00% 0.053 Pembesian Kolom 1 Pembesian Kayu Kolom Type KA4 - uk 20 x 20 cm 241.047501 Kg 0.018 0.00% 100.00% 100.00% 0.018 Pembesian Lantai Kubah Mutu baja tulangan : Ø = BJTP 24 (Polos) dan D = BJTD 40 (Ulir) Pembesian Balok Lantai Atap 1 Pembesian Balok Type B16 - 20 x 40 cm 413.008784 Kg 0.031 0.00% 100.00% 100.00% 0.031 2 Pembesian Balok Type B10 - 20 x 40 cm 442.708365 Kg 0.033 0.00% 100.00% 100.00% 0.033 3 Pembesian Balok Type B19 - 15 x 30 cm 189.059013 Kg 0.014 0.00% 100.00% 100.00% 0.014 4 Pembesian Balok Type CB5 - 20 x 40 cm 145.616432 Kg 0.011 0.00% 100.00% 100.00% 0.011 Pembesian PLat Lantai Atas 1 Pembesian Plat Lantai Type S2 - Tebal 100 mm 407.15 Kg 0.030 0.00% 100.00% 100.00% 0.030 Pembesian Ramp 1 Kolom type KR 15 x 40 cm 639.95 Kg 0.047 100.00% 0.00% 100.00% 0.047 2 Kolom type KR1 15 x 40 cm 92.25 Kg 0.007 100.00% 0.00% 100.00% 0.007 3 Balok type B16 20 x 40 cm 1614.25 Kg 0.120 100.00% 0.00% 100.00% 0.120 4 CB 240 92.16 Kg 0.007 100.00% 0.00% 100.00% 0.007 5 Plat tebal 12 cm 1620.61 Kg 0.120 100.00% 0.00% 100.00% 0.120 PEKERJAAN BETON Beton Pile Cap 1 Beton Pondasi type - 60 x 60 cm 11.018 M3 0.087 50.00% 50.00% 100.00% 0.087 2 Beton Pondasi type - 135 x 70 cm 7.6545 M3 0.061 100.00% 0.00% 100.00% 0.061 3 Beton Pondasi type - 135 x 125 cm 6.75 M3 0.053 100.00% 0.00% 100.00% 0.053 4 Beton Pondasi type - 135 x 135 cm 69.255 M3 0.549 100.00% 0.00% 100.00% 0.549 Page 4
  5. 5. MINGGU KE : 32 (TIGA PULUH DUA) s/d Minggu Ini (%) PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015 NO URAIAN VOLUME UNIT BOBOT (%) Progres thd Jenis Pekerjaan Prestasi thd Bobot Kerja (%) Minggu Lalu (%) Minggu Ini (%) 5 Beton Pondasi type - 210 x 135 cm 28.35 M3 0.225 100.00% 0.00% 100.00% 0.225 6 Beton Pondasi Menara - 170 x 170 cm 2.89 M3 0.023 0.00% 100.00% 100.00% 0.023 Beton Sloof 1 Beton type TB1 - uk 30 x 70 cm 10.08 M3 0.080 100.00% 0.00% 100.00% 0.080 2 Beton type TB1A - uk 30 x 70 cm 12.285 M3 0.097 100.00% 0.00% 100.00% 0.097 3 Beton type TB2 - uk 30 x 60 cm 43.20 M3 0.342 100.00% 0.00% 100.00% 0.342 4 Beton type TB3 - uk 25 x 50 cm 10.20 M3 0.081 100.00% 0.00% 100.00% 0.081 5 Beton type TB4 - uk 30 x 60 cm 15.39 M3 0.122 100.00% 0.00% 100.00% 0.122 6 Beton type TB5 - uk 20 x 50 cm 15.34 M3 0.122 100.00% 0.00% 100.00% 0.122 7 Beton type TB6 - uk 20 x 50 cm 11.08 M3 0.088 100.00% 0.00% 100.00% 0.088 8 Beton type TB7 - uk 20 x 40 cm 4.60 M3 0.036 100.00% 0.00% 100.00% 0.036 Beton DPT - Tangga 1 Beton DPT tangga 19.56 M3 0.155 100.00% 0.00% 100.00% 0.155 2 Beton DPT Peninggian Lantai 26.02 M3 0.206 100.00% 0.00% 100.00% 0.206 Beton Lantai Dasar Mutu beton Ready Mix K 300 - tanpa fly ash Beton Kolom 1 Beton Kolom Type K1 - uk 60 x 60 cm 17.82 M3 0.141 100.00% 0.00% 100.00% 0.141 2 Beton Kolom Type K1A - uk 60 x 60 cm 7.128 M3 0.056 100.00% 0.00% 100.00% 0.056 3 Beton Kolom Type K2 - uk 30 x 30 cm 15.2685 M3 0.121 100.00% 0.00% 100.00% 0.121 4 Beton Kolom Type K2A - uk 40 x 40 cm 7.12 M3 0.056 100.00% 0.00% 100.00% 0.056 5 Beton Kolom Type K3 - uk 20 x 20 0.348 M3 0.003 100.00% 0.00% 100.00% 0.003 6 Beton Kolom Type K4 - uk 17 x 20 1.479 M3 0.012 100.00% 0.00% 100.00% 0.012 7 Beton Kolom Type K5 - uk 15 x 48 0.619875 M3 0.005 100.00% 0.00% 100.00% 0.005 Beton Tangga 1 Beton Tangga Utama As C/9 2.41254 M3 0.019 100.00% 0.00% 100.00% 0.019 2 Beton Tangga Utama As F/9 2.41254 M3 0.019 100.00% 0.00% 100.00% 0.019 3 Beton Tangga Entrance Outdoor 86.5425 M3 0.685 100.00% 0.00% 100.00% 0.685 4 Beton Balok Tangga - Type B4 - 20 x 50 cm 4.5 M3 0.036 100.00% 0.00% 100.00% 0.036 Beton Plat Lantai Dasar 1 Beton Plat Lantai Dasar - tebal 12 cm 171.35 M3 1.357 100.00% 0.00% 100.00% 1.357 Beton Balok Lantai Atas 1 Beton Balok Type B1 - 45 x 90 cm 29.16 M3 0.231 100.00% 0.00% 100.00% 0.231 2 Beton Balok Type B2 - 40 x 80 cm 19.2 M3 0.152 100.00% 0.00% 100.00% 0.152 3 Beton Balok Type B3 - 40 x 90 cm 11.52 M3 0.091 100.00% 0.00% 100.00% 0.091 4 Beton Balok Type B4 - 20 x 50 cm 33.082 M3 0.262 100.00% 0.00% 100.00% 0.262 5 Beton Balok Type B5 - 25 x 50 cm 9.50625 M3 0.075 100.00% 0.00% 100.00% 0.075 6 Beton Balok Type B5A - 25 x 50 cm 2.5 M3 0.020 100.00% 0.00% 100.00% 0.020 7 Beton Balok Type B6 - 30 x 70 cm 5.355 M3 0.042 100.00% 0.00% 100.00% 0.042 8 Beton Balok Type B7 - 30 x 60 cm 15.12 M3 0.120 100.00% 0.00% 100.00% 0.120 9 Beton Balok Type B8 - 30 x 60 cm 5.76 M3 0.046 100.00% 0.00% 100.00% 0.046 10 Beton Balok Type B9 - 30 x 70 cm 2.52 M3 0.020 100.00% 0.00% 100.00% 0.020 11 Beton Balok Type B10 - 20 x 40 cm 4.4 M3 0.035 100.00% 0.00% 100.00% 0.035 12 Beton Balok Type B16 - 20 x 40 cm 1.374 M3 0.011 100.00% 0.00% 100.00% 0.011 13 Beton Balok Type B18 - 30 x 60 cm 1.62 M3 0.013 100.00% 0.00% 100.00% 0.013 14 Beton Balok Type CB3 - 25 x 50 cm 0.75 M3 0.006 100.00% 0.00% 100.00% 0.006 15 Beton Balok Type CB5 - 20 x 40 cm 0.48 M3 0.004 100.00% 0.00% 100.00% 0.004 Beton PLat Lantai Atas 1 Beton Plat Lantai Type S1 - Tebal 120 mm 89.6328 M3 0.710 100.00% 0.00% 100.00% 0.710 2 Beton Plat Lantai Type S2 - Tebal 130 mm 19.981 M3 0.158 100.00% 0.00% 100.00% 0.158 3 Pembesian Plat Lantai Type S3 dirubah menjadi S2 (Area Dak Samping) - Tebal 130 mm - Sesuai email per 24.11.1423.6002 M3 0.187 100.00% 0.00% 100.00% 0.187 Beton Kolom 1 Beton Kolom Type K1 - uk 60 x 60 cm 11.52 M3 0.091 100.00% 0.00% 100.00% 0.091 2 Beton Kolom Type KA1 - uk 30 x 30 cm 8.55 M3 0.068 100.00% 0.00% 100.00% 0.068 3 Beton Kolom Type KA2 - uk 14 x 40 cm 7.252 M3 0.057 100.00% 0.00% 100.00% 0.057 4 Beton Kolom Type KA3 - uk 13 x 30 cm 0.3471 M3 0.003 100.00% 0.00% 100.00% 0.003 5 Beton Kolom Type KT1 - uk 13 x 40 cm 0.832 M3 0.007 100.00% 0.00% 100.00% 0.007 Beton Tangga 1 Beton Tangga Utama As C/8 2.58075 M3 0.020 100.00% 0.00% 100.00% 0.020 2 Beton Tangga Utama As F/8 2.58075 M3 0.020 100.00% 0.00% 100.00% 0.020 Beton Balok Lantai Mezanine 1 Beton Balok Type B1 - 45 x 90 cm 19.44 M3 0.154 100.00% 0.00% 100.00% 0.154 2 Beton Balok Type B2 - 40 x 80 cm 3.84 M3 0.030 100.00% 0.00% 100.00% 0.030 3 Beton Balok Type B4 - 20 x 50 cm 2.2 M3 0.017 100.00% 0.00% 100.00% 0.017 4 Beton Balok Type B5 - 25 x 50 cm 5.78 M3 0.046 100.00% 0.00% 100.00% 0.046 5 Beton Balok Type B8 - 30 x 60 cm 2.2 M3 0.017 100.00% 0.00% 100.00% 0.017 6 Beton Balok Type B10 - 20 x 40 cm 0.84 M3 0.007 100.00% 0.00% 100.00% 0.007 7 Beton Balok Type B11 - 25 x 50 cm 0.375 M3 0.003 100.00% 0.00% 100.00% 0.003 8 Beton Balok Type B13 - 20 x 40 cm 4 M3 0.032 100.00% 0.00% 100.00% 0.032 9 Beton Balok Type B14 - 20 x 40 cm 13.68 M3 0.108 100.00% 0.00% 100.00% 0.108 10 Beton Balok Type B19 - 15 x 30 cm 0.81 M3 0.006 100.00% 0.00% 100.00% 0.006 11 Beton Balok Type CB1 - 20 x 50 cm 1.44 M3 0.011 100.00% 0.00% 100.00% 0.011 12 Beton Balok Type CB2 - 20 x 50 cm 2.36 M3 0.019 100.00% 0.00% 100.00% 0.019 13 Beton Balok Type CB5 - 20 x 50 cm 0.56 M3 0.004 100.00% 0.00% 100.00% 0.004 14 Beton Balok Type L1 - 15 x 60 cm 1.8 M3 0.014 100.00% 0.00% 100.00% 0.014 Beton PLat Lantai Mezzanine 1 Beton Plat Lantai Type S1 - Tebal 120 mm 38.88 M3 0.308 100.00% 0.00% 100.00% 0.308 2 Beton Plat Lantai Type S3 - Tebal 100 mm 17.85 M3 0.141 100.00% 0.00% 100.00% 0.141 Beton Kolom 1 Beton Kolom Type K1 - uk 40 x 40 cm 5.85 M3 0.046 100.00% 0.00% 100.00% 0.046 Page 5
