SlideShare a Scribd company logo
6
1
Curriculum Vitae
Personnel Detail
Name : Afrizal Zaini Amd.
Place, date of birth : Lhokseumawe, April 25-1970.
Sex : Male
Marital Status : Married
Religion : Moslem
Nationality : Indonesia.
Address : Perumahan Bumi Rakata Asri Blok G1. No. 21
RT/RW 003/003 Ciwedus, Cilegon, Banten-Indonesia.
Mobile phone : +6285225925050
Email : afril_ap70@yahoo.co.id
No. Passport : A 1583856
Education Background And Courses.
 1987-1990 (Senior High School) SMA Negeri I Lhokseumawe, Majoring in
Biology, Aceh Utara – NAD.
 1991-1995 Polytechnic Unsyiah, Department Civil Engineering,
Lhokseumawe-NAD.
 July 17-2004 Task Risk Assessment (Certificate)
 July 18-2004 Work Permit System Rev-6 (Certificate)
 Emergency Training ( T- B.O.S.E.I.T). Training date 3-4 October 2012.
 HSE Awareness ( Certificate, PT. PLP )
 OPERCOM Methodology by VINCI Energies and TOTAL E&P INDONESIE,
 ICAPS Pre-commissioning and Commissioning Tools, by VINCI Energies and TOTAL E&P
INDONESIE.
 Medical Certificate,
 November 10-2014, Autoclave Engineers Coning and Threading Machine Training, by ISE
International Pte Ltd, Singapore
Summary of Work
Over 9 years of hand on Instrument/ Electrical experience in industrial petroleum oil and
gas, gas plant, Petrochemical, Boiler Plant and Recovery Boiler project including process
control, measurement of instrument and electrical. Areas of expertise in job site environment
include construction, commissioning and start up of process control system, trouble Shooting
and able to read P & ID, Hook Up, instrument location drawing and Electric wiring &
schematic drawing (as built Drawing if Required).
6
2
Missions and Task
To perform on safe manner the commissioning activities on yard and on site, in respect
with standing instruction and Work Permit instructions.
Execute the inspection and Quality Control activities on site, collecting the relevant objective
proofs, ensuring supervision and coordination of quality control activities on instrument
equipment/systems construction and installation activities.
Commissioning Preparation.
 Witnessing of contractor pre-commissioning activities, as defined by the supervisor in a
professional way.
 Ensure that witnessing activities do not delay contractor activities more than necessary.
 Attend FAT / SAT as required by supervisor.
Commissioning execution.
 Perform the commissioning activity with respect of the WP in a professional manner, in
respect with company specification.
 Raise and clear punch list items. Report any non conformity to his supervisor.
 Fill commissioning test and check sheets before supervisor approval
Duties and Responsibilities.
 Carry out instrument Commissioning activity, such loop test, function test and sequent test and
Operation Test Procedure.
 Carry out instrument device troubleshooting, calibrated and work modification.
 Carry out Preventive Maintenance (PM) coverage Re-calibrated, repair and Matrix Test.
 Familiar with Fire and Gas System ( Gas Detector, Smoke Detector, Manual Call Point, ESD
Push Button, Heat Detector, Flame Detector and Open Path, Fusible Plug System, Deluge
System, Water Mist System and early Warning Smoke Detector) coverage Calibration and
Trouble Shooting
 Familiar with Instrument control pneumatic, Hydraulic System (WHCP System),and I/P
System. Preparation, installation, fabrication, Conning and Threading Auto Clave Tubing by
Manual or Machine.
 Carry out instrument construction work, such connection tubing and connection cable.
 Verification and review drawing, material data sheet, P & ID diagram, vendor drawing and as
built drawing.
 Assist to vendor for inspection and witness with client for Site Acceptance Test.
 Inspection field installation like install support, install cable tray, install equipments or device.
 As Per International Standards, Specifications, Instrument Calibration Method of Statement &
As Per Approved Project Drawings Supervised, Inspected & Witnessed Instrument Cable Duct
Bank, Cable Pulling from RIB to J.B & Control Room and RGS conduit, Stanchion of
instrument devices, Marshalling Panel, Junction Boxes installation, Mounting of instrument
devices such as pressure, level, temperature transmitter, RTD and thermocouple, pressure,
Level, Flow and temperature switch & Control valves . Calibration of Transmitters, Control
valves, Switches of all Parameters like Pressure, Level, temperature.
6
3
Working Experience.
1. Dietsmann Mantaining Energy.
Project : ERHA North Project, OSO Condensate Pipeline Replacement Project,
Satellite Field Development Project Phase I, OCIP Project, Mobil Producing
Negeria Unlimited, Negeria – West Africa.
Period : May 2011 up to August 2015..
Position : Pre-commissioning and Commissioning (E & I) Team.
Responsibility : Execution of preparation and review document for commissioning procedure,
execution of calibration test, loop check test, function test and OTP (operation test procedure).
Issued punch list system of related to commissioning phase.
Assist start up team for execution startup phase.
2. PT. Indokomas Buana Perkasa, Contracted PT.Total Indonesie
Project : Bekapai Senipah Peciko Maintenance project
Period : September 2009 up to May 2011.
Position : FO/PJT-CMS Team, Instrument Technician Commissioning
Responsibility : Execution of preparation and review document for commissioning procedure
and preparation OTP will be submitted to Star-up team, execution of calibration test, loop
