Enterprise Resource Planning (ERP): Introduction to ERP,
Implementation of ERP. Business process reengineering (BPR):
Process of BPR, Structural Change.
 Enterprise Resource Planning (ERP) is a software
that is built to organizations belonging to
different industrial sectors, regardless of their
size and strength.
 The ERP package is designed to support and
integrate almost every functional area of a
business process such as procurement of goods
and services, sale and distribution, finance,
accountings, human resource, manufacturing,
production planning, logistics & warehouse
management.
 During early phases of development,
integrated solutions were designed for
particular process areas such as −
 Material Management − the integrated
system was known as Material Requirement
Planning (MRP)
 Manufacturing − the integrated system was
known as Manufacturing Resource Planning
 Supports the integrated business process inside the organization.
 Improves capital planning and helps in executing organizational plans
and strategies.
 Helps speed up the decision-making process over the analysis of
accurate data.
 Helps extend the business network to wider domains, expanding the
products and services to reach more customers, suppliers, and
partners.
 Identifies operational risks to improve governance.
 Provides protection against organizational data breaches and security
threats to leakage of information.
 Makes the organization adaptable to the rapid changes in the
business process according to the needs.
 Gives long-term profit by providing means to increase the customer
base.
 1. Strategic Planning
 2. Procedure Review
 3. Data Collection and Clean-Up
 4.Training andTesting
 5. Go Live and Evaluation
 Set objectives.
 The objectives should be clearly defined prior to
implementing the ERP solution. ERP systems are
massive and you won’t be able to implement every
function.You need to define the scope of
implementation.
 Develop a project plan.
 The team should develop a project plan which includes
previously defined goals and objectives, timelines,
training procedures, as well as individual team
responsibilities.
 Assign a project team.
Assign a project team with employees from
sales, customer service, accounting,
purchasing, operations and senior
management.
 Examine current business processes and
information flow.
Have the team perform an analysis on which
business processes should be improved. Gather
copies of key documents such as invoices,
batch tickets and bill of lading for the analysis.
 Review software capabilities.
 Dedicate 3-5 days of intensive review of the software
capabilities for the project team.Train on every aspect
of the ERP software to fully educate the team on
capabilities and identify gaps
 Identify manual processes.
 Evaluate which processes that are manual and should
be automated with the ERP system.
 Develop standard operating procedures.
 These procedures should be documented. Make sure
that you modify the document as your SOPs change
 Convert data.
 You can’t assume 100% of the data can be
converted as there may be outdated information
in the system. Determine which information
should be converted through an analysis of
current data.
 Collect new data.
 Define the new data that needs to be collected.
Identify the source documents of the data.
 Review all data input.
 After the converted and manually collected data
is entered into the ERP database, then it must be
reviewed for accuracy and completeness.
 Clean-up data.
 Review and weed out unneeded information such
as customers who haven’t purchased in a while or
are no longer in business.
 Pre-test the database.
 The project team should practice in the test
database to confirm that all information is
accurate and working correctly.
 Verify testing.
 Make sure the actual test mirrors the Standard
Operating Procedures outlined in step 2, and
determine whether modifications need to made.
 Train theTrainer.
 It is less costly and very effective if you train the
trainer. Assign project team members to run the
in-house training.
 Perform final testing.
 The project team needs to perform a final test on
the data and processes once training is complete
and make any needed adjustments
 Develop a final Go-Live Checklist.
 Sample Final Go Live Countdown Checklist Sample
▪ Physical inventory process is complete.
▪ Beginning balance entry procedures are developed for
all modules.
▪ Any transition issues are addressed.
▪ Documents & modifications are tested thoroughly.
 Evaluate the solution.
 Develop a structured evaluation plan which ties back to
the goals and objectives that were set in the planning
stage
 It involves the radical redesign of core
business processes to achieve dramatic
improvements in productivity, cycle times
and quality.
 In Business Process Reengineering,
companies start with a blank sheet of paper
and rethink existing processes to deliver
more value to the customer.
 Refocus company values on customer needs
 Redesign core processes, often using
information technology to enable improvements
 Reorganize a business into cross-functional
teams with end-to-end responsibility for a
process
 Rethink basic organizational and people issues
 Improve business processes across the
organization
 Reduce costs and cycle time. Business Process
Reengineering reduces costs and cycle times by
eliminating unproductive activities and the employees
who perform them. Reorganization by teams
decreases the need for management layers,
accelerates information flows, and eliminates the
errors and rework caused by multiple handoffs.
 Improve quality. Business Process Reengineering
improves quality by reducing the fragmentation of
work and establishing clear ownership of processes.
Workers gain responsibility for their output and can
measure their performance based on prompt
feedback.
 “If you fail to plan, you plan to fail”. Planning and
Preparation are vital factors for any activity or event to be
successful, and reengineering is no exception. Before
attempting reengineering, the question ‘Is BPR necessary?’
should be asked?
 There should be a significant need for the process to be
reengineered.
 A cross-functional team is established with a game plan for
the process of reengineering.
 Another important factor to be considered is to understand
the expectations of your customers and where your existing
process falls short of meeting those requirements.
 Having identified the customer driven objectives, the
mission or vision statement is formulated.
 Before the reengineering team can proceed to
redesign the process, they should understand the
existing process.
 The important aspect of BPR (what makes BPR, BPR)
is that the improvement should provide dramatic
results.
 A large manufacturer spent six million dollars over a
period of one year in a bid to develop a parts-tracking
system and was all set to go online. Only then did he
realize that he had totally overlooked a small piece of
information – ‘the mode of transmission of
information between the scheduling staff and the
shop floor was through a phone call.’
 The objective of this phase is to produce one or
more alternatives to the current situation, which
satisfy the strategic goals of the enterprise.
 The first step in this phase is benchmarking.
“Benchmarking is the comparing of both the
performance of the organization’s processes and
the way those processes are conducted with
those relevant peer organizations to obtain
ideas for improvement”
 Having identified the potential improvements
we perform simulation and ABC to analyze
factors like the time and cost involved.
• The implementation stage is where reengineering
efforts meet the most resistance and hence it is by far
the most difficult one.
• The question that confronts us would be,’ If BPR
promises such breath taking results then why wasn’t it
adopted much earlier?’
• requirements for the construction of theTo-Be
components can be added and the result organized
into aWork Breakdown Structure (WBS).
• The benefit here is that we can now define the causal
and time sequential relationships between the
activities planned.
• A process cannot be reengineered overnight.
• very vital part in the success of every
reengineering effort lies in improving the
reengineered process continuously.
• Two things have to be monitored – the
progress of action and the results
Mis unit iv PIMR
Mis unit iv PIMR