  6. 6. MINGGU KE : 32 (TIGA PULUH DUA) s/d Minggu Ini (%) PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015 NO URAIAN VOLUME UNIT BOBOT (%) Progres thd Jenis Pekerjaan Prestasi thd Bobot Kerja (%) Minggu Lalu (%) Minggu Ini (%) Beton Lantai Atap Mutu beton Ready Mix K 300 - tanpa fly ash 1 Beton Balok Lantai Atap 2 Beton Balok Type B2 - 40 x 80 cm 3.84 M3 0.030 100.00% 0.00% 100.00% 0.030 3 Beton Balok Type B1A - 30 x 70 cm 3.15 M3 0.025 100.00% 0.00% 100.00% 0.025 4 Beton Balok Type B4 - 20 x 50 cm 3.88 M3 0.031 100.00% 0.00% 100.00% 0.031 5 Beton Balok Type B13 - 20 x 40 cm 3.12 M3 0.025 100.00% 0.00% 100.00% 0.025 6 Beton Balok Type B15 - 30 x 70 cm 16.64 M3 0.132 100.00% 0.00% 100.00% 0.132 7 Beton Balok Type B17 - 40 x 30 cm 1.80 M3 0.014 100.00% 0.00% 100.00% 0.014 8 Beton Balok Type B19 - 15 x 30 cm 0.37 M3 0.003 100.00% 0.00% 100.00% 0.003 9 Beton Balok Type CB3 - 25 x 50 cm 5.25 M3 0.042 100.00% 0.00% 100.00% 0.042 10 Beton Balok Type CB6 - 30 x 70 cm 2.30 M3 0.018 100.00% 0.00% 100.00% 0.018 11 Beton Balok Daguan/Dudukan Kuda - kuda baja 0.38 M3 0.003 100.00% 0.00% 100.00% 0.003 Beton PLat Lantai Atap 1 Beton Plat Lantai Type S2 - Tebal 100 mm 18.58 M3 0.147 100.00% 0.00% 100.00% 0.147 2 Beton Plat Lantai Type S3 - Tebal 150 mm 7.28 M3 0.058 100.00% 0.00% 100.00% 0.058 Beton Kolom 1 Beton Kayu Kolom Type KA4 - uk 20 x 20 cm 1.09 M3 0.009 100.00% 0.00% 100.00% 0.009 Beton Lantai Kubah Mutu beton Ready Mix K 300 - tanpa fly ash Beton Balok Lantai Atap 1 Beton Balok Type B16 - 20 x 40 cm M3 0.017 0.00% 100.00% 100.00% 0.017 2 Beton Balok Type B10 - 20 x 40 cm M3 0.021 0.00% 100.00% 100.00% 0.021 3 Beton Balok Type B19 - 15 x 30 cm M3 0.007 0.00% 100.00% 100.00% 0.007 4 Beton Balok Type CB5 - 20 x 40 cm M3 0.006 0.00% 100.00% 100.00% 0.006 Beton PLat Lantai Atas 1 Beton Plat Lantai Type S2 - Tebal 100 mm M3 0.011 0.00% 100.00% 100.00% 0.011 Betn Ramp 1 Kolom type KR 15 x 40 cm M3 0.026 0.00% 100.00% 100.00% 0.026 2 Kolom type KR1 15 x 40 cm M3 0.004 0.00% 100.00% 100.00% 0.004 3 Balok type B16 20 x 40 cm M3 0.077 0.00% 100.00% 100.00% 0.077 4 CB 240 M3 0.004 0.00% 100.00% 100.00% 0.004 5 Plat tebal 12 cm M3 0.109 0.00% 100.00% 100.00% 0.109 Sub Total : 29.348 V PEKERJAAN STRUKTUR BAJA A Struktur Baja Pintu Utama Pekerjaan Kolom Baja a Kolom IWF 400.200.8.13 - type KB1 1986.336 Kg 0.242 100.00% 0.00% 100.00% 0.242 b Kolom IWF 300.150.6,5.9 - type KB2 456.181 Kg 0.056 100.00% 0.00% 100.00% 0.056 c Stifner plat dan base plate 244.2517 Kg 0.030 100.00% 0.00% 100.00% 0.030 Pekerjaan Balok Baja a Kolom IWF 300.150.6,5.9 - type BB1 678.216 Kg 0.083 100.00% 0.00% 100.00% 0.083 b Kolom IWF 250.125.5,5.8 - type BB1 273.504 Kg 0.033 100.00% 0.00% 100.00% 0.033 c Stifner plat dan base plate 95.172 Kg 0.012 100.00% 0.00% 100.00% 0.012 d Cat Zinkromat 3733.6607 Kg 0.030 100.00% 0.00% 100.00% 0.030 Struktur Baja Atap Pekerjaan Kuda - Kuda Baja 1 Kolom IWF 200.100.5,5.8 - type R1 895 Kg 0.109 100.00% 0.00% 100.00% 0.109 2 Gording C 150.50.20.2,3 1,342 Kg 0.163 100.00% 0.00% 100.00% 0.163 3 Bracing RB D 16 403 Kg 0.049 100.00% 0.00% 100.00% 0.049 4 Reng Baja Ringan 271 M2 0.136 100.00% 0.00% 100.00% 0.136 5 Pek penutup atap spandek 271 M2 0.216 100.00% 0.00% 100.00% 0.216 Sub Total : 1.158 PEKERJAAN ARSITEKTUR A Pekerjaan Plafond A.1 Plafond Lantai Dasar a Plafond Flat Lantai Dasar Plafond gypsum 9 mm ex Jayaboard/setara rangka hollow galvanized uk 40 x 40 mm + 40 x 20 mm tebal = 0,45 mm 1 Ruang Serba Guna 575.33 M2 0.555 30.00% 50.00% 80.00% 0.444 2 Ruang Preparation 28.53 M2 0.028 30.00% 0.00% 30.00% 0.008 3 Ruang Gudang 18.32 M2 0.018 30.00% 0.00% 30.00% 0.005 4 Ruang Meeting Dan Ruang Kerja 34.31 M2 0.033 30.00% 0.00% 30.00% 0.010 5 Ruang Klinik 17.31 M2 0.017 30.00% 0.00% 30.00% 0.005 6 Ruang Marbot 17.31 M2 0.017 30.00% 0.00% 30.00% 0.005 7 Ruang Penitipan Sepatu Dan Selasar samping 107.54 M2 0.104 30.00% 0.00% 30.00% 0.031 8 Ruang Rias 1 dan 2 35.72 M2 0.034 30.00% 0.00% 30.00% 0.010 b Plafond Flat Lantai Dasar Plafond GRC Board tebal = 3 mm + rangka hollow galvanized uk 40 x 40 mm + 40 x 20 mm tebal = 0,45 mm 1 Teras samping kanan 30.09 M2 0.028 0.00% 0.00% 0.00% 0.000 2 Teras samping Kiri 30.09 M2 0.028 0.00% 0.00% 0.00% 0.000 3 Toilet Pria dan wanita 64.29 M2 0.059 0.00% 0.00% 0.00% 0.000 4 Toilet Disabilitas/Khusus Orang Cacat 3.96 M2 0.004 0.00% 0.00% 0.00% 0.000 5 Tempat Wudhu Pria dan Wanita 78.10 M2 0.072 0.00% 0.00% 0.00% 0.000 6 Selasar Samping 14.60 M2 0.013 0.00% 0.00% 0.00% 0.000 c Plafond Exposed Beton Plafond exposed beton - acian 1 Teras luar 58.29 M2 0.037 0.00% 0.00% 0.00% 0.000 d Plafond Up Ceiling Plafond gypsum 9 mm ex Jayaboard/setara rangka hollow Galvanized uk 40 x 40 mm + 40 x 20 mm tebal = 0,45 mm 1 Ruang Seba Guna 163.10 M2 0.164 0.00% 0.00% 0.00% 0.000 Page 6
  7. 7. MINGGU KE : 32 (TIGA PULUH DUA) s/d Minggu Ini (%) PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015 NO URAIAN VOLUME UNIT BOBOT (%) Progres thd Jenis Pekerjaan Prestasi thd Bobot Kerja (%) Minggu Lalu (%) Minggu Ini (%) e List Plafond List plafond shadowline - aluminium 1 Ruang Seba Guna 291.17 M2 0.110 0.00% 0.00% 0.00% 0.000 2 Ruang Preparation 21.55 M2 0.008 0.00% 0.00% 0.00% 0.000 3 Ruang Gudang 17.55 M2 0.007 0.00% 0.00% 0.00% 0.000 4 Ruang Meeting Dan Ruang Kerja 33.85 M2 0.013 0.00% 0.00% 0.00% 0.000 5 Ruang Klinik 16.70 M2 0.006 0.00% 0.00% 0.00% 0.000 6 Ruang Marbot 16.70 M2 0.006 0.00% 0.00% 0.00% 0.000 7 Ruang Penitipan Sepatu Dan Selasar samping 92.33 M2 0.035 0.00% 0.00% 0.00% 0.000 8 Ruang Rias 1 dan 2 37.00 M2 0.014 0.00% 0.00% 0.00% 0.000 9 Teras samping kanan 26.00 M2 0.010 0.00% 0.00% 0.00% 0.000 10 Teras samping Kiri 26.00 M2 0.010 0.00% 0.00% 0.00% 0.000 11 Toilet Pria dan wanita 46.00 M2 0.017 0.00% 0.00% 0.00% 0.000 12 Tempat Wudhu Pria dan Wanita 55.04 M2 0.021 0.00% 0.00% 0.00% 0.000 13 Tempat wudhu luar 14.35 M2 0.005 0.00% 0.00% 0.00% 0.000 14 Selasar Samping 27.10 M2 0.010 0.00% 0.00% 0.00% 0.000 4 Toilet Disabilitas/Khusus Orang Cacat 7.40 M2 0.003 0.00% 0.00% 0.00% 0.000 f Pekerjaan Pengecatan Plafond 1 Cat plafond ex Vinilex/Setara 1,113.79 M2 0.168 0.00% 0.00% 0.00% 0.000 A.2 Plafond Lantai Atas a Plafond Flat Lantai Atas Plafond gypsum 9 mm ex Jayaboard/setara rangka hollow Galvanized uk 40 x 40 mm + 40 x 20 mm tebal = 0,45 mm 1 Ruang Shalat 250.90 M2 0.253 0.00% 0.00% 0.00% 0.000 2 Ruang Mihrab + Ruang Imam / Utility 16.04 M2 0.015 0.00% 0.00% 0.00% 0.000 a Plafond Flat Peforated Lantai Atas Plafond gypsum peforated + rangka hollow galvanized uk 40 x 40 mm + 40 x 20 mm tebal = 0,45 mm 1 Ruang Shalat 86.20 M2 0.109 0.00% 0.00% 0.00% 0.000 c Plafond Exposed Beton Plafond exposed beton - acian 1 Teras luar 156.48 M2 