check test, function test and OTP (operation test procedure). Issued punch list system of related
to commissioning phase.
Assist start up team for execution startup phase.
3. PT. Indokomas Buana Perkasa, Contracted PT.Total Indonesie.
Project : Tunu South Pashe 11, South Manifold Platform and South
Compression Platform and South Utility Platform,.
Period : June 2008 up to September 2009.
Position : PJC-Commissioning Team, Instrument Technician Commissioning
Responsibility : Execution of preparation and review document for commissioning procedure
and preparation OTP will be submitted to Star-up team, execution of calibration test, loop
check test, function test and OTP (operation test procedure). Issued punch list system of related
to commissioning phase.
Assist start up team for execution startup phase.
4. PT. Sinar Mulia Abadi.
Project : Conoco Phillips Indonesia, WHP – C & D North Belut, Batam
Island.
Period : March 2008 till up May 2008.
Position : Instrument Technician Commissioning
Responsibility : Execution of preparation and review document for commissioning procedure
and, execution of calibration test, loop check test, function test and. Issued punch list system of
related to commissioning phase.
6
4
5. PT. Angkasa Engineer Indonesia.
Project : Conoco Philips Indonesia. KERISI Development Project, Natuna
Sea.
Period : October 2007 till up January 2008.
Position : Instrument Technician Commissioning
Responsibility : Execution of preparation and review document for commissioning procedure
and, execution of calibration test, loop check test, function test. Issued punch list system of
related to commissioning phase.
6. PT. Angkasa Engineer Indonesia.
Project : Conoco Philips Indonesia. KERISI Development Project, Batam
Island.
Period : June 2007 till up 02 September 2007.
Position : Instrument Technician Commissioning
Responsibility : Execution of preparation and review document for commissioning procedure
and preparation OTP will be submitted to Star-up team, execution of calibration test, loop
check test, function test and OTP (operation test procedure). Issued punch list system of related
to commissioning phase.
Assist start up team for execution startup phase.
7. PT. BABCOCK & WILCOX a McDermott Company
Project : Tanjung Jati B " Coal Fired Power Plant 2 x 660 MW "
Jepara, Central Java.
Period : May 2005 till up 02 November 2006.
Position : Instrument Technician Commissioning
Responsibility : Execution of preparation and review document for commissioning procedure
and preparation OTP will be submitted to Star-up team, execution of calibration test, loop
check test, function test and OTP (operation test procedure). Issued punch list system of related
to commissioning phase.
Assist start up team for execution startup phase.
8. PT. SAS International
Project : Project Public Address Services. CNOOC SES Ltd, South East
Sumatra.
Period : January 2005 - April 2005
Position : Instrument Technician Commissioning
Responsibility : Execution of preparation and review document for commissioning procedure
and execution of calibration test, loop check test, function test. Issued punch list system of
related to commissioning phase.
6
5
9. PT. Sinar Mulia Abadi.
Project : Libo Gas Station/ Test Station (Caltex), Re - Instrumentation
Sungai Pakning (Pertamina-Dumai) – Riau. VLP Gas
Compressor-
Kaltim (VICO Indonesia).
Period : February 2004 – October 2004
Position : Instrument Technician Commissioning
Responsibility : Execution of preparation and review document for commissioning procedure
and preparation OTP will be submitted to Star-up team, execution of calibration test, loop
check test, function test and OTP (operation test procedure). Issued punch list system of related
to commissioning phase. Assist start up team for execution startup phase.
9. PT. Ismatiur
Project : Project Creep-1 Amoco Mitsui PTA Indonesia, Merak – Banten.
Period : June 2003 - December 2003.
Position : Instrument Technician Commissioning
Responsibility : Execution of preparation and review document for commissioning procedure
and execution of calibration test, loop check test, function test.
10. PT. Teknik Umum Sanko Eng.
Project : Project Jetty No. 3 Asahimas Chemical, Anyer – Banten.
Period : September 2002 – January 2003.
Position : Instrument Technician Commissioning
Responsibility : Execution of preparation and review document for commissioning procedure
and execution of calibration test, loop check test, function test..
11. PT. Sapta Krida Karya Mas.
Project : Project KMK Global Sport, Cikupa – Tangerang.
Period : October 2000 – May 2001
Position : Instrument Technician Commissioning
Responsibility : Execution of preparation and review document for commissioning procedure
and execution of calibration test, loop check test, function test.
12. PT. Teknik Umum Sanko Eng.
Project : Project Showa Esterindo Indonesia Ethyl Acetate Plant Bojonegara,
Banten.
Period : February 1998 – December 1998
Position : Material Control
Responsibility : Preparation and review of material data sheet, balancing material.
6
6
13. PT. Teknik Umum Sanko Eng.
Project : Project Suralaya Coal Fired Power Plant 3 x 600 MW,
Unit 5, 6 and 7, Merak – Banten.
Period : July 1996 – 1998
Position : Skill Instrument / electric
Responsibility : Termination power and control cable, fabrication support and cable
tray, Pulling cable and installation contruction E/I.
Personnel Qualification
- High motivation and initiative.
- High willingness to actively new thing
Your Faithfully
Afrizal Zaini

