SlideShare a Scribd company logo
1 of 10
CURRICULUM VITAE
NAME: CHONG THIAM SEONG
PERSONAL PARTICULAR
Date of birth: 27th
January 1970
Nationality: Malaysian
Race: Chinese
Age: 46
Marital Status:Married
Sex: Male.
Address: 12A, Lebuh Tembok 1
Taman Permai
30100 Ipoh
Perak.
Phone:
Home: 05-2916715
Office: 03-55228018
H/P: 012-5016715
Email: ctseong2000@hotmail.com
1
EDUCATION
Post Tertiary MBA (American Liberty University) Completed
Lead Academic Sdn.Bhd
45-47 The Boulevard,
Mid Valley City.
Kuala Lumpur.
Tel: 03-22833939
Fax: 0322821227
2009
Tertiary: Victoria University of Technology
Victoria, Australia.
Bachelor of Engineering (Mechanical)
1996
Secondary: Footscray College of TAFE
Victoria, Australia.1991
EXPERIENCE
Maintenance Manager – Yeo Hiap Seng (M) Sdn.Bhd
(20/05/2013 to date)
• Reporting to General Manager ( Operation)
• To lead the planning and maintain all lines efficiency. ( Equipment performance
loss)
• To control the Operation Expenses thru out the year. ( OPEX - RM XX. million)
• To be the key person of all lines Overhaul & OEM coming with Master plan.
• To improve the uptime of the machine after overhaul.
• To reduce plant downtime based on plant efficiency.
• To create critical spares items and to create critical jobs for Preventive
maintenance
• To implement zero accident for SAFETY
• To manage day to day for all machines on floor
• Manpower arrangement to support production
• EPL accountability.
• To care of department welfare.
• Prepared and planning for specific lines overhaul.
• Tracking master calendar for overhauling.
• To conduct and implement one to one discussion every month with engineers.
• To be one of the member for the group of HACCP , GMP
• WWTP, Facilities, Utilities Management.
• Project Improvement – Maintain project Improvement Cost
2
Engineering Services Manager- F&N Beverages Manufacturing Sdn.Bhd
01/10/2010 to 2013( May 19th
)
• Reporting to National Engineering Services Manager
• To lead the planning and maintain all lines efficiency. ( Equipment performance
loss)
• To control the Operation Expenses thru out the year. ( OPEX - RM XX. million)
• To be the key person of all lines Overhaul & OEM coming with Masterplan.
• To improve the uptime of the machine after overhaul.
• To reduce plant downtime based on plant efficiency.
• To create critical spares items and to create critical jobs for Preventive
maintenance
• To implement zero accident for SAFETY
• To manage day to day for all machines on floor
• Manpower arrangement to support production
• To be one of the member for the group of HACCP , GMP
• EPL accountability.
• To care of department welfare.
• Prepared and planning for specific lines overhaul.
• Tracking master calendar for overhauling.
• To conduct and implement one to one discussion every month with engineers.
• To be one of the member for the group ISO 22000, ISO 14001
Engineering Manager- F&N Beverages Manufacturing Sdn.Bhd
01/09/2009 to 01/10/2010
• Reporting to National Engineering Services Manager
• To maintain all lines efficiency. ( Equipment performance loss EPL)
• To control the Operation Expenses ( OPEX - RM 16.8 million)
• To improve the uptime of the machine.
• To reduce plant downtime based on plant efficiency
• To create critical spares items and to create critical jobs for Preventive
maintenance
• To implement zero accident for SAFETY
• To be one of the member for the group of HACCP , GMP
3
Maintenance Manager- KLK Palm Oleo Klang
03/11/2008 to 01/09/2009
• Reporting to Plant manager
• To maintain plant productivity and Quality
• To control the Operating expenses.
• To improve productivity measurement.