0.099 0.00% 0.00% 0.00% 0.000 d Plafond GRC 1 Plafond Teras Entrace - Plafond GRC 5 mm 35.71 M2 0.033 0.00% 0.00% 0.00% 0.000 e List Plafond List plafond shadowline - aluminium 1 Ruang Shalat 85.08 M2 0.032 0.00% 0.00% 0.00% 0.000 2 Ruang Shalat area pforated gypsum 258.90 M2 0.098 0.00% 0.00% 0.00% 0.000 f List Plafond List plafond gypsum uk 5 x 5 cm 1 Ruang Mihrab + Ruang Imam / Utility 27.30 M2 0.003 0.00% 0.00% 0.00% 0.000 g Pekerjaan Pengecatan Plafond 1 Cat plafond 545.33 M2 0.082 0.00% 0.00% 0.00% 0.000 A.3 Plafond Lantai Mezanine a Plafond Flat Lantai Atas Plafond gypsum 9 mm ex Jayaboard/setara rangka hollow galvanized uk 40 x 40 mm + 40 x 20 mm tebal = 0,45 mm 1 Ruang Shalat 244.11 M2 0.236 0.00% 0.00% 0.00% 0.000 b List Plafond List plafond shadowline - aluminium 1 Ruang Shalat 81.94 M2 0.031 0.00% 0.00% 0.00% 0.000 c List Plafond List plafond gypsum uk 5 x 5 cm 1 Ruang Shalat area pforated gypsum 259.6 M2 0.033 0.00% 0.00% 0.00% 0.000 d Pekerjaan Pengecatan Plafond Cat plafond ex Vinilex/Setara 1 Cat plafond ex Vinilex/Setara 244.11 M2 0.037 0.00% 0.00% 0.00% 0.000 A.4 Plafond Lantai Kubah a Plafond Flat Lantai Atas Plafond gypsum 9 mm ex Jayaboard/setara rangka hollow galvanized uk 40 x 40 mm + 40 x 20 mm tebal = 0,45 mm 1 Ruang Shalat 240.43 M2 0.303 0.00% 0.00% 0.00% 0.000 b List Plafond List plafond shadowline - aluminium 1 Ruang Shalat 61.90 M2 0.023 0.00% 0.00% 0.00% 0.000 c List Plafond List plafond gypsum uk 5 x 5 cm 1 Ruang Shalat area pforated gypsum 72.24 M2 0.009 0.00% 0.00% 0.00% 0.000 d Plafond Ornamen Kubah 1 Plafond ornamen kubah - uk 9,7 x 9,7 m2 1.00 M2 0.197 0.00% 0.00% 0.00% 0.000 e Pekerjaan Pengecatan Plafond 1 Cat plafond ex Vinilex/Setara 240.43 M2 0.036 0.00% 0.00% 0.00% 0.000 B Pekerjaan Penutup Lantai Dan Dinding B.1 Lantai Dasar a Penutup Lantai Homogenous Tile (1) Pek penutup lantai homogenous tile uk 60 x 60 cm - ex Indogress Marmaro Bianco Travertino/Setara 1 Ruang Seba Guna 578.89 M2 1.853 0.00% 0.00% 0.00% 0.000 2 Ruang Preparation 26.17 M2 0.084 0.00% 0.00% 0.00% 0.000 3 Ruang Gudang 17.55 M2 0.056 0.00% 0.00% 0.00% 0.000 4 Ruang Meeting Dan Ruang Kerja 34.31 M2 0.110 0.00% 0.00% 0.00% 0.000 5 Ruang Rias 1 dan 2 35.72 M2 0.114 0.00% 0.00% 0.00% 0.000 Page 7
  8. 8. MINGGU KE : 32 (TIGA PULUH DUA) s/d Minggu Ini (%) PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015 NO URAIAN VOLUME UNIT BOBOT (%) Progres thd Jenis Pekerjaan Prestasi thd Bobot Kerja (%) Minggu Lalu (%) Minggu Ini (%) b Penutup Lantai Homogenous Tile (3) Pek penutup lantai homogenous tile uk 40 x 40 cm - Polish/Gloss - ex Indogress Uni Color 1 Ruang Klinik 17.31 M2 0.044 0.00% 0.00% 0.00% 0.000 2 Ruang Marbot 17.31 M2 0.044 0.00% 0.00% 0.00% 0.000 c Penutup Lantai Homogenous Tile (4) Pek penutup lantai homogenous tile uk 40 x 40 cm - unPolish/matt - Indogress Mytica/ Setara 1 Ruang Penitipan Sepatu Dan Selasar samping 125.82 M2 0.360 0.00% 0.00% 0.00% 0.000 2 Bawah tangga selesar 21.64 M2 0.062 0.00% 0.00% 0.00% 0.000 3 Teras samping kanan 28.55 M2 0.082 0.00% 0.00% 0.00% 0.000 4 Teras samping Kiri 28.55 M2 0.082 0.00% 0.00% 0.00% 0.000 5 Toilet Pria dan wanita 27.60 M2 0.079 0.00% 0.00% 0.00% 0.000 6 Selasar Samping 14.60 M2 0.042 0.00% 0.00% 0.00% 0.000 7 Tangga samping 48.78 M2 0.140 0.00% 0.00% 0.00% 0.000 c Penutup Lantai Keramik (5) Pek penutup lantai keramik 30 x 30 cm - unPolish/matt - ex Roman type 63306042 / Setara 1 Tempat Wudhu Pria dan Wanita 77.80 M2 0.094 0.00% 0.00% 0.00% 0.000 2 Toilet Pria dan wanita 41.36 M2 0.050 0.00% 0.00% 0.00% 0.000 3 Toilet Disabilitas 3.30 M2 0.004 0.00% 0.00% 0.00% 0.000 d Penutup Lantai Batu Alam (6) Pek penutup lantai Batu Alam Andesite Bakar rata mesin - uk 30 x 30 1 Teras luar 254.98 M2 0.375 0.00% 0.00% 0.00% 0.000 2 Teras Belakang (Dekat jendela) 3.20 M2 0.005 0.00% 0.00% 0.00% 0.000 e Penutup Lantai Batu Alam (7) Pek penutup lantai Batu Alam Templek 1 Tempat wudhu luar 39.27 M2 0.049 0.00% 0.00% 0.00% 0.000 2 Teras Belakang (Dekat jendela) 7.20 M2 0.009 0.00% 0.00% 0.00% 0.000 f Penutup Dinding Pek penutup dinding keramik 30 x 60 cm - unPolish/matt - ex Roman W63535 Coloseum Beige/Setara 1 T. Wudhu Luar 26.14 M2 0.035 0.00% 0.00% 0.00% 0.000 2 Tempat Wudhu Pria dan Wanita 81.00 M2 0.109 0.00% 0.00% 0.00% 0.000 g Pek penutup dinding keramik 30 x 30 cm - unPolish/matt - ex Roman W63535 Coloseum Beige/Setara 1 Toilet pria dan wanita 49.17 M2 0.064 0.00% 0.00% 0.00% 0.000 h Penutup Lantai Grass Block (9) Pek penutup lantai Grass Block 1 Area taman dekat menara 6.29 M2 0.009 0.00% 0.00% 0.00% 0.000 B.2 Lantai Atas a Penutup Lantai Homogenous Tile (1) Pek penutup lantai homogenous tile uk 60 x 60 cm - ex Indogress Marmaro Bianco Travertino/Setara 1 Ruang Shalat 489.60 M2 1.401 0.00% 0.00% 0.00% 0.000 2 Ruang Mihrab + Ruang Imam / Utility 16.04 M2 0.046 0.00% 0.00% 0.00% 0.000 b Penutup Lantai Homogenous Tile (1) Pek penutup lantai border homogenous tile uk 60 x 10 cm - ex Indogrees Uni Color / Setara 1 Ruang Shalat 360.00 M2 0.453 0.00% 0.00% 0.00% 0.000 c Penutup Lantai Homogenous Tile (4) Pek penutup lantai homogenous tile uk 40 x 40 cm - unPolish/matt - Indogress Mytica/Setara 1 Teras 69.30 M2 0.198 0.00% 0.00% 0.00% 0.000 2 Selasar Luar / Bawah Canopy 158.11 M2 0.453 0.00% 0.00% 0.00% 0.000 3 Pasang drop keramik untuk gutter - teras samping 49.00 M2 0.140 0.00% 0.00% 0.00% 0.000 d Penutup Lantai Batu Alam (6) Pek penutup lantai Batu Alam Andesite Bakar rata mesin - uk 30 x 30 1 Teras luar dan Ramp 79.71 M2 0.120 0.00% 0.00% 0.00% 0.000 2 Tangga entrance 155.36 M2 0.235 0.00% 0.00% 0.00% 0.000 e Penutup Lantai Batu Alam (7) Pek penutup lantai Batu Alam Templek 1 Wudhu luar ruang imam 7.15 M2 0.009 0.00% 0.00% 0.00% 0.000 g Penutup Lantai rumput sintetis (13) Pek penutup lantai rumput sintetis 1 Pelataran 154.65 M2 0.357 0.00% 0.00% 0.00% 0.000 h Penutup Waterproofing + Screed Pek Waterproofing coating Sika + penutup screed 1 Dak Atas (termasuk dak ruang mihrab dan utility) 81.63 M2 0.116 0.00% 0.00% 0.00% 0.000 2 Pelataran 314.09 M2 0.448 0.00% 0.00% 0.00% 0.000 B.3 Lantai Mezzanine a Penutup Lantai Homogenous Tile (1) Pek penutup lantai homogenous tile uk 60 x 60 cm - ex Indogress Natura / Setara 1 Ruang Shalat 241.08 M2 0.690 0.00% 0.00% 0.00% 0.000 b Penutup Lantai Homogenous Tile (1) Pek penutup lantai border homogenous tile uk 60 x 10 cm - ex Indogrees Uni Color / Setara 1 Ruang Shalat 186.00 M2 0.234 0.00% 0.00% 0.00% 0.000 c Penutup Lantai Homogenous Tile (4) Pek penutup lantai homogenous tile uk 40 x 40 cm - unPolish/matt ex Indogrees Uni Color / Setara 1 Tangga Utama 49.98 M2 0.126 0.00% 0.00% 0.00% 0.000 d Pek Waterproofing coating Sika + penutup screed Pek Waterproofing membrane sheet 3 mm + penutup screed 1 Dak Atas Canopy Selasar 144.70 M2 0.207 0.00% 0.00% 0.00% 0.000 B.4 Lantai Atap a Penutup Waterproofing + Screed Pek Waterproofing membrane sheet 3 mm + penutup screed 1 Dak Atas Atap 170.99 M2 0.244 0.00% 0.00% 0.00% 0.000 C.1 Lantai Dasar a Pekerjaan Pasang Dinding 1 Pek Dinding bata merah + campuran semen dan pasir - Trasraam 381.00 M2 0.422 0.00% 50.00% 50.00% 0.211 2 Pek Dinding bata merah + campuran semen dan pasir 1,408.78 M2 1.474 100.00% 0.00% 100.00% 1.474 3 Pek plesteran dinding - campuran semen dan pasir 2,817.56 M2 0.866 100.00% 0.00% 100.00% 0.866 Page 8