More Related Content

What's hot

CV to Jan 2015
CV to Jan 2015CV to Jan 2015
CV to Jan 2015
Graham Tungatt
 
Leo St Louis - Resume
Leo St Louis - ResumeLeo St Louis - Resume
Leo St Louis - Resume
Leo St Louis-Lead Safety Advisor
 
Leo st louis resume
Leo st louis   resumeLeo st louis   resume
Hse resume(brief) roy stanley amuegbunem8z
Hse resume(brief)   roy stanley amuegbunem8zHse resume(brief)   roy stanley amuegbunem8z
Hse resume(brief) roy stanley amuegbunem8z
Roy Stanley Amuegbunem
 
Curriculum Vitae Anbika, ST (Update)
Curriculum Vitae Anbika, ST (Update)Curriculum Vitae Anbika, ST (Update)
Curriculum Vitae Anbika, ST (Update)
Anbika, ST
 
Vijay cv
Vijay cvVijay cv
Vijay cv
vijay parmar
 
Baumann, Erik Resume 1
Baumann, Erik Resume 1Baumann, Erik Resume 1
Baumann, Erik Resume 1
Erik Baumann
 
CV Nick Day
CV Nick DayCV Nick Day
CV Nick Day
Nicholas Day
 
Sasikumar A
Sasikumar ASasikumar A
Sasikumar A
sasikumar A
 
Laydon william6
Laydon william6Laydon william6
Laydon william6
Laydon Williams
 
kamran arif
kamran arifkamran arif
kamran arif
kamran arif
 
EKPRANGAREDDY2016
EKPRANGAREDDY2016EKPRANGAREDDY2016
EKPRANGAREDDY2016
Ekp Reddy
 
NewSTS Brochure
NewSTS BrochureNewSTS Brochure
NewSTS Brochure
Franco R
 
Keith Patrick C.V._2015
Keith Patrick C.V._2015Keith Patrick C.V._2015
Keith Patrick C.V._2015
Keith Patrick
 
Gary Fitzsimmons. CV .Oct- 2016
Gary Fitzsimmons. CV .Oct- 2016Gary Fitzsimmons. CV .Oct- 2016
Gary Fitzsimmons. CV .Oct- 2016
Gary Fitzsimmons
 
Michael D. Rapp Csm, Oshp2
Michael D. Rapp  Csm, Oshp2Michael D. Rapp  Csm, Oshp2
Michael D. Rapp Csm, Oshp2
Michael D. Rapp
 
Joseph W Koricanek - Resume - 07.2016
Joseph W Koricanek - Resume - 07.2016Joseph W Koricanek - Resume - 07.2016
Joseph W Koricanek - Resume - 07.2016
Joseph W Koricanek
 
Wayne Justin Smith Jr. Resume
Wayne Justin Smith Jr. ResumeWayne Justin Smith Jr. Resume
Wayne Justin Smith Jr. Resume
Wayne Smith
 
Laydon William6
Laydon William6Laydon William6
Laydon William6
Laydon Williams
 

What's hot (19)

CV to Jan 2015
CV to Jan 2015CV to Jan 2015
CV to Jan 2015
 
Leo St Louis - Resume
Leo St Louis - ResumeLeo St Louis - Resume
Leo St Louis - Resume
 
Leo st louis resume
Leo st louis   resumeLeo st louis   resume
Leo st louis resume
 
Hse resume(brief) roy stanley amuegbunem8z
Hse resume(brief)   roy stanley amuegbunem8zHse resume(brief)   roy stanley amuegbunem8z
Hse resume(brief) roy stanley amuegbunem8z
 
