YAYA SUNARYA
Mobile Phone : +62812 77 060949.
E-mail : yays.sunarya@yahoo.com
Date of birth : May 09, 1977.
Status : Married.
Nationality : Indonesia.
Education : Senior High School.
Address : Jl. Rajawali Timur Gg. R.A Barnas No. 110/77 Rt.04 Rw.06
Dungus Cariang Andir Kabupaten Bandung.
Jawa Barat 40183.
INSTRUMENT Pre-Commissioning & Commissioning.
For Onshore / Offshore at Oil & Gas Facilities.
Profile :
A more than 16-years of Instrumentation for Installation, pre-commissioning and commissioning activities
at onshore and offshore oil & gas facilities. Good attitude, kind, communicative, diligent, tolerant, target
oriented, discipline, honest, and be responsible.
Seeking a similar role with more competitive challenge and growth where deep and consistence learning
plus great team player in a fast growing environment will be utilized and advanced.
Summary of Technical Skills :
 Knowledge and experienced in instrument pre-commissioning activities.
 Knowledge and experienced in instrument commissioning activities such as loop testing, function
test (for all field instrument, fire and gas detector and etc), cause/effect test, trouble shoot and
etc.
 Knowledge and experienced in inspection installation electrical and instrument equipment.
 Having knowledge with instrument and electrical drawing such as P&ID, loop drawing, hook-up
drawing, schematic drawing, cause and effect diargam etc.
 Having knowledge for cause and effect test.
 Having knowledge with reporting activities (daily report, function test report).
Professional Experience :
PERTAMINA HULU ENERGY WEST MADURA OFFSHORE (PHE WMO).
Periode March 2016 up to present (at PT. Teknika Regulindo Asia).
Electrical Commissioning Superintendent.
Project Assignment :
EPCI – 1 PHE-12, PHE-24 and CPP2 Platforms and Pipeline.
Responsibilities :
 Verify for pre-commissioning document such as check sheet and test sheet.
 Prepare for commissioning dossier.
 Prepare for operational test procedure such as navigation aids system, lighting system, 24 Vdc
UPS system, 230 Vac UPS system, DC system.
PERTAMINA HULU ENERGY OFFSHORE WEST JAVA (PHE ONWJ).
Periode Dec 2012 – Sept 2015 (at PT. Teknika Regulindo Asia).
Instrument Commissioning Supervisor.
Project Assignment :
On Behalf PHE ONWJ C&OR (Commissioning & Operation Readiness) for PHE ONWJ Project (ECHO
F&G and HVAC System Upgrade, LIMA Subsidence Remediation, MRA-MMJ Gas Lift, ULA Project,
Foxtrot Reactivation, KL Gas Lift, ZUB NUI Reactivation, Bravo F&G Upgrade. etc).
Responsibilities :
 Inspection for installation and review pre-commissioning document document for closing
Mechanical Completion Certificate (MC1).
 Witnessing for commissioning activities and review commissioning document for closing System
Handover (SH1) to operation.
 Performed for cause and effect test.
 Assist operation for Plan Performance activities.
 Witness for closing punch list.
PREMIER OIL
Period Aug 2012 – Sept 2012 (at PT. Teknika Regulindo Asia)
Electrical Commissioning Technician
Project Assignment :
ANOA Phase 4 AGX Compression Reconfiguration Project, AGX Platform Natuna Sea
Offshore
Responsibilities :
 Responsible for performing functional test for electrical equipment such as Gas Turbine.
Generator (GT) Solar Turbine, all accessories at GT 7500 such as DC/AC Back up oil Pump,
Ventilation Fan, Starter Motor, Pre post Lube Oil Pump, and Lube Oil Cooler. Also responsible for
GT 7500, GT 7400, GT 7300 Load Sharing KVAR and KW. Functional Test for Load Shedding
GT 7500 Causes and Effect.
 Responsible for Normal Lighting and Emergency Lighting Pre-commissioning and
Commissioning.
 Functional Test Fin Fan after Cooler, Local Operation and Remote Operation. Status
motor at MCS.
 Assist Start up Gas Turbine Generator.
CONOCO PHILLIPS INDONESIA
Period Oct 2011 – Feb 2012 (at PT. Teknika Regulindo Asia)
Instrument Commissioning Supervisor
Project Assignment :
Bawal Subsea Development Project - Hang Tuah Platform, Natuna.
Topside Modification Onshore Fabrication and Offshore Hook-Up.
Responsibilities :
 Dismantling & Installing various electrical panel & control.
 The covered modification work in chemical injection.
 Dismantling & Installing line tubing , hook up in chemical injection & PHPU for supply TUTU
panel.
 Cable pulling, continuity & insulation test.
 Dismantling & Installing accumulator & modification line filter in PHPU.
 Assist vendor for connection umbilical in TUTU panel.
 Assist Commissioning team for start-up process.
 Closing Punch List & mark-up drawing.
