Case Study
of
A Chassis Manufacturer
© torque Management Services Pvt. Ltd. 2
Basic Challenges
 Too Dirty….
Inside Bins, Workstations, Components, Trolley’s, Machines & Equipment's, Ceiling
& Roof Structures , Shop Floor,
To create cleaning Culture. I make Dirty I clean. Broom Stand to every area, Cleaning
Day.
 Too Much
WIP …Careless / doesn't know the importance of material, Material Get Dropped
on Floor. Go For 01 Hrs. WIP on line…later on it will be 30 minutes.
 Too Heavy
Material Handling Bins, trolleys etc. Weight ratio of 20 (Trolley Weight) : 80
(Components)
 Poor Visual control’s.
Within one Minute Search Time.
© torque Management Services Pvt. Ltd.
Work Initial Level Target
To achieve Top Class 5S-level with
maximum Audit Score
45 pt 100 pt
Reduction of Quality Defect (DMP Points)
by 50%
191pt 100pt
Improvement in Productivity by Data Not
Available
20-30%
Safer Work Environment avoiding any
Accident
2 Acc/month Zero Acc/Month
Better Inventory Management, reduction
of WIP by 50-60% Over 8-hours 2-hours
Objectives
© torque Management Services Pvt. Ltd.
 Awareness Revolution & Training on Lean Tools
Formation of Teams
5S, 3-Fixed & Visual Control
Stores Reform, FIFO introduced
Deployment of Container Kanban & Water Spider
Lighter & Sleek Combination Trolleys introduced
Better line Balancing & Process Improvements
Key Steps Taken
© torque Management Services Pvt. Ltd.
Improvements
In
5S & Material Handling
At
Shop Floor
© torque Management Services Pvt. Ltd.
Before After
Benefits:
• Fasteners keeping racks replaced with trolleys with small bins (96 big
bins replaced with 46 smaller ones)
• 02 hours inventory for fasteners ensured
Optimization of space utilization
© torque Management Services Pvt. Ltd.
Before
Benefits:
• Better looks with 02 hours inventory & free space
After
Optimization of space utilization
© torque Management Services Pvt. Ltd.
AfterBefore
Damper damaged due to
improper storage
A Frame trolley designed for
Damper
Advantage – Damages eliminated
Material handling Improvement
© torque Management Services Pvt. Ltd.
Subject Engine Trolley Modification
Improveme
nt
■ Before Improvement : ■ After Improvement :
1. No alignment.
2. Difficulty in loading on fixture.
3. Damaged & Strength less
1. Single piece flow.
2. Ease of loading.
3. Strengthened & Wheels replaced
Snap shots
Teflon &
Strengthen
Kaizen Improvements
© torque Management Services Pvt. Ltd.
Subject Shop 02 Maintenance
Improveme
nt
■ Before Improvement : ■ After Improvement :
1. No Cleaning
2. Wanted + unwanted items
3. No Systematic Arrangement
1. Cleaning
2. Removal of unwanted
3. Systematic Arrangement of wanted items
Snap
shots
5S improvement
© torque Management Services Pvt. Ltd. 11
5S Improvements
© torque Management Services Pvt. Ltd.
Line Side all Trolleys
Made, Sub Assembly &
Rear Axle Assembly Cover
Kaizen Improvements
© torque Management Services Pvt. Ltd.
Stores
Improvements
© torque Management Services Pvt. Ltd.
Subject Store Small pallet FIFO system with Transparent & easy access to the stored materials
Improvement
■ Before Improvement : ■ After Improvement :
1. No accessibility inside small pallets
2. No FIFO system for the stored parts
3. Condition of the parts not visible
4. Loose material filled
1. Clear accessibility inside small pallets
2. FIFO System for the stored parts
3. Condition of the parts are visible