Curriculum Vitae Anbika, ST (Update)
Curriculum Vitae Anbika, ST (Update)Curriculum Vitae Anbika, ST (Update)
Curriculum Vitae Anbika, ST (Update)
 
Vijay cv
Vijay cvVijay cv
Vijay cv
 
Baumann, Erik Resume 1
Baumann, Erik Resume 1Baumann, Erik Resume 1
Baumann, Erik Resume 1
 
CV Nick Day
CV Nick DayCV Nick Day
CV Nick Day
 
Sasikumar A
Sasikumar ASasikumar A
Sasikumar A
 
Laydon william6
Laydon william6Laydon william6
Laydon william6
 
kamran arif
kamran arifkamran arif
kamran arif
 
EKPRANGAREDDY2016
EKPRANGAREDDY2016EKPRANGAREDDY2016
EKPRANGAREDDY2016
 
NewSTS Brochure
NewSTS BrochureNewSTS Brochure
NewSTS Brochure
 
Keith Patrick C.V._2015
Keith Patrick C.V._2015Keith Patrick C.V._2015
Keith Patrick C.V._2015
 
Gary Fitzsimmons. CV .Oct- 2016
Gary Fitzsimmons. CV .Oct- 2016Gary Fitzsimmons. CV .Oct- 2016
Gary Fitzsimmons. CV .Oct- 2016
 
Michael D. Rapp Csm, Oshp2
Michael D. Rapp  Csm, Oshp2Michael D. Rapp  Csm, Oshp2
Michael D. Rapp Csm, Oshp2
 
Joseph W Koricanek - Resume - 07.2016
Joseph W Koricanek - Resume - 07.2016Joseph W Koricanek - Resume - 07.2016
Joseph W Koricanek - Resume - 07.2016
 
Wayne Justin Smith Jr. Resume
Wayne Justin Smith Jr. ResumeWayne Justin Smith Jr. Resume
Wayne Justin Smith Jr. Resume
 
Laydon William6
Laydon William6Laydon William6
Laydon William6
 

Viewers also liked

Company profile Polaris
Company profile Polaris Company profile Polaris
Company profile Polaris
Polaris Informatica srl
 
Tejaswi Drushti Bestseller For Super Eyesight Dr Shriniwas Kashalikar
Tejaswi Drushti Bestseller For Super Eyesight Dr  Shriniwas KashalikarTejaswi Drushti Bestseller For Super Eyesight Dr  Shriniwas Kashalikar
Tejaswi Drushti Bestseller For Super Eyesight Dr Shriniwas Kashalikar
banothkishan
 
networks for kids
networks for kidsnetworks for kids
networks for kids
wil123by
 
Новинки POS-периферии (АТОЛ)
Новинки POS-периферии (АТОЛ)Новинки POS-периферии (АТОЛ)
Новинки POS-периферии (АТОЛ)
PartnerSB
 
МУП ПОВВ
МУП ПОВВМУП ПОВВ
МУП ПОВВ
Santehmen Supergeroy
 
Opponeringen
OpponeringenOpponeringen
Opponeringen
Arlandagymnasiet
 
Sinus And Other Troubles Dr
Sinus And  Other  Troubles      DrSinus And  Other  Troubles      Dr
Sinus And Other Troubles Dr
banothkishan
 
Official transcript of the degree_UJI
Official transcript of the degree_UJIOfficial transcript of the degree_UJI
Official transcript of the degree_UJIJavi Pérez Blasco
 
Punj lloyd ru4 qfy2010-310510
Punj lloyd ru4 qfy2010-310510Punj lloyd ru4 qfy2010-310510
Punj lloyd ru4 qfy2010-310510
Angel Broking
 
Formazione e Consapevolezza
Formazione e ConsapevolezzaFormazione e Consapevolezza
Formazione e Consapevolezza
Polaris Informatica srl
 
I learn forum 2013 philippe gilLe e-learning au service du marketing et du bu...
I learn forum 2013 philippe gilLe e-learning au service du marketing et du bu...I learn forum 2013 philippe gilLe e-learning au service du marketing et du bu...
I learn forum 2013 philippe gilLe e-learning au service du marketing et du bu...
IL-DI - International Learning and Development Institute
 
White paper Mobile Learning
White paper Mobile LearningWhite paper Mobile Learning
Волжский
ВолжскийВолжский
Волжский
Ku4molodec
 
Новак
НовакНовак
Новак
Rosteplo
 
Book - Thesis-draft 05- FINAL 2015-12-10
Book - Thesis-draft 05- FINAL 2015-12-10Book - Thesis-draft 05- FINAL 2015-12-10
Book - Thesis-draft 05- FINAL 2015-12-10
Msizi Mkhize
 