TOTAL BONGKOT (PTT Exploration and Production)
Period June 2011 – July 2011 (at PT. Teknika Regulindo Asia)
Electrical Commissioning Technician
Project Assignment :
Commissioning Living Quarter Bongkot Thailand Project.
Responsibilities :
 Performed Commissioning lighting.
HESS INDONESIA PANGKAH LTD
Period Sept 2010 – May 2011 (at PT. Teknika Regulindo Asia)
Electrical Commissioning Technician
Projects Assignments :
CPP & AUP EPCC Project - Ujung Pangkah Development Phase 2 Project Commissioning
Services.
Responsibilities :
Assist vendors for performed functional and operation test of:
 Grounding system.
 UPS system.
 HV/LV switchboard system
 Diesel engine generator.
 Gas engine generator.
 Air compressor and air dryer system.
 Motors and pumps control system.
 Lighting distribution board system.
 HVAC system.
 Fuel gas system.
PT. TRANSPORTASI GAS INDONESIA (TGI)
Period Jan 2010 – Aug 2010 (at PT. Teknika Regulindo Asia)
Electrical Maintenance
Projects Assignments :
Operations & Maintenance for Balance of Plant EPCC for Jabung Gas Booster Station Project – Jambi.
Responsibilities :
Performed operation and maintenance activities of:
 Routine visit and recording gauge metering.
 Lubrication schedule.
 Check for provision of consumable and spare parts.
 Operate and monitoring electrical equipment.
 Troubleshooting.
 Performing maintenance task.
PT. TRANSPORTASI GAS INDONESIA (TGI)
Period Feb 2009 – Dec 2009 (at PT. Teknika Regulindo Asia)
Electrical Commissioning Supervisor
Projects Assignments :
Commissioning for EPCC of Jabung Gas Booster Station Project – Jambi.
Responsibilities :
Performing preliminary check:
 Physical check on site of the installation.
 Through review of the Pre-commissioning dossier.
Monitoring for performed functional test of:
 Grounding system.
 UPS system.
 LV switchboard system
 Diesel engine generator.
 Gas engine generator.
 Air compressor and air dryer system.
 Motors and pumps control system.
 Lighting distribution board system.
 Fuel gas system.
 Cathodic protection system.
TOTAL E&P INDONESIA
Period July 2008 – March 2009 (at PT. Teknika Regulindo Asia)
Electrical Commissioning Technician
Projects Assignments :
PECIKO Field Development Project Phase 5.
Responsibilities :
Performing preliminary check:
 Physical check on site of the installation.
 Through review of the Pre-commissioning dossier.
 Assist vendors.
Performed functional test of:
 Grounding system.
 AC/DC switchboard system
 Diesel engine generator.
 Lighting distribution board system.
 Cathodic protection system.
 PAGA System.
PT. PROSAFE / VME
Period Jan 2008 – June 2008 (at PT. Angkasa Engineers Indonesia)
QC Instrument
Project Assignments :
FPSO Cidade de Sao Mateus Project - PT. PROSAFE/VME (Global Separation Technology), Batam
Island, Indonesia.
Responsibilities :
 Verification of Electrical / Instrument Material & Equipment for palform M-30 (Flare system),
paltform M-50 (Water Injection System), and Platform M-63 (Dehydration System).
 Inspection for Installation Junction Boxes, Cable Tray, Hook up Tubing, Field Instrument,
Lighting.
 Review for Mechanical Completion document.
CONOCO PHILLIPS INDONESIA
Period Oct 2007 – Jan 2008 (at PT. Angkasa Engineers Indonesia)
Instrument Commissioning
Project Assignments :
KERISI CPP Project / Conoco Phillips Indonesia Offshore Natuna Sea, Indonesia.
Responsibilities :
 Loops test of all field instrument such as F&G System, Cause and Effect Test and Trouble
shooting.
CONOCO PHILLIPS INDONESIA
Period Aug 2007 – Sept 2007 (at PT. Angkasa Engineers Indonesia)
Instrument Commissioning
Projects Assignments :
KERISI CPP Project / Conoco Phillips Indonesia – Onshore SMOE kabil, Batam.
Responsibilities :
 Loops test and functional test F&G system at Living Quarter Area.
KODECO PPP
Period March 2007 – Aug 2007 (at PT. Angkasa Engineers Indonesia)
Instrument QA/QC
Project Assignments :
KODECO PPP – EPC Project - PROFAB INDONESIA Batam Island, Indonesia
Responsibilities :
 Assist PT. Sempec for Material Verification.
 Inspection for Installation Junction boxes, Cable Tray, Hook Up Tubing, Field Instrument.
CONOCO PHILLIPS INDONESIA
Period Jan 2007 – March 2007 (at PT. Angkasa Engineers Indonesia)
Instrument Technician
Project Assignments :
Kerisi CPP Project/ Conoco Philiips SOME Kabil Batam Island, Indonesia.
Responsibilities :
 Hydro Testing Ball Valve (Manual & SDV/ BDV Valve).
CONOCO PHILLIPS INDONESIA
Period Sept 2006 – Oct 2006 (at PT. Angkasa Engineers Indonesia)
Instrument Pre-commissioning
Project Assignments :
