SlideShare a Scribd company logo
For all your Construction needs!
BRIEF INTRODUCTION
A. T. MALLARI BUILDERS is a Tarlac- based Design + Build
firm that offers a wide range of construction related
services. Formed in October 2012, its key officers have
wide array experience in their specific areas of expertise,
particularly in architecture, general construction and fit
out works. For the past year alone, our team have
successfully completed and worked on small to medium
scale construction, renovation and alteration projects
focusing on residential contracting, warehouses,
commercial buildings, interior finishing, fit-out works &
Site Development projects. Now we are engaged on
multi-million projects on agro-industrial and heavy steel
works like factories & warehouses.
Eng’r. Alvin, the company’s owner/manager is a registered
Civil Engineer for more than twenty five years who works
with Contractors, Architects and Interior Designers and
handles different projects from Mansions, restaurants,
Corporate offices and Apartments to Commercial Buildings
and Warehouses/Industrial projects during his practice.
He is a globally certified Project Management Professional
given by Project Management Institute (PMI) in
Pennsylvania USA.
MISSION AND VISION
“COMMITMENT is our biggest ASSET…”
Construction is a tough business overflowed with
unfulfilled promises. A. T. MALLARI BUILDERS will
be known as one of the most ethical & honest
service provider in the industry. Every decision
will be based on our core ethics.
ATMB wants to establish a strong reputation on
meeting client satisfaction and building long term
relationship with them.
ON-GOING PROJECTS
Project : Two-storey Commercial Bldg.
Location : Cut-cut 1, Capas, Tarlac
Owner : A + M Mallari
Scope of Work : General works
Project Cost : Php 3,900,000.00
Project : Two-storey Commercial Bldg.
W/ roof deck
Location : San Nicolas, Tarlac City
Owner : A + M Mallari
Scope of Work : General works
Project Cost : Php 4,850,000.00
Project : 2 Storey 5 bedroom Residence
Location : San Francisco, Mabalacat Pampanga
Owner : Mr. Beneth Macam
Scope of Work : General works
Project Cost : Php 6,000,000.00
ON-GOING PROJECTS
Project : Lapuz Complex Site Development
Owner : Municipality of Concepcion, Tarlac
Scope of Work : General works ( Paid Royalty )
Project Cost : Php 11,300,000.00
RECENTLY COMPLETED PROJECTS
Project : 5 unit - CR General Renovation
Location : Clarkfield, Pampanga
Owner : Outback Five Star Clark Phils. Inc.
Scope of Work : General works
Project Cost : Php 5,400,000.00
RECENTLY COMPLETED PROJECTS
RECENTLY COMPLETED PROJECTS
Project : Sacristy
Location : Sto. Rosario, Capas Tarlac
Owner : San Nicolas De Tolentino Shrine
Scope of Work : General works
Project Cost : Php 3,000,000.00
Project : 150 L.m. ( 3-90cm dia. )
Drainage system
Location : Sta. Maria, Mabalacat City
Owner : iLeslie Holdings Inc.
Designer : Mabalacat City Engg.
Scope of Work : General works
Project Cost : Php 3,400,000.00
COMPLETED PROJECTS
Project : Bossanova Ext. and Support facilities
& Site Development works
Location : Capas, Tarlac
Designer : AT Mallari / Ar. AM Garcia, UAP