Allegato elenco grandi interventi chirurgici
Allegato elenco grandi interventi chirurgiciAllegato elenco grandi interventi chirurgici
Allegato elenco grandi interventi chirurgici
Fabio Bolo
 
India during medieval period
India during medieval periodIndia during medieval period
India during medieval period
Girish Arabbi
 
DRAMA powerpoint presentation.
DRAMA powerpoint presentation.DRAMA powerpoint presentation.
DRAMA powerpoint presentation.
Karl Ruiz
 
Pics for dps
Pics for dpsPics for dps
Pics for dps
Zaralucille
 

Viewers also liked (19)

Company profile Polaris
Company profile Polaris Company profile Polaris
Company profile Polaris
 
Tejaswi Drushti Bestseller For Super Eyesight Dr Shriniwas Kashalikar
Tejaswi Drushti Bestseller For Super Eyesight Dr  Shriniwas KashalikarTejaswi Drushti Bestseller For Super Eyesight Dr  Shriniwas Kashalikar
Tejaswi Drushti Bestseller For Super Eyesight Dr Shriniwas Kashalikar
 
networks for kids
networks for kidsnetworks for kids
networks for kids
 
Новинки POS-периферии (АТОЛ)
Новинки POS-периферии (АТОЛ)Новинки POS-периферии (АТОЛ)
Новинки POS-периферии (АТОЛ)
 
МУП ПОВВ
МУП ПОВВМУП ПОВВ
МУП ПОВВ
 
Opponeringen
OpponeringenOpponeringen
Opponeringen
 
Sinus And Other Troubles Dr
Sinus And  Other  Troubles      DrSinus And  Other  Troubles      Dr
Sinus And Other Troubles Dr
 
Official transcript of the degree_UJI
Official transcript of the degree_UJIOfficial transcript of the degree_UJI
Official transcript of the degree_UJI
 
Punj lloyd ru4 qfy2010-310510
Punj lloyd ru4 qfy2010-310510Punj lloyd ru4 qfy2010-310510
Punj lloyd ru4 qfy2010-310510
 
Formazione e Consapevolezza
Formazione e ConsapevolezzaFormazione e Consapevolezza
Formazione e Consapevolezza
 
I learn forum 2013 philippe gilLe e-learning au service du marketing et du bu...
I learn forum 2013 philippe gilLe e-learning au service du marketing et du bu...I learn forum 2013 philippe gilLe e-learning au service du marketing et du bu...
I learn forum 2013 philippe gilLe e-learning au service du marketing et du bu...
 
White paper Mobile Learning
White paper Mobile LearningWhite paper Mobile Learning
White paper Mobile Learning
 
Волжский
ВолжскийВолжский
Волжский
 
Новак
НовакНовак
Новак
 
Book - Thesis-draft 05- FINAL 2015-12-10
Book - Thesis-draft 05- FINAL 2015-12-10Book - Thesis-draft 05- FINAL 2015-12-10
Book - Thesis-draft 05- FINAL 2015-12-10
 
Allegato elenco grandi interventi chirurgici
Allegato elenco grandi interventi chirurgiciAllegato elenco grandi interventi chirurgici
Allegato elenco grandi interventi chirurgici
 
India during medieval period
India during medieval periodIndia during medieval period
India during medieval period
 
DRAMA powerpoint presentation.
DRAMA powerpoint presentation.DRAMA powerpoint presentation.
DRAMA powerpoint presentation.
 
Pics for dps
Pics for dpsPics for dps
Pics for dps
 

Similar to CV Update1 2015, November.

kolligars-I-1
kolligars-I-1kolligars-I-1
kolligars-I-1
kolligar situmorang
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar Patel
 
Gorga Silalahi (CV)
Gorga Silalahi (CV)Gorga Silalahi (CV)
Gorga Silalahi (CV)
gorga juliabner
 
RESUME
RESUMERESUME
RESUME
GEORGE PAUL
 
Cv noor ali syarifudin
Cv noor ali syarifudinCv noor ali syarifudin
Cv noor ali syarifudin
Noor Ali Sy
 
01.Nedumaran Instrument Engineer
01.Nedumaran Instrument Engineer01.Nedumaran Instrument Engineer
01.Nedumaran Instrument Engineer
T. Nedumaran
 
Curriculum vitae anbika, st (update)
Curriculum vitae anbika, st (update)Curriculum vitae anbika, st (update)
Curriculum vitae anbika, st (update)
Anbika, ST
 
Joe_Winston_-_Occupational_Records.PDF
Joe_Winston_-_Occupational_Records.PDFJoe_Winston_-_Occupational_Records.PDF
Joe_Winston_-_Occupational_Records.PDF
Joe Winston Phillip
 