Kerisi WHP-K Project / Conoco Philips SMOE Kabil Batam Island, Indonesia.
Responsibilities :
 Closing for Mechanical Completions (MC) such as Leak Testing for Impulse Line, inpection
installation for instrumentation.
BABCOCK & WILCOX
Period April 2005 – June 2006 (at PT. Wasamitra Engineering)
Instrument Commissioning
Project Assignments :
Tanjung Jati B " Coal Fired Power Plant 2 x 660 MW "Jepara, Central Java.
Responsibilities :
 Performed calibration of all field instrument such as smart type transmitters, Converters,
Switches, Pressure Gauge, Stroke of Control Valve, etc.
 Loop test, Function Test, Trouble shooting and Assistance for Start-Up.
PT. PUPUK KUJANG
Period Nov 2004 – April 2005(at PT. Wijaya Engindo Nusa).
Instrument Commissioning
Project Assignments :
Pupuk Kujang 1B project.
Responsibilities :
 Performed calibration of all field instrument such as smart type transmitters, converters,
Switches, Pressure Gauge, Stroke of Control Valve, etc.
 Loop test, Function Test, Cause & Effect test, Trouble shooting and Assist for Start-Up.
BELANAK FPSO CONOCO PHILLIPS
Period Aug 2004 – Nov 2004 (at Kellog Brow & Root / Total Automation Singapore).
Instrument Commissioning
Project Assignments :
ConocoPhillips FPSO “Belanak” Project Batam Island – Indonesia.
Responsibilities :
 Loop test, Function test and Trouble shooting.
BELANAK FPSO CONOCO PHILLIPS
Periode June 2003 – July 2004 (at PT. J Ray Mc Dermott Indonesia)
Instrument Technician
Project Assignments :
ConocoPhillips FPSO “Belanak” Project Batam Island, Indonesia
Responsibilities :
 Fabrication and Installation of Support Line Tubing, Hook Up, Impulse Line Tubing, Air
signal Tubing and Leak Test Instrument Tubing.
PT. PUPUK KALIMANTAN TIMUR
Period April 2002 – Jan 2003 (at PT. Foxboro Perkind Indonesia)
Instrument Commissioning
Project Assignments :
Pupuk Kaltim - 4 Project - Pupuk Kalimantan Timur
Responsibilities :
 Calibration of all field instrument such as smart type transmitters, converters, Switches,
Pressure Gauge, Stroke of Control Valve, etc.
 Loop Test, Function Test, Trouble shooting, Commissioning and Assist for Start-Up.
PT. BADAK NGL BONTANG
Period April 2000 – Nov 2001 (at PT. Wijaya Engindo Nusa)
Instrument Commissioning
Project Assignments :
Train A-F DCS/ESD Retrofit Project (PGR) PT. BADAK NGL Bontang, East Kalimantan
Responsibilities :
 Calibration of all field instrument such as smart type transmitters, converters, Switches,
Pressure Gauge, Stroke of Control Valve, etc.
 Loop test, Function Test, Trouble shooting, Commissioning and Assist for Start-Up.
PT. CALTEX FACIFIC INDONESIA
Period Aug 2000 – March 2001 (at PT. Wijaya Engindo Nusa)
Instrument Commissioning
Project Assignments :
Central Gathering Station Area-10 - Caltex Pacific Indonesia Duri Riau, Sumatera.
Responsibilities :
 Calibration of all field Instrument such as smart type transmitters, converters, Switches,
Pressure Gauge, Stroke of Control Valve, etc.
 Loop test, Function Test, Trouble shooting, Commissioning and Assist for Start-Up.
PT. BADAK NGL BONTANG
Period Dec 1998 – July 2000 (at PT. Wijaya Engindo Nusa)
Instrument Commissioning
Project Assignments :
Train-H Project - BADAK NGL Bontang, East Kalimantan
Responsibilities :
 Calibration of all field instrument such as smart type transmitters, converters, Switches, Pressure
Gauge, Stroke of Control Valve, etc.
 Loop test, Function test, Trouble shooting, Commissioning and Assist for Start-Up.
PT. BADAK NGL BONTANG
Period June 1998 – Dec 1998 (at PT. Wijaya Engindo Nusa)
Instrument Technician
Project Assignments :
3
rd
Loading Dock/LPG Storage Project, PT. BADAK NGL
Responsibilities :
 Calibration of all field instrument such as smart type transmitters, converters, Switches, Pressure
Gauge, Stroke of Control Valve, etc.
 Loop test, Function test, Trouble shooting, Commissioning and Assist for Start-Up.
TRAININGS / COURSES
Location & Organizer Specialized Training Years
PT. Teknika Regulindo Asia -
Jakarta Opercom Methodology & ICAPS 2012
PT. Samson Tiara – Cilegon Tropical BOSIET & Travel Safety by Boat Code 2011
5502
BSI Jakarta OHSAS / Hazard Identification, Risk Assessment 2011
& Control (HIRAC) Training
BSI Jakarta Identify Legal & Other Requirements HIRAC 2011
Training
PT. BARRON International -
Bogor SEA SURVIVAL Training 2011
P2M-Mechanical Electrical and Instrument System 2009
Engineering Department,
Faculty of Engineering
University of Indonesia - Jakarta
Fun English Center - Jakarta Basic for Conversation - Elementary 2009