• To reduce plant downtime based on plant efficiency.
• To create critical spares items and to create critical jobs for Preventive
maintenance.
• To revamp stores.
• To implement zero accident for SAFETY
Maintenance Manager - West Port Oil mills
Soon Soon Group
01/02/2008 to 03/11/2008
• Reporting to Operation manager
• To maintain plant productivity and Quality
• To control the Operating expenses.
• To reduce the manufacturing expenses by 5%.
• To improve productivity measurement.
• To reduce plant downtime.
• To create critical spares items and to create critical jobs for Preventive
maintenance.
• To establish a TPM for maintenance.
• To implement zero accident for SAFETY
• Manage and improve management tools, maintenance procedures and
methods
• Devise and schedule maintenance programmes in collaboration with the
production, process, electrical, instrumentation, maintenance and civil
department.
• Carry out innovations and improvements aiming at improving equipment
reliability and maintenance performance.
• To keep the equipment in good condition by setting up proper preventive
maintenance schedule for each equipment.
• Contribute to the budget preparation and monitor expenditure in relation
with current budget.
4
Plant Manager 2/Maintenance Manager - West Port Oil mills
Soon Soon Group
01/07/2007 to 01/02/2008
• Reporting to Operation Manager
• To maintain plant productivity and Quality
• To control the Operating expenses.
• To reduce the manufacturing expenses by 5%.
• To improve productivity measurement.
• To reduce plant downtime.
• To establish a TPM for maintenance.
• To implement zero accident for SAFETY
• To minimize complaint from customer.
Plant Manager 2 - West Port Oil mills
Soon Soon Group
02/10/2006 to 01/07/2007
• Reporting to Group Chief Operating Officer Mr.HengCC
• To maintain plant productivity and Quality
• To control the Operating expenses.
• To reduce the manufacturing expenses by 5%.
• To improve productivity measurement.
• To reduce plant downtime.
• To establish a TPM for maintenance.
• To implement zero accident for SAFETY
• To minimize complaint from customer.
Senior Engineer (Dept.Manager) – Production & Operation
Tasek Corporation Berhad
20/07/2005 to 13/10/2006 (2 years)
• Reporting to Division Manager of the performance of both
VRM and Ball Mills. - Coal Mills and Raw Mills.
• To make sure all upstream and downstream process not
affected during daily operation.
5
• To make sure enough raw materials for the Kiln daily
operation.
• Responsible for good reliability of all systems.
• To keep all records up to date.
• Managing all spare availabities.
• Planning for shut down.
Senior Engineer – Mechanical and Maintenance
Tasek Corporation Berhad
03/05/2005 20/07/2005
• Reporting to Division Manager for daily performance of
both VRM and Ball Mills.
• Also to manage Facilities Department.
• Responsible for good reliability of all systems.
• Managing all spare availabities.
• Planning for shut down.
• To manage daily workshop activities.
Project Leader (Lubrication Engineer ) Working with Shell for consignment stock
Lafarge Malayan Cement – KANTHAN WORKS
Year 2003 – 2005
• Successfully reduce the consignment stocks from 52
various of lubrication to 16 types of lubrication.
• Co-coordinating with Shell Company Engineer to ensure
the Lubriplan System works.
• To rationalize and manage oil in store.
• Responsible for consignment stock working smoothly.
• Ensuring and monitor all equipment using the right oil and
correct volume.
• To ensure schedule for oil samplings are being done.
• Ensuring all lubrication systems work properly.