More Related Content

What's hot

Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process ReengineeringChandan Kumar
 
Bpr implementation process an analysis of key success & failure factors
Bpr implementation process an analysis of key success & failure factorsBpr implementation process an analysis of key success & failure factors
Bpr implementation process an analysis of key success & failure factorsSana Fatima
 
5 common mistakes companies make when setting up maintenance KPIs
5 common mistakes companies make when setting up maintenance KPIs5 common mistakes companies make when setting up maintenance KPIs
5 common mistakes companies make when setting up maintenance KPIsOptimizing Rotating Equipment
 
Business process-reengineering
Business process-reengineeringBusiness process-reengineering
Business process-reengineeringrajatiipm
 
Business process reengineering and human resource management by yehia el zont
Business process reengineering and human resource management by yehia el zontBusiness process reengineering and human resource management by yehia el zont
Business process reengineering and human resource management by yehia el zontYehia Elzont
 
BPR at Lady Harding Hospital New Delhi
BPR at Lady Harding Hospital New DelhiBPR at Lady Harding Hospital New Delhi
BPR at Lady Harding Hospital New DelhiAnand Madhav
 
Business Process Re-engineering BPR
Business Process Re-engineering BPRBusiness Process Re-engineering BPR
Business Process Re-engineering BPRadcom2015
 