More Related Content

What's hot

RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)
RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)
RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)
RAMA SAMY
 
NACE CP LEVEL II ENGINEER
NACE CP LEVEL II ENGINEERNACE CP LEVEL II ENGINEER
NACE CP LEVEL II ENGINEER
RAMA SAMY
 
Updated CV (06 April 2016)
Updated CV (06 April 2016)Updated CV (06 April 2016)
Updated CV (06 April 2016)Ronald Marpaung
 
C.v. p maidens
C.v. p maidensC.v. p maidens
C.v. p maidens
PETER MAIDENS
 
OKHANI TED MOST RECENT
OKHANI TED MOST RECENTOKHANI TED MOST RECENT
OKHANI TED MOST RECENTOKHANI TED
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
shaik karimulla
 
CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.docAbdul Razzaq
 
A year with Larsen & Toubro
A year with  Larsen & ToubroA year with  Larsen & Toubro
A year with Larsen & ToubroJAIPRAKASH PATIL
 
Resume- Tiwari
Resume- TiwariResume- Tiwari
Resume- TiwariAk Tiwari
 
SHER ZAMAN CV (2)
SHER ZAMAN CV (2)SHER ZAMAN CV (2)
SHER ZAMAN CV (2)Sher Zaman
 

What's hot (19)

RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)
RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)RAMASAMY  (NACE CERTIFIED   CP LEVEL II ENGINEER)
RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)
 
NACE CP LEVEL II ENGINEER
NACE CP LEVEL II ENGINEERNACE CP LEVEL II ENGINEER
NACE CP LEVEL II ENGINEER
 
Updated CV (06 April 2016)
Updated CV (06 April 2016)Updated CV (06 April 2016)
Updated CV (06 April 2016)
 
PRATIK PATEL
PRATIK PATELPRATIK PATEL
PRATIK PATEL
 
C.v. p maidens
C.v. p maidensC.v. p maidens
C.v. p maidens
 
CV_E&I QC
CV_E&I QCCV_E&I QC
CV_E&I QC
 
OKHANI TED MOST RECENT
OKHANI TED MOST RECENTOKHANI TED MOST RECENT
OKHANI TED MOST RECENT
 
Stewart Kane CV 2016
Stewart Kane CV 2016Stewart Kane CV 2016
Stewart Kane CV 2016
 
ELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIANELECTRICAL TECHNICIAN
ELECTRICAL TECHNICIAN
 
Kareem cv updated
Kareem cv  updatedKareem cv  updated
Kareem cv updated
 
CV Bambang Eko Hermawan
CV Bambang Eko HermawanCV Bambang Eko Hermawan
CV Bambang Eko Hermawan
 
OKEREKE CHISOM CV
OKEREKE CHISOM CVOKEREKE CHISOM CV
OKEREKE CHISOM CV
 
CV_Abdul Razzaq.doc
CV_Abdul Razzaq.docCV_Abdul Razzaq.doc
CV_Abdul Razzaq.doc
 
cv Instrument Commissioning Engineer
cv Instrument Commissioning Engineercv Instrument Commissioning Engineer
cv Instrument Commissioning Engineer
 
A year with Larsen & Toubro
A year with  Larsen & ToubroA year with  Larsen & Toubro
A year with Larsen & Toubro
 
Resume- Tiwari
Resume- TiwariResume- Tiwari
Resume- Tiwari
 
CV_Shahzad Ali SEC-CSD Engineer
CV_Shahzad Ali SEC-CSD EngineerCV_Shahzad Ali SEC-CSD Engineer
CV_Shahzad Ali SEC-CSD Engineer
 
SHER ZAMAN CV (2)
SHER ZAMAN CV (2)SHER ZAMAN CV (2)
SHER ZAMAN CV (2)
 
DHARMA PUTRA
DHARMA PUTRADHARMA PUTRA
DHARMA PUTRA
 

Viewers also liked

Walden and the Hermeneutics of Being American
Walden and the Hermeneutics of Being AmericanWalden and the Hermeneutics of Being American
Walden and the Hermeneutics of Being AmericanRonen Akkauy
 
Basic geometric triangles
Basic geometric trianglesBasic geometric triangles
Basic geometric trianglesTylerBliz
 
Darba tirgus un migracija
Darba tirgus un migracijaDarba tirgus un migracija
Darba tirgus un migracija
LDDK
 
Profil Pengusaha Sukses
Profil Pengusaha SuksesProfil Pengusaha Sukses
Profil Pengusaha Sukses
Akadusyifa .
 
THE ROLE OF THE REPRESENTATIVE ON OUTSOURCED COMPANIES IN INDIA
THE ROLE OF THE REPRESENTATIVE ON OUTSOURCED COMPANIES IN INDIATHE ROLE OF THE REPRESENTATIVE ON OUTSOURCED COMPANIES IN INDIA
THE ROLE OF THE REPRESENTATIVE ON OUTSOURCED COMPANIES IN INDIAEUSTAQUIO CALDEIRA BRANT
 
Observación participante y no participante
Observación participante y no participanteObservación participante y no participante
Observación participante y no participante
Universidad Juárez Autónoma de Tabasco
 
Is science superstitious
Is science superstitiousIs science superstitious
Is science superstitious
inayat ullah
 
Biography of pb shelley
Biography of pb shelleyBiography of pb shelley
Biography of pb shelley
inayat ullah
 
Gender Diversity in Tech - #BeBoldForChange
Gender Diversity in Tech - #BeBoldForChangeGender Diversity in Tech - #BeBoldForChange
Gender Diversity in Tech - #BeBoldForChange
Michelle Gyimah
 
Real Estate Indonesia
Real Estate IndonesiaReal Estate Indonesia
Real Estate Indonesia
Akadusyifa .
 
Globalisasi informasi akadusyifa
Globalisasi informasi akadusyifaGlobalisasi informasi akadusyifa
Globalisasi informasi akadusyifa
Akadusyifa .
 
akadusyifa
akadusyifaakadusyifa
akadusyifa
Akadusyifa .
 
