NTPC BARH
BSTPP- BARH SUPER THERMAL POWER PLANT
CONTENT: Overview; BSTPP at a glance; Various parts of BSTPP; Electrical Overview; Switch Yard; Transformer; Generator...
Project Report on Industrial Summer Training at NTPC SimhadriAshish Uppu
The following pdf is a Project Report about my Industrial Training at NTPC Limited Simhadri, Visakhapatnam, Andhra Pradesh, India. It includes all the fundamentals of a Thermal Power Plant: its layout, various departments, principal components etc. It also contains a brief profile about the company.
NTPC BARH
BSTPP- BARH SUPER THERMAL POWER PLANT
CONTENT: Overview; BSTPP at a glance; Various parts of BSTPP; Electrical Overview; Switch Yard; Transformer; Generator...
Project Report on Industrial Summer Training at NTPC SimhadriAshish Uppu
The following pdf is a Project Report about my Industrial Training at NTPC Limited Simhadri, Visakhapatnam, Andhra Pradesh, India. It includes all the fundamentals of a Thermal Power Plant: its layout, various departments, principal components etc. It also contains a brief profile about the company.
NTPC is India’s largest energy conglomerate with roots planted way back in 1975 to accelerate power development in India. Since then it has established itself as the dominant power major with presence in the entire value chain of the power generation business. From fossil fuels it has forayed into generating electricity via hydro, nuclear and renewable energy sources. This foray will play a major role in lowering its carbon footprint by reducing green house gas emissions. To strengthen its core business, the corporation has diversified into the fields of consultancy, power trading, training of power professionals, rural electrification, ash utilization and coal mining as well.
NTPC became a Maharatna company in May 2010, one of the only four companies to be awarded this status. NTPC was ranked 431st in the ‘2015, Forbes Global 2000’ ranking of the World’s biggest companies.
The total installed capacity of the company is 44,798 MW (including JVs) with 17 coal based and 7 gas based stations. 7 Joint Venture stations are coal based and 8 renewable energy projects. The company has set a target to have an installed power generating capacity of 1,28,000 MW by the year 2032. The capacity will have a diversified fuel mix comprising 56% coal, 16% Gas, 11% Nuclear and 17% Renewable Energy Sources including hydro. By 2032, non fossil fuel based generation capacity shall make up nearly 28% of NTPC’s portfolio.NTPC has been operating its plants at high efficiency levels. Although the company has 17.73% of the total national capacity, it contributes 25.91% of total power generation due to its focus on high efficiency.
Vision
“To be the world’s largest and best power producer, powering India’s growth.”
MISSION
Develop and provide reliable power, related products and services at competitive prices, integrating multiple energy sources with innovative and eco-friendly technologies and contribute to society.
Core Values – BE COMMITTED
B Business Ethics
E Environmentally & Economically Sustainable
C Customer Focus
O Organizational & Professional Pride
M Mutual Respect & Trust
M Motivating Self & others
I Innovation & Speed
T Total Quality for Excellence
T Transparent & Respected Organization
E Enterprising
D Devoted
NTPC Electric Supply Company Ltd. (NESCL)
The company was formed on August 21, 2002. It is a wholly owned subsidiary company of NTPC with the objective of making a foray into the business of distribution and supply of electrical power, as a sequel to reforms initiated in the power sector. The company was also mandated to take up consultancy and other assignments in the area of Electrical Distribution Management System.
Its maiden entry into power distribution was by forming a 50:50 JV company ‘KINESCO Power and Utility Private Ltd.’ with Kerala Industrial Infrastructure Development Corporation (KINFRA). It is already distributing power in KINFRA.
This presentations contains the basic layout of a thermal power palnt along with the components.Coal and it's types.Future of thermal power plant in India.
NTPC is India’s largest energy conglomerate with roots planted way back in 1975 to accelerate power development in India. Since then it has established itself as the dominant power major with presence in the entire value chain of the power generation business. From fossil fuels it has forayed into generating electricity via hydro, nuclear and renewable energy sources. This foray will play a major role in lowering its carbon footprint by reducing green house gas emissions. To strengthen its core business, the corporation has diversified into the fields of consultancy, power trading, training of power professionals, rural electrification, ash utilization and coal mining as well.
NTPC became a Maharatna company in May 2010, one of the only four companies to be awarded this status. NTPC was ranked 431st in the ‘2015, Forbes Global 2000’ ranking of the World’s biggest companies.