Bussines Process Engireening.pptx
Bussines Process Engireening.pptxBussines Process Engireening.pptx
Bussines Process Engireening.pptxssuser97f09c
 
Success And Failure of BPR in a Public Sector Industry
Success And Failure of BPR in a Public Sector IndustrySuccess And Failure of BPR in a Public Sector Industry
Success And Failure of BPR in a Public Sector Industryharikrishnanjl
 
Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process ReengineeringShillu Blue
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineeringNitin Gulgulia
 
Business process mapping
Business process mappingBusiness process mapping
Business process mappingDAVIS THOMAS
 
Bpr 05 Process Mapping Tools
Bpr 05 Process Mapping ToolsBpr 05 Process Mapping Tools
Bpr 05 Process Mapping Toolsmsq2004
 
Kaizen – Forms & Checklists
Kaizen – Forms & ChecklistsKaizen – Forms & Checklists
Kaizen – Forms & ChecklistsAnand Subramaniam
 
Business Process Re-Engineering
Business Process Re-EngineeringBusiness Process Re-Engineering
Business Process Re-EngineeringK. S. Alok Ranjan
 

What's hot (20)

Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process Reengineering
 
Bpr implementation process an analysis of key success & failure factors
Bpr implementation process an analysis of key success & failure factorsBpr implementation process an analysis of key success & failure factors
Bpr implementation process an analysis of key success & failure factors
 
About BPR
About BPRAbout BPR
About BPR
 
5 common mistakes companies make when setting up maintenance KPIs
5 common mistakes companies make when setting up maintenance KPIs5 common mistakes companies make when setting up maintenance KPIs
5 common mistakes companies make when setting up maintenance KPIs
 
Maintenance KPI
Maintenance KPIMaintenance KPI
Maintenance KPI
 
Business process-reengineering
Business process-reengineeringBusiness process-reengineering
Business process-reengineering
 
Business process reengineering and human resource management by yehia el zont
Business process reengineering and human resource management by yehia el zontBusiness process reengineering and human resource management by yehia el zont
Business process reengineering and human resource management by yehia el zont
 
BPR at Lady Harding Hospital New Delhi
BPR at Lady Harding Hospital New DelhiBPR at Lady Harding Hospital New Delhi
BPR at Lady Harding Hospital New Delhi
 
Bpr
BprBpr
Bpr
 
Business Process Re-engineering BPR
Business Process Re-engineering BPRBusiness Process Re-engineering BPR
Business Process Re-engineering BPR
 
Bussines Process Engireening.pptx
Bussines Process Engireening.pptxBussines Process Engireening.pptx
Bussines Process Engireening.pptx
 
4 business process reengineering
4 business process reengineering4 business process reengineering
4 business process reengineering
 
Success And Failure of BPR in a Public Sector Industry
Success And Failure of BPR in a Public Sector IndustrySuccess And Failure of BPR in a Public Sector Industry
Success And Failure of BPR in a Public Sector Industry
 
Business Process Reengineering
Business Process ReengineeringBusiness Process Reengineering
Business Process Reengineering
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
 
Business process mapping
Business process mappingBusiness process mapping
Business process mapping
 
Bpr 05 Process Mapping Tools
Bpr 05 Process Mapping ToolsBpr 05 Process Mapping Tools
Bpr 05 Process Mapping Tools
 
Kaizen – Forms & Checklists
Kaizen – Forms & ChecklistsKaizen – Forms & Checklists
Kaizen – Forms & Checklists
 
Business process reengineering
Business process reengineeringBusiness process reengineering
Business process reengineering
 
Business Process Re-Engineering
Business Process Re-EngineeringBusiness Process Re-Engineering
Business Process Re-Engineering
 

Similar to Mis unit iv PIMR

Bisuness process management
Bisuness process managementBisuness process management
Bisuness process managementDigvijay Mahalle
 
