A dynamic, result driven, & BITS Pilani qualified, chemical engineering professional working as & offering 38 years multi
faceted manufacturing experience mainly overseeing operation & maintenance of cement plant
Key Attributes
• Possess strong general management skills in production, quality & operations in a reputed & growth oriented firm.
• Proficiency in techno-commercial studies for technical evaluation & due diligence of projects.
• A management executive offering a customer focused & performance driven approach to meet targets.
• Extensive knowledge of cement kiln process theory, plant operations, and optimizations.
• Domain expertise in cement chemistry & cement process calculations to achieve cost reduction.
• Proven competency & distinction in achieving productivity enhancement and reducing energy consumption.
• Adept in root cause analysis as well as trouble shooting of processes.
• Proving ability in conducting feasibility studies, project conceptualizing & commissioning operations.
• Demonstrated capability in quality assurance and quality control in cement clinker plant
• Establish cost effective vendor sources to maintain market & cost leadership of the company.
• Adroit in monitoring and measuring Energy Audit & Environmental Study,
• Excellent interpersonal, organisational analytical & negotiation skills
• Proven ability to work efficiently in demanding work environments, meet deadlines & deliver results.
Organisational Experience
BAGALKOT CEMENT LTD,BAGALKOT,KARNATAKA
HEAD-WORKS (MAY 2015 till DATE)
(Reporting to CMD)
BINANI CEMENT,PINDWARA,SIROHI,RAJASTHAN.
HEAD - OPERATIONS (SEPTEMBER 2014 till MARCH 2015)
(Reporting to Head-Rajasthan/MD)
J.K. Cement Ltd., Nimbahera Establishment
Unit Head (Jan 2012 till August, 2014)
(Reporting to Managing Director based at Kanpur)
Senior V.P. (Operation & Maintenance) (Apr 2008 to Dec 2011)
(Reported to the President Works & led a team of 250)
VP (Operation & Maintenance) (Apr 2003 to Mar 2008)
(Reported to the President Works & led a team of 250)
Assistant VP (Production & QC) (Apr 1999 to Mar 2003)
(Reported to the President Works & led a team of 200)
Senior General Manager - Production & QC (Apr 1997 to Mar 1999)
(Reported to the VICE President Works & led a team of 150)
General Manager- Production & QC (Apr 1993- Mar 1997)
(Reported to the VICE PRESIDENT and led a team of 150)
Manager- Production & QC (Apr 1989 to Mar 1993)
(Reported to the Works Manager & led a team of 50)
Deputy Chief Engineer- Project (Sep 1985 to Mar 1989)
(Reported to the Works Manager & led a team of 6)
Assistant Engineer (Aug 1976 - Mar 1981)
(Reported to the Production Manager & led a team of 4)
Job Profile:
As HEAD - WORKS at Bagalkot Cement responsible for productivity and profitability of the company.The plant is a 0.6
mtpa cement unit producing OPC and PSC .
As HEAD - OPERATIONS at Binani Cement incharge of operations of its 6 mtpa main plant with two kilns and grinding unit
at NEEM-KA-THANA.
As Unit Head, heading cement plants and CPP’s at Nimbahera, Mangrol including a captive power plant at Shambupura &
Jharli Grinding Unit, Jharli (Haryana) and responsible for plant operations & optimization with following Key Performance
Matrices-
• Determine strategic goals as well as plan, monitor, control, & report on plant operations.
• Undertake studies relating to plant modification, upgradation, capacity enhancements & optimisation.
Résumé ofRésumé of Kishor Kumar JaloriKishor Kumar Jalori, Page, Page 11
Profile: President/ Business Head/ CEO in cement or related building material industry
Strategic Planning /Excellence in Cement Manufacturing/ P&L Responsibility
2. • Handle conceptualisation, raw mix designing, plant specification detailing, commissioning, & environmental clearance.
• Oversee general administration including personnel, recruitment & training, manpower planning.
• Coordinate process control & measurement to optimise plant operations by driving cost control/ cost reduction.
• Liaise with stakeholders for approval of new projects & handle dynamics of the internal & external environment.
• Track limestone sourcing from 4 captive mines.
• Supervise 21 MW & 25 MW captive power plant & 2 x 10 MW waste heat recovery units besides the captive power
plant at Shambupura with power generating capacity of 15 MW.
• Optimize performance of Nimbahera unit having 3 kilns with a total clinker capacity of 24 LTPA & cement grinding
capacity of 30 LTPA as well as Mangrol unit with clinker capacity of 2.4 MTPA & cement grinding capacity of 3 MTPA.
• The Unit II at Mangrol has latest technology with roller press in finish mode for raw meal, ILC kiln with cross bar cooler
for clinkerisation and combi-grinding roller press & ball mill for cement mill. A robo-lab is installed for chemical testing
and a 10 MW WHR system for heat recovery along with 25 MW CPP. Captive Power Plant at Shambupura has a
power generating capacity of 15 MW.