CV_Sachin Lone
CV_Sachin LoneCV_Sachin Lone
CV_Sachin Lone
Sachin 9975714374
 
M ZAIDI resume 2015
M ZAIDI resume 2015M ZAIDI resume 2015
M ZAIDI resume 2015
Mohd zaidi Mohd zaid
 
pandi resume Instrument Technician
pandi resume Instrument Technicianpandi resume Instrument Technician
pandi resume Instrument Technician
PANDI MUTHU
 
CV
CVCV
CV- Ho Xuan Minh Huu
CV- Ho Xuan Minh HuuCV- Ho Xuan Minh Huu
CV- Ho Xuan Minh Huu
huu ho
 
Cv pisalsart and attach file
Cv pisalsart and attach fileCv pisalsart and attach file
REY CV
REY CVREY CV
REY CV
rey purol
 
Leo Kencono Resume-Updated December 2015
Leo Kencono Resume-Updated December 2015Leo Kencono Resume-Updated December 2015
Leo Kencono Resume-Updated December 2015
Leo Kencono
 
QUIN ROLANDO I. VALCORZA
QUIN ROLANDO I. VALCORZAQUIN ROLANDO I. VALCORZA
QUIN ROLANDO I. VALCORZA
Quin Rolando Valcorza
 
Marlon Maisog CV GE 1
Marlon Maisog CV GE 1Marlon Maisog CV GE 1
Marlon Maisog CV GE 1
Marlon Maisog
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
Mateo Laurel
 
Bangun CV
Bangun CVBangun CV

Similar to CV Update1 2015, November. (20)

kolligars-I-1
kolligars-I-1kolligars-I-1
kolligars-I-1
 
Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)Nitinkumar CV. ( Instrument Supervisor)
Nitinkumar CV. ( Instrument Supervisor)
 
Gorga Silalahi (CV)
Gorga Silalahi (CV)Gorga Silalahi (CV)
Gorga Silalahi (CV)
 
RESUME
RESUMERESUME
RESUME
 
Cv noor ali syarifudin
Cv noor ali syarifudinCv noor ali syarifudin
Cv noor ali syarifudin
 
01.Nedumaran Instrument Engineer
01.Nedumaran Instrument Engineer01.Nedumaran Instrument Engineer
01.Nedumaran Instrument Engineer
 
Curriculum vitae anbika, st (update)
Curriculum vitae anbika, st (update)Curriculum vitae anbika, st (update)
Curriculum vitae anbika, st (update)
 
Joe_Winston_-_Occupational_Records.PDF
Joe_Winston_-_Occupational_Records.PDFJoe_Winston_-_Occupational_Records.PDF
Joe_Winston_-_Occupational_Records.PDF
 
CV_Sachin Lone
CV_Sachin LoneCV_Sachin Lone
CV_Sachin Lone
 
M ZAIDI resume 2015
M ZAIDI resume 2015M ZAIDI resume 2015
M ZAIDI resume 2015
 
pandi resume Instrument Technician
pandi resume Instrument Technicianpandi resume Instrument Technician
pandi resume Instrument Technician
 
CV
CVCV
CV
 
CV- Ho Xuan Minh Huu
CV- Ho Xuan Minh HuuCV- Ho Xuan Minh Huu
CV- Ho Xuan Minh Huu
 
Cv pisalsart and attach file
Cv pisalsart and attach fileCv pisalsart and attach file
Cv pisalsart and attach file
 
REY CV
REY CVREY CV
REY CV
 
Leo Kencono Resume-Updated December 2015
Leo Kencono Resume-Updated December 2015Leo Kencono Resume-Updated December 2015
Leo Kencono Resume-Updated December 2015
 
QUIN ROLANDO I. VALCORZA
QUIN ROLANDO I. VALCORZAQUIN ROLANDO I. VALCORZA
QUIN ROLANDO I. VALCORZA
 
Marlon Maisog CV GE 1
Marlon Maisog CV GE 1Marlon Maisog CV GE 1
Marlon Maisog CV GE 1
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
 
Bangun CV
Bangun CVBangun CV
Bangun CV
 

CV Update1 2015, November.