: BPR IMPLEMENTAION AND TOOLS THAT SUPPORT BPR
: BPR IMPLEMENTAION AND TOOLS THAT SUPPORT BPR: BPR IMPLEMENTAION AND TOOLS THAT SUPPORT BPR
: BPR IMPLEMENTAION AND TOOLS THAT SUPPORT BPRPOOJA UDAYAN
 
Business Process Re‐Engineering Shivaji University Syllabus
Business Process Re‐Engineering Shivaji University SyllabusBusiness Process Re‐Engineering Shivaji University Syllabus
Business Process Re‐Engineering Shivaji University SyllabusIshwar Bulbule
 
Reessssssssssßdddeeeeeeeeeeeengineering.ppt
Reessssssssssßdddeeeeeeeeeeeengineering.pptReessssssssssßdddeeeeeeeeeeeengineering.ppt
Reessssssssssßdddeeeeeeeeeeeengineering.pptAyaMofre7
 
RE-DESIGN BUSINESS PROCESSES AND ENGAGE EMPLOYEES TO BEST UTILIZE ERP SOFTWAR...
RE-DESIGN BUSINESS PROCESSES AND ENGAGE EMPLOYEES TO BEST UTILIZE ERP SOFTWAR...RE-DESIGN BUSINESS PROCESSES AND ENGAGE EMPLOYEES TO BEST UTILIZE ERP SOFTWAR...
RE-DESIGN BUSINESS PROCESSES AND ENGAGE EMPLOYEES TO BEST UTILIZE ERP SOFTWAR...David McDonald
 
Business Process Reengineering | Case studies
Business Process Reengineering | Case studiesBusiness Process Reengineering | Case studies
Business Process Reengineering | Case studiesSumit Sanyal
 
BUSINESS PROCESS REENGINNERING MODULE 4
BUSINESS PROCESS REENGINNERING MODULE 4BUSINESS PROCESS REENGINNERING MODULE 4
BUSINESS PROCESS REENGINNERING MODULE 4POOJA UDAYAN
 
Enterprise resource planning, Evolution, Importance, Advantage for Business
Enterprise resource planning, Evolution, Importance, Advantage for BusinessEnterprise resource planning, Evolution, Importance, Advantage for Business
Enterprise resource planning, Evolution, Importance, Advantage for BusinessPraveen Venugopal
 
Five Step Methodology To Implement Bpr
Five Step Methodology To Implement BprFive Step Methodology To Implement Bpr
Five Step Methodology To Implement BprRoy Antony Arnold G
 
Suggest an intelligent framework for building business process management [ p...
Suggest an intelligent framework for building business process management [ p...Suggest an intelligent framework for building business process management [ p...
Suggest an intelligent framework for building business process management [ p...ijseajournal
 
SAP Business Transformations - Mandrekar
SAP Business Transformations - MandrekarSAP Business Transformations - Mandrekar
SAP Business Transformations - MandrekarDeepak Mandrekar
 

Similar to Mis unit iv PIMR (20)

Bisuness process management
Bisuness process managementBisuness process management
Bisuness process management
 
ERP ppt.ppt
ERP ppt.pptERP ppt.ppt
ERP ppt.ppt
 
: BPR IMPLEMENTAION AND TOOLS THAT SUPPORT BPR
: BPR IMPLEMENTAION AND TOOLS THAT SUPPORT BPR: BPR IMPLEMENTAION AND TOOLS THAT SUPPORT BPR
: BPR IMPLEMENTAION AND TOOLS THAT SUPPORT BPR
 
Business Process Management
Business Process ManagementBusiness Process Management
Business Process Management
 
Business Process Re‐Engineering Shivaji University Syllabus
Business Process Re‐Engineering Shivaji University SyllabusBusiness Process Re‐Engineering Shivaji University Syllabus
Business Process Re‐Engineering Shivaji University Syllabus
 
Reessssssssssßdddeeeeeeeeeeeengineering.ppt
Reessssssssssßdddeeeeeeeeeeeengineering.pptReessssssssssßdddeeeeeeeeeeeengineering.ppt
Reessssssssssßdddeeeeeeeeeeeengineering.ppt
 
RE-DESIGN BUSINESS PROCESSES AND ENGAGE EMPLOYEES TO BEST UTILIZE ERP SOFTWAR...
RE-DESIGN BUSINESS PROCESSES AND ENGAGE EMPLOYEES TO BEST UTILIZE ERP SOFTWAR...RE-DESIGN BUSINESS PROCESSES AND ENGAGE EMPLOYEES TO BEST UTILIZE ERP SOFTWAR...
RE-DESIGN BUSINESS PROCESSES AND ENGAGE EMPLOYEES TO BEST UTILIZE ERP SOFTWAR...
 