• Ensure all filter elements and pumps are working properly.
SECTION ENGINEER (Cement Milling and Packing Plant) – MECHANICAL
ASSOCIATED PAN MALAYSIA CEMENT SDN.BHD – KANTHAN WORKS
Year 2001 – 2003 ( Lafarge)
Section: Cement Milling and Packing Plant. (6 Cement Mills and 3 Rotary Packers)
• Improve reliability of cement mill and packing plant
section.
• Ensuring all spares is available during PM.
6
• Ensuring the regular maintenance activities being carried
out.
• Plan and implementing preventive measure.
• Avoid any breakdown of the equipments.
• Managing the revenue budget within approved.
• Coordinating with other departments for planned
and scheduled maintenance of the equipments
without hindering the operation scheduled of the plant.
• Ensuring the effective utilization of the teammates
and contract labor to achieve the overall target.
SECTION ENGINEER (KILN KK3 AND KK4) – MECHANICAL
ASSOCIATED PAN MALAYSIA CEMENT SDN.BHD – KANTHAN WORKS
Year 2000 – 2001 ( Lafarge)
Section: KILN K3 (3000t/d) and KILN K4 (6100t/d)
• Reporting to Chief Mechanical Engineer the daily
performance of both kiln and coolers.
• Responsible for good reliability of all systems.
• Managing all spare availabities.
• Planning for shut down.
SECTION ENGINEER (Raw Milling KK4) – MECHANICAL
ASSOCIATED PAN MALAYSIA CEMENT SDN.BHD – KANTHAN WORKS
Year 2000 – 2001 ( Lafarge)
Section: KK4 Vertical Raw Mill ( 280t/hr) x 2 Units
• Ensuring good reliability of the systems.
• Planning for PM and Shut Down
• Managing spares.
• Study and source out materials that can prolong the life of
the system due to wear and tear.
SECTION ENGINEER (Raw Milling) – MECHANICAL
ASSOCIATED PAN MALAYSIA CEMENT SDN.BHD – KANTHAN WORKS
Year 1999 – 2000 ( Lafarge)
Section: KK3 Raw Mill and Clay Reclaimer KK4
• Ensuring good reliability of the systems.
• Planning for PM and Shut Down
• Managing spares.
• Study and source out materials that can prolong the life of
the system due to wear and tear.
7
GRADUATE ENGINEER – MECHANICAL
ASSOCIATED PAN MALAYSIA CEMENT SDN.BHD – KANTHAN WORKS
Year 1998 – 1999 ( Lafarge)
• Participating in commissioning of new line KK4 ( 6100 t/d)
• Working on shift with IHI Engineers during test run.
• Modifying some mechanical defects of equipment.
• Reporting to Chief Mechanical Engineer the daily progress.
GRADUATE ENGINEER – MECHANICAL
ASSOCIATED PAN MALAYSIA CEMENT SDN.BHD – KANTHAN WORKS
Year 1997 – 1998 ( Lafarge)
• Actively involve in project of new line (Kiln Kanthan K4 -
IHI)
• Update and check all the equipments (mechanical)
following the right specification.
• Report to Mechanical Chief Engineer. (Mr. Lee Biang
Chan) daily work progress.
MECHANICAL ENGINEER ASSISTANCE
02/01/1996-15/02/1997
Mentor: Mr. Soon Hean Hooi (Factory Manager)
ADDRESS: CHOO BEE METAL
46-48, LEBUH RAYA BENDAHARA
31650 IPOH.
• The project undertaken was to modify straightening
machine, to maintain good reliability for shearing machine
and decoration pipe machine.
• The project undertaken was to modify and commissioning
flat bar straightening machine, project management and
consultation.
REFERENCE:
1. Mr. Soon Hean Hooi ( Engineering Director)
CHOO BEE METAL
46-48, LEBUH RAYA BENDAHARA
8
31650 IPOH.
H/P 0125253232
2. Mr. Lee Kwee Soon
Senior Operation Manager
Perak- Hanjoong Simen
H/P 0125078322
Off; 05-7775217
Note: Monthly draw pay salary : RM 9215 + Allowance
Expected Salary : RM 13000
9
31650 IPOH.
H/P 0125253232
2. Mr. Lee Kwee Soon
Senior Operation Manager
Perak- Hanjoong Simen
H/P 0125078322
Off; 05-7775217
Note: Monthly draw pay salary : RM 9215 + Allowance
Expected Salary : RM 13000
9