  9. 9. MINGGU KE : 32 (TIGA PULUH DUA) s/d Minggu Ini (%) PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015 NO URAIAN VOLUME UNIT BOBOT (%) Progres thd Jenis Pekerjaan Prestasi thd Bobot Kerja (%) Minggu Lalu (%) Minggu Ini (%) 4 Pek acian dinding - semen abu 2,817.56 M2 0.194 100.00% 0.00% 100.00% 0.194 5 Pek cat dinding ex Vinilex 2,817.56 M2 0.426 0.00% 0.00% 0.00% 0.000 6 Pek pasangan rollag teras samping 20.48 M2 0.151 0.00% 0.00% 0.00% 0.000 7 Pek Kolom praktis 14 x 14 cm besi 4Ø8 + Ø8-200 228.00 M3 0.139 100.00% 0.00% 100.00% 0.139 C.2 Lantai Atas a Pekerjaan Pasang Dinding 1 Pek Dinding bata merah + campuran semen dan pasir 381.00 M2 0.536 25.00% 0.00% 25.00% 0.134 2 Pek plesteran dinding - campuran semen dan pasir 1,408.78 M2 0.315 0.00% 0.00% 0.00% 0.000 3 Pek acian dinding - semen abu 2,817.56 M2 0.071 0.00% 0.00% 0.00% 0.000 4 Pek cat dinding ex Vinilex 2,817.56 M2 0.155 0.00% 0.00% 0.00% 0.000 5 Pek pasangan rollag teras samping 2,817.56 M2 0.132 0.00% 0.00% 0.00% 0.000 6 Pek pasangan rollag Trap teras entrance 20.48 M2 0.050 0.00% 0.00% 0.00% 0.000 7 Pek Kolom praktis 14 x 14 cm besi 4Ø8 + Ø8-200 228.00 M2 0.056 0.00% 0.00% 0.00% 0.000 C.3 Lantai Mezannine a Pekerjaan Pasang Dinding 1 Pek Dinding bata merah + campuran semen dan pasir 589.20 M2 0.616 0.00% 0.00% 0.00% 0.000 2 Pek plesteran dinding - campuran semen dan pasir 1,185.49 M2 0.364 0.00% 0.00% 0.00% 0.000 3 Pek acian dinding - semen abu 1,185.49 M2 0.082 0.00% 0.00% 0.00% 0.000 4 Pek cat dinding ex Vinilex 1,185.49 M2 0.179 0.00% 0.00% 0.00% 0.000 5 Pek Kolom praktis 14 x 14 cm besi 4Ø8 + Ø8-200 127.60 M2 0.078 0.00% 0.00% 0.00% 0.000 C.4 Pek Pasangan Lainnya 1 Pek Ring Balok praktis 14 x 14 cm besi 4Ø8 + Ø8-200 200.65 M2 0.122 0.00% 0.00% 0.00% 0.000 2 Pek Tanggulan Lantai - pasangan bata tinggi 90 cm 180.59 M2 0.189 0.00% 0.00% 0.00% 0.000 3 Pek Ban - Banan diatas dak canopy selasar Lt. Atas 191.30 M2 0.040 0.00% 0.00% 0.00% 0.000 4 pekerjaan kolom praktis tanggulan 296.40 M2 0.180 0.00% 0.00% 0.00% 0.000 c.5 Pekerjaan Pasangan Shaft 1 Pasangan bata 294.48 M2 0.308 0.00% 40.00% 40.00% 0.123 2 Shaft plesteran 294.48 M2 0.111 0.00% 40.00% 40.00% 0.044 3 bekisting kolom praktis 83.71 M2 0.084 0.00% 40.00% 40.00% 0.034 4 beton kolom praktis 5.02 M2 0.147 0.00% 40.00% 40.00% 0.059 Parapet 1 Pasangan Bata 232.56 M2 0.243 100.00% 0.00% 100.00% 0.243 2 Plesteran 465.12 M2 0.207 90.00% 0.00% 90.00% 0.186 3 bekisting kolom praktis 19.21 M2 0.019 90.00% 0.00% 90.00% 0.017 4 beton kolom praktis 1.13 M3 0.033 70.00% 30.00% 100.00% 0.033 D Pekerjaan Kusen, Pintu Dan Jendela 1 Pintu Type P1 - uk 180 x 350 cm 8.00 Unit 0.418 0.00% 0.00% 0.00% 0.000 Kusen pintu alumunium powder coating putih 4" ex Alexindo/ setara Daun pintu frame alumunium + kaca 5 mm Engsel dan kunci standard/ex Deksson/Setara 2 Pintu Type P2 - uk 90 x 240 cm 11.00 Unit 0.442 0.00% 0.00% 0.00% 0.000 Kusen kayu enggeneering door Daun pintu engeneering door Engsel dekkson ES s/s 5 x 3 x 3 mm 4 BB Lever Handle LHTR DKS 040 sss Acsesories Mortise Lock MTS LDKS 84030 + Cylinder Cyl DKS DC 60 M SN + Door Stoper DKS 886 SN 3 Pintu Type P3 - uk 160 x 240 cm 1.00 Unit 0.035 0.00% 0.00% 0.00% 0.000 Kusen pintu alumunium powder coating putih 4" ex Alexindo/ setara Daun pintu frame alumunium + kaca 5 mm Engsel dan kunci standard/ex Deksson/Setara 4 Pintu Type P11 - uk 80 x 240 cm 2.00 Unit 0.080 0.00% 0.00% 0.00% 0.000 Kusen kayu enggeneering door Daun pintu engeneering door Engsel dekkson ES s/s 5 x 3 x 3 mm 4 BB Lever Handle LHTR DKS 040 sss Acsesories Mortise Lock MTS LDKS 84030 + Cylinder Cyl DKS DC 60 M SN + Door Stoper DKS 886 SN 5 Pintu Type P5 - uk 70 x 210 cm 10.00 Unit 0.401 0.00% 0.00% 0.00% 0.000 Kusen kayu enggeneering door Daun pintu engeneering door Engsel dekkson ES s/s 5 x 3 x 3 mm 4 BB Lever Handle LHTR DKS 040 sss Acsesories Mortise Lock MTS LDKS 84030 + Cylinder Cyl DKS DC 60 M SN + Door Stoper DKS 886 SN 6 Pintu Type P6 - uk 100 x 240 cm 1.00 Unit 0.036 0.00% 0.00% 0.00% 0.000 Kusen besi hollow 40 x 60 finish cat Daun pintu besi siku 40 x 40 mm jarak 4 cm - finish cat 7 Pintu Type P7 - uk 72 x 385 cm 24.00 Unit 0.723 0.00% 0.00% 0.00% 0.000 Kusen pintu alumunium powder coating putih 4" ex Alexindo/ setara Daun pintu frame alumunium + kaca 5 mm Engsel dan kunci standard/ex Deksson/Setara 8 Pintu Type J6 - uk 72 x 395 cm 24.00 Unit 0.613 0.00% 0.00% 0.00% 0.000 Kusen pintu alumunium powder coating putih 4" ex Alexindo/ setara Daun jendela kaca nako 9 Pintu Utama Type P8 - uk 240 x 300 cm 1.00 Unit 0.236 0.00% 0.00% 0.00% 0.000 Kusen kayu solid Jati - finish melamik Daun pintu kayu solid motif - jati - finish melamik Engsel dekkson ES s/s 5 x 3 x 3 mm 4 BB Pull Handle DKS 802 32 x 457 x 300 SSS Acsesories Mortise Lock MTS LDKS 84030 + Cylinder Cyl DKS DC 60 M SN + Door Stoper DKS 886 SN 10 Pintu type P9 - uk 100 x 300 cm 2.00 Unit 0.054 0.00% 0.00% 0.00% 0.000 Kusen pintu alumunium powder coating putih 4" ex Alexindo/ setara Daun pintu frame alumunium + kaca 5 mm Engsel dan kunci standard/ex Deksson/Setara Page 9
  10. 10. MINGGU KE : 32 (TIGA PULUH DUA) s/d Minggu Ini (%) PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015 NO URAIAN VOLUME UNIT BOBOT (%) Progres thd Jenis Pekerjaan Prestasi thd Bobot Kerja (%) Minggu Lalu (%) Minggu Ini (%) 11 Pintu Type P10 - uk 110 x 240 cm 1.00 Unit 0.135 0.00% 0.00% 0.00% 0.000 Kusen kayu solid Jati - finish melamik Daun pintu kayu solid motif - jati - finish melamik Engsel dekkson ES s/s 5 x 3 x 3 mm 4 BB Pull Handle DKS 802 32 x 457 x 300 SSS Acsesories Mortise Lock MTS LDKS 84030 + Cylinder Cyl DKS DC 60 M SN + Door Stoper DKS 886 SN 12 Pintu Type P4 - uk 80 x 240 cm 4.00 Unit 0.107 0.00% 0.00% 0.00% 0.000 Kusen besi hollow 40 x 60 finish cat Daun pintu besi hollow 40 x 20 jarak 4 cm - finish cat 13 Pintu Type P4a - uk 80 x 180 cm - ruang pompa 1.00 Unit 0.028 0.00% 0.00% 0.00% 0.000 Kusen besi hollow 40 x 60 finish cat Daun pintu besi hollow 40 x 20 jarak 4 cm - finish cat 13 Jendela type J1 - uk 100 x 360 cm 10.00 Unit 0.225 0.00% 0.00% 0.00% 0.000 Kusen jendela alumunium powder coating putih 4" ex Alexindo/ setara Daun jendela kaca nako 14 Jendela type J1A - uk 100 x 360 cm 4.00 Unit 0.121 0.00% 0.00% 0.00% 0.000 Kusen jendela alumunium powder coating putih 4" ex Alexindo/ setara Daun jendela frame alumunium + kaca 5 mm 15 Jendela type J2 - uk 160 x 350 cm 2.00 Unit 0.064 0.00% 0.00% 0.00% 0.000 Kusen jendela alumunium powder coating putih 4" ex Alexindo/ setara Daun jendela frame alumunium + kaca 5 mm 16 Jendela type J3 - uk 80 x 220 cm 4.00 Unit 0.107 0.00% 0.00% 0.00% 