Perilaku Organisasi
Perilaku OrganisasiPerilaku Organisasi
Perilaku Organisasi
Akadusyifa .
 
Follow me akadusyifa
Follow me akadusyifaFollow me akadusyifa
Follow me akadusyifa
Akadusyifa .
 
Rights of the child in the psychological and
Rights of the child in the psychological andRights of the child in the psychological and
Rights of the child in the psychological and
Dr Khaled Mahboub Emara
 

Viewers also liked (18)

Walden and the Hermeneutics of Being American
Walden and the Hermeneutics of Being AmericanWalden and the Hermeneutics of Being American
Walden and the Hermeneutics of Being American
 
Basic geometric triangles
Basic geometric trianglesBasic geometric triangles
Basic geometric triangles
 
Darba tirgus un migracija
Darba tirgus un migracijaDarba tirgus un migracija
Darba tirgus un migracija
 
s.choudhary-resume
s.choudhary-resumes.choudhary-resume
s.choudhary-resume
 
Profil Pengusaha Sukses
Profil Pengusaha SuksesProfil Pengusaha Sukses
Profil Pengusaha Sukses
 
Master certificate - RUC
Master certificate - RUCMaster certificate - RUC
Master certificate - RUC
 
THE ROLE OF THE REPRESENTATIVE ON OUTSOURCED COMPANIES IN INDIA
THE ROLE OF THE REPRESENTATIVE ON OUTSOURCED COMPANIES IN INDIATHE ROLE OF THE REPRESENTATIVE ON OUTSOURCED COMPANIES IN INDIA
THE ROLE OF THE REPRESENTATIVE ON OUTSOURCED COMPANIES IN INDIA
 
Observación participante y no participante
Observación participante y no participanteObservación participante y no participante
Observación participante y no participante
 
Is science superstitious
Is science superstitiousIs science superstitious
Is science superstitious
 
Biography of pb shelley
Biography of pb shelleyBiography of pb shelley
Biography of pb shelley
 
Gender Diversity in Tech - #BeBoldForChange
Gender Diversity in Tech - #BeBoldForChangeGender Diversity in Tech - #BeBoldForChange
Gender Diversity in Tech - #BeBoldForChange
 
Real Estate Indonesia
Real Estate IndonesiaReal Estate Indonesia
Real Estate Indonesia
 
Globalisasi informasi akadusyifa
Globalisasi informasi akadusyifaGlobalisasi informasi akadusyifa
Globalisasi informasi akadusyifa
 
akadusyifa
akadusyifaakadusyifa
akadusyifa
 
Perilaku Organisasi
Perilaku OrganisasiPerilaku Organisasi
Perilaku Organisasi
 
Follow me akadusyifa
Follow me akadusyifaFollow me akadusyifa
Follow me akadusyifa
 
Rights of the child in the psychological and
Rights of the child in the psychological andRights of the child in the psychological and
Rights of the child in the psychological and
 
Sim kelompok 8
Sim kelompok 8Sim kelompok 8
Sim kelompok 8
 

Similar to Yaya Sunarya CV

CV Update1 2015, November.
CV Update1 2015, November.CV Update1 2015, November.
CV Update1 2015, November.Afrizal Zaini
 
Marlon Maisog CV GE 1
Marlon Maisog CV GE 1Marlon Maisog CV GE 1
Marlon Maisog CV GE 1Marlon Maisog
 
Jigar naik cv(e & i) engineer
Jigar naik cv(e & i) engineerJigar naik cv(e & i) engineer
Jigar naik cv(e & i) engineer
Jigar naik
 
Ali Roziki CV New 01
Ali Roziki CV New 01Ali Roziki CV New 01
Ali Roziki CV New 01Ali Roziki
 
Muthukumaran cv
Muthukumaran cvMuthukumaran cv
Muthukumaran cv
S Kumar
 
pandi resume Instrument Technician
pandi resume Instrument Technicianpandi resume Instrument Technician
pandi resume Instrument TechnicianPANDI MUTHU
 
Yeoh KS CV Rev 1
Yeoh KS CV Rev 1Yeoh KS CV Rev 1
Yeoh KS CV Rev 1Yeoh KS
 

Similar to Yaya Sunarya CV (20)

Gorga Silalahi (CV)
Gorga Silalahi (CV)Gorga Silalahi (CV)
Gorga Silalahi (CV)
 
CV Update1 2015, November.
CV Update1 2015, November.CV Update1 2015, November.
CV Update1 2015, November.
 
CV New 2016
CV New 2016CV New 2016
CV New 2016
 
Marlon Maisog CV GE 1
Marlon Maisog CV GE 1Marlon Maisog CV GE 1
Marlon Maisog CV GE 1
 
Totie Laurel CV
Totie Laurel CVTotie Laurel CV
Totie Laurel CV
 
FILTHER RIEOALEX
FILTHER RIEOALEXFILTHER RIEOALEX
FILTHER RIEOALEX
 
mpita20_CV_Amec
mpita20_CV_Amecmpita20_CV_Amec
mpita20_CV_Amec
 
ugandhar CompEx resume
ugandhar CompEx resumeugandhar CompEx resume
ugandhar CompEx resume
 
jragojo CV
jragojo CVjragojo CV
jragojo CV
 
RTrongco Resume
RTrongco ResumeRTrongco Resume
RTrongco Resume
 
Jigar naik cv(e & i) engineer
Jigar naik cv(e & i) engineerJigar naik cv(e & i) engineer
Jigar naik cv(e & i) engineer
 