More Related Content

What's hot (20)

CVFergul16_noDOB
CVFergul16_noDOBCVFergul16_noDOB
CVFergul16_noDOB
 
Mishal AlDelaigan_CV
Mishal AlDelaigan_CVMishal AlDelaigan_CV
Mishal AlDelaigan_CV
 
Drying plant layout ,blender ,mixer, emulsification mills, homogenizers
Drying plant layout ,blender ,mixer, emulsification mills, homogenizersDrying plant layout ,blender ,mixer, emulsification mills, homogenizers
Drying plant layout ,blender ,mixer, emulsification mills, homogenizers
 
Graham Harker Resume RB 15
Graham Harker Resume RB 15Graham Harker Resume RB 15
Graham Harker Resume RB 15
 
LARRY CV
LARRY CVLARRY CV
LARRY CV
 
new cv kishor
new cv kishornew cv kishor
new cv kishor
 
Babu Resune
Babu ResuneBabu Resune
Babu Resune
 
Mohan bhaltadak.
Mohan bhaltadak.Mohan bhaltadak.
Mohan bhaltadak.
 
Nikhil CV
Nikhil CVNikhil CV
Nikhil CV
 
kashif( 23-2-15)
kashif( 23-2-15)kashif( 23-2-15)
kashif( 23-2-15)
 
Resume Nikhil Sudan
Resume Nikhil SudanResume Nikhil Sudan
Resume Nikhil Sudan
 
Presentation csl-2
Presentation csl-2Presentation csl-2
Presentation csl-2
 
Mutsa CV current.01_20 PM,07-May-16
Mutsa CV current.01_20 PM,07-May-16Mutsa CV current.01_20 PM,07-May-16
Mutsa CV current.01_20 PM,07-May-16
 
Pharmaceutical plant layout
Pharmaceutical plant layoutPharmaceutical plant layout
Pharmaceutical plant layout
 
DMeyer 2016
DMeyer 2016DMeyer 2016
DMeyer 2016
 
my C.V
my C.Vmy C.V
my C.V
 
Chandrasekaran
ChandrasekaranChandrasekaran
Chandrasekaran
 
Resume Wizar1 Martella Owes
Resume Wizar1 Martella OwesResume Wizar1 Martella Owes
Resume Wizar1 Martella Owes
 
1 - NEW RESUME OKT 2016
1 - NEW RESUME OKT 20161 - NEW RESUME OKT 2016
1 - NEW RESUME OKT 2016
 
Plant location and Layout
Plant location and LayoutPlant location and Layout
Plant location and Layout
 

Viewers also liked

Oval Colorful Rings from ShinyJewel
Oval Colorful Rings from ShinyJewelOval Colorful Rings from ShinyJewel
Oval Colorful Rings from ShinyJewelkent_chan
 
Crossfit cumbayork2
Crossfit cumbayork2Crossfit cumbayork2
Crossfit cumbayork2jdlz21
 
Resume_Asha Verma 7.8 Years of exp in Mainframe
Resume_Asha Verma 7.8 Years of exp in MainframeResume_Asha Verma 7.8 Years of exp in Mainframe
Resume_Asha Verma 7.8 Years of exp in MainframeAsha Verma
 
Draft evaluation 6
Draft evaluation 6Draft evaluation 6
Draft evaluation 6Hannahmd3
 
CIBC 19th Annual Whistler Institutional Investor Conference
CIBC 19th Annual Whistler Institutional Investor ConferenceCIBC 19th Annual Whistler Institutional Investor Conference
CIBC 19th Annual Whistler Institutional Investor ConferenceCarling Gaze
 

Viewers also liked (7)

Oval Colorful Rings from ShinyJewel
Oval Colorful Rings from ShinyJewelOval Colorful Rings from ShinyJewel
Oval Colorful Rings from ShinyJewel
 
Crossfit cumbayork2
Crossfit cumbayork2Crossfit cumbayork2
Crossfit cumbayork2
 
Resume_Asha Verma 7.8 Years of exp in Mainframe
Resume_Asha Verma 7.8 Years of exp in MainframeResume_Asha Verma 7.8 Years of exp in Mainframe
Resume_Asha Verma 7.8 Years of exp in Mainframe
 
Draft evaluation 6
Draft evaluation 6Draft evaluation 6
Draft evaluation 6
 
CIBC 19th Annual Whistler Institutional Investor Conference
CIBC 19th Annual Whistler Institutional Investor ConferenceCIBC 19th Annual Whistler Institutional Investor Conference
CIBC 19th Annual Whistler Institutional Investor Conference
 
First conditional
First conditionalFirst conditional
First conditional
 
PPR2015
PPR2015PPR2015
PPR2015
 

Similar to CURRICULUM VITAE Jan 2016

Similar to CURRICULUM VITAE Jan 2016 (20)

Venkat_Resume
Venkat_ResumeVenkat_Resume
Venkat_Resume
 
resumegfp_2016
resumegfp_2016resumegfp_2016
resumegfp_2016
 
Resume - Kishor Kumar Jalori new
Resume - Kishor Kumar Jalori newResume - Kishor Kumar Jalori new
Resume - Kishor Kumar Jalori new
 