Owner : Mr. & Mrs. Jose Yumul
Scope of Work : General Works
Project Cost : Php 23,000,000.00
COMPLETED PROJECTS
Project : 2 Warehouse & Site Devt
Location : PEZ, Pulung Cacutud, Angeles City
Owner : AHDMI
Designer : AT Mallari
Scope of Work : General works
Project Cost : Php 48,000,000.00
COMPLETED PROJECTS
Project : Warehouse 3 & Admin Bldg. Extension
Location : PEZ, Pulung Cacutud, Angeles City
Owner : MK Themed Attractions Phils. Inc.
Designer : Ar. V. Dicuangco, UAP
Scope of Work : General works
Project Cost : Php 40,000,000.00
COMPLETED PROJECTS
Project : Assorted works
Location : Mabalacat Pampanga
Designer : Eng’r. Alex Bautista
Owner : iLeslie Holdings, Inc.
Scope of Work : General works
Project Cost : Php 5,000,000.00
COMPLETED PROJECTS
Project : Proposed 2 storey 10 unit Apartment 1 bedroom
( grd floor only )
Location : Cristorey, Capas, Tarlac
Designer : Ar. AM Garcia, UAP
Owner : Mr. & Mrs. A. De Guzman
Scope of Work : General works
Project Cost : Php 2,156,000.00
COMPLETED PROJECTS
Project : Tw-Storey Residence
Location : Sto. Rosario, Capas Tarlac
Designer : Ar. AM Garcia, UAP
Owner : Mr. & Mrs. Michael Descanzo
Scope of Work : General works
Project Cost : Php 3,000,000.00
Project : Warehouse w/ mezanine
Location : PEZA Angeles City
Designer : AT Mallari / Ar. AM Garcia, UAP
Owner : Provovative Quality Aparell
Scope of Work : General Works
Project Cost : Php 17,500,000.00
COMPLETED PROJECTS
Project : Construction of Warehouse 1 & 2 and Admin Bldg. perimeter
fence/Gates
Location : PEZA, Pulung Cacutud, Angeles City
Designer : TEMA Design
Owner : MK Themed Attractions Phils. Inc.
Scope of Work : General Works
Project Cost : Php 43,000,000.00
COMPLETED PROJECTS
Project : Hidden Road Inn & Support facilities
Location : San Juan, Concepcion, Tarlac
Designer : AT Mallari / Ar. AM Garcia, UAP
Owner : Mr. & Mrs. Jose Yumul
Scope of Work : General Works
Project Cost : Php 22,000,000.00
COMPLETED PROJECTS
Project : Proposed two-storey resdience
Location : Bamban, Tarlac
Designer : AT Mallari / Ar. AM Garcia, UAP
Owner : Eng’r. & Mrs. R. Mallillin
Scope of Work : General works
Project Cost : Php 3,500,000.00
Project : Restobar and grill
Location : Alfonso, Concepcion Tarlac
Designer : Ar. AM Garcia, UAP
Owner : Ms. Villanueva
Scope of Work : General Works
Project Cost : Php 3,200,000.00
Project : Five Bedroom residence
Location : San Juan, Concepcion, Tarlac
Designer : AT Mallari / Ar. AM Garcia, UAP
Owner : Dr. Rosemary Yumul Vercales
Scope of Work : General Works
Project Cost : Php 3,500,000.00
Project : Single storey Residence
Location : Aranguren Capas, Tarlac
Designer : AT Mallari / Ar. AM Garcia, UAP
Owner : Mr. Mark Yamson
Scope of Work : General Works
Project Cost : Php 2,000,000.00
COMPLETED PROJECTS
Project : Maintenance of Ash pond & Leachate; Anda Gate &
Guard house
Location : TIPCO cpd. TECO Special Economic Zone,
Mabalacat Pampanga
Designer : AT Mallari
Owner : Asia Pacific Energy Corp.
Scope of Work : General Works
Project Cost : Php 1,262,000.00
COMPLETED PROJECTS
COMPLETED PROJECTS
Project : Private Resort
Location : Banaba Bamban, Tarlac
Designer : AT Mallari / Ar. AM Garcia, UAP