CV Herwandi
CV HerwandiCV Herwandi
CV Herwandi
 
Ali Roziki CV New 01
Ali Roziki CV New 01Ali Roziki CV New 01
Ali Roziki CV New 01
 
Sudipto Bhattacharjee Resume
Sudipto Bhattacharjee ResumeSudipto Bhattacharjee Resume
Sudipto Bhattacharjee Resume
 
Muthukumaran cv
Muthukumaran cvMuthukumaran cv
Muthukumaran cv
 
pandi resume Instrument Technician
pandi resume Instrument Technicianpandi resume Instrument Technician
pandi resume Instrument Technician
 
CV Indra Puji S Oct 2015
CV Indra Puji S Oct 2015CV Indra Puji S Oct 2015
CV Indra Puji S Oct 2015
 
Yeoh KS CV Rev 1
Yeoh KS CV Rev 1Yeoh KS CV Rev 1
Yeoh KS CV Rev 1
 
EPLopez RESUME
EPLopez RESUMEEPLopez RESUME
EPLopez RESUME
 
CV 15 Sep2016
CV 15 Sep2016CV 15 Sep2016
CV 15 Sep2016
 

Yaya Sunarya CV

  • 1. YAYA SUNARYA Mobile Phone : +62812 77 060949. E-mail : yays.sunarya@yahoo.com Date of birth : May 09, 1977. Status : Married. Nationality : Indonesia. Education : Senior High School. Address : Jl. Rajawali Timur Gg. R.A Barnas No. 110/77 Rt.04 Rw.06 Dungus Cariang Andir Kabupaten Bandung. Jawa Barat 40183. INSTRUMENT Pre-Commissioning & Commissioning. For Onshore / Offshore at Oil & Gas Facilities. Profile : A more than 16-years of Instrumentation for Installation, pre-commissioning and commissioning activities at onshore and offshore oil & gas facilities. Good attitude, kind, communicative, diligent, tolerant, target oriented, discipline, honest, and be responsible. Seeking a similar role with more competitive challenge and growth where deep and consistence learning plus great team player in a fast growing environment will be utilized and advanced. Summary of Technical Skills :  Knowledge and experienced in instrument pre-commissioning activities.  Knowledge and experienced in instrument commissioning activities such as loop testing, function test (for all field instrument, fire and gas detector and etc), cause/effect test, trouble shoot and etc.  Knowledge and experienced in inspection installation electrical and instrument equipment.  Having knowledge with instrument and electrical drawing such as P&ID, loop drawing, hook-up drawing, schematic drawing, cause and effect diargam etc.  Having knowledge for cause and effect test.  Having knowledge with reporting activities (daily report, function test report).
  • 2. Professional Experience : PERTAMINA HULU ENERGY WEST MADURA OFFSHORE (PHE WMO). Periode March 2016 up to present (at PT. Teknika Regulindo Asia). Electrical Commissioning Superintendent. Project Assignment : EPCI – 1 PHE-12, PHE-24 and CPP2 Platforms and Pipeline. Responsibilities :  Verify for pre-commissioning document such as check sheet and test sheet.  Prepare for commissioning dossier.  Prepare for operational test procedure such as navigation aids system, lighting system, 24 Vdc UPS system, 230 Vac UPS system, DC system. PERTAMINA HULU ENERGY OFFSHORE WEST JAVA (PHE ONWJ). Periode Dec 2012 – Sept 2015 (at PT. Teknika Regulindo Asia). Instrument Commissioning Supervisor. Project Assignment : On Behalf PHE ONWJ C&OR (Commissioning & Operation Readiness) for PHE ONWJ Project (ECHO F&G and HVAC System Upgrade, LIMA Subsidence Remediation, MRA-MMJ Gas Lift, ULA Project, Foxtrot Reactivation, KL Gas Lift, ZUB NUI Reactivation, Bravo F&G Upgrade. etc). Responsibilities :  Inspection for installation and review pre-commissioning document document for closing Mechanical Completion Certificate (MC1).  Witnessing for commissioning activities and review commissioning document for closing System Handover (SH1) to operation.  Performed for cause and effect test.  Assist operation for Plan Performance activities.  Witness for closing punch list. PREMIER OIL Period Aug 2012 – Sept 2012 (at PT. Teknika Regulindo Asia) Electrical Commissioning Technician Project Assignment : ANOA Phase 4 AGX Compression Reconfiguration Project, AGX Platform Natuna Sea Offshore Responsibilities :  Responsible for performing functional test for electrical equipment such as Gas Turbine. Generator (GT) Solar Turbine, all accessories at GT 7500 such as DC/AC Back up oil Pump, Ventilation Fan, Starter Motor, Pre post Lube Oil Pump, and Lube Oil Cooler. Also responsible for GT 7500, GT 7400, GT 7300 Load Sharing KVAR and KW. Functional Test for Load Shedding GT 7500 Causes and Effect.  Responsible for Normal Lighting and Emergency Lighting Pre-commissioning and Commissioning.  Functional Test Fin Fan after Cooler, Local Operation and Remote Operation. Status motor at MCS.  Assist Start up Gas Turbine Generator.
