1. CURRICULUM VITAE
NAME: CHONG THIAM SEONG
PERSONAL PARTICULAR
Date of birth: 27th
January 1970
Nationality: Malaysian
Race: Chinese
Age: 46
Marital Status:Married
Sex: Male.
Address: 12A, Lebuh Tembok 1
Taman Permai
30100 Ipoh
Perak.
Phone:
Home: 05-2916715
Office: 03-55228018
H/P: 012-5016715
Email: ctseong2000@hotmail.com
1
2. EDUCATION
Post Tertiary MBA (American Liberty University) Completed
Lead Academic Sdn.Bhd
45-47 The Boulevard,
Mid Valley City.
Kuala Lumpur.
Tel: 03-22833939
Fax: 0322821227
2009
Tertiary: Victoria University of Technology
Victoria, Australia.
Bachelor of Engineering (Mechanical)
1996
Secondary: Footscray College of TAFE
Victoria, Australia.1991
EXPERIENCE
Maintenance Manager – Yeo Hiap Seng (M) Sdn.Bhd
(20/05/2013 to date)
• Reporting to General Manager ( Operation)
• To lead the planning and maintain all lines efficiency. ( Equipment performance
loss)
• To control the Operation Expenses thru out the year. ( OPEX - RM XX. million)
• To be the key person of all lines Overhaul & OEM coming with Master plan.
• To improve the uptime of the machine after overhaul.
• To reduce plant downtime based on plant efficiency.
• To create critical spares items and to create critical jobs for Preventive
maintenance
• To implement zero accident for SAFETY
• To manage day to day for all machines on floor
• Manpower arrangement to support production
• EPL accountability.
• To care of department welfare.
• Prepared and planning for specific lines overhaul.
• Tracking master calendar for overhauling.
• To conduct and implement one to one discussion every month with engineers.
• To be one of the member for the group of HACCP , GMP
• WWTP, Facilities, Utilities Management.
• Project Improvement – Maintain project Improvement Cost
2
3. Engineering Services Manager- F&N Beverages Manufacturing Sdn.Bhd
01/10/2010 to 2013( May 19th
)
• Reporting to National Engineering Services Manager
• To lead the planning and maintain all lines efficiency. ( Equipment performance
loss)
• To control the Operation Expenses thru out the year. ( OPEX - RM XX. million)
• To be the key person of all lines Overhaul & OEM coming with Masterplan.
• To improve the uptime of the machine after overhaul.
• To reduce plant downtime based on plant efficiency.
• To create critical spares items and to create critical jobs for Preventive
maintenance
• To implement zero accident for SAFETY
• To manage day to day for all machines on floor
• Manpower arrangement to support production
• To be one of the member for the group of HACCP , GMP
• EPL accountability.
• To care of department welfare.
• Prepared and planning for specific lines overhaul.
• Tracking master calendar for overhauling.
• To conduct and implement one to one discussion every month with engineers.
• To be one of the member for the group ISO 22000, ISO 14001
Engineering Manager- F&N Beverages Manufacturing Sdn.Bhd
01/09/2009 to 01/10/2010
• Reporting to National Engineering Services Manager
• To maintain all lines efficiency. ( Equipment performance loss EPL)
• To control the Operation Expenses ( OPEX - RM 16.8 million)
• To improve the uptime of the machine.
• To reduce plant downtime based on plant efficiency
• To create critical spares items and to create critical jobs for Preventive
maintenance
• To implement zero accident for SAFETY
• To be one of the member for the group of HACCP , GMP
3
4. Maintenance Manager- KLK Palm Oleo Klang
03/11/2008 to 01/09/2009
• Reporting to Plant manager
• To maintain plant productivity and Quality
• To control the Operating expenses.
• To improve productivity measurement.
• To reduce plant downtime based on plant efficiency.
• To create critical spares items and to create critical jobs for Preventive
maintenance.
• To revamp stores.
• To implement zero accident for SAFETY
Maintenance Manager - West Port Oil mills
Soon Soon Group
01/02/2008 to 03/11/2008
• Reporting to Operation manager
• To maintain plant productivity and Quality
• To control the Operating expenses.
• To reduce the manufacturing expenses by 5%.
• To improve productivity measurement.
• To reduce plant downtime.
• To create critical spares items and to create critical jobs for Preventive
maintenance.
• To establish a TPM for maintenance.
• To implement zero accident for SAFETY
• Manage and improve management tools, maintenance procedures and
methods
• Devise and schedule maintenance programmes in collaboration with the
production, process, electrical, instrumentation, maintenance and civil
department.
• Carry out innovations and improvements aiming at improving equipment
reliability and maintenance performance.
• To keep the equipment in good condition by setting up proper preventive
maintenance schedule for each equipment.
• Contribute to the budget preparation and monitor expenditure in relation
with current budget.
4
5. Plant Manager 2/Maintenance Manager - West Port Oil mills
Soon Soon Group
01/07/2007 to 01/02/2008
• Reporting to Operation Manager
• To maintain plant productivity and Quality
• To control the Operating expenses.
• To reduce the manufacturing expenses by 5%.
• To improve productivity measurement.
• To reduce plant downtime.
• To establish a TPM for maintenance.
• To implement zero accident for SAFETY
• To minimize complaint from customer.
Plant Manager 2 - West Port Oil mills
Soon Soon Group
02/10/2006 to 01/07/2007
• Reporting to Group Chief Operating Officer Mr.HengCC
• To maintain plant productivity and Quality
• To control the Operating expenses.