Owner : Mr. Arnel M. De Guzman
Scope of Work : Function Hall, Bath House, S. pool
Rest House, Perimeter Fence
(Labor works only)
Project contract : Php 1,500,000.00
COMPLETED PROJECTS
Project : Leanne Arcade Two – Storey Commercial Bldg.
Location : Mc. Arthur Hi-way, Junction, Capas, Tarlac
Designer : AA Carreon Architect
Owner : Mr. & Mrs. Halcon Talavera
Scope of Work : Structural, Int. Finishing & Plumbing Works
( Labor works only )
Project Contract : Php 2,000,000.00
COMPLETED PROJECTS
Project : Two – Storey Residence
Location : Sto. Domingo II Capas, Tarlac
Designer : Ar. A. R. Canasa, UAP
Owner : Mrs. L. Laquian
Scope of Work : General Works
Project Cost : Php 4,000.000.00
Project : Mooring Station
Location : SBMA
Designer : AT Mallari /Giga Mare Inc.
Owner : GIGA MARE inc.
Scope of Work : General Works
Project Cost : Php 2,423,000.00
COMPLETED PROJECTS
Project : PPP - School Building TYPE 3
One – Storey Four Classroom
Location : San Roque Lapaz, Tarlac
Designer/Main Contractor :
Megawide Construction Corp.
Owner : Dep-Ed
Scope of Work : Sub-con– General Works
Project Cost : Php 2,547,169.73
Project : PPP - School Building TYPE 8
Two – Storey Four Classroom
Location : Guevara Lapaz, Tarlac
Designer/Main Contractor :
Megawide Construction Corp.
Owner : Dep-Ed
Scope of Work : Sub-con– General Works
Project Cost : Php 2,060,000.00
Project : Microsoft Call Center
Location : Clarkfield, Pampanga
Designer : Ar. Mylene Pabillano, UAP
Owner : Sutherland Global Services
Scope of Work : Electrical Works
Project Cost : Php 6,000,000.00
COMPLETED PROJECTS
Project : Airconditioned Cafeteria
Location : Clarkfield, Pampanga
Designer : Ar. Mylene Pabillano, UAP
Owner : Sutherland Global Services
Scope of Work : General Works
Project Cost : Php 4,100,000.00
Project : Assorted projects
Location : Tibag, Tarlac City
Designer : Ar. Mylene Pabillano, UAP
Owner : Sutherland Global Services
Scope of Work : Diesel Tank, Warning Lights
Roll up mosquito screen, Stair handrail
Exit doors, Manual transfer switch, etc.
Project Cost : Php 2,140.,000.00
COMPLETED PROJECTS
Project : Pilmico Farms
Designer : RTCo Architecture
Owner : Pilmico Animal Nutrition Corp.
Scope of Work : Project Management & Supervision only ( 0.5 % of contarct cost )
Under G. T. Briones Enterprises ( General Contractor)
Project Cost : Php 82,000,000.00
& Location
. Nucleus Farm – 1st Expansion (Sto. Rosario Capas, Tarlac)
. Nucleus Farm 2nd Expansion (Sto. Rosario Capas, Tarlac)
. Farm 1 (Cut-Cut II Capas, Tarlac)
. Farm 4 (Cut-Cut II Capas, Tarlac)
. Farm 5 (San Agustin MURCIA Concepcion, Tarlac)
. Farm 7 (San Agustin MURCIA Concepcion, Tarlac)
EQUIPMENT & POWER TOOLS
MINI EXCAVATOR PC-10 – 1 UNIT
MINI LOADER – 1 UNIT
EQUIPMENT & POWER TOOLS
PAY LOADER TCM 75 B– 1 UNIT
CANTER DROP SIDE – 1 UNIT
EQUIPMENT & POWER TOOLS
DUMP TRUCK – 1 UNIT
BACKHOE PC 40 – 1 UNIT
EQUIPMENT & POWER TOOLS
BACKHOE PC 120 – 1 UNIT
EQUIPMENT & POWER TOOLS
BAGGY MIXER – 6 UNITS WELDING MACHINE – 6 UNITS
PORTABLE JACK HAMMER- 2 UNITS
CUT OFF MACHINE – 4 UNITS
ORGANIZATIONAL CHART
PERMITS & LICENSES
PERMITS & LICENSES
PERMITS & LICENSES
PERMITS & LICENSES
SUPPLIERS LIST