  • 3. CONOCO PHILLIPS INDONESIA Period Oct 2011 – Feb 2012 (at PT. Teknika Regulindo Asia) Instrument Commissioning Supervisor Project Assignment : Bawal Subsea Development Project - Hang Tuah Platform, Natuna. Topside Modification Onshore Fabrication and Offshore Hook-Up. Responsibilities :  Dismantling & Installing various electrical panel & control.  The covered modification work in chemical injection.  Dismantling & Installing line tubing , hook up in chemical injection & PHPU for supply TUTU panel.  Cable pulling, continuity & insulation test.  Dismantling & Installing accumulator & modification line filter in PHPU.  Assist vendor for connection umbilical in TUTU panel.  Assist Commissioning team for start-up process.  Closing Punch List & mark-up drawing. TOTAL BONGKOT (PTT Exploration and Production) Period June 2011 – July 2011 (at PT. Teknika Regulindo Asia) Electrical Commissioning Technician Project Assignment : Commissioning Living Quarter Bongkot Thailand Project. Responsibilities :  Performed Commissioning lighting. HESS INDONESIA PANGKAH LTD Period Sept 2010 – May 2011 (at PT. Teknika Regulindo Asia) Electrical Commissioning Technician Projects Assignments : CPP & AUP EPCC Project - Ujung Pangkah Development Phase 2 Project Commissioning Services. Responsibilities : Assist vendors for performed functional and operation test of:  Grounding system.  UPS system.  HV/LV switchboard system  Diesel engine generator.  Gas engine generator.  Air compressor and air dryer system.  Motors and pumps control system.  Lighting distribution board system.  HVAC system.  Fuel gas system.
  • 4. PT. TRANSPORTASI GAS INDONESIA (TGI) Period Jan 2010 – Aug 2010 (at PT. Teknika Regulindo Asia) Electrical Maintenance Projects Assignments : Operations & Maintenance for Balance of Plant EPCC for Jabung Gas Booster Station Project – Jambi. Responsibilities : Performed operation and maintenance activities of:  Routine visit and recording gauge metering.  Lubrication schedule.  Check for provision of consumable and spare parts.  Operate and monitoring electrical equipment.  Troubleshooting.  Performing maintenance task. PT. TRANSPORTASI GAS INDONESIA (TGI) Period Feb 2009 – Dec 2009 (at PT. Teknika Regulindo Asia) Electrical Commissioning Supervisor Projects Assignments : Commissioning for EPCC of Jabung Gas Booster Station Project – Jambi. Responsibilities : Performing preliminary check:  Physical check on site of the installation.  Through review of the Pre-commissioning dossier. Monitoring for performed functional test of:  Grounding system.  UPS system.  LV switchboard system  Diesel engine generator.  Gas engine generator.  Air compressor and air dryer system.  Motors and pumps control system.  Lighting distribution board system.  Fuel gas system.  Cathodic protection system. TOTAL E&P INDONESIA Period July 2008 – March 2009 (at PT. Teknika Regulindo Asia) Electrical Commissioning Technician Projects Assignments : PECIKO Field Development Project Phase 5. Responsibilities : Performing preliminary check:  Physical check on site of the installation.  Through review of the Pre-commissioning dossier.  Assist vendors.
  • 5. Performed functional test of:  Grounding system.  AC/DC switchboard system  Diesel engine generator.  Lighting distribution board system.  Cathodic protection system.  PAGA System. PT. PROSAFE / VME Period Jan 2008 – June 2008 (at PT. Angkasa Engineers Indonesia) QC Instrument Project Assignments : FPSO Cidade de Sao Mateus Project - PT. PROSAFE/VME (Global Separation Technology), Batam Island, Indonesia. Responsibilities :  Verification of Electrical / Instrument Material & Equipment for palform M-30 (Flare system), paltform M-50 (Water Injection System), and Platform M-63 (Dehydration System).  Inspection for Installation Junction Boxes, Cable Tray, Hook up Tubing, Field Instrument, Lighting.  Review for Mechanical Completion document. CONOCO PHILLIPS INDONESIA Period Oct 2007 – Jan 2008 (at PT. Angkasa Engineers Indonesia) Instrument Commissioning Project Assignments : KERISI CPP Project / Conoco Phillips Indonesia Offshore Natuna Sea, Indonesia. Responsibilities :  Loops test of all field instrument such as F&G System, Cause and Effect Test and Trouble shooting. CONOCO PHILLIPS INDONESIA Period Aug 2007 – Sept 2007 (at PT. Angkasa Engineers Indonesia) Instrument Commissioning Projects Assignments : KERISI CPP Project / Conoco Phillips Indonesia – Onshore SMOE kabil, Batam. Responsibilities :  Loops test and functional test F&G system at Living Quarter Area. KODECO PPP Period March 2007 – Aug 2007 (at PT. Angkasa Engineers Indonesia) Instrument QA/QC Project Assignments : KODECO PPP – EPC Project - PROFAB INDONESIA Batam Island, Indonesia Responsibilities :