0.000 Kusen jendela alumunium powder coating putih 4" ex Alexindo/ setara Daun jendela frame alumunium + kaca 5 mm 17 Jendela type J3A - uk 160 x 220 cm 2.00 Unit 0.055 0.00% 0.00% 0.00% 0.000 Kusen jendela alumunium powder coating putih 4" ex Alexindo/ setara Daun jendela frame alumunium + kaca 5 mm 18 Jendela type J4 - uk 100 x 99 cm 2.00 Unit 0.027 0.00% 0.00% 0.00% 0.000 Kusen jendela alumunium powder coating putih 4" ex Alexindo/ setara Daun jendela kaca nako 19 Jendela type J5 - uk 50 x 330 cm 16.00 Unit 0.332 0.00% 0.00% 0.00% 0.000 Kusen jendela alumunium powder coating putih 4" ex Alexindo/ setara Daun jendela kaca 5 mm - Jendela fixed 20 Jendela type J5A - uk 50 x 540 cm 16.00 Unit 0.427 0.00% 0.00% 0.00% 0.000 Kusen jendela alumunium powder coating putih 4" ex Alexindo/ setara Daun jendela kaca nako 21 Jendela Type J6 - uk 80 x 180 cm - ruang pompa 1.00 Unit 0.028 0.00% 0.00% 0.00% 0.000 Kusen besi hollow 40 x 60 finish cat Daun pintu besi hollow 40 x 20 jarak 4 cm - finish cat 22 Jendela Maintenance Kubah - uk 75 x 60 cm 16.00 Unit 0.232 0.00% 0.00% 0.00% 0.000 Kusen jendela alumunium powder coating putih 4" ex Alexindo/ setara Daun jendela kaca E Pekerjaan Sanitary E.1 Sanitary Toilet Pria + T. Wudhu - Lantai Dasar 1 Lavatory ex TOTO type LW521V1A 3.00 Unit 0.017 0.00% 0.00% 0.00% 0.000 2 Lavatory Faucet ex TOTO type TX 111LRYR 3.00 Unit 0.003 0.00% 0.00% 0.00% 0.000 3 Paper Holder ex TOTO type AW360I 3.00 Unit 0.011 0.00% 0.00% 0.00% 0.000 4 Closet ex TOTO CW421J 3.00 Unit 0.040 0.00% 0.00% 0.00% 0.000 5 Jet Washer ex TOTO TX4035 V1 3.00 Unit 0.006 0.00% 0.00% 0.00% 0.000 6 Floor Drain ex TOTO Type TX1 BN 5.00 Unit 0.006 0.00% 0.00% 0.00% 0.000 7 Closet Jongkok ex TOTO type CE7 2.00 Unit 0.007 0.00% 0.00% 0.00% 0.000 8 Kran Dinding ex TOTO Type T23BQ13N 36.00 Unit 0.048 0.00% 0.00% 0.00% 0.000 9 Urinoir ex TOTO Type Khusus Muslim 3.00 Unit 0.057 0.00% 0.00% 0.00% 0.000 10 Cermin wastafel 3.00 Unit 0.034 0.00% 0.00% 0.00% 0.000 11 Cubicle toilet 5.00 Pintu 0.134 0.00% 0.00% 0.00% 0.000 12 Grill tempat wudhu - Siku baja + Plat strip 32.35 M' 0.136 0.00% 0.00% 0.00% 0.000 E.2 Sanitary Toilet Wanita + T. Wudhu - Lantai Dasar 1 Lavatory ex TOTO type LW521V1A 3.00 Unit 0.017 0.00% 0.00% 0.00% 0.000 2 Lavatory Faucet ex TOTO type TX 111LRYR 3.00 Unit 0.003 0.00% 0.00% 0.00% 0.000 3 Paper Holder ex TOTO type AW360I 3.00 Unit 0.011 0.00% 0.00% 0.00% 0.000 4 Closet ex TOTO CW421J 3.00 Unit 0.040 0.00% 0.00% 0.00% 0.000 5 Jet Washer ex TOTO TX4035 V1 3.00 Unit 0.006 0.00% 0.00% 0.00% 0.000 6 Floor Drain ex TOTO Type TX1 BN 5.00 Unit 0.006 0.00% 0.00% 0.00% 0.000 7 Closet Jongkok ex TOTO type CE7 2.00 Unit 0.007 0.00% 0.00% 0.00% 0.000 8 Kran Dinding ex TOTO Type T23BQ13N 24.00 Unit 0.032 0.00% 0.00% 0.00% 0.000 9 Cermin wastafel 3.00 Unit 0.034 0.00% 0.00% 0.00% 0.000 10 Cubicle toilet 5.00 Pintu 0.134 0.00% 0.00% 0.00% 0.000 11 Grill tempat wudhu - Siku baja + Plat strip 32.35 M' 0.136 0.00% 0.00% 0.00% 0.000 E.3 Toilet Disabilitas Lt. Dasar 1 Lavatory ex TOTO type LW521V1A 1.00 Unit 0.006 0.00% 0.00% 0.00% 0.000 2 Lavatory Faucet ex TOTO type TX 111LRYR 1.00 Unit 0.001 0.00% 0.00% 0.00% 0.000 3 Paper Holder ex TOTO type AW360I 1.00 Unit 0.004 0.00% 0.00% 0.00% 0.000 4 Closet ex TOTO CW421J 1.00 Unit 0.013 0.00% 0.00% 0.00% 0.000 5 Jet Washer ex TOTO TX4035 V1 1.00 Unit 0.002 0.00% 0.00% 0.00% 0.000 6 Floor Drain ex TOTO Type TX1 BN 1.00 Unit 0.001 0.00% 0.00% 0.00% 0.000 7 Kran Dinding ex TOTO Type T23BQ13N 1.00 Unit 0.001 0.00% 0.00% 0.00% 0.000 8 Cermin wastafel 1.00 Unit 0.011 0.00% 0.00% 0.00% 0.000 9 Pek railing pegangan 1.00 Unit 0.030 0.00% 0.00% 0.00% 0.000 E.4 Toilet Imam - Lantai Atas 1 Kran Dinding ex TOTO Type T23BQ13N 3.00 Unit 0.004 0.00% 0.00% 0.00% 0.000 2 Grill tempat wudhu - Siku baja + Plat strip 3.58 M' 0.015 0.00% 0.00% 0.00% 0.000 3 Grill tempat Pelataran - Siku baja + Plat strip 44.25 M' 0.186 0.00% 0.00% 0.00% 0.000 Page 10
  11. 11. MINGGU KE : 32 (TIGA PULUH DUA) s/d Minggu Ini (%) PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015 NO URAIAN VOLUME UNIT BOBOT (%) Progres thd Jenis Pekerjaan Prestasi thd Bobot Kerja (%) Minggu Lalu (%) Minggu Ini (%) F Pekerjaan Railing Tangga Dan Void F.1 Pekerjaan Railing Tangga Railing besi hollow 20 x 40 mm finish cat + Handrailing kayu solid 50 x 80 finish melamik 1 Tangga Lt. Dasar 50.84 M' 0.175 0.00% 0.00% 0.00% 0.000 2 Tangga Lt. Atas 59.80 M' 0.205 0.00% 0.00% 0.00% 0.000 3 Railing void mezanine 15.10 M' 0.052 0.00% 0.00% 0.00% 0.000 4 Handrailing - pipa stainless 2" untuk pegangan disable di ramp 59.95 M' 0.206 0.00% 0.00% 0.00% 0.000 5 Pasang railing teras samping 49.00 M' 0.168 0.00% 0.00% 0.00% 0.000 F.2 Pekerjaan Tangga Maintenance 1 Tangga maintenance - besi pipa diameter 1,5" dan 1" finish cat - area dak ruang mihrab3.00 Unit 0.031 0.00% 0.00% 0.00% 0.000 G Pekerjaan Ornamen Fasad 1 Pekerjaan ornamen fasad - tampak 1 - sisi luar a Kerawangan KR 1 - GRC + Rangka finish Cat sisi luar - dengan backing rangka hollow finish cat + covering wiremesh + panel GRC finish cat sisi dalam1.00 PS 0.386 0.00% 0.00% 0.00% 0.000 b Architrave gawangan plester + aci finish cat - lebar profil 5 cm 32.30 PS 0.016 0.00% 0.00% 0.00% 0.000 c Architrave gawangan keramik - lebar architrave 30 cm 32.30 PS 0.096 0.00% 0.00% 0.00% 0.000 d Kerawangan KR 2 - Kerawangan GRC finish cat 1.00 PS 0.059 0.00% 0.00% 0.00% 0.000 e Architrave gawangan GRC finish cat - lebar architrave 350 mm 21.30 PS 0.033 0.00% 0.00% 0.00% 0.000 f Kerawangan KR 3 - Kerawangan GRC finish cat 1.00 PS 0.074 0.00% 0.00% 0.00% 0.000 g Architrave gawangan GRC finish cat - lebar architrave 350 mm - lengkung kubah luar 1.00 PS 0.030 0.00% 0.00% 0.00% 0.000 h Kerawangan KR 4 - Kerawangan GRC finish cat 1.00 PS 0.095 0.00% 0.00% 0.00% 0.000 i Architrave gawangan GRC finish cat - lebar architrave - lengkung kubah dalam 1.00 PS 0.068 0.00% 0.00% 0.00% 0.000 2 Pekerjaan ornamen fasad - tampak 1 - sisi dalam a Architrave gawangan GRC finish cat - lebar architrave 800 mm 1.00 Unit 0.075 0.00% 0.00% 0.00% 0.000 3 Pekerjaan ornamen fasad - tampak samping a Kerwangan GRC (depan jendela samping ) finish cat - uk 100 x 385 - termasuk frame ban - banan keliling12.00 Unit 0.579 0.00% 0.00% 0.00% 0.000 4 Pekerjaan ornamen fasad - tampak samping a Kerawangan roster - area selasar tempat wudhu 125.80 M2 0.432 0.00% 0.00% 0.00% 0.000 5 Pekerjaan ornamen tampak belakang - tampak 3 - sisi luar a Kerawangan KR 1 - Besi plat peforated finish cat - uk Cek Gambar 1.00 PS 0.735 0.00% 0.00% 0.00% 0.000 b Architrave gawangan plester + aci finish cat - lebar profil 5 cm 34.60 PS 0.017 0.00% 0.00% 0.00% 0.000 c Architrave gawangan keramik - lebar architrave 30 cm 34.60 PS 0.103 0.00% 0.00% 0.00% 0.000 H Pekerjaan Minaret 1 Pekerjaan Minaret Masjid - H 24 1.00 PS 2.351 0.00% 0.00% 0.00% 0.000 Panel GRC teba 2 cm - Segmented 12 setiap 20 cm finish cat Struktur minaret besi pipa baja 18" + rangka CNP 150.65.20.2,3 