More Related Content

Similar to AT Mallari Builders Co. profile 11-2023.pdf

Luca_Tentellini_Portfolio_27_03_22.pdf
Luca_Tentellini_Portfolio_27_03_22.pdfLuca_Tentellini_Portfolio_27_03_22.pdf
Luca_Tentellini_Portfolio_27_03_22.pdf
Luca Tentellini
 
Tim projects completed
Tim projects completedTim projects completed
Tim projects completed
Tim Fugate
 
Lon Dunaway Resume
Lon Dunaway ResumeLon Dunaway Resume
Lon Dunaway ResumeLon Dunaway
 
Sustainable Communities and Net-Zero Energy: Municipal Incentives That Actual...
Sustainable Communities and Net-Zero Energy: Municipal Incentives That Actual...Sustainable Communities and Net-Zero Energy: Municipal Incentives That Actual...
Sustainable Communities and Net-Zero Energy: Municipal Incentives That Actual...
Derek Satnik
 
RRozek Project List 9 20 15
RRozek Project List 9 20 15RRozek Project List 9 20 15
RRozek Project List 9 20 15Roman Rozek
 
16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land development16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land development
Fernando Bravo, P.E., CFM
 
16 0824_Fernando Bravo-Project Management & Land Development
16 0824_Fernando Bravo-Project Management & Land Development16 0824_Fernando Bravo-Project Management & Land Development
16 0824_Fernando Bravo-Project Management & Land DevelopmentFernando Bravo, P.E., CFM
 
Portfolio
PortfolioPortfolio
Portfolio
22Magui22
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)John Adams
 
Project Resume - Keane
Project Resume - KeaneProject Resume - Keane
Project Resume - KeaneLisa Loveland
 
Long Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction ProgramLong Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction ProgramCordoba Corp
 
DAC Presentation - 150927
DAC Presentation - 150927DAC Presentation - 150927
DAC Presentation - 150927Brian Davison
 

Similar to AT Mallari Builders Co. profile 11-2023.pdf (20)

Luca_Tentellini_Portfolio_27_03_22.pdf
Luca_Tentellini_Portfolio_27_03_22.pdfLuca_Tentellini_Portfolio_27_03_22.pdf
Luca_Tentellini_Portfolio_27_03_22.pdf
 
Tim projects completed
Tim projects completedTim projects completed
Tim projects completed
 
Lon Dunaway Resume
Lon Dunaway ResumeLon Dunaway Resume
Lon Dunaway Resume
 
Done
DoneDone
Done
 
Slk m india
Slk m indiaSlk m india
Slk m india
 
Sustainable Communities and Net-Zero Energy: Municipal Incentives That Actual...
Sustainable Communities and Net-Zero Energy: Municipal Incentives That Actual...Sustainable Communities and Net-Zero Energy: Municipal Incentives That Actual...
Sustainable Communities and Net-Zero Energy: Municipal Incentives That Actual...
 
RRozek Project List 9 20 15
RRozek Project List 9 20 15RRozek Project List 9 20 15
RRozek Project List 9 20 15
 
16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land development16 0824 fernando bravo project management & land development
16 0824 fernando bravo project management & land development
 
16 0824_Fernando Bravo-Project Management & Land Development
16 0824_Fernando Bravo-Project Management & Land Development16 0824_Fernando Bravo-Project Management & Land Development
16 0824_Fernando Bravo-Project Management & Land Development
 
Portfolio
PortfolioPortfolio
Portfolio
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016
 
JA CV 050915 (1) (1)
JA CV 050915 (1) (1)JA CV 050915 (1) (1)
JA CV 050915 (1) (1)
 
Project Resume - Keane
Project Resume - KeaneProject Resume - Keane
Project Resume - Keane
 
Long Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction ProgramLong Beach Community College District Bond Construction Program
Long Beach Community College District Bond Construction Program
 
SBCV2016
SBCV2016SBCV2016
SBCV2016
 
CV
CVCV
CV
 
DAC Presentation - 150927
DAC Presentation - 150927DAC Presentation - 150927
DAC Presentation - 150927
 
Edward_Piekut-3
Edward_Piekut-3Edward_Piekut-3
Edward_Piekut-3
 
KLupdate 2015
KLupdate 2015KLupdate 2015
KLupdate 2015
 
Leslie Lopena_CV
Leslie Lopena_CVLeslie Lopena_CV
Leslie Lopena_CV
 

Recently uploaded

Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
Kamal Acharya
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
fxintegritypublishin
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
karthi keyan
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
AmarGB2
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
top1002
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
bakpo1
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
obonagu
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
ChristineTorrepenida1
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Dr.Costas Sachpazis
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
FluxPrime1
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
gestioneergodomus
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
SamSarthak3
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
Pratik Pawar
 

Recently uploaded (20)

Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
Final project report on grocery store management system..pdf
Final project report on grocery store management system..pdfFinal project report on grocery store management system..pdf
Final project report on grocery store management system..pdf
 
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdfHybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdf
 
CME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional ElectiveCME397 Surface Engineering- Professional Elective
CME397 Surface Engineering- Professional Elective
 
