A. T. Mallari Builders is a construction firm based in Tarlac, Philippines that offers services including general contracting, renovation, and site development. The company has completed both small and large scale projects over the past year, ranging from residential homes to commercial buildings and warehouses. The owner, Engr. Alvin Mallari, has over 25 years of experience in construction project management.
Multi-skilled &PMI certified EPC Project Manager with a “hands on” approach to work, excellent commercial and contract awareness, and a proven track record in Management from concept to completion (e.g. planning, contract development , award and design review &development , infrastructure, procurement, contracts management, on and off-site management, sub contract
Indigenous contractor providing a wide range of engineering, construction, maintenance and support services across the public and private sectors. People are our most valuable asset.
Kennelly's "can do" teams complete work safely, on time, and on budget.
Multi-skilled &PMI certified EPC Project Manager with a “hands on” approach to work, excellent commercial and contract awareness, and a proven track record in Management from concept to completion (e.g. planning, contract development , award and design review &development , infrastructure, procurement, contracts management, on and off-site management, sub contract
Indigenous contractor providing a wide range of engineering, construction, maintenance and support services across the public and private sectors. People are our most valuable asset.
Kennelly's "can do" teams complete work safely, on time, and on budget.
As an architect and senior manager, Luca continues a family tradition.
He brings 25 years of professional experience having designed and managed projects on three continents.
Since 2018 he lives and works in Toronto achieving significant Canadian experience as a Studio Director in managing interior design teams, and administering various project types ranging from luxury residential interior design to commercial and high-end family houses.
Luca is a senior member of the Italian Order of Architects, OAPPC, ROME
Capabilities and specific experience
Project Management
Design Direction
Construction Management
Architecture (Buildings)
Multidisciplinary coordination
Interior Design
Sectors
Hotel & Resort
Commercial
Residential
Sustainable Communities and Net-Zero Energy: Municipal Incentives That Actual...Derek Satnik
This presentation summarizes a broad national study done in Canada on how cities can effectively enable developers to build net-zero communities. This study focused on which technologies to use, how to invest in them, and how to get innovative projects approved through municipal processes.
The study was a partnership between the Federation of Canadian Municipalities (FCM, through their Green Municipal Fund, GMF) and eight developers from four medium-sized Canadian cities to observe three basic concepts:
-1- The technical feasibility of achieving net-zero energy communities at the eight projects;
-2- The financial feasibility of building such projects;
-3- The process feasibility to obtain government approval of projects and all required permits.
The full report is available online at https://s2etech.com/fcm-gmf/
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
More Related Content
Similar to AT Mallari Builders Co. profile 11-2023.pdf
As an architect and senior manager, Luca continues a family tradition.
He brings 25 years of professional experience having designed and managed projects on three continents.
Since 2018 he lives and works in Toronto achieving significant Canadian experience as a Studio Director in managing interior design teams, and administering various project types ranging from luxury residential interior design to commercial and high-end family houses.
Luca is a senior member of the Italian Order of Architects, OAPPC, ROME
Capabilities and specific experience
Project Management
Design Direction
Construction Management
Architecture (Buildings)
Multidisciplinary coordination
Interior Design
Sectors
Hotel & Resort
Commercial
Residential
Sustainable Communities and Net-Zero Energy: Municipal Incentives That Actual...Derek Satnik
This presentation summarizes a broad national study done in Canada on how cities can effectively enable developers to build net-zero communities. This study focused on which technologies to use, how to invest in them, and how to get innovative projects approved through municipal processes.
The study was a partnership between the Federation of Canadian Municipalities (FCM, through their Green Municipal Fund, GMF) and eight developers from four medium-sized Canadian cities to observe three basic concepts:
-1- The technical feasibility of achieving net-zero energy communities at the eight projects;
-2- The financial feasibility of building such projects;
-3- The process feasibility to obtain government approval of projects and all required permits.