Ornamen bulan sabit - plat stainless steel Tangga maintenance I Pekerjaan Kubah Masjid 1 Pekerjaan Kubah Masjid Radius 4750 mm 1.00 PS 0.619 0.00% 60.00% 60.00% 0.371 Tebal GRC Atap - 10 mm Tebal GRC Ceililng - 8 mm List Bawah Kubah Frame pipa 4" dan 3" cat zincromat 2 Finishing atap kubah finish cat 1.00 PS 0.104 0.00% 0.00% 0.00% 0.000 3 pekerjaan tangga service 11.00 m 0.034 0.00% 0.00% 0.00% 0.000 Sub Total : 4.648 A PEKERJAAN GROUND WATERTANK 1 Pekerjaan Galian Tanah 108.1344 M3 0.073 100.00% 0.00% 100.00% 0.073 2 Pekerjaan galian tanah - galian manual 108.1344 M3 0.054 100.00% 0.00% 100.00% 0.054 3 Pekerjaan buang atau lansir tanah 37.27 M3 0.013 0.00% 100.00% 100.00% 0.013 Pekerjaan urugan GWT Pekerjaan Struktur GWT 1 Pekerjaan urugan pasir bawah GWT 3.84 M3 0.007 100.00% 0.00% 100.00% 0.007 2 Pekerjaan lantai kerja bawah GWT 38.4 M3 0.196 100.00% 0.00% 100.00% 0.196 3 Pekerjaan bekisting GWT 123.67 M3 0.133 100.00% 0.00% 100.00% 0.133 4 Pekerjaan cor beton readymix K300 + termasuk tutup GWT 26.8224 M3 0.588 100.00% 0.00% 100.00% 0.588 5 Pekerjaan waterproofing coating ex Sika 99.82 M2 0.130 0.000 0.00% 0.00% 0.00% C Pekerjaan Finishing GWT 1 Pekerjaan pasang keramik dinding 30 x 30 ex Asia Tile Putih 123.67 M2 0.156 0.00% 0.00% 0.00% 0.000 2 tutup manhole 100x100 2.00 pcs 0.010 0.00% 0.00% 0.00% 0.000 II PEKERJAAN RUMAH POMPA A Pekerjaan Rumah Pompa 1 Pekerjaan kolom beton 15 x 20 cm 0.48 M3 0.014 0.00% 35.00% 35.00% 0.005 2 Pekerjaan cor dak atap ruang pompa tebal 12 cm 23.80 M3 0.457 0.00% 30.00% 30.00% 0.137 3 Pekerjaan pasangan dinding 17.50 M2 0.019 0.00% 35.00% 35.00% 0.007 4 Pekerjaan plesteran dinding 35.00 M2 0.009 0.00% 0.00% 0.00% 0.000 5 Pekerjaan acian dinding 35.00 M2 0.003 0.00% 0.00% 0.00% 0.000 6 Pekerjaan pengecatan 50.80 M2 0.007 0.00% 0.00% 0.00% 0.000 7 Pekerjaan waterproofing coating ex Sika 10.96 M2 0.014 0.00% 0.00% 0.00% 0.000 8 Pekerjaan lantai keramik 12.03 M2 0.015 0.00% 0.00% 0.00% 0.000 9 pintu besi 2.00 pcs 0.069 0.00% 0.00% 0.00% 0.000 10 talang air d3" 2.00 pcs 0.018 0.00% 0.00% 0.00% 0.000 11 batu alam 12.10 m2 0.014 0.00% 0.00% 0.00% 0.000 12 bekisting kolom 6.40 m2 0.005 0.00% 100.00% 100.00% 0.005 Sub Total : 1.218 A PEKERJAAN ELEKTRIKAL I. PANEL 1 PANEL MDP 1.00 Unit 0.737 0.00% 0.00% 0.00% 0.000 2 LP-DASAR 1.00 Unit 0.098 0.00% 0.00% 0.00% 0.000 3 PP-AC DASAR 1.00 Unit 0.132 0.00% 0.00% 0.00% 0.000 4 LP-ATAS 1.00 Unit 0.092 0.00% 0.00% 0.00% 0.000 5 PP-AC ATAS 1.00 Unit 0.098 0.00% 0.00% 0.00% 0.000 6 PP-TRANSFER PUMP 1.00 Unit 0.090 0.00% 0.00% 0.00% 0.000 7 Grounding System 1.00 Ls 0.137 0.00% 50.00% 50.00% 0.069 Page 11
  12. 12. MINGGU KE : 32 (TIGA PULUH DUA) s/d Minggu Ini (%) PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015 NO URAIAN VOLUME UNIT BOBOT (%) Progres thd Jenis Pekerjaan Prestasi thd Bobot Kerja (%) Minggu Lalu (%) Minggu Ini (%) 8 Material Bantu 1.00 Ls 0.039 0.00% 0.00% 0.00% 0.000 9 Testing & Commissioning 1.00 Ls 0.015 0.00% 0.00% 0.00% 0.000 II. KABEL FEEDER - ex Supreme/Setara 1 Dari Genset Existing ke MDP 80.00 m 0.396 0.00% 0.00% 0.00% 0.000 NYFGBY 4x95mm2 + 50 mm2 2 Dari PLN Existing ke MDP NYFGBY 4x185mm2 + 70 mm2) 80.00 m 0.782 0.00% 0.00% 0.00% 0.000 Dari MDP ke : 3 LP-DASAR, NYY 4 x 10 mm2+NYA 10 mm2 5.00 m 0.003 100.00% 0.00% 100.00% 0.003 4 PP-AC DASAR, NYY 4 x 70 mm2+NYA 35 mm2 5.00 m 0.019 90.00% 0.00% 90.00% 0.019 5 LP-ATAS, NYY 4 x 10 mm2+NYA 10 mm2 35.00 m 0.024 90.00% 0.00% 90.00% 0.024 6 PP-AC ATAS, NYY 4 x 25 mm2+NYA 25 mm2 35.00 m 0.060 90.00% 0.00% 90.00% 0.060 7 PP-TRANSFER PUMP, NYFGBY 4 x 6 mm2+NYA 6mm2 52.00 m 0.038 90.00% 0.00% 90.00% 0.038 III RAK KABEL III.1. Lantai Dasar a Instalasi Rak Kabel termasuk Penggantung dan accessories Straight 185.00 m 0.428 0.00% 0.00% 0.00% 0.000 W = 450 x 100 mm Elbow 450 x 100 mm 1.00 bh 0.001 0.00% 0.00% 0.00% 0.000 Tee 450 x 450 x 450 mm 1.00 bh 0.002 0.00% 0.00% 0.00% 0.000 b Material Bantu 1.00 lot 0.007 0.00% 0.00% 0.00% 0.000 IV. LAMPU PENERANGAN, INSTALASI PENERANGAN DAN STOP KONTAK IV.1 Lantai Dasar - ex Panasonic Standard 1 Lampu Sorot Pohon 50 W 28.00 bh 0.176 0.00% 0.00% 0.00% 0.000 2 Lampu Up Light 80 W 2.00 bh 0.007 0.00% 0.00% 0.00% 0.000 3 Lampu Down light PLC 26 W 82.00 bh 0.125 0.00% 0.00% 0.00% 0.000 4 Lampu Step Light 18 W 22.00 bh 0.067 0.00% 0.00% 0.00% 0.000 5 Lampu TL Blak 1x36 W 97.00 bh 0.177 0.00% 0.00% 0.00% 0.000 6 Lampu Baret TLE 18 W 6.00 bh 0.024 0.00% 0.00% 0.00% 0.000 7 Lampu Spot Light 250 W 4.00 bh 0.031 0.00% 0.00% 0.00% 0.000 8 Stop Kontak 1 phase 10 A, 200 VA 46.00 bh 0.016 0.00% 0.00% 0.00% 0.000 9 Saklar tunggal 8.00 bh 0.002 0.00% 0.00% 0.00% 0.000 10 Saklar ganda 8.00 bh 0.003 0.00% 0.00% 0.00% 0.000 11 Instalasi Penerangan, NYM 3x2,5 mm2 in conduit PVC dia.20 241.00 ttk 0.413 0.00% 80.00% 80.00% 0.331 12 Instalasi Stop Kontak, NYM 3x2,5 mm2 in conduit PVC dia 20 46.00 ttk 0.097 0.00% 50.00% 50.00% 0.049 13 Instalasi Exhaust Fan, NYM 3x2,5 mm2 in conduit PVC dia.20 8.00 ttk 0.014 0.00% 50.00% 50.00% 0.007 IV.1 Lantai Atas, Mezzanine - ex Panasonic Standard 1 Wall lamp 50 W 22.00 bh 0.074 0.00% 0.00% 0.00% 0.000 2 Lampu Up Light 80 W 18.00 bh 0.082 0.00% 0.00% 0.00% 0.000 3 Lampu Down light PLC 26 W 76.00 bh 0.116 0.00% 0.00% 0.00% 0.000 4 Lampu Step Light 18 W 55.00 bh 0.167 0.00% 0.00% 0.00% 0.000 5 Lampu TL Blak 1x36 W 16.00 bh 0.029 0.00% 0.00% 0.00% 0.000 6 Lampu Spot Light 250 W 4.00 bh 0.031 0.00% 0.00% 0.00% 0.000 7 Stop Kontak 1 phase 10 A, 200 VA 17.00 bh 0.006 0.00% 0.00% 0.00% 0.000 8 Saklar tunggal 4.00 bh 0.001 0.00% 0.00% 0.00% 0.000 9 Saklar ganda 7.00 bh 0.003 0.00% 0.00% 0.00% 0.000 10 Instalasi Penerangan, NYM 3x2,5 mm2 in conduit PVC dia.20 191.00 ttk 0.328 0.00% 80.00% 80.00% 0.262 11 Instalasi Stop Kontak, NYM 3x2,5 mm2 in conduit PVC dia 20 17.00 ttk 0.036 0.00% 50.00% 50.00% 0.018 12 Material Bantu 1.00 lot 0.050 0.00% 0.00% 0.00% 0.000 13 Testing & Commissioning 1.00 lot 0.021 0.00% 0.00% 0.00% 0.000 V. PENANGKAL PETIR 1 Air Terminal, type Spit sentz 24.00 Unit 0.057 0.00% 0.00% 0.00% 0.000 2 Conductor BC 50 mm 2 180.00 m 0.067 0.00% 0.00% 0.00% 0.000 3 Cable Clamp+Support 1.00 lot 0.007 0.00% 0.00% 0.00% 0.000 4 Grounding 12 M BC 50 mm 3.00 lot 0.017 0.00% 0.00% 0.00% 0.000 5 Bak Kontrol 400 x 400 3.00 bh 0.00% 0.00% 0.00% 0.000 6 Ijin Depnaker 1.00 lot 0.067 0.00% 0.00% 0.00% 0.000 V. GENSET DAN PENYAMBUNGAN PLN Sambungan PLN 1.00 lot 1.347 0.00% 0.00% 0.00% 0.000 Genset 150 kva 1.00 unit 2.018 0.00% 0.00% 0.00% 0.000 Sub Total : 0.879 PEKERJAAN ELEKTRONIK INSTALASI FIRE ALARM Peralatan Utama MCFA type Conventional 5 zone lengkap dengan : 1.00 Set 0.137 0.00% 0.00% 0.00% 0.000 * Rectifier * Battery nicad kapasitas bertahanan min. 4 jam * Control Relay modul for Lift, Fire pump * Power supply * Stabilizer * Active announciator * Sirene 60 - 70 dB * Power surge Arrester *Material bantu Announciator 1.00 Unit 0.060 0.00% 0.00% 0.00% 0.000 MDF Fire Alarm 1.00 Unit 0.044 0.00% 0.00% 0.00% 0.000 Grounding system 1.00 lot 0.023 0.00% 0.00% 0.00% 0.000 Kabel Utama Kabel dari MCFA ke : - JB-FA.Dasar, NYA 2x1,5mm2 4.00 m' 0.007 0.00% 0.00% 0.00% 0.004 (Dalam PVC H Conduit ∅ 20 mm) 0.000 - JB-FA.Atas, NYA 2x1,5mm2 36.00 m' 0.065 0.00% 0.00% 0.00% 0.032 Page 12