INVESTMENT IN ERP
INVESTMENT IN ERPINVESTMENT IN ERP
INVESTMENT IN ERP
 
Business Process Reengineering | Case studies
Business Process Reengineering | Case studiesBusiness Process Reengineering | Case studies
Business Process Reengineering | Case studies
 
Session 2 & 3
Session 2 & 3Session 2 & 3
Session 2 & 3
 
BUSINESS PROCESS REENGINNERING MODULE 4
BUSINESS PROCESS REENGINNERING MODULE 4BUSINESS PROCESS REENGINNERING MODULE 4
BUSINESS PROCESS REENGINNERING MODULE 4
 
Erp implementation lifecycle
Erp implementation lifecycleErp implementation lifecycle
Erp implementation lifecycle
 
Sage ERP Cost Benefit Analysis
Sage ERP Cost Benefit AnalysisSage ERP Cost Benefit Analysis
Sage ERP Cost Benefit Analysis
 
Enterprise resource planning, Evolution, Importance, Advantage for Business
Enterprise resource planning, Evolution, Importance, Advantage for BusinessEnterprise resource planning, Evolution, Importance, Advantage for Business
Enterprise resource planning, Evolution, Importance, Advantage for Business
 
Five Step Methodology To Implement Bpr
Five Step Methodology To Implement BprFive Step Methodology To Implement Bpr
Five Step Methodology To Implement Bpr
 
Mit Great
Mit GreatMit Great
Mit Great
 
Bpr assignement
Bpr assignementBpr assignement
Bpr assignement
 
Suggest an intelligent framework for building business process management [ p...
Suggest an intelligent framework for building business process management [ p...Suggest an intelligent framework for building business process management [ p...
Suggest an intelligent framework for building business process management [ p...
 
ERP, SAP
ERP, SAPERP, SAP
ERP, SAP
 
SAP Business Transformations - Mandrekar
SAP Business Transformations - MandrekarSAP Business Transformations - Mandrekar
SAP Business Transformations - Mandrekar
 

More from Arnav Chowdhury

Startup Funding and Strategies for Future
Startup Funding and Strategies for FutureStartup Funding and Strategies for Future
Startup Funding and Strategies for FutureArnav Chowdhury
 
Marketing Management Introduction.pptx
Marketing Management Introduction.pptxMarketing Management Introduction.pptx
Marketing Management Introduction.pptxArnav Chowdhury
 
Marketing Management Product.pptx
Marketing Management Product.pptxMarketing Management Product.pptx
Marketing Management Product.pptxArnav Chowdhury
 
Institutional Support to Entrepreneurship
Institutional Support to EntrepreneurshipInstitutional Support to Entrepreneurship
Institutional Support to EntrepreneurshipArnav Chowdhury
 
New Venture Expansion and Exit Strategies
New Venture Expansion and Exit StrategiesNew Venture Expansion and Exit Strategies
New Venture Expansion and Exit StrategiesArnav Chowdhury
 
Creating a Business Plan
Creating a Business PlanCreating a Business Plan
Creating a Business PlanArnav Chowdhury
 
Business Research Methodology ( Data Collection)
Business Research Methodology ( Data Collection)Business Research Methodology ( Data Collection)
Business Research Methodology ( Data Collection)Arnav Chowdhury
 
Business Research Methods (Introduction)
Business Research Methods (Introduction)Business Research Methods (Introduction)
Business Research Methods (Introduction)Arnav Chowdhury
 