  • 1. 6 1 Curriculum Vitae Personnel Detail Name : Afrizal Zaini Amd. Place, date of birth : Lhokseumawe, April 25-1970. Sex : Male Marital Status : Married Religion : Moslem Nationality : Indonesia. Address : Perumahan Bumi Rakata Asri Blok G1. No. 21 RT/RW 003/003 Ciwedus, Cilegon, Banten-Indonesia. Mobile phone : +6285225925050 Email : afril_ap70@yahoo.co.id No. Passport : A 1583856 Education Background And Courses.  1987-1990 (Senior High School) SMA Negeri I Lhokseumawe, Majoring in Biology, Aceh Utara – NAD.  1991-1995 Polytechnic Unsyiah, Department Civil Engineering, Lhokseumawe-NAD.  July 17-2004 Task Risk Assessment (Certificate)  July 18-2004 Work Permit System Rev-6 (Certificate)  Emergency Training ( T- B.O.S.E.I.T). Training date 3-4 October 2012.  HSE Awareness ( Certificate, PT. PLP )  OPERCOM Methodology by VINCI Energies and TOTAL E&P INDONESIE,  ICAPS Pre-commissioning and Commissioning Tools, by VINCI Energies and TOTAL E&P INDONESIE.  Medical Certificate,  November 10-2014, Autoclave Engineers Coning and Threading Machine Training, by ISE International Pte Ltd, Singapore Summary of Work Over 9 years of hand on Instrument/ Electrical experience in industrial petroleum oil and gas, gas plant, Petrochemical, Boiler Plant and Recovery Boiler project including process control, measurement of instrument and electrical. Areas of expertise in job site environment include construction, commissioning and start up of process control system, trouble Shooting and able to read P & ID, Hook Up, instrument location drawing and Electric wiring & schematic drawing (as built Drawing if Required).
  • 2. 6 2 Missions and Task To perform on safe manner the commissioning activities on yard and on site, in respect with standing instruction and Work Permit instructions. Execute the inspection and Quality Control activities on site, collecting the relevant objective proofs, ensuring supervision and coordination of quality control activities on instrument equipment/systems construction and installation activities. Commissioning Preparation.  Witnessing of contractor pre-commissioning activities, as defined by the supervisor in a professional way.  Ensure that witnessing activities do not delay contractor activities more than necessary.  Attend FAT / SAT as required by supervisor. Commissioning execution.  Perform the commissioning activity with respect of the WP in a professional manner, in respect with company specification.  Raise and clear punch list items. Report any non conformity to his supervisor.  Fill commissioning test and check sheets before supervisor approval Duties and Responsibilities.  Carry out instrument Commissioning activity, such loop test, function test and sequent test and Operation Test Procedure.  Carry out instrument device troubleshooting, calibrated and work modification.  Carry out Preventive Maintenance (PM) coverage Re-calibrated, repair and Matrix Test.  Familiar with Fire and Gas System ( Gas Detector, Smoke Detector, Manual Call Point, ESD Push Button, Heat Detector, Flame Detector and Open Path, Fusible Plug System, Deluge System, Water Mist System and early Warning Smoke Detector) coverage Calibration and Trouble Shooting  Familiar with Instrument control pneumatic, Hydraulic System (WHCP System),and I/P System. Preparation, installation, fabrication, Conning and Threading Auto Clave Tubing by Manual or Machine.  Carry out instrument construction work, such connection tubing and connection cable.  Verification and review drawing, material data sheet, P & ID diagram, vendor drawing and as built drawing.  Assist to vendor for inspection and witness with client for Site Acceptance Test.  Inspection field installation like install support, install cable tray, install equipments or device.  As Per International Standards, Specifications, Instrument Calibration Method of Statement & As Per Approved Project Drawings Supervised, Inspected & Witnessed Instrument Cable Duct Bank, Cable Pulling from RIB to J.B & Control Room and RGS conduit, Stanchion of instrument devices, Marshalling Panel, Junction Boxes installation, Mounting of instrument devices such as pressure, level, temperature transmitter, RTD and thermocouple, pressure, Level, Flow and temperature switch & Control valves . Calibration of Transmitters, Control valves, Switches of all Parameters like Pressure, Level, temperature.
  • 3. 6 3 Working Experience. 1. Dietsmann Mantaining Energy. Project : ERHA North Project, OSO Condensate Pipeline Replacement Project, Satellite Field Development Project Phase I, OCIP Project, Mobil Producing Negeria Unlimited, Negeria – West Africa. Period : May 2011 up to August 2015.. Position : Pre-commissioning and Commissioning (E & I) Team. Responsibility : Execution of preparation and review document for commissioning procedure, execution of calibration test, loop check test, function test and OTP (operation test procedure). Issued punch list system of related to commissioning phase. Assist start up team for execution startup phase. 2. PT. Indokomas Buana Perkasa, Contracted PT.Total Indonesie Project : Bekapai Senipah Peciko Maintenance project Period : September 2009 up to May 2011. Position : FO/PJT-CMS Team, Instrument Technician Commissioning Responsibility : Execution of preparation and review document for commissioning procedure and preparation OTP will be submitted to Star-up team, execution of calibration test, loop check test, function test and OTP (operation test procedure). Issued punch list system of related to commissioning phase. Assist start up team for execution startup phase. 