Investor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptxInvestor-Presentation-Q1FY2024 investor presentation document.pptx
Investor-Presentation-Q1FY2024 investor presentation document.pptx
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
Basic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparelBasic Industrial Engineering terms for apparel
Basic Industrial Engineering terms for apparel
 
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
一比一原版(SFU毕业证)西蒙菲莎大学毕业证成绩单如何办理
 
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
在线办理(ANU毕业证书)澳洲国立大学毕业证录取通知书一模一样
 
Unbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptxUnbalanced Three Phase Systems and circuits.pptx
Unbalanced Three Phase Systems and circuits.pptx
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...
 
DESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docxDESIGN A COTTON SEED SEPARATION MACHINE.docx
DESIGN A COTTON SEED SEPARATION MACHINE.docx
 
DfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributionsDfMAy 2024 - key insights and contributions
DfMAy 2024 - key insights and contributions
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdfAKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
AKS UNIVERSITY Satna Final Year Project By OM Hardaha.pdf
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
weather web application report.pdf
weather web application report.pdfweather web application report.pdf
weather web application report.pdf
 

AT Mallari Builders Co. profile 11-2023.pdf

  • 1. For all your Construction needs!
  • 2. BRIEF INTRODUCTION A. T. MALLARI BUILDERS is a Tarlac- based Design + Build firm that offers a wide range of construction related services. Formed in October 2012, its key officers have wide array experience in their specific areas of expertise, particularly in architecture, general construction and fit out works. For the past year alone, our team have successfully completed and worked on small to medium scale construction, renovation and alteration projects focusing on residential contracting, warehouses, commercial buildings, interior finishing, fit-out works & Site Development projects. Now we are engaged on multi-million projects on agro-industrial and heavy steel works like factories & warehouses. Eng’r. Alvin, the company’s owner/manager is a registered Civil Engineer for more than twenty five years who works with Contractors, Architects and Interior Designers and handles different projects from Mansions, restaurants, Corporate offices and Apartments to Commercial Buildings and Warehouses/Industrial projects during his practice. He is a globally certified Project Management Professional given by Project Management Institute (PMI) in Pennsylvania USA.
  • 3. MISSION AND VISION “COMMITMENT is our biggest ASSET…” Construction is a tough business overflowed with unfulfilled promises. A. T. MALLARI BUILDERS will be known as one of the most ethical & honest service provider in the industry. Every decision will be based on our core ethics. ATMB wants to establish a strong reputation on meeting client satisfaction and building long term relationship with them.
  • 4. ON-GOING PROJECTS Project : Two-storey Commercial Bldg. Location : Cut-cut 1, Capas, Tarlac Owner : A + M Mallari Scope of Work : General works Project Cost : Php 3,900,000.00 Project : Two-storey Commercial Bldg. W/ roof deck Location : San Nicolas, Tarlac City Owner : A + M Mallari Scope of Work : General works Project Cost : Php 4,850,000.00
  • 5. Project : 2 Storey 5 bedroom Residence Location : San Francisco, Mabalacat Pampanga Owner : Mr. Beneth Macam Scope of Work : General works Project Cost : Php 6,000,000.00 ON-GOING PROJECTS