  13. 13. MINGGU KE : 32 (TIGA PULUH DUA) s/d Minggu Ini (%) PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015 NO URAIAN VOLUME UNIT BOBOT (%) Progres thd Jenis Pekerjaan Prestasi thd Bobot Kerja (%) Minggu Lalu (%) Minggu Ini (%) (Dalam PVC H Conduit ∅ 20 mm) Testing & Commisioning 1.00 Lot 0.027 0.00% 0.00% 0.00% 0.000 Lantai Dasar Terminal box Fire Alarm 1.00 bh 0.005 0.00% 0.00% 0.00% 0.000 Photo Electric Smoke Detector 11.00 bh 0.042 0.00% 0.00% 0.00% 0.000 Rate Of Rise Heat Detector 8.00 bh 0.012 0.00% 0.00% 0.00% 0.000 Manual push button 1.00 bh 0.002 0.00% 0.00% 0.00% 0.000 Alarm Bell 1.00 bh 0.003 0.00% 0.00% 0.00% 0.000 Indicator lamp 1.00 bh 0.002 0.00% 0.00% 0.00% 0.000 Instalasi Detektor, NYA 2 x 1,5 mm² 19.00 ttk 0.040 0.00% 0.00% 0.00% 0.032 Instalasi Alarm Bell & Indicator Lamp, NYA 2 x 1,5 mm² 1.00 ttk 0.003 0.00% 0.00% 0.00% 0.002 Material bantu 1.00 Lot 0.021 0.00% 0.00% 0.00% 0.016 Testing & Commissioning 1.00 Lot 0.027 0.00% 0.00% 0.00% 0.000 Lantai Atas Terminal box Fire Alarm 1.00 bh 0.005 0.00% 0.00% 0.00% 0.000 Photo Electric Smoke Detector 5.00 bh 0.019 0.00% 0.00% 0.00% 0.000 Rate Of Rise Heat Detector 6.00 bh 0.009 0.00% 0.00% 0.00% 0.000 Manual push button 1.00 bh 0.002 0.00% 0.00% 0.00% 0.000 Alarm Bell 1.00 bh 0.003 0.00% 0.00% 0.00% 0.000 Indicator lamp 1.00 bh 0.002 0.00% 0.00% 0.00% 0.000 Instalasi Detektor, NYA 2 x 1,5 mm² 11.00 ttk 0.023 0.00% 0.00% 0.00% 0.000 Instalasi Alarm Bell & Indicator Lamp, NYA 2 x 1,5 mm² 1.00 ttk 0.003 0.00% 0.00% 0.00% 0.001 Material bantu 1.00 Lot 0.023 0.00% 0.00% 0.00% 0.011 Testing & Commisioning 1.00 Lot 0.032 0.00% 0.00% 0.00% 0.000 INSTALASI TATA SUARA Peralatan Utama Tata Suara - Radio Tuner AM/FM + Antenna 1.00 Set 0.029 0.00% 0.00% 0.00% 0.000 - DVD Player 1.00 unit 0.021 0.00% 0.00% 0.00% 0.000 - Mixer Frame w/Moudules + Speaker selector 1.00 unit 0.090 0.00% 0.00% 0.00% 0.000 - Power Amplifier 240 Watt 3.00 unit 0.067 0.00% 0.00% 0.00% 0.000 - Paging Microphone 1.00 unit 0.013 0.00% 0.00% 0.00% 0.000 - Cabinet Rack 1.00 unit 0.058 0.00% 0.00% 0.00% 0.000 - MDF 1.00 unit 0.009 0.00% 0.00% 0.00% 0.000 Peralatan Utama Tata Suara Car Call - Mixer Frame w/Moudules 1.00 unit 0.082 0.00% 0.00% 0.00% 0.000 - Power Amplifier 120 Watt 1.00 unit 0.047 0.00% 0.00% 0.00% 0.000 - Paging Microphone 1.00 unit 0.010 0.00% 0.00% 0.00% 0.000 -Horn speaker 15 W 4.00 bh 0.011 0.00% 0.00% 0.00% 0.000 -Instalasi Speaker, NYMHY 2 x 1.5 mm² 4.00 ttk 0.007 0.00% 0.00% 0.00% 0.004 Kabel Utama Kabel dari speaker selector ke : - MDF-SS.1 NYM 2 x 2,5 mm² + PVC Conduit dia 20 mm 3.00 m' 0.010 0.00% 0.00% 0.00% 0.005 Kabel dari MDF-SS.1 ke : - JBTS-DASAR NYMHY 2 x 1,5 mm² + PVC Conduit dia 20 mm 4.00 m' 0.007 0.00% 0.00% 0.00% 0.004 - JBTS-ATAS NYMHY 2 x 1,5 mm² + PVC Conduit dia 20 mm 36.00 m' 0.063 0.00% 0.00% 0.00% 0.032 Testing & Commisioning 1.00 Lot 0.032 0.00% 0.00% 0.00% 0.000 SUB TOTAL. B1 Lantai Dasar Junction Box 1.00 bh 0.008 0.00% 0.00% 0.00% 0.000 Coloumb speaker 20 w 8.00 bh 0.039 0.00% 0.00% 0.00% 0.000 Ceiling Speaker 3 W 14.00 bh 0.013 0.00% 0.00% 0.00% 0.000 Instalasi Speaker, NYMHY 2 x 1.5 mm² 22.00 ttk 0.039 0.00% 0.00% 0.00% 0.019 Material bantu 1.00 Lot 0.023 0.00% 0.00% 0.00% 0.011 Testing & Commisioning 1.00 Lot 0.032 0.00% 0.00% 0.00% 0.000 SUB TOTAL. B2 Lantai Atas, Mezzanine Junction Box 1.00 bh 0.008 0.00% 0.00% 0.00% 0.000 Coloumb speaker 20 w 12.00 bh 0.058 0.00% 0.00% 0.00% 0.000 Ceiling Speaker 3 W 40.00 bh 0.038 0.00% 0.00% 0.00% 0.000 Horn Speaker menara 15 W 2.00 bh 0.007 0.00% 0.00% 0.00% 0.000 Instalasi Speaker, NYMHY 2 x 1.5 mm² 54.00 ttk 0.095 0.00% 0.00% 0.00% 0.000 Material bantu 1.00 Lot 0.023 0.00% 0.00% 0.00% 0.000 Testing & Commisioning 1.00 Lot 0.032 0.00% 0.00% 0.00% 0.000 Sub Total : 0.174 C. PEKERJAAN PEMADAM KEBAKARAN I PEKERJAAN PEMIPAAN 1 Site Plan& lantai dasar a. Pengadaan dan Pemasangan Pipa BS sch 40 dia. 100 mm 255 mtr 69.27% 0.00% 0.00% 0.00% 0.000 dia. 65 mm 20 mtr 3.06% 0.00% 0.00% 0.00% 0.000 b. Valve - Valve Gate Valve dia. 100 mm 5 bh 17.33% 0.00% 0.00% 0.00% 0.000 dia. 65 mm 1 bh 1.63% 0.00% 0.00% 0.00% 0.000 c. Out Door Hydrant Box 5 bh 13.30% 0.00% 0.00% 0.00% 0.000 Hydrant pilar 5 bh 14.78% 0.00% 0.00% 0.00% 0.000 Indoor Hydrant Box 1 bh 3.35% 0.00% 0.00% 0.00% 0.000 lengkap dengan nozle,hose rackkatup vander hydent d. Air Release Valve (dia. 50) 1 bh 7.53% 0.00% 0.00% 0.00% 0.000 e. Fire Extinguisher Class ABC 3 Kg 3 bh 2.06% 0.00% 0.00% 0.00% 0.000 f. Fitting 1 lot 1.91% 0.00% 0.00% 0.00% 0.000 g. Material Bantu 1 lot 0.88% 0.00% 0.00% 0.00% 0.000 Page 13
  14. 14. MINGGU KE : 32 (TIGA PULUH DUA) s/d Minggu Ini (%) PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015 NO URAIAN VOLUME UNIT BOBOT (%) Progres thd Jenis Pekerjaan Prestasi thd Bobot Kerja (%) Minggu Lalu (%) Minggu Ini (%) h. Pengetesan 1 lot 2.68% 0.00% 0.00% 0.00% 0.000 I. Conecting Hidrant Pipa 6”x50 m+Gate Valve 6" 2 bh + 50 m 23.27% 0.00% 0.00% 0.00% 0.000 Bongkar Pasang trotoar, jalan, ondasi batu kali Sub Total : 0.000 D. PEKERJAAN PLUMBING I. PERALATAN UTAMA PLUMBING 1 Shalow Well (Lokasi Site) 3.00 Unit 0.258 0.00% 0.00% 0.00% 0.000 Kapasitas : 45 l/m Head : 30 meter Speed : 1450 rpm Daya : 0.5Kw/ 3Ø/ 220 V/50 hz/1 ph 2 Transfer Pump (Lokasi Ruang Pompa) 2.00 Unit 0.275 0.00% 0.00% 0.00% 0.000 Kapasitas : 125 l/m Head : 25 meter Speed : 1450 rpm Daya : 3 Kw/380 V/50 Hz/3 ph Type : End Suction Spesifikasi Pompa : Alternate with WLC 1 Operasi, 1 Stand By 3 Tanki Air Bawah (Ground Water Tank) , Lokasi Site 1.00 set 0.00% 0.00% 0.00% 0.000 Kapasitas : 30 m3 Bahan : Beton Bertulang Lengkap dengan dudukan pondasi, dan pipa over flow, dan sistim drain. Termasuk tangga pengontrol 4 Tanki Air Atas (Roof tank) , Lokasi Atap 3.00 unit 0.299 0.00% 0.00% 0.00% 0.000 Kapasitas : 3300 liter Bahan : Fiber Lengkap dengan dudukan pondasi, dan pipa over flow, dan sistem drain. 