L. SELVA MOHAN (CV)
L. SELVA  MOHAN (CV)L. SELVA  MOHAN (CV)
L. SELVA MOHAN (CV)
 
Resume
ResumeResume
Resume
 
amir akhtar cv engineer - Copy
amir akhtar cv engineer - Copyamir akhtar cv engineer - Copy
amir akhtar cv engineer - Copy
 
Resume - Kishor Kumar Jalori new
Resume - Kishor Kumar Jalori newResume - Kishor Kumar Jalori new
Resume - Kishor Kumar Jalori new
 
Ajay resume new
Ajay resume newAjay resume new
Ajay resume new
 
Ajay resume
Ajay resume Ajay resume
Ajay resume
 
redacvEPT
redacvEPTredacvEPT
redacvEPT
 
Resume
ResumeResume
Resume
 
David Baker - CV
David Baker - CVDavid Baker - CV
David Baker - CV
 
Resume of Srinivas
Resume of SrinivasResume of Srinivas
Resume of Srinivas
 
Resume-SD (1)
Resume-SD (1)Resume-SD (1)
Resume-SD (1)
 
Sharath-Resume
Sharath-ResumeSharath-Resume
Sharath-Resume
 
April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_1
 
Sudhir Niphadkar 1007-S
Sudhir Niphadkar 1007-SSudhir Niphadkar 1007-S
Sudhir Niphadkar 1007-S
 
CV
CVCV
CV
 
resume
resumeresume
resume
 
Adam_Smith_CV13042016 (1)
Adam_Smith_CV13042016 (1)Adam_Smith_CV13042016 (1)
Adam_Smith_CV13042016 (1)
 