  • 6. Project : Lapuz Complex Site Development Owner : Municipality of Concepcion, Tarlac Scope of Work : General works ( Paid Royalty ) Project Cost : Php 11,300,000.00 RECENTLY COMPLETED PROJECTS
  • 7. Project : 5 unit - CR General Renovation Location : Clarkfield, Pampanga Owner : Outback Five Star Clark Phils. Inc. Scope of Work : General works Project Cost : Php 5,400,000.00 RECENTLY COMPLETED PROJECTS
  • 8. RECENTLY COMPLETED PROJECTS Project : Sacristy Location : Sto. Rosario, Capas Tarlac Owner : San Nicolas De Tolentino Shrine Scope of Work : General works Project Cost : Php 3,000,000.00
  • 9. Project : 150 L.m. ( 3-90cm dia. ) Drainage system Location : Sta. Maria, Mabalacat City Owner : iLeslie Holdings Inc. Designer : Mabalacat City Engg. Scope of Work : General works Project Cost : Php 3,400,000.00 COMPLETED PROJECTS
  • 10. Project : Bossanova Ext. and Support facilities & Site Development works Location : Capas, Tarlac Designer : AT Mallari / Ar. AM Garcia, UAP Owner : Mr. & Mrs. Jose Yumul Scope of Work : General Works Project Cost : Php 23,000,000.00 COMPLETED PROJECTS
  • 11. Project : 2 Warehouse & Site Devt Location : PEZ, Pulung Cacutud, Angeles City Owner : AHDMI Designer : AT Mallari Scope of Work : General works Project Cost : Php 48,000,000.00 COMPLETED PROJECTS
  • 12. Project : Warehouse 3 & Admin Bldg. Extension Location : PEZ, Pulung Cacutud, Angeles City Owner : MK Themed Attractions Phils. Inc. Designer : Ar. V. Dicuangco, UAP Scope of Work : General works Project Cost : Php 40,000,000.00 COMPLETED PROJECTS
  • 13. Project : Assorted works Location : Mabalacat Pampanga Designer : Eng’r. Alex Bautista Owner : iLeslie Holdings, Inc. Scope of Work : General works Project Cost : Php 5,000,000.00 COMPLETED PROJECTS
  • 14. Project : Proposed 2 storey 10 unit Apartment 1 bedroom ( grd floor only ) Location : Cristorey, Capas, Tarlac Designer : Ar. AM Garcia, UAP Owner : Mr. & Mrs. A. De Guzman Scope of Work : General works Project Cost : Php 2,156,000.00 COMPLETED PROJECTS
  • 15. Project : Tw-Storey Residence Location : Sto. Rosario, Capas Tarlac Designer : Ar. AM Garcia, UAP Owner : Mr. & Mrs. Michael Descanzo Scope of Work : General works Project Cost : Php 3,000,000.00 Project : Warehouse w/ mezanine Location : PEZA Angeles City Designer : AT Mallari / Ar. AM Garcia, UAP Owner : Provovative Quality Aparell Scope of Work : General Works Project Cost : Php 17,500,000.00 COMPLETED PROJECTS
  • 16. Project : Construction of Warehouse 1 & 2 and Admin Bldg. perimeter fence/Gates Location : PEZA, Pulung Cacutud, Angeles City Designer : TEMA Design Owner : MK Themed Attractions Phils. Inc. Scope of Work : General Works Project Cost : Php 43,000,000.00 COMPLETED PROJECTS
  • 17. Project : Hidden Road Inn & Support facilities Location : San Juan, Concepcion, Tarlac Designer : AT Mallari / Ar. AM Garcia, UAP Owner : Mr. & Mrs. Jose Yumul Scope of Work : General Works Project Cost : Php 22,000,000.00 COMPLETED PROJECTS
  • 18. Project : Proposed two-storey resdience Location : Bamban, Tarlac Designer : AT Mallari / Ar. AM Garcia, UAP Owner : Eng’r. & Mrs. R. Mallillin Scope of Work : General works Project Cost : Php 3,500,000.00
  • 19. Project : Restobar and grill Location : Alfonso, Concepcion Tarlac Designer : Ar. AM Garcia, UAP Owner : Ms. Villanueva Scope of Work : General Works Project Cost : Php 3,200,000.00
  • 20. Project : Five Bedroom residence Location : San Juan, Concepcion, Tarlac Designer : AT Mallari / Ar. AM Garcia, UAP Owner : Dr. Rosemary Yumul Vercales Scope of Work : General Works Project Cost : Php 3,500,000.00