4. Sets of 100nos bundled
Snap shots
14
Stores Kaizen-2
© torque Management Services Pvt. Ltd.
Subject Air Piping Area
Improvement
■ Before Improvement : ■ After Improvement :
1. Air pipes lying in improper condition
2. No segregation of air pipe variants
3. Stored in high rise racks with non
accessible areas
1. Air pipes arranged in proper condition
2. Segregation of different model pipes
3. New racks with low rise partitions with easy
accessible areas
Snap shots
Stores Kaizen-3
© torque Management Services Pvt. Ltd. 16
Area Chassis Assy – Shop II Imp. Process Shop 02
Team VC Dwivedi, Amrish, RK Sharma, Sridhaar, Aidan, Vikas Loss / Waste Type 5S/Time / Movement/Inventory
Subject Mezzanine floor racks are flooded with Fasteners in Open condition, it gets dusty , no inventory norms
Improvement
All Fasteners are packed in separate packing with minimum quantity, no dusty fasteners, pack of 100nos made
■ Before Improvement : ■ After Improvement :
Snap shots
5.Control ■ Improvement Effect :- 1) 5s 2) EEI Improved
Stores Kaizen-4
© torque Management Services Pvt. Ltd.
Tool Keeping
Concept
© torque Management Services Pvt. Ltd.
Another tool
keeping
arrangement
with the
similar
concept
Many types of Tool Arrangement
© torque Management Services Pvt. Ltd.
Arrangement
made for
keeping
different sizes
of Torque
wrenches,
according to
the usage.
Torque Wrenches Arrangement
© torque Management Services Pvt. Ltd.
Drop Box
Concept
© torque Management Services Pvt. Ltd.
DROP BOX-PLAN :
A Revolutionary concept
SCALE FOR ACCUMULATION LEVEL
•Collect any tiny part
dropped on floor
•Put it immediately in
Drop box
•Analysis & clear the
items once in week
© torque Management Services Pvt. Ltd.
Material Drop Trend -(4-Weeks)
22
Accounting leads to improvement----
© torque Management Services Pvt. Ltd.
Time Study
&
Productivity Improvement
© torque Management Services Pvt. Ltd.
Time study (Stage 1 & 2)
TOTAL ASSOCIATES ON 2 STAGES (BEFORE): 11 Nos.
STAGE 1 STAGE 2
CONVEYOR DIRECTION
OP 1 LH OP 2 LH
OP 4 RHOP 3 RH OP 4 RH OP 3 RH OP 2 RH OP 1 RH
OP 5 LH OP 4 LH OP 7 LH
© torque Management Services Pvt. Ltd.
Time study (Stage 1 & 2)
TOTAL ASSOCIATES ON 2 STAGES (AFTER): 9 Nos. (Time study is going on for further stages)
STAGE 1 STAGE 2
CONVEYOR DIRECTION
OP 1 LH OP 2 LH
OP 4 RHOP 3 RH OP 9 RH OP 8 RH
OP 5 LH OP 6 LH OP 7 LHOP 2 LH
OP 4 RH
© torque Management Services Pvt. Ltd.
20 % Increase in productivity achieved
at the first 2 stages. Same concept has
been planned to be deployed gradually
in all stages.
© torque Management Services Pvt. Ltd. 27
Shop Look – After Improvement
 WIP Reduced (01 Hrs Norms)
 Space Saved (Trolleys 130 to
60,BIN Size FPO 35 to 15, 26
Hardware Racks removed )
 Housekeeping Improved
 Effort and Time Reduced
 Better Visual
 Better Ergonomics
Customer
Speaks---
© torque Management Services Pvt. Ltd.
Work
Initial
Level Target Achieved
To achieve Top Class 5S-level
with maximum Audit Score 45 pt 100 pt 78 pt
Reduction of Quality Defect
(DMP Points) by 50% 191pt 100pt 100pt
Improvement in Productivity
by
To be
assessed
20-30% 20%
Safer Work Environment
avoiding any Accident 2
Acc/month
Zero
Acc/Month Zero
Acc/Month
Better Inventory
Management, reduction of
WIP by 50-60%
Over 8-
hours
2-hours 2-hours
Goals Achieved at the end of Project
© torque Management Services Pvt. Ltd.