The full report is available online at https://s2etech.com/fcm-gmf/
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Hybrid optimization of pumped hydro system and solar- Engr. Abdul-Azeez.pdffxintegritypublishin
Advancements in technology unveil a myriad of electrical and electronic breakthroughs geared towards efficiently harnessing limited resources to meet human energy demands. The optimization of hybrid solar PV panels and pumped hydro energy supply systems plays a pivotal role in utilizing natural resources effectively. This initiative not only benefits humanity but also fosters environmental sustainability. The study investigated the design optimization of these hybrid systems, focusing on understanding solar radiation patterns, identifying geographical influences on solar radiation, formulating a mathematical model for system optimization, and determining the optimal configuration of PV panels and pumped hydro storage. Through a comparative analysis approach and eight weeks of data collection, the study addressed key research questions related to solar radiation patterns and optimal system design. The findings highlighted regions with heightened solar radiation levels, showcasing substantial potential for power generation and emphasizing the system's efficiency. Optimizing system design significantly boosted power generation, promoted renewable energy utilization, and enhanced energy storage capacity. The study underscored the benefits of optimizing hybrid solar PV panels and pumped hydro energy supply systems for sustainable energy usage. Optimizing the design of solar PV panels and pumped hydro energy supply systems as examined across diverse climatic conditions in a developing country, not only enhances power generation but also improves the integration of renewable energy sources and boosts energy storage capacities, particularly beneficial for less economically prosperous regions. Additionally, the study provides valuable insights for advancing energy research in economically viable areas. Recommendations included conducting site-specific assessments, utilizing advanced modeling tools, implementing regular maintenance protocols, and enhancing communication among system components.
Immunizing Image Classifiers Against Localized Adversary Attacksgerogepatton
This paper addresses the vulnerability of deep learning models, particularly convolutional neural networks
(CNN)s, to adversarial attacks and presents a proactive training technique designed to counter them. We
introduce a novel volumization algorithm, which transforms 2D images into 3D volumetric representations.
When combined with 3D convolution and deep curriculum learning optimization (CLO), itsignificantly improves
the immunity of models against localized universal attacks by up to 40%. We evaluate our proposed approach
using contemporary CNN architectures and the modified Canadian Institute for Advanced Research (CIFAR-10
and CIFAR-100) and ImageNet Large Scale Visual Recognition Challenge (ILSVRC12) datasets, showcasing
accuracy improvements over previous techniques. The results indicate that the combination of the volumetric
input and curriculum learning holds significant promise for mitigating adversarial attacks without necessitating
adversary training.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
We have compiled the most important slides from each speaker's presentation. This year’s compilation, available for free, captures the key insights and contributions shared during the DfMAy 2024 conference.
Student information management system project report ii.pdfKamal Acharya
Our project explains about the student management. This project mainly explains the various actions related to student details. This project shows some ease in adding, editing and deleting the student details. It also provides a less time consuming process for viewing, adding, editing and deleting the marks of the students.