  • 21. Project : Single storey Residence Location : Aranguren Capas, Tarlac Designer : AT Mallari / Ar. AM Garcia, UAP Owner : Mr. Mark Yamson Scope of Work : General Works Project Cost : Php 2,000,000.00 COMPLETED PROJECTS
  • 22. Project : Maintenance of Ash pond & Leachate; Anda Gate & Guard house Location : TIPCO cpd. TECO Special Economic Zone, Mabalacat Pampanga Designer : AT Mallari Owner : Asia Pacific Energy Corp. Scope of Work : General Works Project Cost : Php 1,262,000.00 COMPLETED PROJECTS
  • 23. COMPLETED PROJECTS Project : Private Resort Location : Banaba Bamban, Tarlac Designer : AT Mallari / Ar. AM Garcia, UAP Owner : Mr. Arnel M. De Guzman Scope of Work : Function Hall, Bath House, S. pool Rest House, Perimeter Fence (Labor works only) Project contract : Php 1,500,000.00
  • 24. COMPLETED PROJECTS Project : Leanne Arcade Two – Storey Commercial Bldg. Location : Mc. Arthur Hi-way, Junction, Capas, Tarlac Designer : AA Carreon Architect Owner : Mr. & Mrs. Halcon Talavera Scope of Work : Structural, Int. Finishing & Plumbing Works ( Labor works only ) Project Contract : Php 2,000,000.00
  • 25. COMPLETED PROJECTS Project : Two – Storey Residence Location : Sto. Domingo II Capas, Tarlac Designer : Ar. A. R. Canasa, UAP Owner : Mrs. L. Laquian Scope of Work : General Works Project Cost : Php 4,000.000.00 Project : Mooring Station Location : SBMA Designer : AT Mallari /Giga Mare Inc. Owner : GIGA MARE inc. Scope of Work : General Works Project Cost : Php 2,423,000.00
  • 26. COMPLETED PROJECTS Project : PPP - School Building TYPE 3 One – Storey Four Classroom Location : San Roque Lapaz, Tarlac Designer/Main Contractor : Megawide Construction Corp. Owner : Dep-Ed Scope of Work : Sub-con– General Works Project Cost : Php 2,547,169.73 Project : PPP - School Building TYPE 8 Two – Storey Four Classroom Location : Guevara Lapaz, Tarlac Designer/Main Contractor : Megawide Construction Corp. Owner : Dep-Ed Scope of Work : Sub-con– General Works Project Cost : Php 2,060,000.00
  • 27. Project : Microsoft Call Center Location : Clarkfield, Pampanga Designer : Ar. Mylene Pabillano, UAP Owner : Sutherland Global Services Scope of Work : Electrical Works Project Cost : Php 6,000,000.00 COMPLETED PROJECTS Project : Airconditioned Cafeteria Location : Clarkfield, Pampanga Designer : Ar. Mylene Pabillano, UAP Owner : Sutherland Global Services Scope of Work : General Works Project Cost : Php 4,100,000.00 Project : Assorted projects Location : Tibag, Tarlac City Designer : Ar. Mylene Pabillano, UAP Owner : Sutherland Global Services Scope of Work : Diesel Tank, Warning Lights Roll up mosquito screen, Stair handrail Exit doors, Manual transfer switch, etc. Project Cost : Php 2,140.,000.00
  • 28. COMPLETED PROJECTS Project : Pilmico Farms Designer : RTCo Architecture Owner : Pilmico Animal Nutrition Corp. Scope of Work : Project Management & Supervision only ( 0.5 % of contarct cost ) Under G. T. Briones Enterprises ( General Contractor) Project Cost : Php 82,000,000.00 & Location . Nucleus Farm – 1st Expansion (Sto. Rosario Capas, Tarlac) . Nucleus Farm 2nd Expansion (Sto. Rosario Capas, Tarlac) . Farm 1 (Cut-Cut II Capas, Tarlac) . Farm 4 (Cut-Cut II Capas, Tarlac) . Farm 5 (San Agustin MURCIA Concepcion, Tarlac) . Farm 7 (San Agustin MURCIA Concepcion, Tarlac)
  • 29. EQUIPMENT & POWER TOOLS MINI EXCAVATOR PC-10 – 1 UNIT MINI LOADER – 1 UNIT
  • 30. EQUIPMENT & POWER TOOLS PAY LOADER TCM 75 B– 1 UNIT CANTER DROP SIDE – 1 UNIT
  • 31. EQUIPMENT & POWER TOOLS DUMP TRUCK – 1 UNIT BACKHOE PC 40 – 1 UNIT
  • 32. EQUIPMENT & POWER TOOLS BACKHOE PC 120 – 1 UNIT
  • 33. EQUIPMENT & POWER TOOLS BAGGY MIXER – 6 UNITS WELDING MACHINE – 6 UNITS PORTABLE JACK HAMMER- 2 UNITS CUT OFF MACHINE – 4 UNITS
  • 37.