The total installed capacity of the company is 44,798 MW (including JVs) with 17 coal based and 7 gas based stations. 7 Joint Venture stations are coal based and 8 renewable energy projects. The company has set a target to have an installed power generating capacity of 1,28,000 MW by the year 2032. The capacity will have a diversified fuel mix comprising 56% coal, 16% Gas, 11% Nuclear and 17% Renewable Energy Sources including hydro. By 2032, non fossil fuel based generation capacity shall make up nearly 28% of NTPC’s portfolio.NTPC has been operating its plants at high efficiency levels. Although the company has 17.73% of the total national capacity, it contributes 25.91% of total power generation due to its focus on high efficiency.
Vision
“To be the world’s largest and best power producer, powering India’s growth.”
MISSION
Develop and provide reliable power, related products and services at competitive prices, integrating multiple energy sources with innovative and eco-friendly technologies and contribute to society.
Core Values – BE COMMITTED
B Business Ethics
E Environmentally & Economically Sustainable
C Customer Focus
O Organizational & Professional Pride
M Mutual Respect & Trust
M Motivating Self & others
I Innovation & Speed
T Total Quality for Excellence
T Transparent & Respected Organization
E Enterprising
D Devoted
NTPC Electric Supply Company Ltd. (NESCL)
The company was formed on August 21, 2002. It is a wholly owned subsidiary company of NTPC with the objective of making a foray into the business of distribution and supply of electrical power, as a sequel to reforms initiated in the power sector. The company was also mandated to take up consultancy and other assignments in the area of Electrical Distribution Management System.
Its maiden entry into power distribution was by forming a 50:50 JV company ‘KINESCO Power and Utility Private Ltd.’ with Kerala Industrial Infrastructure Development Corporation (KINFRA). It is already distributing power in KINFRA.
This presentations contains the basic layout of a thermal power palnt along with the components.Coal and it's types.Future of thermal power plant in India.
Steam turbines and its associated systems(ntpc ramagundam)abdul mohammad
Steam turbine is an excellent prime mover to convert heat energy of steam to mechanical energy. Of all heat engines and prime movers the steam turbine is nearest to the ideal and it is widely used in power plants and in all industries where power is needed for process.
In power generation mostly steam turbine is used because of its greater thermal efficiency and higher power-to-weight ratio. Because the turbine generates rotary motion, it is particularly suited to be used to drive an electrical generator – about 80% of all electricity generation in the world is by use of steam turbines.
Rotor is the heart of the steam turbine and it affects the efficiency of the steam turbine. In this project we have mainly discussed about the working process of a steam turbine. The thermal efficiency of a steam turbine is much higher than that of a steam engine.
Installation & Working of Coal Fired Thermal Power PlantMuhammad Awais
Statement of Submission:
It is certified that the following students of PRESTON University Islamabad (Mechanical Department) have successfully completed the project named Installation & Working of Coal Fired Thermal Power Plant. This project fulfills the complete requirement of the topic given by the project adviser.
PREFACE
This thesis ″Installation & Working of Coal Fired Thermal Power Plant ″ is made on a final semester project of B-Tech (Hons) Mechanical.
This thesis includes the basic concept of Coal Fired Thermal Power Plant, there principles, factors, types of Boilers, Coal, Turbines, calculation and basic design of C.F.T.P.P system for energy.
This thesis has been written according to rules and standards of ASME (American Society of Mechanical Engineers).
All the concepts, factors, calculations, design fulfills the proper rules of Coal Fired Thermal Power Plant according to ASME.
In this book the chapters contains the following
Introduction to Thermal coal fired power plant.
Introduction to Thermal coal fired power plant System
Coal
Boiler
Turbine
Generator
Transmission Line
Best Regards,
C.F.T.P.P Project Group
Abhinav Kumar Mechanical Engineering Vocational Training NTPC Ltd UnchaharABHINAV KUMAR
A Seminar report on Vocational Training at NTPC Ltd Unchahar. I have covered the basic elements of thermal power plant. I undergone 4 weeks training after my 2nd year of Bachelor's of Technology in Mechanical Engineering. I was Assigned the Turbine Maintenance and Boiler Maintenance Departments.