More Related Content

What's hot

What's hot (20)

How to implement Single minute exchange of die
How to implement Single minute exchange of die How to implement Single minute exchange of die
How to implement Single minute exchange of die
 
SMED - Single Minute Exchange of Dies
SMED - Single Minute Exchange of DiesSMED - Single Minute Exchange of Dies
SMED - Single Minute Exchange of Dies
 
Single Minute Exchange of Dies
Single Minute Exchange of DiesSingle Minute Exchange of Dies
Single Minute Exchange of Dies
 
The SMED Method by CLT Services
The SMED Method by CLT ServicesThe SMED Method by CLT Services
The SMED Method by CLT Services
 
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUSTInternship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
Internship Presentation_Hamza-Nasir-Mechatronics-CEME_NUST
 
PresentacióN S.M.E.D
PresentacióN S.M.E.DPresentacióN S.M.E.D
PresentacióN S.M.E.D
 
Traffic Light System
Traffic Light SystemTraffic Light System
Traffic Light System
 
SMED Jabil Juarez
SMED Jabil JuarezSMED Jabil Juarez
SMED Jabil Juarez
 
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALACLEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
LEAN Setup Reduction (SMED) training for welding by JULIAN KALAC
 
DNA_KAIZEN
DNA_KAIZENDNA_KAIZEN
DNA_KAIZEN
 
Resume
ResumeResume
Resume
 
Kaizen Blitz 5S salvagnini Nov 2011
Kaizen Blitz 5S salvagnini Nov 2011Kaizen Blitz 5S salvagnini Nov 2011
Kaizen Blitz 5S salvagnini Nov 2011
 
Takt Time, Cycle Time & Line Balancing
Takt Time, Cycle Time & Line BalancingTakt Time, Cycle Time & Line Balancing
Takt Time, Cycle Time & Line Balancing
 
Training
TrainingTraining
Training
 
Resume
ResumeResume
Resume
 
SMED
SMEDSMED
SMED
 
CompanyPPt
CompanyPPtCompanyPPt
CompanyPPt
 
03 manufacturing operations
03 manufacturing operations03 manufacturing operations
03 manufacturing operations
 
Manufacturing Excellence Case Studies By Tetrahedron
Manufacturing Excellence Case Studies By Tetrahedron Manufacturing Excellence Case Studies By Tetrahedron
Manufacturing Excellence Case Studies By Tetrahedron
 
UNIT #2 AMENDMENT
UNIT #2  AMENDMENTUNIT #2  AMENDMENT
UNIT #2 AMENDMENT
 

Similar to A model case study of Improvement Activities

Lean Manufacturing Consultants in Chennai - Hash Management Services LLP
Lean Manufacturing Consultants in Chennai - Hash Management Services LLPLean Manufacturing Consultants in Chennai - Hash Management Services LLP
Lean Manufacturing Consultants in Chennai - Hash Management Services LLPHash Management Services LLP
 
Allison training report
Allison training reportAllison training report
Allison training reportInfosys
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS Julian Kalac P.Eng
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)MohammedLahssaini1
 
Lean journey from changodar to colombo - case study of pump mfg. company - 3r...
Lean journey from changodar to colombo - case study of pump mfg. company - 3r...Lean journey from changodar to colombo - case study of pump mfg. company - 3r...
Lean journey from changodar to colombo - case study of pump mfg. company - 3r...ADD VALUE CONSULTING Inc
 
RENAULT NISSAN AUTOMOTIVE INDIA PRIVATE LIMITED
RENAULT NISSAN AUTOMOTIVE INDIA PRIVATE LIMITEDRENAULT NISSAN AUTOMOTIVE INDIA PRIVATE LIMITED
RENAULT NISSAN AUTOMOTIVE INDIA PRIVATE LIMITEDAvinish Kumar Jain
 
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...ADD VALUE CONSULTING Inc
 
FC VSM Presentation Future State Aug 5 -7 2013
FC VSM Presentation Future State Aug 5 -7  2013FC VSM Presentation Future State Aug 5 -7  2013
FC VSM Presentation Future State Aug 5 -7 2013Donna Skala
 
Final Presentation-2-23-12
Final Presentation-2-23-12Final Presentation-2-23-12
Final Presentation-2-23-12Keith Johnson
 
Tpm implementation oee increment
Tpm implementation oee incrementTpm implementation oee increment
Tpm implementation oee incrementVinoth Axus
 
Cam gear process improvement shifter assembly manufacturing
Cam gear process improvement  shifter assembly manufacturingCam gear process improvement  shifter assembly manufacturing
Cam gear process improvement shifter assembly manufacturingQuan Nguyen
 
REPAIR METHODS FOR MATERIAL HANDLING EQUIPMENT
REPAIR METHODS FOR MATERIAL HANDLING EQUIPMENTREPAIR METHODS FOR MATERIAL HANDLING EQUIPMENT
REPAIR METHODS FOR MATERIAL HANDLING EQUIPMENTlaxtwinsme
 
TPM PRECISION CHANGEOVERS
TPM PRECISION CHANGEOVERSTPM PRECISION CHANGEOVERS
TPM PRECISION CHANGEOVERSMax Lyons
 
Case study electronics industry
Case study   electronics industryCase study   electronics industry
Case study electronics industryGanesh TN
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET Journal
 