5 Pengolahan Limbah Septic tank Biotec 1.00 set 0.810 0.00% 0.00% 0.00% 0.000 Kapasitas : 15 m3 Bahan : FRP 6 Resapan 1.00 bh 0.00% 0.00% 0.00% 0.000 Kapasitas : 3 m3 Bahan : Pasangan Bata Lengkap dengan tutup 7 Material Bantu 1.00 lot 0.022 0.00% 0.00% 0.00% 0.000 8 Testing & Commissioning 1.00 lot 0.024 0.00% 0.00% 0.00% 0.000 Sub. Total-I (PERALATAN UTAMA) II. PEKERJAAN AIR HUJAN Pipa PVC AW Class 10 K - ex Wavin 1 Site Plan dia. 100 mm 72.00 m 0.075 0.00% 0.00% 0.00% 0.000 2 Lt. -dasar dia. 100 mm (Pipa Tegak) 65.00 m 0.068 0.00% 0.00% 0.00% 0.000 3 Lt. atas dia. 100 mm (Pipa Tegak) 52.00 m 0.054 0.00% 0.00% 0.00% 0.000 4 Lt. Atap dia. 100 mm (Pipa Tegak) 78.00 m 0.081 0.00% 0.00% 0.00% 0.000 Roof Drain dia. 100 mm 13.00 bh 0.034 0.00% 0.00% 0.00% 0.000 bak kontrol 400X400 13.00 bh 5 Fitting 1.00 lot 0.026 0.00% 0.00% 0.00% 0.000 6 Material Bantu 1.00 lot 0.007 0.00% 0.00% 0.00% 0.000 7 Pengetesan 1.00 lot 0.013 0.00% 0.00% 0.00% 0.000 Sub. Total-II (PEKERJAAN AIR HUJAN) III. PEKERJAAN AIR BERSIH III.1. Site Plan 1 Penyambungan PDAM dia. 25 mm 1.00 lot 0.00% 0.00% 0.00% 0.000 Perizinan Penyambungan PDAM 1.00 lot 0.00% 0.00% 0.00% 0.000 Instalasi Ruang Pompa 2 Gate Valve dia. 65 mm 4.00 bh 0.058 0.00% 0.00% 0.00% 0.000 dia. 50 mm 3.00 bh 3 Check Valve dia. 50 mm 3.00 bh 0.020 0.00% 0.00% 0.00% 0.000 4 Strainer dia. 65 mm 3.00 bh 0.00% 0.00% 0.00% 0.000 5 Flexible Joint dia. 50 mm 3.00 bh 0.018 0.00% 0.00% 0.00% 0.000 dia. 65 mm 3.00 bh 0.022 0.00% 0.00% 0.00% 0.000 6 Floater Valve dia. 50 mm 1.00 bh 0.005 0.00% 0.00% 0.00% 0.000 7 Header dia. 80 mm 1.00 set 0.016 0.00% 0.00% 0.00% 0.000 8 Instalasi Air Bersih menggunakan pipa GIP Medium Class dia. 65 mm 6.00 m' 0.008 0.00% 0.00% 0.00% 0.000 dia. 50 mm 6.00 m' 0.007 0.00% 0.00% 0.00% 0.000 9 Fitting 1.00 lot 0.001 0.00% 0.00% 0.00% 0.000 10 Material Bantu 1.00 lot 0.001 0.00% 0.00% 0.00% 0.000 11 Pengetesan 1.00 lot 0.001 0.00% 0.00% 0.00% 0.000 Site Plan Page 14
  15. 15. MINGGU KE : 32 (TIGA PULUH DUA) s/d Minggu Ini (%) PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015 NO URAIAN VOLUME UNIT BOBOT (%) Progres thd Jenis Pekerjaan Prestasi thd Bobot Kerja (%) Minggu Lalu (%) Minggu Ini (%) 13 (Pipa Galvanized Iron Medium Class) dia. 65 mm (Dari SHALOOW WELL) 1.00 lot 0.034 0.00% 0.00% 0.00% 0.000 dia. 50 mm (Dari PDAM) 1.00 lot 0.021 0.00% 0.00% 0.00% 0.000 dia. 50 mm 40.00 M 0.056 0.00% 0.00% 0.00% 0.000 14 Water Meter dia. 25 mm 1.00 bh 0.004 0.00% 0.00% 0.00% 0.000 15 Fitting 1.00 lot 0.007 0.00% 0.00% 0.00% 0.000 16 Material Bantu 1.00 lot 0.006 0.00% 0.00% 0.00% 0.000 17 Pengetesan 1.00 lot 0.016 0.00% 0.00% 0.00% 0.000 III.2. Lantai dasar Instalasi Air Bersih menggunakan pipa PPR PN 10 - ex Wavin Tigris 1 dia. 65 mm (Pipa Tegak Distribusi) 15.00 m 0.015 0.00% 0.00% 0.00% 0.000 dia. 50 mm pipa transfer 15.00 m 0.011 0.00% 0.00% 0.00% 0.000 dia. 65 mm 24.00 m 0.025 0.00% 0.00% 0.00% 0.000 dia. 50 mm 18.00 m 0.013 0.00% 0.00% 0.00% 0.000 dia. 40 mm 10.00 m 0.005 0.00% 0.00% 0.00% 0.000 dia. 32 mm 32.00 m 0.012 0.00% 0.00% 0.00% 0.000 dia. 25 mm 68.00 m 0.018 0.00% 0.00% 0.00% 0.000 dia. 20 mm 46.00 m 0.010 0.00% 0.00% 0.00% 0.000 dia. 15 mm 268.00 m 0.030 0.00% 0.00% 0.00% 0.000 2 Gate Valve dia. 40 mm 1.00 bh 0.005 0.00% 0.00% 0.00% 0.000 dia. 32 mm 8.00 bh 0.030 0.00% 0.00% 0.00% 0.000 dia. 25mm 2.00 bh 0.005 0.00% 0.00% 0.00% 0.000 3 Fitting 1.00 lot 0.022 0.00% 0.00% 0.00% 0.000 4 Material Bantu 1.00 lot 0.006 0.00% 0.00% 0.00% 0.000 5 Pengetesan 1.00 lot 0.016 0.00% 0.00% 0.00% 0.000 III.3. Lt. -ATAP 1 (Pipa Galvanized Iron Medium Class) HEADER dia. 80 mm 1.00 lot 0.012 0.00% 0.00% 0.00% 0.000 dia. 65 mm 26.00 m 0.036 0.00% 0.00% 0.00% 0.000 dia. 50 mm 16.00 m 0.019 0.00% 0.00% 0.00% 0.000 dia. 40 mm 36.00 m 0.019 0.00% 0.00% 0.00% 0.000 2 Gate Valve dia. 40 mm 9.00 bh 0.042 0.00% 0.00% 0.00% 0.000 dia. 65 mm 1.00 bh 0.014 0.00% 0.00% 0.00% 0.000 Floating Valve dia. 40 mm 3.00 bh 0.018 0.00% 0.00% 0.00% 0.000 3 Fitting 1.00 lot 0.023 0.00% 0.00% 0.00% 0.000 4 Material Bantu 1.00 lot 0.015 0.00% 0.00% 0.00% 0.000 5 Pengetesan 1.00 lot 0.023 0.00% 0.00% 0.00% 0.000 PEKERJAAN AIR KOTOR, BEKAS DAN VENTING Lt. Dasar (Pipa PVC Class AW, Class 10 K) Air Kotor & air bekas - ex Wavin 1 dia. 150 mm 22.00 M2 0.046 100.00% 0.00% 100.00% 0.046 2 dia. 100 mm 152.00 M2 0.159 80.00% 0.00% 80.00% 0.127 3 dia. 80 mm 24.00 M2 0.016 100.00% 0.00% 100.00% 0.016 4 dia. 65 mm 54.00 M2 0.019 100.00% 0.00% 100.00% 0.019 5 dia. 50 mm 12.00 M2 0.003 100.00% 0.00% 100.00% 0.003 (Pipa Vent PVC Class D, Class 5 K) Venting 1 dia. 65 mm (Pipa Tegak) 6.00 M2 0.002 100.00% 0.00% 100.00% 0.002 2 dia. 65 mm 18.00 M2 0.005 100.00% 0.00% 100.00% 0.005 3 dia. 50 mm 34.00 M2 0.008 100.00% 0.00% 100.00% 0.008 4 dia. 40 mm 8.00 M2 0.002 100.00% 0.00% 100.00% 0.002 5 dia. 32 mm 24.00 M2 0.004 100.00% 0.00% 100.00% 0.004 Floor Drain (FD) 1 dia. 65 mm 11.00 bh 0.039 0.00% 0.00% 0.00% 0.000 2 Clean Out (CO) 3 dia. 80 mm 2.00 m 0.003 0.00% 0.00% 0.00% 0.000 4 dia. 65 mm 5.00 m 0.008 0.00% 0.00% 0.00% 0.000 5 Fitting 1.00 lot 0.015 0.00% 0.00% 0.00% 0.000 6 Material Bantu 1.00 lot 0.016 0.00% 0.00% 0.00% 0.000 7 Pengetesan 1.00 lot 0.021 0.00% 0.00% 0.00% 0.000 Sub Total : 0.230 PEKERJAAN TATA UDARA (VAC) PERALATAN UTAMA Lantai dasar Indoor Unit AC 8.00 Unit 0.025 0.00% 0.00% 0.00% 0.000 Indoor Unit AC 3.00 Unit 0.001 0.00% 0.00% 0.00% 0.000 Indoor Unit AC 3.00 Unit 0.001 0.00% 0.00% 0.00% 0.000 PI Pemasangan 1.00 lot 0.001 0.00% 0.00% 0.00% 0.000 Material Bantu 1.00 lot 0.000 0.00% 0.00% 0.00% 0.000 Pengetesan 1.00 lot 0.000 0.00% 0.00% 0.00% 0.000 Lantai Atas Indoor Unit AC 4.00 Unit 0.013 0.00% 0.00% 0.00% 0.000 Lantai Mezzanine Indoor Unit AC 6.00 Unit 0.002 0.00% 0.00% 0.00% 0.000 Pemasangan 1.00 lot 0.000 0.00% 0.00% 0.00% 0.000 Material Bantu 1.00 lot 0.000 0.00% 0.00% 0.00% 0.000 Pengetesan 1.00 lot 0.000 0.00% 0.00% 0.00% 0.000 Page 15
  16. 16. MINGGU KE : 32 (TIGA PULUH DUA) s/d Minggu Ini (%) PERIODE : 07 SEPTEMBER s.d 13 SEPTEMBER 2015 NO URAIAN VOLUME UNIT BOBOT (%) Progres thd Jenis Pekerjaan Prestasi thd Bobot Kerja (%) Minggu Lalu (%) Minggu Ini (%) PEKERJAAN PEMIPAAN Lantai dasar Pipa Referigerant & Pipa Drain Pipa Referigerant AC 9.000 btu/h (1/4" dan 1/2") 42.00 m 0.000 0.00% 0.00% 0.00% 0.004 Pipa Drain (1/2") 30.00 m 0.000 0.00% 0.00% 0.00% 0.000 Pipa Referigerant & Pipa Drain Pipa Referigerant AC 12.000 btu/h (1/4" dan 1/2") 42.00 m 0.000 0.00% 0.00% 0.00% 0.004 Pipa Drain (1/2") 30.00 m 0.000 0.00% 0.00% 0.00% 0.000 Pipa Referigerant & Pipa Drain Pipa Referigerant AC 75.000 btu/h (1/2" dan 1") 8.00 m 0.000 0.00% 0.00% 0.00% 0.001 Pipa Drain (3/4") 48.00 m 0.000 0.00% 0.00% 0.00% 0.000 Lantai Atas Pipa Referigerant & Pipa Drain Pipa Referigerant AC 75.000 btu/h (1/2" dan 1") 56.00 m 0.001 0.00% 0.00% 0.00% 0.000 Pipa Drain (3/4") 45.00 m 0.000 0.00% 0.00% 0.00% 0.000 Lantai Mezzanaine Pipa Referigerant & Pipa Drain Pipa Referigerant AC 24.000 btu/h (3/8" dan5/82") 84.00 m 0.001 0.00% 0.00% 0.00% 0.000 Pipa Drain (1/2") 90.00 m 0.000 0.00% 0.00% 0.00% 0.000 PEKERJAAN FAN Lantai dasar EXHAUST FAN ex KDK/Setara 10.00 Unit 0.001 0.00% 0.00% 0.00% 0.000 Pemasangan 1.00 lot 0.000 0.00% 0.00% 0.00% 0.000 Material Bantu 1.00 lot 0.000 0.00% 0.00% 0.00% 0.000 Pengetesan 1.00 lot 0.000 0.00% 0.00% 0.00% 0.000 PEKERJAAN PEMIPAAN EXHAUST FAN Instalasi Pipa PVC Exhaust Lantai Dasar PVC dia. 100 mm 20.00 m 0.000 0.00% 0.00% 0.00% 0.000 PVC dia. 80 mm 14.00 m 0.000 0.00% 0.00% 0.00% 0.000 Fitting 1.00 lot 0.000 0.00% 0.00% 0.00% 0.000 Material Bantu 1.00 lot 0.000 0.00% 0.00% 0.00% 0.000 PEKERJAAN GRILLE & LOUVRE Lantai Dasar Louvre 150x150 2.00 bh 0.000 0.00% 0.00% 0.00% 0.000 Material Bantu 1.00 lot 0.000 0.00% 0.00% 0.00% 0.000 Sub Total : 0.009 TOTAL……….. 49.963 Page 16

×