1. John Pattison
• Telephone number: 07976 814458 • Email address: johnpattison11@aol.com •
• Clean Full UK Driving License •
I am an experience Senior Project Manager for the past 30 years in roofing and external cladding /
envelope management. My experience includes working on both new and refurbishment projects
each with its own characteristics and logistical issues. I am discreet when dealing with confidential
information, have a good knowledge of Health and Safety regulations and am a dependable team
member / leader who can work without supervision. I am able to get on well with people and still
maintain a professional work ethic. I am hard working,diligent, a good problem solver and continue to
enjoy gaining experience and completing projects.I am honest and proactive. A qualified teacher and
carpenter with some shop fitting experience.
Employment
Lakesmere Ltd
Date: Sept 1998 to current
Managerial position dealing with projects that have involved Kalzip in both roof and wall
construction on buildings utilising various makes and combinations of rain-screen panels,
windows, louvres and curtain walling, many of these constructions being of an intricate and
bespoke design.
Project: Senior Project Manager at Bradwell Decommissioning Nuclear Site
Approximate value: £7,000,000
Date: 30 March 2013 - Current
A complete weather envelope being installed on the decommissioned Bradwell Nuclear Power
station. A kalzip project involving both roof and wall construction.
Project: Project Manager at Heathrow T2A
Approximate Value: £12,794,000
Date: 28 Apr 2012 to 28 Mar 2013
Manage roof light installation. Quality Management and finishes.
Project: Kingsyard Energy centre (Olympic Park, London)
Approximate Value: £1,500,000
Date: 21 Jan 2012 to 27 Apr 2012
SIPS panel wall construction with a bespoke EPDM weathering. This building was clad with core 10
steel, louvres and other decorative finishes, but presented an installation challenge due to its
location, against a main railway line.
Project: ITC Media centre and the catering village
Approximate Value: £1,800,00
Date: 03 Sept 2011 to 20 Jan 2012
Both bespoke designs utilising modern materials.
Project: Westfield Energy centre, Stratford
2. Approximate Value: £1,500,000
Date: 01 Oct 2010 to 01 Sep 2011
SIPS panel wall construction with a bespoke EPDM weathering. This building was also clad with
core 10 steel, louvres and other decorative finishes, but again presented an installation challenge
due to its location.
Project: Aquatics Centre
Approximate value: £3,000,000
Date: 14 Sept 2009 to 30 Sept 2010
Construction of the Kalzip roof on this iconic build
Project: Woodlane Station, London
Approximate value: £500,000
Date: 02 May 2009 to 13 Sept 2009
Roof and walkway installation
Project: Kings Cross Station, London
Date: 01 Nov 2008 to 01 May 2009
Prefabricated zinc clad SIPS panels, with dormer windows, delivered on specially adapted
transport to lifted and installed onto inclined steelwork in a highly active city environment.
Project: Jemstock, Hilton Hotel, Canary Wharf
Approximate value: £1,000,000
Date: 01 Jan 2008 to 30 Oct 2008
Rain screen panel removal, substructure replacement and enhancement followed by re-
instatement of the panels, all from cradles on the Hilton hotel, Canary Wharf. All this work was
completed whilst the hotel was fully functional requiring high levels of co-ordination with the
hotel management to avoid any potential disturbances to the guests.
Environmental Systems
Date: 1997-1998
I worked as a Project manager for on the external thermal upgrade of the YMCA Croydon.
Nordic Building Contractors, Denmark
Date: 1994 - 1997
Site Manager for on the rain-screen cladding and window installation for two 24 storey tower
blocks. Each block containing 144 occupied flats, where liaison with the tenants and public were
essential. Again the improvements were to increase the thermal installation in line with the
“document L” regulations.
Self employed
Date: 1985 to 1994
I was managing contracts being built “from the foundations to finishes” on several projects with
values up to £1.2 million in and around the Ipswich area for 10 years.
Teacher
3. Date: 1975 to 1985
Teaching at Secondary school level craft and technical drawing subjects up to advanced levels.
Qualifications
NVQ Slinger/Signaller
Advanced Operator’s Course
Approved Contractor’s Programme
Level 1 working at heights
First aid at work
Site manager’s safety certificate
Safety net inspector
RIBA-approved CDP seminar attendance certificate
MEWPS for Manager
Managing working and rescue at height
CSCS Contract’s Manager
Site Management Safety Training Scheme for the Construction and civil Engineering
Industries
Nuclear Site Triple Bar Exam
Teacher Training qualification - Shoreditch College, Englefield Green, Egham, Surrey
2 ‘A’ levels n- William Rhodes Secondary School, Chesterfield, Derbyshire.
6 ‘O’ Levels - William Rhodes Secondary School, Chesterfield, Derbyshire
Additional skills
Blubeam
Microsoft Words
Excel
Publisher
Powerpoint
IMS
Interests and hobbies:
Walking, cycling, reading, musicals, travelling and building design. I enjoy going to the theatre,
and have previously enjoyed marquetry restoring old furniture and French polishing the finished
products.
Reference upon request