1. No. Description Year
1.
Berantai Marginal Field, PM309
Modification proposal for current process system by installing turbo expander as a
second driver for offgas compression system.
Flare reduction exercise in order to solve high flaring issue during unit shut down and
to increase export gas recovery.
Project support team on behalf of JV partner throughout working period.
2012- 2015
2.
Ande Ande Lumut Field Indonesia. Proposal of Development Plan for installation of
WHP (tripods, flexible / rigid pipeline to FPSO), lease FPSO with refurbish topside
facilities and drilling of 43 development wells.
2013
3.
FPSO Cossack Pioneer. Feasibility study on potential FPSO to hire/purchase prior
refurbishment and installation of topside facilities (e.g. technical evaluation of existing
facilities and risk evaluation)
2013
4.
Tembikai & Chenang Field. Provide support to Field Development Department for
Proposal of Tembikai & Chenang marginal field development through Risk Service
Contract (RSC).
2014
5.
KSB, PTT, PTB Aceh Onshore. Feasibility study to perform asset evaluation (current
facilities) and proposal for modification/rejuvenation scope. 2014
6.
Husky CNOOC Madura Field Indonesia. Proposal for conversion of Floating Production
Unit (FPU) inclusive Engineering, Procurement, Construction, Installation and
Commissioning (EPCIC) scope.
2014
PROJECTS INVOLVED