Similar to A model case study of Improvement Activities (20)

Lean Manufacturing Consultants in Chennai - Hash Management Services LLP
Lean Manufacturing Consultants in Chennai - Hash Management Services LLPLean Manufacturing Consultants in Chennai - Hash Management Services LLP
Lean Manufacturing Consultants in Chennai - Hash Management Services LLP
 
Allison training report
Allison training reportAllison training report
Allison training report
 
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
JULIAN KALAC -EXAMPLES OF LEAN SIX SIGMA BLACK BELT PROJECTS
 
Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)Implémentation Méthode Single Minute Exchange of Dies(SMED)
Implémentation Méthode Single Minute Exchange of Dies(SMED)
 
Lean journey from changodar to colombo - case study of pump mfg. company - 3r...
Lean journey from changodar to colombo - case study of pump mfg. company - 3r...Lean journey from changodar to colombo - case study of pump mfg. company - 3r...
Lean journey from changodar to colombo - case study of pump mfg. company - 3r...
 
RENAULT NISSAN AUTOMOTIVE INDIA PRIVATE LIMITED
RENAULT NISSAN AUTOMOTIVE INDIA PRIVATE LIMITEDRENAULT NISSAN AUTOMOTIVE INDIA PRIVATE LIMITED
RENAULT NISSAN AUTOMOTIVE INDIA PRIVATE LIMITED
 
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
Why Total Productive Maintenance (TPM) In Process Industry? - ADDVALUE - Nile...
 
FC VSM Presentation Future State Aug 5 -7 2013
FC VSM Presentation Future State Aug 5 -7  2013FC VSM Presentation Future State Aug 5 -7  2013
FC VSM Presentation Future State Aug 5 -7 2013
 
Final Presentation-2-23-12
Final Presentation-2-23-12Final Presentation-2-23-12
Final Presentation-2-23-12
 
Tpm implementation oee increment
Tpm implementation oee incrementTpm implementation oee increment
Tpm implementation oee increment
 
Cam gear process improvement shifter assembly manufacturing
Cam gear process improvement  shifter assembly manufacturingCam gear process improvement  shifter assembly manufacturing
Cam gear process improvement shifter assembly manufacturing
 
REPAIR METHODS FOR MATERIAL HANDLING EQUIPMENT
REPAIR METHODS FOR MATERIAL HANDLING EQUIPMENTREPAIR METHODS FOR MATERIAL HANDLING EQUIPMENT
REPAIR METHODS FOR MATERIAL HANDLING EQUIPMENT
 
TPM PRECISION CHANGEOVERS
TPM PRECISION CHANGEOVERSTPM PRECISION CHANGEOVERS
TPM PRECISION CHANGEOVERS
 
Pres2023.pptx
Pres2023.pptxPres2023.pptx
Pres2023.pptx
 
Case study electronics industry
Case study   electronics industryCase study   electronics industry
Case study electronics industry
 
Internship at RNAIPL
Internship at RNAIPLInternship at RNAIPL
Internship at RNAIPL
 
Renni Consultancy - Introduction
Renni Consultancy - IntroductionRenni Consultancy - Introduction
Renni Consultancy - Introduction
 
The Access Rail System.
The Access Rail System.The Access Rail System.
The Access Rail System.
 
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing FacilityIRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
IRJET- Value Stream Mapping (VSM) – A Case Study in Manufacturing Facility
 
Lean Manufacturing
Lean ManufacturingLean Manufacturing
Lean Manufacturing
 

Recently uploaded

JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTSkajalroy875762
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistanvineshkumarsajnani12
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Availablepr788182
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPanhandleOilandGas
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSkajalroy875762
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptxRoofing Contractor
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...meghakumariji156
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165meghakumariji156
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book nowkapoorjyoti4444
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...ssuserf63bd7
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptxnandhinijagan9867
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...pujan9679
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Adnet Communications
 

Recently uploaded (20)

JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTSJAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR  ESCORTS
JAJPUR CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN JAJPUR ESCORTS
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in PakistanChallenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
Challenges and Opportunities: A Qualitative Study on Tax Compliance in Pakistan
 
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service AvailableBerhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
Berhampur Call Girl Just Call 8084732287 Top Class Call Girl Service Available
 
PHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation FinalPHX May 2024 Corporate Presentation Final
PHX May 2024 Corporate Presentation Final
 
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTSDurg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
Durg CALL GIRL ❤ 82729*64427❤ CALL GIRLS IN durg ESCORTS
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book nowGUWAHATI 💋 Call Girl 9827461493 Call Girls in  Escort service book now
GUWAHATI 💋 Call Girl 9827461493 Call Girls in Escort service book now
 
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
Horngren’s Cost Accounting A Managerial Emphasis, Canadian 9th edition soluti...
 
