14. LOWER SIBALOM HYDROPOWER PROJECT
Location: Barangay Sinundulan and Barangay
Atabay in the Municipality of San Remegio, Antique
Plant Capacity: 3.6 MWp
Estimated project cost: PhP 670,250,680.97 or Php
185,305,690.07 per MWp
17. MIDDLE SIBALOM HYDROPOWER PROJECT
Location: Barangay Sinundulan and Barangay
Atabay in the Municipality of San Remegio, Antique
Plant Capacity: 5.1 MWp
Estimated project cost: PhP 973,955,689.98 or Php
190,971,703.92 per MWp