CURRICULUM VITAE Jan 2016

  • 1. CURRICULUM VITAE NAME: CHONG THIAM SEONG PERSONAL PARTICULAR Date of birth: 27th January 1970 Nationality: Malaysian Race: Chinese Age: 46 Marital Status:Married Sex: Male. Address: 12A, Lebuh Tembok 1 Taman Permai 30100 Ipoh Perak. Phone: Home: 05-2916715 Office: 03-55228018 H/P: 012-5016715 Email: ctseong2000@hotmail.com 1
  • 2. EDUCATION Post Tertiary MBA (American Liberty University) Completed Lead Academic Sdn.Bhd 45-47 The Boulevard, Mid Valley City. Kuala Lumpur. Tel: 03-22833939 Fax: 0322821227 2009 Tertiary: Victoria University of Technology Victoria, Australia. Bachelor of Engineering (Mechanical) 1996 Secondary: Footscray College of TAFE Victoria, Australia.1991 EXPERIENCE Maintenance Manager – Yeo Hiap Seng (M) Sdn.Bhd (20/05/2013 to date) • Reporting to General Manager ( Operation) • To lead the planning and maintain all lines efficiency. ( Equipment performance loss) • To control the Operation Expenses thru out the year. ( OPEX - RM XX. million) • To be the key person of all lines Overhaul & OEM coming with Master plan. • To improve the uptime of the machine after overhaul. • To reduce plant downtime based on plant efficiency. • To create critical spares items and to create critical jobs for Preventive maintenance • To implement zero accident for SAFETY • To manage day to day for all machines on floor • Manpower arrangement to support production • EPL accountability. • To care of department welfare. • Prepared and planning for specific lines overhaul. • Tracking master calendar for overhauling. • To conduct and implement one to one discussion every month with engineers. • To be one of the member for the group of HACCP , GMP • WWTP, Facilities, Utilities Management. • Project Improvement – Maintain project Improvement Cost 2
  • 3. Engineering Services Manager- F&N Beverages Manufacturing Sdn.Bhd 01/10/2010 to 2013( May 19th ) • Reporting to National Engineering Services Manager • To lead the planning and maintain all lines efficiency. ( Equipment performance loss) • To control the Operation Expenses thru out the year. ( OPEX - RM XX. million) • To be the key person of all lines Overhaul & OEM coming with Masterplan. • To improve the uptime of the machine after overhaul. • To reduce plant downtime based on plant efficiency. • To create critical spares items and to create critical jobs for Preventive maintenance • To implement zero accident for SAFETY • To manage day to day for all machines on floor • Manpower arrangement to support production • To be one of the member for the group of HACCP , GMP • EPL accountability. • To care of department welfare. • Prepared and planning for specific lines overhaul. • Tracking master calendar for overhauling. • To conduct and implement one to one discussion every month with engineers. • To be one of the member for the group ISO 22000, ISO 14001 Engineering Manager- F&N Beverages Manufacturing Sdn.Bhd 01/09/2009 to 01/10/2010 • Reporting to National Engineering Services Manager • To maintain all lines efficiency. ( Equipment performance loss EPL) • To control the Operation Expenses ( OPEX - RM 16.8 million) • To improve the uptime of the machine. • To reduce plant downtime based on plant efficiency • To create critical spares items and to create critical jobs for Preventive maintenance • To implement zero accident for SAFETY • To be one of the member for the group of HACCP , GMP 3
  • 4. Maintenance Manager- KLK Palm Oleo Klang 03/11/2008 to 01/09/2009 • Reporting to Plant manager • To maintain plant productivity and Quality • To control the Operating expenses. • To improve productivity measurement. • To reduce plant downtime based on plant efficiency. • To create critical spares items and to create critical jobs for Preventive maintenance. • To revamp stores. • To implement zero accident for SAFETY Maintenance Manager - West Port Oil mills Soon Soon Group 01/02/2008 to 03/11/2008 • Reporting to Operation manager • To maintain plant productivity and Quality • To control the Operating expenses. • To reduce the manufacturing expenses by 5%. • To improve productivity measurement. • To reduce plant downtime. • To create critical spares items and to create critical jobs for Preventive maintenance. • To establish a TPM for maintenance. • To implement zero accident for SAFETY • Manage and improve management tools, maintenance procedures and methods • Devise and schedule maintenance programmes in collaboration with the production, process, electrical, instrumentation, maintenance and civil department. • Carry out innovations and improvements aiming at improving equipment reliability and maintenance performance. • To keep the equipment in good condition by setting up proper preventive maintenance schedule for each equipment. • Contribute to the budget preparation and monitor expenditure in relation with current budget. 4