Buy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail AccountsBuy gmail accounts.pdf buy Old Gmail Accounts
Buy gmail accounts.pdf buy Old Gmail Accounts
 
Phases of Negotiation .pptx
 Phases of Negotiation .pptx Phases of Negotiation .pptx
Phases of Negotiation .pptx
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 

A model case study of Improvement Activities

  • 1. © torque Management Services Pvt. Ltd. Case Study of A Chassis Manufacturer
  • 2. © torque Management Services Pvt. Ltd. 2 Basic Challenges  Too Dirty…. Inside Bins, Workstations, Components, Trolley’s, Machines & Equipment's, Ceiling & Roof Structures , Shop Floor, To create cleaning Culture. I make Dirty I clean. Broom Stand to every area, Cleaning Day.  Too Much WIP …Careless / doesn't know the importance of material, Material Get Dropped on Floor. Go For 01 Hrs. WIP on line…later on it will be 30 minutes.  Too Heavy Material Handling Bins, trolleys etc. Weight ratio of 20 (Trolley Weight) : 80 (Components)  Poor Visual control’s. Within one Minute Search Time.
  • 3. © torque Management Services Pvt. Ltd. Work Initial Level Target To achieve Top Class 5S-level with maximum Audit Score 45 pt 100 pt Reduction of Quality Defect (DMP Points) by 50% 191pt 100pt Improvement in Productivity by Data Not Available 20-30% Safer Work Environment avoiding any Accident 2 Acc/month Zero Acc/Month Better Inventory Management, reduction of WIP by 50-60% Over 8-hours 2-hours Objectives
  • 4. © torque Management Services Pvt. Ltd.  Awareness Revolution & Training on Lean Tools Formation of Teams 5S, 3-Fixed & Visual Control Stores Reform, FIFO introduced Deployment of Container Kanban & Water Spider Lighter & Sleek Combination Trolleys introduced Better line Balancing & Process Improvements Key Steps Taken
  • 5. © torque Management Services Pvt. Ltd. Improvements In 5S & Material Handling At Shop Floor
  • 6. © torque Management Services Pvt. Ltd. Before After Benefits: • Fasteners keeping racks replaced with trolleys with small bins (96 big bins replaced with 46 smaller ones) • 02 hours inventory for fasteners ensured Optimization of space utilization
  • 7. © torque Management Services Pvt. Ltd. Before Benefits: • Better looks with 02 hours inventory & free space After Optimization of space utilization
  • 8. © torque Management Services Pvt. Ltd. AfterBefore Damper damaged due to improper storage A Frame trolley designed for Damper Advantage – Damages eliminated Material handling Improvement
  • 9. © torque Management Services Pvt. Ltd. Subject Engine Trolley Modification Improveme nt ■ Before Improvement : ■ After Improvement : 1. No alignment. 2. Difficulty in loading on fixture. 3. Damaged & Strength less 1. Single piece flow. 2. Ease of loading. 3. Strengthened & Wheels replaced Snap shots Teflon & Strengthen Kaizen Improvements
  • 10. © torque Management Services Pvt. Ltd. Subject Shop 02 Maintenance Improveme nt ■ Before Improvement : ■ After Improvement : 1. No Cleaning 2. Wanted + unwanted items 3. No Systematic Arrangement 1. Cleaning 2. Removal of unwanted 3. Systematic Arrangement of wanted items Snap shots 5S improvement
  • 11. © torque Management Services Pvt. Ltd. 11 5S Improvements
  • 12. © torque Management Services Pvt. Ltd. Line Side all Trolleys Made, Sub Assembly & Rear Axle Assembly Cover Kaizen Improvements
  • 13. © torque Management Services Pvt. Ltd. Stores Improvements