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...Amil Baba Dawood bangali
Contact with Dawood Bhai Just call on +92322-6382012 and we'll help you. We'll solve all your problems within 12 to 24 hours and with 101% guarantee and with astrology systematic. If you want to take any personal or professional advice then also you can call us on +92322-6382012 , ONLINE LOVE PROBLEM & Other all types of Daily Life Problem's.Then CALL or WHATSAPP us on +92322-6382012 and Get all these problems solutions here by Amil Baba DAWOOD BANGALI
#vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore#blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #blackmagicforlove #blackmagicformarriage #aamilbaba #kalajadu #kalailam #taweez #wazifaexpert #jadumantar #vashikaranspecialist #astrologer #palmistry #amliyaat #taweez #manpasandshadi #horoscope #spiritual #lovelife #lovespell #marriagespell#aamilbabainpakistan #amilbabainkarachi #powerfullblackmagicspell #kalajadumantarspecialist #realamilbaba #AmilbabainPakistan #astrologerincanada #astrologerindubai #lovespellsmaster #kalajaduspecialist #lovespellsthatwork #aamilbabainlahore #Amilbabainuk #amilbabainspain #amilbabaindubai #Amilbabainnorway #amilbabainkrachi #amilbabainlahore #amilbabaingujranwalan #amilbabainislamabad
2. BRIEF INTRODUCTION
A. T. MALLARI BUILDERS is a Tarlac- based Design + Build
firm that offers a wide range of construction related
services. Formed in October 2012, its key officers have
wide array experience in their specific areas of expertise,
particularly in architecture, general construction and fit
out works. For the past year alone, our team have
successfully completed and worked on small to medium
scale construction, renovation and alteration projects
focusing on residential contracting, warehouses,
commercial buildings, interior finishing, fit-out works &
Site Development projects. Now we are engaged on
multi-million projects on agro-industrial and heavy steel
works like factories & warehouses.
Eng’r. Alvin, the company’s owner/manager is a registered
Civil Engineer for more than twenty five years who works
with Contractors, Architects and Interior Designers and
handles different projects from Mansions, restaurants,
Corporate offices and Apartments to Commercial Buildings
and Warehouses/Industrial projects during his practice.
He is a globally certified Project Management Professional
given by Project Management Institute (PMI) in
Pennsylvania USA.
3. MISSION AND VISION
“COMMITMENT is our biggest ASSET…”
Construction is a tough business overflowed with
unfulfilled promises. A. T. MALLARI BUILDERS will
be known as one of the most ethical & honest
service provider in the industry. Every decision
will be based on our core ethics.
ATMB wants to establish a strong reputation on
meeting client satisfaction and building long term
relationship with them.
4. ON-GOING PROJECTS
Project : Two-storey Commercial Bldg.
Location : Cut-cut 1, Capas, Tarlac
Owner : A + M Mallari
Scope of Work : General works
Project Cost : Php 3,900,000.00
Project : Two-storey Commercial Bldg.
W/ roof deck
Location : San Nicolas, Tarlac City
Owner : A + M Mallari
Scope of Work : General works
Project Cost : Php 4,850,000.00
5. Project : 2 Storey 5 bedroom Residence
Location : San Francisco, Mabalacat Pampanga
Owner : Mr. Beneth Macam
Scope of Work : General works
Project Cost : Php 6,000,000.00
ON-GOING PROJECTS
6. Project : Lapuz Complex Site Development
Owner : Municipality of Concepcion, Tarlac
Scope of Work : General works ( Paid Royalty )
Project Cost : Php 11,300,000.00
RECENTLY COMPLETED PROJECTS
7. Project : 5 unit - CR General Renovation
Location : Clarkfield, Pampanga
Owner : Outback Five Star Clark Phils. Inc.
Scope of Work : General works
Project Cost : Php 5,400,000.00
RECENTLY COMPLETED PROJECTS
8. RECENTLY COMPLETED PROJECTS
Project : Sacristy
Location : Sto. Rosario, Capas Tarlac
Owner : San Nicolas De Tolentino Shrine
Scope of Work : General works
Project Cost : Php 3,000,000.00
9. Project : 150 L.m. ( 3-90cm dia. )
Drainage system
Location : Sta. Maria, Mabalacat City
Owner : iLeslie Holdings Inc.
Designer : Mabalacat City Engg.
Scope of Work : General works
Project Cost : Php 3,400,000.00
COMPLETED PROJECTS
10. Project : Bossanova Ext. and Support facilities
& Site Development works
Location : Capas, Tarlac
Designer : AT Mallari / Ar. AM Garcia, UAP
Owner : Mr. & Mrs. Jose Yumul
Scope of Work : General Works
Project Cost : Php 23,000,000.00
COMPLETED PROJECTS
11. Project : 2 Warehouse & Site Devt
Location : PEZ, Pulung Cacutud, Angeles City
Owner : AHDMI
Designer : AT Mallari
Scope of Work : General works
Project Cost : Php 48,000,000.00
COMPLETED PROJECTS
12. Project : Warehouse 3 & Admin Bldg. Extension
Location : PEZ, Pulung Cacutud, Angeles City
Owner : MK Themed Attractions Phils. Inc.
