High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
Social issues grievances
1. SHARDA UNIVERSITY
GREATER NOIDA , U.P.(201301)
DEPARTMENT OF COMPUTER SCIENCE & ENGINEERING
MAJOR PROJECT ON
“SOCIAL ISSUES GRIEVANCES”
Under the Guidance
Of:
Mr. Sushant
Jhingran
Assistant Professor,
Dept. Of CSE
Made By :
Kashish
Mittal(2018014212)
Deepanjoy
Das(2018008155)
2. 1. INTRODUCTION
1.1 PROBLEM DEFINITION
Social grievance of a socially defined group that it suffers from systematic inequality, exclusion,
lack of opportunity to satisfy basic needs, and other disadvantage. Social grievance is often at the
root of conflict. When groups mobilise, they may take violent or non-violent action to address social
grievance. Conflict transformation and peacebuilding support groups and mobilisers in choosing
non-violent means while taking grievances seriously.
Many current violent conflicts are rooted in group-based grievances arising from inequality,
exclusion, lack of opportunities to satisfy basic needs (food, healthcare, education), poor
governance or feelings of injustice. When an aggrieved group is mobilised and assigns blame to
others (to an ethnic or religious group or to an authority or state) for its perceived political,
economic or social problems, those grievances can cross the tipping point into social upheaval and
violence.
3. 2. LITERATURE SURVEY
There are few projects on this topic, either they are for any particular department or they are not properly working. Most
of them are not very handy for public and even public are not aware of.
This networking site will be only use for development of local areas and aware people for their own right and duty all over
India. The government can easily focus on their constituencies and focus on the major issues people are facing first. People
can give their feedback of the government. Poor people can know about the free scheme’s government are providing which
they are unaware. This will bring democracy and more development.
In this platform people discuss about own local problem and those solution for development for their local areas. This
networking site will be only use for development of local areas and aware people for their own right and duty. The
government can easily focus on their constituencies and focus on the major issues people are facing. People can give
their feedback of the government. Poor people can know about the free scheme’s government are providing.
Having drawn the rough specifications the next step is to check where it is feasible to implement the system if the
benefits from the computerization, the efforts is not justified. A feasibility study in this case is the portion of the SDLC
that determines three types of feasibility to implement the system.
4. 3. PROJECT OVERVIEW
Introduction to Project Management
In this platform people discuss about own local problem and those solution for development for their local areas.
This networking site will be only use for development of local areas and aware people for their own right and duty.
The government can easily focus on their constituencies and focus on the major issues people are facing. People
can give their feedback of the government. Poor people can know about the free scheme’s government are
providing.
The Project Management Lifecycle
• Phase 1: ‘D’ – Conception and Definition Conception and Definition Conception and Definition –
Identifying the need, agreeing a solution, setting and checking
aims and objectives.
• Phase 2: ‘P’ – Planning– Agreeing milestones and stages, putting tasks against a time-line, and
identifying resource requirements.
• Phase 3: ‘E’ – Implementation and Execution Implementation and Execution Implementation and
Execution – Putting the plan into action, monitoring performance, and exercising control and
influence where necessary.
• Phase 4: ‘C’ – Run-down & Closure down & Closure – The transition of the Project into a Service,
5. HARDWARE AND SOFTWARE REQUIREMENTS
Hardware
Requirements
(Minimum)
Dual-core 2.8 GHz, 8 gig RAM, 10 gig disk space.
Hardware
Requirements
(Recommended)
Dual-core 2.8 GHz, 8 gig RAM, 10 gig disk space.
Operating System Tested on Windows 7/8, Mac OS 10.5.2. Course
software should be viable on all systems which
support a Java SE 7 Developer's Kit
Software
Requirements
Angular 9,Eclipse
8. Project Management Tasks
Definition Key tasks in the Definition Phase include:
• Agreeing aims and rationale
• Forming a project team
• Identifying key stakeholders
• Developing SMART objectives
• Agreeing scope of work and key stages
• Stating required standards and specifications
• Designing systems and procedures
• Completing a risk assessment for the project
• Completing a feasibility study
• Gaining approval to proceed
The importance of bringing clarity and getting buy-in during this phase cannot be underestimated, as it forms the
foundations for the rest of the project. Cutting corners at this point can lead to costly mistakes and great frustration
as disagreements emerge later in the process.
9. Methodology/ Planning of work:
The plan consists of data requirements, data flow diagram, use case diagrams, class diagram
and implementation.
Project development approach:
The approach is in 4 steps:
Design
Implementation
Test
Review