Planning and organizing Entrepreneurial Venture
Planning and organizing Entrepreneurial VenturePlanning and organizing Entrepreneurial Venture
Planning and organizing Entrepreneurial VentureArnav Chowdhury
 
Fundamentals of Entrepreneurship
Fundamentals of EntrepreneurshipFundamentals of Entrepreneurship
Fundamentals of EntrepreneurshipArnav Chowdhury
 
Unit v: Cyber Safety Mechanism
Unit v: Cyber Safety MechanismUnit v: Cyber Safety Mechanism
Unit v: Cyber Safety MechanismArnav Chowdhury
 
UNIT IV:Security Measurement Strategies
UNIT IV:Security Measurement StrategiesUNIT IV:Security Measurement Strategies
UNIT IV:Security Measurement StrategiesArnav Chowdhury
 
Unit iii: Common Hacking Techniques
Unit iii: Common Hacking TechniquesUnit iii: Common Hacking Techniques
Unit iii: Common Hacking TechniquesArnav Chowdhury
 
Information Technology and Modern Gadgets
Information Technology and Modern GadgetsInformation Technology and Modern Gadgets
Information Technology and Modern GadgetsArnav Chowdhury
 

More from Arnav Chowdhury (20)

Startup Funding and Strategies for Future
Startup Funding and Strategies for FutureStartup Funding and Strategies for Future
Startup Funding and Strategies for Future
 
Marketing Management Introduction.pptx
Marketing Management Introduction.pptxMarketing Management Introduction.pptx
Marketing Management Introduction.pptx
 
Marketing Management Product.pptx
Marketing Management Product.pptxMarketing Management Product.pptx
Marketing Management Product.pptx
 
Institutional Support to Entrepreneurship
Institutional Support to EntrepreneurshipInstitutional Support to Entrepreneurship
Institutional Support to Entrepreneurship
 
New Venture Expansion and Exit Strategies
New Venture Expansion and Exit StrategiesNew Venture Expansion and Exit Strategies
New Venture Expansion and Exit Strategies
 
Creating a Business Plan
Creating a Business PlanCreating a Business Plan
Creating a Business Plan
 
Business Research Methodology ( Data Collection)
Business Research Methodology ( Data Collection)Business Research Methodology ( Data Collection)
Business Research Methodology ( Data Collection)
 
Business Research Methods (Introduction)
Business Research Methods (Introduction)Business Research Methods (Introduction)
Business Research Methods (Introduction)
 
Planning and organizing Entrepreneurial Venture
Planning and organizing Entrepreneurial VenturePlanning and organizing Entrepreneurial Venture
Planning and organizing Entrepreneurial Venture
 
Fundamentals of Entrepreneurship
Fundamentals of EntrepreneurshipFundamentals of Entrepreneurship
Fundamentals of Entrepreneurship
 
ICT tools in Education
ICT tools in EducationICT tools in Education
ICT tools in Education
 
Unit v: Cyber Safety Mechanism
Unit v: Cyber Safety MechanismUnit v: Cyber Safety Mechanism
Unit v: Cyber Safety Mechanism
 
UNIT IV:Security Measurement Strategies
UNIT IV:Security Measurement StrategiesUNIT IV:Security Measurement Strategies
UNIT IV:Security Measurement Strategies
 
Unit iii: Common Hacking Techniques
Unit iii: Common Hacking TechniquesUnit iii: Common Hacking Techniques
Unit iii: Common Hacking Techniques
 
Cyber Crime
Cyber CrimeCyber Crime
Cyber Crime
 
Information Technology and Modern Gadgets
Information Technology and Modern GadgetsInformation Technology and Modern Gadgets
Information Technology and Modern Gadgets
 