Designer : Ar. V. Dicuangco, UAP
Scope of Work : General works
Project Cost : Php 40,000,000.00
COMPLETED PROJECTS
13. Project : Assorted works
Location : Mabalacat Pampanga
Designer : Eng’r. Alex Bautista
Owner : iLeslie Holdings, Inc.
Scope of Work : General works
Project Cost : Php 5,000,000.00
COMPLETED PROJECTS
14. Project : Proposed 2 storey 10 unit Apartment 1 bedroom
( grd floor only )
Location : Cristorey, Capas, Tarlac
Designer : Ar. AM Garcia, UAP
Owner : Mr. & Mrs. A. De Guzman
Scope of Work : General works
Project Cost : Php 2,156,000.00
COMPLETED PROJECTS
15. Project : Tw-Storey Residence
Location : Sto. Rosario, Capas Tarlac
Designer : Ar. AM Garcia, UAP
Owner : Mr. & Mrs. Michael Descanzo
Scope of Work : General works
Project Cost : Php 3,000,000.00
Project : Warehouse w/ mezanine
Location : PEZA Angeles City
Designer : AT Mallari / Ar. AM Garcia, UAP
Owner : Provovative Quality Aparell
Scope of Work : General Works
Project Cost : Php 17,500,000.00
COMPLETED PROJECTS
16. Project : Construction of Warehouse 1 & 2 and Admin Bldg. perimeter
fence/Gates
Location : PEZA, Pulung Cacutud, Angeles City
Designer : TEMA Design
Owner : MK Themed Attractions Phils. Inc.
Scope of Work : General Works
Project Cost : Php 43,000,000.00
COMPLETED PROJECTS
17. Project : Hidden Road Inn & Support facilities
Location : San Juan, Concepcion, Tarlac
Designer : AT Mallari / Ar. AM Garcia, UAP
Owner : Mr. & Mrs. Jose Yumul
Scope of Work : General Works
Project Cost : Php 22,000,000.00
COMPLETED PROJECTS
18. Project : Proposed two-storey resdience
Location : Bamban, Tarlac
Designer : AT Mallari / Ar. AM Garcia, UAP
Owner : Eng’r. & Mrs. R. Mallillin
Scope of Work : General works
Project Cost : Php 3,500,000.00
19. Project : Restobar and grill
Location : Alfonso, Concepcion Tarlac
Designer : Ar. AM Garcia, UAP
Owner : Ms. Villanueva
Scope of Work : General Works
Project Cost : Php 3,200,000.00
20. Project : Five Bedroom residence
Location : San Juan, Concepcion, Tarlac
Designer : AT Mallari / Ar. AM Garcia, UAP
Owner : Dr. Rosemary Yumul Vercales
Scope of Work : General Works
Project Cost : Php 3,500,000.00
21. Project : Single storey Residence
Location : Aranguren Capas, Tarlac
Designer : AT Mallari / Ar. AM Garcia, UAP
Owner : Mr. Mark Yamson
Scope of Work : General Works
Project Cost : Php 2,000,000.00
COMPLETED PROJECTS
22. Project : Maintenance of Ash pond & Leachate; Anda Gate &
Guard house
Location : TIPCO cpd. TECO Special Economic Zone,
Mabalacat Pampanga
Designer : AT Mallari
Owner : Asia Pacific Energy Corp.
