Larry R. Fasnacht has over 38 years of experience in piping, welding, and mechanical management. He has worked on numerous nuclear power plant projects in roles such as principal welding engineer, mechanical superintendent, and site manager. Fasnacht has extensive qualifications and training in welding procedures such as ASME, Areva, orbital flux core, and Miller induction heating. He holds a diploma from Lower Dauphin High School and completed an apprenticeship program with Local #520 Plumbers and Pipefitters.
1. LARRY R. FASNACHT
111 San Jo Drive.
Grantville Pa. 17028
Cell: 252-646-2484
Email: Larryboss351@Gmail.com
Welding, Piping, Mechanical Manager and Superintendent with 38 years of experience in all aspects of the
Piping Industry with an excellent individual work ethic, a sincere desire for project completion ahead of
schedule with complete procedure compliance and attention to detail: safety is a priority.
EDUCATION
• 2011 - ASME PIC qualification Columbia station
• 2007 - Areva – Video Narrow Groove certification
• 2003 - Oceanside Ca. Specialized Training on Computerized Microprocessor Pipe Beveling Equipment
• 2002 - Houston, Texas-Training courses on Miller Induction Heating System
• 2002- Magna-Tech orbital flux core training
• 2002 – Lincoln STT training
• 2001- United Association / Hartford Insurance Independent National Welding Certifications
(1, 2, 3, 4, 6, 22, 44)
• 1999 - Intel Orbital Welding Certification (1999)
• 1996 - P.C.I. Video Narrow Groove Weld Procedure Training.
• 1978-1982 - Local #520 Plumbers and Pipefitters Apprenticeship Program - Harrisburg, PA
• 1976 - Lower Dauphin High School (Diploma) - Hummelstown, PA.
SUMMARY OF EXPERIENCE
2016 Black Diamond- VC Summer Unit 1 Oversight Principal Welding Engineer
Reactor Vessel Head Replacement Fabrication – Changwon South Korea
2014 PCI-Westinghouse Watts Bar Supt. Oversight Reactor assembly.
2014 PCI Westinghouse Supt. Davis-Besse Feed water replacement. Perfect 10
2013 PCI-Westinghouse- Shanghai- China Supt. on AP1000 safe end narrow groove
2013 Days Zimmerman- FPL Turkey Point Oversight Unit 4 EPU upgrade
2012 PCI- Westinghouse- FP&L Turkey Point- Oversight on Unit 3 reactor EPU upgrade
2012 July transferred to UNIT 4 spent fuel pool upgrade for PCI in charge of installation.
2011 PCI-Westinghouse – Columbia Nuclear, WA – Mechanical Supt. perfect 10 from client.
Energy Northwest – Over-sight on package close-out
2010 PCI –Westinghouse – St Lucie- Supt. – refueling outage
2009 PCI -Westinghouse-San Onofre- Supt. on nuclear steam generator replacement.
2. LARRY R. FASNACHT
111 San Jo Drive.
Grantville Pa. 17028
Cell: 252-646-2484
Email: Larryboss351@Gmail.com
2009 PCI-Westinghouse- Columbia Nuclear, Wash. – Supt. Perfect 10 from client.
2009 PCI Westinghouse – Calvert Cliffs – Supt. re-fueling nuclear outage.
2009 Welding Options Inc. – Portsead, Egypt – Site manager responsible for production, training and
Supervision of locals on pipeline project utilizing orbital flux core and Lincoln STT.
2008 Welding Options Inc. – Suez, Egypt – site manager responsible for production, training and
Supervision of locals on pipeline project utilizing orbital flux core and Lincoln STT.
2008 Welding Options Inc. – Marsa Matrouh, Egypt – Site Manager responsible for production, training and
Supervision of locals on pipeline project utilizing orbital flux core and Lincoln STT.
2007 Welding Options Inc. – Houston, Texas – Site manager responsible schedules, staffing utilizing automatic
Orbital welding for Shell Oil research and development.
2006 Shaw, Stone Webster- Salem, N.J. Refueling outage
2005 PCI-Bechtel –Braidwood , Chicago, IL - Supt. on nuclear steam generator replacement.
2004 Esso-Chad - Chad Africa - Fab Shop Manager - Responsible for World Class High Speed Pipe Fabrication
Shop maintaining all standards of safety, quality, and world-record production. Set new world record
Standards for cost and production.
Featured article in AWS Journal April 2004 on Chad Project.
2002 Esso-Chad- Sr.Piping Supt.- Assistant Fabrication Manager, co-facilitated the training and co-ordination of
High Speed Fabrication Shop utilizing all state of the art technology. Emphasis on safety and production
With compliance to all procedures.
2001 Labov Tosco Refinery- Supt. - Newark, NJ.
2001 G.E. Hinds-Nuclear Welder – TMI - Middletown, PA.
2000 McClure Company - Supt. – Ironwood Lebanon, PA. 850 Megawatt Co-Generation Plant
1999 DSI Co. Intel Computer-Orbital Welder and Detailer - Boston, MA.
1995 – 1999 Bechtel Power/ PCI-Video Machine Welder - Six nuclear steam generator replacements.
Gina, NY / Byron, IL / Braidwood, IL / Salem, NJ / Indian Point, NY / DC Cook.MI.
1994 Herre Brothers- Supt. – Bethlehem Steel, PA
1982 – 1994 Nuclear Certified Welder including 20 re-fueling outages