M= 1:100
june 2009
S-4
TOP LAYER M=1:100
Material quality:
Concrete:- installation of concrate C12/15 (XO), S54 MSZ EN 206-1; MSZ 4798-1:2004
- base: C30/37 (XA2, XV2 (H) MSZ EN 206-1 ; MSZ 4798-1:2004
The test site should be taken every third cube mixer truck. 3 db. 15 cube.
Rebar: - 10; 12;B60.50
- B 38. 24,
Drawing number:
Scale:
Date:
Establishment location:
Hajdúszovát,periphery HRSZ: 098/7
Proprietor:
"STF" Pork producer and distributor Ltd.
4212 Hajdúszovát, Batthányi street. 12.
Engineer:
Sallak Ltd.
Kegyes S. Árpád OKI. engineer
Erdőtelek,
József A. street. 17/A
T-1-10-0106
DTR MRw-b 20/800+250-4
Biogas plant.
Top layer.
Drawn by:
Laszlo Kapas
Zele-Bau Ltd.
3350 Kal Fo ut street 1
www.zelebau.hu

More Related Content

More from Laszlo Kapas

31. Egerbakta nursery South Elevations
31. Egerbakta nursery South Elevations31. Egerbakta nursery South Elevations
31. Egerbakta nursery South ElevationsLaszlo Kapas
 
31. Egerbakta nursery Cross Sections
31. Egerbakta nursery Cross Sections31. Egerbakta nursery Cross Sections
31. Egerbakta nursery Cross SectionsLaszlo Kapas
 
31. Egerbakta nursery Plan
31. Egerbakta nursery Plan31. Egerbakta nursery Plan
31. Egerbakta nursery PlanLaszlo Kapas
 
49. Kapolna commonity center elevetions
49. Kapolna commonity center elevetions49. Kapolna commonity center elevetions
49. Kapolna commonity center elevetionsLaszlo Kapas
 
49. kapolna commonity centerSk-2 Slab Plan
49. kapolna commonity centerSk-2 Slab Plan49. kapolna commonity centerSk-2 Slab Plan
49. kapolna commonity centerSk-2 Slab PlanLaszlo Kapas
 
49. Kapolna commonity centerSk-1 foundations
49. Kapolna commonity centerSk-1 foundations49. Kapolna commonity centerSk-1 foundations
49. Kapolna commonity centerSk-1 foundationsLaszlo Kapas
 
49. Kapolna Commonity Center
49. Kapolna Commonity Center49. Kapolna Commonity Center
49. Kapolna Commonity CenterLaszlo Kapas
 
29. Hajduszovat S-9 Working Drawing. Layer.
29. Hajduszovat S-9 Working Drawing. Layer.29. Hajduszovat S-9 Working Drawing. Layer.
29. Hajduszovat S-9 Working Drawing. Layer.Laszlo Kapas
 
78. Loranr Bozsik scale E-2 elevations
78. Loranr Bozsik scale E-2 elevations78. Loranr Bozsik scale E-2 elevations
78. Loranr Bozsik scale E-2 elevationsLaszlo Kapas
 
78. Lorant Bozsik scaleE-1 plan +section
78. Lorant Bozsik scaleE-1 plan +section78. Lorant Bozsik scaleE-1 plan +section
78. Lorant Bozsik scaleE-1 plan +sectionLaszlo Kapas
 
2008-2012 my drawings english version
2008-2012 my drawings english version2008-2012 my drawings english version
2008-2012 my drawings english versionLaszlo Kapas
 
49. Kapolna Commonity Center
49. Kapolna Commonity Center49. Kapolna Commonity Center
49. Kapolna Commonity CenterLaszlo Kapas
 

More from Laszlo Kapas (12)

31. Egerbakta nursery South Elevations
31. Egerbakta nursery South Elevations31. Egerbakta nursery South Elevations
31. Egerbakta nursery South Elevations
 
31. Egerbakta nursery Cross Sections
31. Egerbakta nursery Cross Sections31. Egerbakta nursery Cross Sections
31. Egerbakta nursery Cross Sections
 
31. Egerbakta nursery Plan
31. Egerbakta nursery Plan31. Egerbakta nursery Plan
31. Egerbakta nursery Plan
 
49. Kapolna commonity center elevetions
49. Kapolna commonity center elevetions49. Kapolna commonity center elevetions
49. Kapolna commonity center elevetions
 
49. kapolna commonity centerSk-2 Slab Plan
49. kapolna commonity centerSk-2 Slab Plan49. kapolna commonity centerSk-2 Slab Plan
49. kapolna commonity centerSk-2 Slab Plan
 
49. Kapolna commonity centerSk-1 foundations
49. Kapolna commonity centerSk-1 foundations49. Kapolna commonity centerSk-1 foundations
49. Kapolna commonity centerSk-1 foundations
 
49. Kapolna Commonity Center
49. Kapolna Commonity Center49. Kapolna Commonity Center
49. Kapolna Commonity Center
 
29. Hajduszovat S-9 Working Drawing. Layer.
29. Hajduszovat S-9 Working Drawing. Layer.29. Hajduszovat S-9 Working Drawing. Layer.
29. Hajduszovat S-9 Working Drawing. Layer.
 
78. Loranr Bozsik scale E-2 elevations
78. Loranr Bozsik scale E-2 elevations78. Loranr Bozsik scale E-2 elevations
78. Loranr Bozsik scale E-2 elevations
 
78. Lorant Bozsik scaleE-1 plan +section
78. Lorant Bozsik scaleE-1 plan +section78. Lorant Bozsik scaleE-1 plan +section
78. Lorant Bozsik scaleE-1 plan +section
 
2008-2012 my drawings english version
2008-2012 my drawings english version2008-2012 my drawings english version
2008-2012 my drawings english version
 
49. Kapolna Commonity Center
49. Kapolna Commonity Center49. Kapolna Commonity Center
49. Kapolna Commonity Center
 

Concrete and rebar specifications for biogas plant top layer

  • 1. GSPublisherEngine 0.0.100.100 M= 1:100 june 2009 S-4 TOP LAYER M=1:100 Material quality: Concrete:- installation of concrate C12/15 (XO), S54 MSZ EN 206-1; MSZ 4798-1:2004 - base: C30/37 (XA2, XV2 (H) MSZ EN 206-1 ; MSZ 4798-1:2004 The test site should be taken every third cube mixer truck. 3 db. 15 cube. Rebar: - 10; 12;B60.50 - B 38. 24, Drawing number: Scale: Date: Establishment location: Hajdúszovát,periphery HRSZ: 098/7 Proprietor: "STF" Pork producer and distributor Ltd. 4212 Hajdúszovát, Batthányi street. 12. Engineer: Sallak Ltd. Kegyes S. Árpád OKI. engineer Erdőtelek, József A. street. 17/A T-1-10-0106 DTR MRw-b 20/800+250-4 Biogas plant. Top layer. Drawn by: Laszlo Kapas Zele-Bau Ltd. 3350 Kal Fo ut street 1 www.zelebau.hu