3. PT. Indokomas Buana Perkasa, Contracted PT.Total Indonesie. Project : Tunu South Pashe 11, South Manifold Platform and South Compression Platform and South Utility Platform,. Period : June 2008 up to September 2009. Position : PJC-Commissioning Team, Instrument Technician Commissioning Responsibility : Execution of preparation and review document for commissioning procedure and preparation OTP will be submitted to Star-up team, execution of calibration test, loop check test, function test and OTP (operation test procedure). Issued punch list system of related to commissioning phase. Assist start up team for execution startup phase. 4. PT. Sinar Mulia Abadi. Project : Conoco Phillips Indonesia, WHP – C & D North Belut, Batam Island. Period : March 2008 till up May 2008. Position : Instrument Technician Commissioning Responsibility : Execution of preparation and review document for commissioning procedure and, execution of calibration test, loop check test, function test and. Issued punch list system of related to commissioning phase.
  • 4. 6 4 5. PT. Angkasa Engineer Indonesia. Project : Conoco Philips Indonesia. KERISI Development Project, Natuna Sea. Period : October 2007 till up January 2008. Position : Instrument Technician Commissioning Responsibility : Execution of preparation and review document for commissioning procedure and, execution of calibration test, loop check test, function test. Issued punch list system of related to commissioning phase. 6. PT. Angkasa Engineer Indonesia. Project : Conoco Philips Indonesia. KERISI Development Project, Batam Island. Period : June 2007 till up 02 September 2007. Position : Instrument Technician Commissioning Responsibility : Execution of preparation and review document for commissioning procedure and preparation OTP will be submitted to Star-up team, execution of calibration test, loop check test, function test and OTP (operation test procedure). Issued punch list system of related to commissioning phase. Assist start up team for execution startup phase. 7. PT. BABCOCK & WILCOX a McDermott Company Project : Tanjung Jati B " Coal Fired Power Plant 2 x 660 MW " Jepara, Central Java. Period : May 2005 till up 02 November 2006. Position : Instrument Technician Commissioning Responsibility : Execution of preparation and review document for commissioning procedure and preparation OTP will be submitted to Star-up team, execution of calibration test, loop check test, function test and OTP (operation test procedure). Issued punch list system of related to commissioning phase. Assist start up team for execution startup phase. 8. PT. SAS International Project : Project Public Address Services. CNOOC SES Ltd, South East Sumatra. Period : January 2005 - April 2005 Position : Instrument Technician Commissioning Responsibility : Execution of preparation and review document for commissioning procedure and execution of calibration test, loop check test, function test. Issued punch list system of related to commissioning phase.
  • 5. 6 5 9. PT. Sinar Mulia Abadi. Project : Libo Gas Station/ Test Station (Caltex), Re - Instrumentation Sungai Pakning (Pertamina-Dumai) – Riau. VLP Gas Compressor- Kaltim (VICO Indonesia). Period : February 2004 – October 2004 Position : Instrument Technician Commissioning Responsibility : Execution of preparation and review document for commissioning procedure and preparation OTP will be submitted to Star-up team, execution of calibration test, loop check test, function test and OTP (operation test procedure). Issued punch list system of related to commissioning phase. Assist start up team for execution startup phase. 9. PT. Ismatiur Project : Project Creep-1 Amoco Mitsui PTA Indonesia, Merak – Banten. Period : June 2003 - December 2003. Position : Instrument Technician Commissioning Responsibility : Execution of preparation and review document for commissioning procedure and execution of calibration test, loop check test, function test. 10. PT. Teknik Umum Sanko Eng. Project : Project Jetty No. 3 Asahimas Chemical, Anyer – Banten. Period : September 2002 – January 2003. Position : Instrument Technician Commissioning Responsibility : Execution of preparation and review document for commissioning procedure and execution of calibration test, loop check test, function test.. 11. PT. Sapta Krida Karya Mas. Project : Project KMK Global Sport, Cikupa – Tangerang. Period : October 2000 – May 2001 Position : Instrument Technician Commissioning Responsibility : Execution of preparation and review document for commissioning procedure and execution of calibration test, loop check test, function test. 12. PT. Teknik Umum Sanko Eng. Project : Project Showa Esterindo Indonesia Ethyl Acetate Plant Bojonegara, Banten. Period : February 1998 – December 1998 Position : Material Control Responsibility : Preparation and review of material data sheet, balancing material.
  • 6. 6 6 13. PT. Teknik Umum Sanko Eng. Project : Project Suralaya Coal Fired Power Plant 3 x 600 MW, Unit 5, 6 and 7, Merak – Banten. Period : July 1996 – 1998 Position : Skill Instrument / electric Responsibility : Termination power and control cable, fabrication support and cable tray, Pulling cable and installation contruction E/I. Personnel Qualification - High motivation and initiative. - High willingness to actively new thing Your Faithfully Afrizal Zaini