Scope of Work : General Works
Project Cost : Php 1,262,000.00
COMPLETED PROJECTS
23. COMPLETED PROJECTS
Project : Private Resort
Location : Banaba Bamban, Tarlac
Designer : AT Mallari / Ar. AM Garcia, UAP
Owner : Mr. Arnel M. De Guzman
Scope of Work : Function Hall, Bath House, S. pool
Rest House, Perimeter Fence
(Labor works only)
Project contract : Php 1,500,000.00
24. COMPLETED PROJECTS
Project : Leanne Arcade Two – Storey Commercial Bldg.
Location : Mc. Arthur Hi-way, Junction, Capas, Tarlac
Designer : AA Carreon Architect
Owner : Mr. & Mrs. Halcon Talavera
Scope of Work : Structural, Int. Finishing & Plumbing Works
( Labor works only )
Project Contract : Php 2,000,000.00
25. COMPLETED PROJECTS
Project : Two – Storey Residence
Location : Sto. Domingo II Capas, Tarlac
Designer : Ar. A. R. Canasa, UAP
Owner : Mrs. L. Laquian
Scope of Work : General Works
Project Cost : Php 4,000.000.00
Project : Mooring Station
Location : SBMA
Designer : AT Mallari /Giga Mare Inc.
Owner : GIGA MARE inc.
Scope of Work : General Works
Project Cost : Php 2,423,000.00
26. COMPLETED PROJECTS
Project : PPP - School Building TYPE 3
One – Storey Four Classroom
Location : San Roque Lapaz, Tarlac
Designer/Main Contractor :
Megawide Construction Corp.
Owner : Dep-Ed
Scope of Work : Sub-con– General Works
Project Cost : Php 2,547,169.73
Project : PPP - School Building TYPE 8
Two – Storey Four Classroom
Location : Guevara Lapaz, Tarlac
Designer/Main Contractor :
Megawide Construction Corp.
Owner : Dep-Ed
Scope of Work : Sub-con– General Works
Project Cost : Php 2,060,000.00
27. Project : Microsoft Call Center
Location : Clarkfield, Pampanga
Designer : Ar. Mylene Pabillano, UAP
Owner : Sutherland Global Services
Scope of Work : Electrical Works
Project Cost : Php 6,000,000.00
COMPLETED PROJECTS
Project : Airconditioned Cafeteria
Location : Clarkfield, Pampanga
Designer : Ar. Mylene Pabillano, UAP
Owner : Sutherland Global Services
Scope of Work : General Works
Project Cost : Php 4,100,000.00
Project : Assorted projects
Location : Tibag, Tarlac City
Designer : Ar. Mylene Pabillano, UAP
Owner : Sutherland Global Services
Scope of Work : Diesel Tank, Warning Lights
Roll up mosquito screen, Stair handrail
Exit doors, Manual transfer switch, etc.
Project Cost : Php 2,140.,000.00
28. COMPLETED PROJECTS
Project : Pilmico Farms
Designer : RTCo Architecture
Owner : Pilmico Animal Nutrition Corp.
Scope of Work : Project Management & Supervision only ( 0.5 % of contarct cost )
Under G. T. Briones Enterprises ( General Contractor)
Project Cost : Php 82,000,000.00
& Location
. Nucleus Farm – 1st Expansion (Sto. Rosario Capas, Tarlac)
. Nucleus Farm 2nd Expansion (Sto. Rosario Capas, Tarlac)
. Farm 1 (Cut-Cut II Capas, Tarlac)
. Farm 4 (Cut-Cut II Capas, Tarlac)
. Farm 5 (San Agustin MURCIA Concepcion, Tarlac)
. Farm 7 (San Agustin MURCIA Concepcion, Tarlac)
29. EQUIPMENT & POWER TOOLS
MINI EXCAVATOR PC-10 – 1 UNIT
MINI LOADER – 1 UNIT
30. EQUIPMENT & POWER TOOLS
PAY LOADER TCM 75 B– 1 UNIT
CANTER DROP SIDE – 1 UNIT