Hierarchical Digital Twin of a Naval Power SystemKerry Sado
A hierarchical digital twin of a Naval DC power system has been developed and experimentally verified. Similar to other state-of-the-art digital twins, this technology creates a digital replica of the physical system executed in real-time or faster, which can modify hardware controls. However, its advantage stems from distributing computational efforts by utilizing a hierarchical structure composed of lower-level digital twin blocks and a higher-level system digital twin. Each digital twin block is associated with a physical subsystem of the hardware and communicates with a singular system digital twin, which creates a system-level response. By extracting information from each level of the hierarchy, power system controls of the hardware were reconfigured autonomously. This hierarchical digital twin development offers several advantages over other digital twins, particularly in the field of naval power systems. The hierarchical structure allows for greater computational efficiency and scalability while the ability to autonomously reconfigure hardware controls offers increased flexibility and responsiveness. The hierarchical decomposition and models utilized were well aligned with the physical twin, as indicated by the maximum deviations between the developed digital twin hierarchy and the hardware.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
CFD Simulation of By-pass Flow in a HRSG module by R&R Consult.pptxR&R Consult
CFD analysis is incredibly effective at solving mysteries and improving the performance of complex systems!
Here's a great example: At a large natural gas-fired power plant, where they use waste heat to generate steam and energy, they were puzzled that their boiler wasn't producing as much steam as expected.
R&R and Tetra Engineering Group Inc. were asked to solve the issue with reduced steam production.
An inspection had shown that a significant amount of hot flue gas was bypassing the boiler tubes, where the heat was supposed to be transferred.
R&R Consult conducted a CFD analysis, which revealed that 6.3% of the flue gas was bypassing the boiler tubes without transferring heat. The analysis also showed that the flue gas was instead being directed along the sides of the boiler and between the modules that were supposed to capture the heat. This was the cause of the reduced performance.
Based on our results, Tetra Engineering installed covering plates to reduce the bypass flow. This improved the boiler's performance and increased electricity production.
It is always satisfying when we can help solve complex challenges like this. Do your systems also need a check-up or optimization? Give us a call!
Work done in cooperation with James Malloy and David Moelling from Tetra Engineering.
More examples of our work https://www.r-r-consult.dk/en/cases-en/
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
1. PRESENTED BY:-
SHIVANK KUMAR
Roll No. 12000713093
SEMESTER: 7th
BRANCH: Mechanical Engineering
DR. B.C. ROY ENGINEERING COLLEGE, DURGAPUR
VOCATIONAL TRAINING – 2016
SUBJECT:- VIVA VOCE ON VOCATIONAL TRAINING
SUBJECT CODE:- ME782
PRESENTED TO:-
MECHANICAL DEPARTMENT
DR. B.C. ROY ENGINEERING COLLEGE,
DURGAPUR
2. *
*Type Government owned corporation
Public company
*Industry Electric Utility
*Founded 1975
*Headquarter New Delhi, India
*Key people Arup Roy Choudhury
(Chairman & MD)
*Products Electrical power
Natural gas
*Services Electricity generation and distribution
natural gas exploration, production, transportation
and distribution
*Revenue INR 73904 Crores (US$ 12.34 billion) (2013-14)
*Net income INR 13834 Crores (US$ 2.31 billion) (2013-14)
*Number of
employees 24,546 (April 2015)
3. *Vision
To be the world’s largest and best power producer,
powering . . India’s growth.
Mission
Develop and provide reliable power, related products and
services at competitive prices, integrating multiple energy
sources with innovative and eco-friendly technologies and
contribute to society.
8. *
HANDLES THE COAL FROM ITS RECEIPT TO TRANSFERRING IT TO
BUNKERS
SUPPLY THE QUANTA OF PROCESSED COAL TO BUNKERS OF COAL MILLS
FOR BOILER OPERATION
TO STACK THE COAL TO COAL YARD
9. *
BOILER CONSISTS OF 3 TYPES OF FANS NAMELY FORCED DRAUGHT,
INDUCED DRAUGHT, AND PRIMARY AIR FAN
TO PRODUCE STEAM BOILER COVERTS ENERGY, IN THE FORM OF
COAL, INTO STEAM
PURE BOILER FEED WATER IS TURNED TO STEAM BY THE HEAT
CREATED FROM BURNING OF COAL
10. *
THREE STAGES OF TURBINE:
HIGH PRESSURE TURBINE
INTERMIDIATE PRESSURE TURBINE
LOW PRESSURE TURBINE
CONVERTS THERMAL ENERGY TO MECHANICAL ENERGY
EXTRACTS THERMAL ENERGY FROM PRESSURIZED STEAM AND USES IT TO
DO MECHANICAL WORK ON A ROTATING OUTPUT SHAFT