• Jharli Grinding Unit has a 260 TPH Combi-grinding cement mill with ThyssenKrupp Roller press & a ball mill.
As VP (Operation & Maintenance), was responsible for overall plant operations & entire plant maintenance of both
Nimbahera & Mangrol Units to meet targets & optimize resources with defined Key Performance Indices-
• Was responsible for raw mix control based on the quality, rate of production and cost optimization.
• Prepared monthly costing as well as evaluated & highlighted performance parameters for entire plant.
• Undertaken process calculations for mass, gas and heat balance
• As Member-Energy Audit Team, monitored fuel usage & optimized costs
As Assistant VP/ Senior General Manager/ Manager- Production & QC, handled production planning & execution, as
well as quality assurance & control with following key responsibilities as per defined Key Performance Indicators-
• Steered operation, production and Quality Control of both Nimbahera and Mangrol units.
• Developed strategies, operational plans, and objectives as per program
• Prepared budgets & executed cost control and cost reduction exercise to improve profitability
• Designed documents, plans, and procedures for robust quality system.
• Mobilized project manpower resources as per planned budget.
• Updated company top management on performance on environmental, heath, & safety management system
As Assistant Engineer, handled operation & maintenance of kilns as well as the erection & commissioning of 2nd
unit as per
the Key Result Areas-
Achievements:
• Made noteworthy contribution & awarded Chairman’s Award on Quality 1992 for excellence in overall performance.
• Introduced industry best practices & achieved increased production capacity from 1.54 MTPA to 3 MTPA through
major modifications & quality improvements.
• Successfully upgraded / modernized existing plant & augmented plant capacity from 1.54 MTPA to 2.4 MTPA.
• Instrumental in effectively identifying, establishing, & standardizing procedures
• Streamlined processes in project execution & driven commissioning of 3 line at Nimbahera in 1988,, Mangrol plant in
• 2001, & Mudhol plant in 2009.
• Made noteworthy contribution in ensuring successful achievements of annual targets in terms of quantity & quality.
• Spearheaded best practice implementation resulting in enhanced cement quality
• Made outstanding efforts to improve production & successfully met stringent quality standards by adding grinding aid.
• Displayed exceptional performance & recognised by top management with quick promotions.
Narmada Cement Ltd., Magdalla, Surat
Assistant Manager (Production & QC) (Apr 1981- Aug 1985)
(Reported to the Works Manager)
Job Profile:
As Assistant Manager (Production & QC), managed production, quality control, procurement of raw material & supervised
plant operations as per the Key Performance Objectives-
• Spearheaded commissioning of 2000 TPD grinding unit as well as coordinated customer service.
Academic Credentials
• Bachelors Degree in Engineering Chemical (Hons), Birla Institute of Technology & Science, Pilani, 69% (1976)
Training & Development
• Delegate at the 5 day all India cement seminar held by NCCBM in New Delhi in 2012, 2010, 2009, 1998, 1996, & 1981
• Undergone three weeks training on energy conservation techniques, conducted by The New Energy & Industrial
• Technology Development Organization/ AOTS Tokyo (2007)
• Attended a 5 day cement seminar, organized by Arabian Cement Co., Cairo (2006)
• Undergone training on cost reduction methods, conducted by CMA, New Delhi (2005)
• Visited for new plant discussion (five days) Taiheiyo Engineering Corporation, Tokyo (2003 & 1995)
Résumé ofRésumé of Kishor Kumar JaloriKishor Kumar Jalori, Page, Page 22
3. • Delegate at an 8 day International cement seminar held in Monaco/ France (2002)
• Participated in a five day International Seminar on Modernisation conducted by NCCBM, New Delhi (1997)
• Underwent six weeks senior executive training at the Administrative Staff College of India, Hyderabad (1993)
• Undergone three weeks General Management Training at the IIM Ahmedabad (1992)
• Attended international cement seminar at National Council for Cement & Building Materials, New Delhi (1991)
• Participated in a five day cement seminar, organized by FLS Mumbai (1991)
• Delegate at the five day energy conference, organized by the European Council at Oporto, Portugal (1986)
• Attended a three weeks international training seminar conducted by FLS Denmark (1985)
• Participated in a 3 day training programme on Energy Audit, conducted by National Productivity Council, Madras (1984)
Personal Details
• Date of Birth: 30th
Aug 1954
• Language Proficiency: English & Hindi
• Computer Skills: Windows MS Office (Word, Excel, Power point)
• Nationality: Indian, Passport No: F 7093123, valid up to 16th April 2016
Résumé ofRésumé of Kishor Kumar JaloriKishor Kumar Jalori, Page, Page 33