• To reduce the manufacturing expenses by 5%.
• To improve productivity measurement.
• To reduce plant downtime.
• To establish a TPM for maintenance.
• To implement zero accident for SAFETY
• To minimize complaint from customer.
Senior Engineer (Dept.Manager) – Production & Operation
Tasek Corporation Berhad
20/07/2005 to 13/10/2006 (2 years)
• Reporting to Division Manager of the performance of both
VRM and Ball Mills. - Coal Mills and Raw Mills.
• To make sure all upstream and downstream process not
affected during daily operation.
5
6. • To make sure enough raw materials for the Kiln daily
operation.
• Responsible for good reliability of all systems.
• To keep all records up to date.
• Managing all spare availabities.
• Planning for shut down.
Senior Engineer – Mechanical and Maintenance
Tasek Corporation Berhad
03/05/2005 20/07/2005
• Reporting to Division Manager for daily performance of
both VRM and Ball Mills.
• Also to manage Facilities Department.
• Responsible for good reliability of all systems.
• Managing all spare availabities.
• Planning for shut down.
• To manage daily workshop activities.
Project Leader (Lubrication Engineer ) Working with Shell for consignment stock
Lafarge Malayan Cement – KANTHAN WORKS
Year 2003 – 2005
• Successfully reduce the consignment stocks from 52
various of lubrication to 16 types of lubrication.
• Co-coordinating with Shell Company Engineer to ensure
the Lubriplan System works.
• To rationalize and manage oil in store.
• Responsible for consignment stock working smoothly.
• Ensuring and monitor all equipment using the right oil and
correct volume.
• To ensure schedule for oil samplings are being done.
• Ensuring all lubrication systems work properly.
• Ensure all filter elements and pumps are working properly.
SECTION ENGINEER (Cement Milling and Packing Plant) – MECHANICAL
ASSOCIATED PAN MALAYSIA CEMENT SDN.BHD – KANTHAN WORKS
Year 2001 – 2003 ( Lafarge)
Section: Cement Milling and Packing Plant. (6 Cement Mills and 3 Rotary Packers)
• Improve reliability of cement mill and packing plant
section.
• Ensuring all spares is available during PM.
6
7. • Ensuring the regular maintenance activities being carried
out.
• Plan and implementing preventive measure.
• Avoid any breakdown of the equipments.
• Managing the revenue budget within approved.
• Coordinating with other departments for planned
and scheduled maintenance of the equipments
without hindering the operation scheduled of the plant.
• Ensuring the effective utilization of the teammates
and contract labor to achieve the overall target.
SECTION ENGINEER (KILN KK3 AND KK4) – MECHANICAL
ASSOCIATED PAN MALAYSIA CEMENT SDN.BHD – KANTHAN WORKS
Year 2000 – 2001 ( Lafarge)
Section: KILN K3 (3000t/d) and KILN K4 (6100t/d)
• Reporting to Chief Mechanical Engineer the daily
performance of both kiln and coolers.
• Responsible for good reliability of all systems.
• Managing all spare availabities.
• Planning for shut down.
SECTION ENGINEER (Raw Milling KK4) – MECHANICAL
ASSOCIATED PAN MALAYSIA CEMENT SDN.BHD – KANTHAN WORKS
Year 2000 – 2001 ( Lafarge)
Section: KK4 Vertical Raw Mill ( 280t/hr) x 2 Units
• Ensuring good reliability of the systems.
• Planning for PM and Shut Down
• Managing spares.
• Study and source out materials that can prolong the life of
the system due to wear and tear.
SECTION ENGINEER (Raw Milling) – MECHANICAL
ASSOCIATED PAN MALAYSIA CEMENT SDN.BHD – KANTHAN WORKS
Year 1999 – 2000 ( Lafarge)
Section: KK3 Raw Mill and Clay Reclaimer KK4
• Ensuring good reliability of the systems.
• Planning for PM and Shut Down
• Managing spares.
• Study and source out materials that can prolong the life of
the system due to wear and tear.
7
8. GRADUATE ENGINEER – MECHANICAL
ASSOCIATED PAN MALAYSIA CEMENT SDN.BHD – KANTHAN WORKS
Year 1998 – 1999 ( Lafarge)
• Participating in commissioning of new line KK4 ( 6100 t/d)
• Working on shift with IHI Engineers during test run.
• Modifying some mechanical defects of equipment.
• Reporting to Chief Mechanical Engineer the daily progress.
GRADUATE ENGINEER – MECHANICAL
ASSOCIATED PAN MALAYSIA CEMENT SDN.BHD – KANTHAN WORKS
Year 1997 – 1998 ( Lafarge)
• Actively involve in project of new line (Kiln Kanthan K4 -
IHI)
• Update and check all the equipments (mechanical)
following the right specification.
• Report to Mechanical Chief Engineer. (Mr. Lee Biang
Chan) daily work progress.
MECHANICAL ENGINEER ASSISTANCE
02/01/1996-15/02/1997
Mentor: Mr. Soon Hean Hooi (Factory Manager)
ADDRESS: CHOO BEE METAL
46-48, LEBUH RAYA BENDAHARA
31650 IPOH.
• The project undertaken was to modify straightening
machine, to maintain good reliability for shearing machine
and decoration pipe machine.
• The project undertaken was to modify and commissioning
flat bar straightening machine, project management and
consultation.
REFERENCE:
1. Mr. Soon Hean Hooi ( Engineering Director)
CHOO BEE METAL
46-48, LEBUH RAYA BENDAHARA
8