  • 5. Plant Manager 2/Maintenance Manager - West Port Oil mills Soon Soon Group 01/07/2007 to 01/02/2008 • Reporting to Operation Manager • To maintain plant productivity and Quality • To control the Operating expenses. • To reduce the manufacturing expenses by 5%. • To improve productivity measurement. • To reduce plant downtime. • To establish a TPM for maintenance. • To implement zero accident for SAFETY • To minimize complaint from customer. Plant Manager 2 - West Port Oil mills Soon Soon Group 02/10/2006 to 01/07/2007 • Reporting to Group Chief Operating Officer Mr.HengCC • To maintain plant productivity and Quality • To control the Operating expenses. • To reduce the manufacturing expenses by 5%. • To improve productivity measurement. • To reduce plant downtime. • To establish a TPM for maintenance. • To implement zero accident for SAFETY • To minimize complaint from customer. Senior Engineer (Dept.Manager) – Production & Operation Tasek Corporation Berhad 20/07/2005 to 13/10/2006 (2 years) • Reporting to Division Manager of the performance of both VRM and Ball Mills. - Coal Mills and Raw Mills. • To make sure all upstream and downstream process not affected during daily operation. 5
  • 6. • To make sure enough raw materials for the Kiln daily operation. • Responsible for good reliability of all systems. • To keep all records up to date. • Managing all spare availabities. • Planning for shut down. Senior Engineer – Mechanical and Maintenance Tasek Corporation Berhad 03/05/2005 20/07/2005 • Reporting to Division Manager for daily performance of both VRM and Ball Mills. • Also to manage Facilities Department. • Responsible for good reliability of all systems. • Managing all spare availabities. • Planning for shut down. • To manage daily workshop activities. Project Leader (Lubrication Engineer ) Working with Shell for consignment stock Lafarge Malayan Cement – KANTHAN WORKS Year 2003 – 2005 • Successfully reduce the consignment stocks from 52 various of lubrication to 16 types of lubrication. • Co-coordinating with Shell Company Engineer to ensure the Lubriplan System works. • To rationalize and manage oil in store. • Responsible for consignment stock working smoothly. • Ensuring and monitor all equipment using the right oil and correct volume. • To ensure schedule for oil samplings are being done. • Ensuring all lubrication systems work properly. • Ensure all filter elements and pumps are working properly. SECTION ENGINEER (Cement Milling and Packing Plant) – MECHANICAL ASSOCIATED PAN MALAYSIA CEMENT SDN.BHD – KANTHAN WORKS Year 2001 – 2003 ( Lafarge) Section: Cement Milling and Packing Plant. (6 Cement Mills and 3 Rotary Packers) • Improve reliability of cement mill and packing plant section. • Ensuring all spares is available during PM. 6
  • 7. • Ensuring the regular maintenance activities being carried out. • Plan and implementing preventive measure. • Avoid any breakdown of the equipments. • Managing the revenue budget within approved. • Coordinating with other departments for planned and scheduled maintenance of the equipments without hindering the operation scheduled of the plant. • Ensuring the effective utilization of the teammates and contract labor to achieve the overall target. SECTION ENGINEER (KILN KK3 AND KK4) – MECHANICAL ASSOCIATED PAN MALAYSIA CEMENT SDN.BHD – KANTHAN WORKS Year 2000 – 2001 ( Lafarge) Section: KILN K3 (3000t/d) and KILN K4 (6100t/d) • Reporting to Chief Mechanical Engineer the daily performance of both kiln and coolers. • Responsible for good reliability of all systems. • Managing all spare availabities. • Planning for shut down. SECTION ENGINEER (Raw Milling KK4) – MECHANICAL ASSOCIATED PAN MALAYSIA CEMENT SDN.BHD – KANTHAN WORKS Year 2000 – 2001 ( Lafarge) Section: KK4 Vertical Raw Mill ( 280t/hr) x 2 Units • Ensuring good reliability of the systems. • Planning for PM and Shut Down • Managing spares. • Study and source out materials that can prolong the life of the system due to wear and tear. SECTION ENGINEER (Raw Milling) – MECHANICAL ASSOCIATED PAN MALAYSIA CEMENT SDN.BHD – KANTHAN WORKS Year 1999 – 2000 ( Lafarge) Section: KK3 Raw Mill and Clay Reclaimer KK4 • Ensuring good reliability of the systems. • Planning for PM and Shut Down • Managing spares. • Study and source out materials that can prolong the life of the system due to wear and tear. 7
  • 8. GRADUATE ENGINEER – MECHANICAL ASSOCIATED PAN MALAYSIA CEMENT SDN.BHD – KANTHAN WORKS Year 1998 – 1999 ( Lafarge) • Participating in commissioning of new line KK4 ( 6100 t/d) • Working on shift with IHI Engineers during test run. • Modifying some mechanical defects of equipment. • Reporting to Chief Mechanical Engineer the daily progress. GRADUATE ENGINEER – MECHANICAL ASSOCIATED PAN MALAYSIA CEMENT SDN.BHD – KANTHAN WORKS Year 1997 – 1998 ( Lafarge) • Actively involve in project of new line (Kiln Kanthan K4 - IHI) • Update and check all the equipments (mechanical) following the right specification. • Report to Mechanical Chief Engineer. (Mr. Lee Biang Chan) daily work progress. MECHANICAL ENGINEER ASSISTANCE 02/01/1996-15/02/1997 Mentor: Mr. Soon Hean Hooi (Factory Manager) ADDRESS: CHOO BEE METAL 46-48, LEBUH RAYA BENDAHARA 31650 IPOH. • The project undertaken was to modify straightening machine, to maintain good reliability for shearing machine and decoration pipe machine. • The project undertaken was to modify and commissioning flat bar straightening machine, project management and consultation. REFERENCE: 1. Mr. Soon Hean Hooi ( Engineering Director) CHOO BEE METAL 46-48, LEBUH RAYA BENDAHARA 8
  • 9. 31650 IPOH. H/P 0125253232 2. Mr. Lee Kwee Soon Senior Operation Manager Perak- Hanjoong Simen H/P 0125078322 Off; 05-7775217 Note: Monthly draw pay salary : RM 9215 + Allowance Expected Salary : RM 13000 9
  • 10. 31650 IPOH. H/P 0125253232 2. Mr. Lee Kwee Soon Senior Operation Manager Perak- Hanjoong Simen H/P 0125078322 Off; 05-7775217 Note: Monthly draw pay salary : RM 9215 + Allowance Expected Salary : RM 13000 9