Unit iv FMIS
Unit iv FMISUnit iv FMIS
Unit iv FMIS
 
Unit iii FMIS
Unit iii FMISUnit iii FMIS
Unit iii FMIS
 
Unit ii FMIS
Unit ii FMISUnit ii FMIS
Unit ii FMIS
 
Unit iv graphics
Unit iv  graphicsUnit iv  graphics
Unit iv graphics
 

Recently uploaded

Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africaictsugar
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Kirill Klimov
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCRashishs7044
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyotictsugar
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchirictsugar
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCRashishs7044
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionMintel Group
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadAyesha Khan
 

Recently uploaded (20)

Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Kenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby AfricaKenya’s Coconut Value Chain by Gatsby Africa
Kenya’s Coconut Value Chain by Gatsby Africa
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024Flow Your Strategy at Flight Levels Day 2024
Flow Your Strategy at Flight Levels Day 2024
 
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR8447779800, Low rate Call girls in Tughlakabad Delhi NCR
8447779800, Low rate Call girls in Tughlakabad Delhi NCR
 
Investment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy CheruiyotInvestment in The Coconut Industry by Nancy Cheruiyot
Investment in The Coconut Industry by Nancy Cheruiyot
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
Marketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent ChirchirMarketplace and Quality Assurance Presentation - Vincent Chirchir
Marketplace and Quality Assurance Presentation - Vincent Chirchir
 
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
8447779800, Low rate Call girls in Uttam Nagar Delhi NCR
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Future Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted VersionFuture Of Sample Report 2024 | Redacted Version
Future Of Sample Report 2024 | Redacted Version
 
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in IslamabadIslamabad Escorts | Call 03070433345 | Escort Service in Islamabad
Islamabad Escorts | Call 03070433345 | Escort Service in Islamabad
 