  • 14. © torque Management Services Pvt. Ltd. Subject Store Small pallet FIFO system with Transparent & easy access to the stored materials Improvement ■ Before Improvement : ■ After Improvement : 1. No accessibility inside small pallets 2. No FIFO system for the stored parts 3. Condition of the parts not visible 4. Loose material filled 1. Clear accessibility inside small pallets 2. FIFO System for the stored parts 3. Condition of the parts are visible 4. Sets of 100nos bundled Snap shots 14 Stores Kaizen-2
  • 15. © torque Management Services Pvt. Ltd. Subject Air Piping Area Improvement ■ Before Improvement : ■ After Improvement : 1. Air pipes lying in improper condition 2. No segregation of air pipe variants 3. Stored in high rise racks with non accessible areas 1. Air pipes arranged in proper condition 2. Segregation of different model pipes 3. New racks with low rise partitions with easy accessible areas Snap shots Stores Kaizen-3
  • 16. © torque Management Services Pvt. Ltd. 16 Area Chassis Assy – Shop II Imp. Process Shop 02 Team VC Dwivedi, Amrish, RK Sharma, Sridhaar, Aidan, Vikas Loss / Waste Type 5S/Time / Movement/Inventory Subject Mezzanine floor racks are flooded with Fasteners in Open condition, it gets dusty , no inventory norms Improvement All Fasteners are packed in separate packing with minimum quantity, no dusty fasteners, pack of 100nos made ■ Before Improvement : ■ After Improvement : Snap shots 5.Control ■ Improvement Effect :- 1) 5s 2) EEI Improved Stores Kaizen-4
  • 17. © torque Management Services Pvt. Ltd. Tool Keeping Concept
  • 18. © torque Management Services Pvt. Ltd. Another tool keeping arrangement with the similar concept Many types of Tool Arrangement
  • 19. © torque Management Services Pvt. Ltd. Arrangement made for keeping different sizes of Torque wrenches, according to the usage. Torque Wrenches Arrangement
  • 20. © torque Management Services Pvt. Ltd. Drop Box Concept
  • 21. © torque Management Services Pvt. Ltd. DROP BOX-PLAN : A Revolutionary concept SCALE FOR ACCUMULATION LEVEL •Collect any tiny part dropped on floor •Put it immediately in Drop box •Analysis & clear the items once in week
  • 22. © torque Management Services Pvt. Ltd. Material Drop Trend -(4-Weeks) 22 Accounting leads to improvement----
  • 23. © torque Management Services Pvt. Ltd. Time Study & Productivity Improvement
  • 24. © torque Management Services Pvt. Ltd. Time study (Stage 1 & 2) TOTAL ASSOCIATES ON 2 STAGES (BEFORE): 11 Nos. STAGE 1 STAGE 2 CONVEYOR DIRECTION OP 1 LH OP 2 LH OP 4 RHOP 3 RH OP 4 RH OP 3 RH OP 2 RH OP 1 RH OP 5 LH OP 4 LH OP 7 LH
  • 25. © torque Management Services Pvt. Ltd. Time study (Stage 1 & 2) TOTAL ASSOCIATES ON 2 STAGES (AFTER): 9 Nos. (Time study is going on for further stages) STAGE 1 STAGE 2 CONVEYOR DIRECTION OP 1 LH OP 2 LH OP 4 RHOP 3 RH OP 9 RH OP 8 RH OP 5 LH OP 6 LH OP 7 LHOP 2 LH OP 4 RH
  • 26. © torque Management Services Pvt. Ltd. 20 % Increase in productivity achieved at the first 2 stages. Same concept has been planned to be deployed gradually in all stages.
  • 27. © torque Management Services Pvt. Ltd. 27 Shop Look – After Improvement  WIP Reduced (01 Hrs Norms)  Space Saved (Trolleys 130 to 60,BIN Size FPO 35 to 15, 26 Hardware Racks removed )  Housekeeping Improved  Effort and Time Reduced  Better Visual  Better Ergonomics Customer Speaks---
  • 28. © torque Management Services Pvt. Ltd. Work Initial Level Target Achieved To achieve Top Class 5S-level with maximum Audit Score 45 pt 100 pt 78 pt Reduction of Quality Defect (DMP Points) by 50% 191pt 100pt 100pt Improvement in Productivity by To be assessed 20-30% 20% Safer Work Environment avoiding any Accident 2 Acc/month Zero Acc/Month Zero Acc/Month Better Inventory Management, reduction of WIP by 50-60% Over 8- hours 2-hours 2-hours Goals Achieved at the end of Project
  • 29. © torque Management Services Pvt. Ltd.

Editor's Notes

  1. b/f photo