Mis unit iv PIMR

  • 1. Enterprise Resource Planning (ERP): Introduction to ERP, Implementation of ERP. Business process reengineering (BPR): Process of BPR, Structural Change.
  • 2.  Enterprise Resource Planning (ERP) is a software that is built to organizations belonging to different industrial sectors, regardless of their size and strength.  The ERP package is designed to support and integrate almost every functional area of a business process such as procurement of goods and services, sale and distribution, finance, accountings, human resource, manufacturing, production planning, logistics & warehouse management.
  • 3.
  • 4.  During early phases of development, integrated solutions were designed for particular process areas such as −  Material Management − the integrated system was known as Material Requirement Planning (MRP)  Manufacturing − the integrated system was known as Manufacturing Resource Planning
  • 5.  Supports the integrated business process inside the organization.  Improves capital planning and helps in executing organizational plans and strategies.  Helps speed up the decision-making process over the analysis of accurate data.  Helps extend the business network to wider domains, expanding the products and services to reach more customers, suppliers, and partners.  Identifies operational risks to improve governance.  Provides protection against organizational data breaches and security threats to leakage of information.  Makes the organization adaptable to the rapid changes in the business process according to the needs.  Gives long-term profit by providing means to increase the customer base.
  • 6.  1. Strategic Planning  2. Procedure Review  3. Data Collection and Clean-Up  4.Training andTesting  5. Go Live and Evaluation
  • 7.  Set objectives.  The objectives should be clearly defined prior to implementing the ERP solution. ERP systems are massive and you won’t be able to implement every function.You need to define the scope of implementation.  Develop a project plan.  The team should develop a project plan which includes previously defined goals and objectives, timelines, training procedures, as well as individual team responsibilities.
  • 8.  Assign a project team. Assign a project team with employees from sales, customer service, accounting, purchasing, operations and senior management.  Examine current business processes and information flow. Have the team perform an analysis on which business processes should be improved. Gather copies of key documents such as invoices, batch tickets and bill of lading for the analysis.
  • 9.  Review software capabilities.  Dedicate 3-5 days of intensive review of the software capabilities for the project team.Train on every aspect of the ERP software to fully educate the team on capabilities and identify gaps  Identify manual processes.  Evaluate which processes that are manual and should be automated with the ERP system.  Develop standard operating procedures.  These procedures should be documented. Make sure that you modify the document as your SOPs change
  • 10.  Convert data.  You can’t assume 100% of the data can be converted as there may be outdated information in the system. Determine which information should be converted through an analysis of current data.  Collect new data.  Define the new data that needs to be collected. Identify the source documents of the data.
  • 11.  Review all data input.  After the converted and manually collected data is entered into the ERP database, then it must be reviewed for accuracy and completeness.  Clean-up data.  Review and weed out unneeded information such as customers who haven’t purchased in a while or are no longer in business.
  • 12.  Pre-test the database.  The project team should practice in the test database to confirm that all information is accurate and working correctly.  Verify testing.  Make sure the actual test mirrors the Standard Operating Procedures outlined in step 2, and determine whether modifications need to made.
  • 13.  Train theTrainer.  It is less costly and very effective if you train the trainer. Assign project team members to run the in-house training.  Perform final testing.  The project team needs to perform a final test on the data and processes once training is complete and make any needed adjustments
  • 14.  Develop a final Go-Live Checklist.  Sample Final Go Live Countdown Checklist Sample ▪ Physical inventory process is complete. ▪ Beginning balance entry procedures are developed for all modules. ▪ Any transition issues are addressed. ▪ Documents & modifications are tested thoroughly.  Evaluate the solution.  Develop a structured evaluation plan which ties back to the goals and objectives that were set in the planning stage
  • 15.  It involves the radical redesign of core business processes to achieve dramatic improvements in productivity, cycle times and quality.  In Business Process Reengineering, companies start with a blank sheet of paper and rethink existing processes to deliver more value to the customer.
  • 16.  Refocus company values on customer needs  Redesign core processes, often using information technology to enable improvements  Reorganize a business into cross-functional teams with end-to-end responsibility for a process  Rethink basic organizational and people issues  Improve business processes across the organization
  • 17.  Reduce costs and cycle time. Business Process Reengineering reduces costs and cycle times by eliminating unproductive activities and the employees who perform them. Reorganization by teams decreases the need for management layers, accelerates information flows, and eliminates the errors and rework caused by multiple handoffs.  Improve quality. Business Process Reengineering improves quality by reducing the fragmentation of work and establishing clear ownership of processes. Workers gain responsibility for their output and can measure their performance based on prompt feedback.
  • 18.
  • 19.  “If you fail to plan, you plan to fail”. Planning and Preparation are vital factors for any activity or event to be successful, and reengineering is no exception. Before attempting reengineering, the question ‘Is BPR necessary?’ should be asked?  There should be a significant need for the process to be reengineered.  A cross-functional team is established with a game plan for the process of reengineering.  Another important factor to be considered is to understand the expectations of your customers and where your existing process falls short of meeting those requirements.  Having identified the customer driven objectives, the mission or vision statement is formulated.
  • 20.  Before the reengineering team can proceed to redesign the process, they should understand the existing process.  The important aspect of BPR (what makes BPR, BPR) is that the improvement should provide dramatic results.  A large manufacturer spent six million dollars over a period of one year in a bid to develop a parts-tracking system and was all set to go online. Only then did he realize that he had totally overlooked a small piece of information – ‘the mode of transmission of information between the scheduling staff and the shop floor was through a phone call.’
  • 21.  The objective of this phase is to produce one or more alternatives to the current situation, which satisfy the strategic goals of the enterprise.  The first step in this phase is benchmarking. “Benchmarking is the comparing of both the performance of the organization’s processes and the way those processes are conducted with those relevant peer organizations to obtain ideas for improvement”  Having identified the potential improvements we perform simulation and ABC to analyze factors like the time and cost involved.
  • 22. • The implementation stage is where reengineering efforts meet the most resistance and hence it is by far the most difficult one. • The question that confronts us would be,’ If BPR promises such breath taking results then why wasn’t it adopted much earlier?’ • requirements for the construction of theTo-Be components can be added and the result organized into aWork Breakdown Structure (WBS). • The benefit here is that we can now define the causal and time sequential relationships between the activities planned.
  • 23. • A process cannot be reengineered overnight. • very vital part in the success of every reengineering effort lies in improving the reengineered process continuously. • Two things have to be monitored – the progress of action and the results