  • 6.  Assist PT. Sempec for Material Verification.  Inspection for Installation Junction boxes, Cable Tray, Hook Up Tubing, Field Instrument. CONOCO PHILLIPS INDONESIA Period Jan 2007 – March 2007 (at PT. Angkasa Engineers Indonesia) Instrument Technician Project Assignments : Kerisi CPP Project/ Conoco Philiips SOME Kabil Batam Island, Indonesia. Responsibilities :  Hydro Testing Ball Valve (Manual & SDV/ BDV Valve). CONOCO PHILLIPS INDONESIA Period Sept 2006 – Oct 2006 (at PT. Angkasa Engineers Indonesia) Instrument Pre-commissioning Project Assignments : Kerisi WHP-K Project / Conoco Philips SMOE Kabil Batam Island, Indonesia. Responsibilities :  Closing for Mechanical Completions (MC) such as Leak Testing for Impulse Line, inpection installation for instrumentation. BABCOCK & WILCOX Period April 2005 – June 2006 (at PT. Wasamitra Engineering) Instrument Commissioning Project Assignments : Tanjung Jati B " Coal Fired Power Plant 2 x 660 MW "Jepara, Central Java. Responsibilities :  Performed calibration of all field instrument such as smart type transmitters, Converters, Switches, Pressure Gauge, Stroke of Control Valve, etc.  Loop test, Function Test, Trouble shooting and Assistance for Start-Up. PT. PUPUK KUJANG Period Nov 2004 – April 2005(at PT. Wijaya Engindo Nusa). Instrument Commissioning Project Assignments : Pupuk Kujang 1B project. Responsibilities :  Performed calibration of all field instrument such as smart type transmitters, converters, Switches, Pressure Gauge, Stroke of Control Valve, etc.  Loop test, Function Test, Cause & Effect test, Trouble shooting and Assist for Start-Up.
  • 7. BELANAK FPSO CONOCO PHILLIPS Period Aug 2004 – Nov 2004 (at Kellog Brow & Root / Total Automation Singapore). Instrument Commissioning Project Assignments : ConocoPhillips FPSO “Belanak” Project Batam Island – Indonesia. Responsibilities :  Loop test, Function test and Trouble shooting. BELANAK FPSO CONOCO PHILLIPS Periode June 2003 – July 2004 (at PT. J Ray Mc Dermott Indonesia) Instrument Technician Project Assignments : ConocoPhillips FPSO “Belanak” Project Batam Island, Indonesia Responsibilities :  Fabrication and Installation of Support Line Tubing, Hook Up, Impulse Line Tubing, Air signal Tubing and Leak Test Instrument Tubing. PT. PUPUK KALIMANTAN TIMUR Period April 2002 – Jan 2003 (at PT. Foxboro Perkind Indonesia) Instrument Commissioning Project Assignments : Pupuk Kaltim - 4 Project - Pupuk Kalimantan Timur Responsibilities :  Calibration of all field instrument such as smart type transmitters, converters, Switches, Pressure Gauge, Stroke of Control Valve, etc.  Loop Test, Function Test, Trouble shooting, Commissioning and Assist for Start-Up. PT. BADAK NGL BONTANG Period April 2000 – Nov 2001 (at PT. Wijaya Engindo Nusa) Instrument Commissioning Project Assignments : Train A-F DCS/ESD Retrofit Project (PGR) PT. BADAK NGL Bontang, East Kalimantan Responsibilities :  Calibration of all field instrument such as smart type transmitters, converters, Switches, Pressure Gauge, Stroke of Control Valve, etc.  Loop test, Function Test, Trouble shooting, Commissioning and Assist for Start-Up. PT. CALTEX FACIFIC INDONESIA Period Aug 2000 – March 2001 (at PT. Wijaya Engindo Nusa) Instrument Commissioning Project Assignments : Central Gathering Station Area-10 - Caltex Pacific Indonesia Duri Riau, Sumatera.
  • 8. Responsibilities :  Calibration of all field Instrument such as smart type transmitters, converters, Switches, Pressure Gauge, Stroke of Control Valve, etc.  Loop test, Function Test, Trouble shooting, Commissioning and Assist for Start-Up. PT. BADAK NGL BONTANG Period Dec 1998 – July 2000 (at PT. Wijaya Engindo Nusa) Instrument Commissioning Project Assignments : Train-H Project - BADAK NGL Bontang, East Kalimantan Responsibilities :  Calibration of all field instrument such as smart type transmitters, converters, Switches, Pressure Gauge, Stroke of Control Valve, etc.  Loop test, Function test, Trouble shooting, Commissioning and Assist for Start-Up. PT. BADAK NGL BONTANG Period June 1998 – Dec 1998 (at PT. Wijaya Engindo Nusa) Instrument Technician Project Assignments : 3 rd Loading Dock/LPG Storage Project, PT. BADAK NGL Responsibilities :  Calibration of all field instrument such as smart type transmitters, converters, Switches, Pressure Gauge, Stroke of Control Valve, etc.  Loop test, Function test, Trouble shooting, Commissioning and Assist for Start-Up.
  • 9. TRAININGS / COURSES Location & Organizer Specialized Training Years PT. Teknika Regulindo Asia - Jakarta Opercom Methodology & ICAPS 2012 PT. Samson Tiara – Cilegon Tropical BOSIET & Travel Safety by Boat Code 2011 5502 BSI Jakarta OHSAS / Hazard Identification, Risk Assessment 2011 & Control (HIRAC) Training BSI Jakarta Identify Legal & Other Requirements HIRAC 2011 Training PT. BARRON International - Bogor SEA SURVIVAL Training 2011 P2M-Mechanical Electrical and Instrument System 2009 Engineering Department, Faculty of Engineering University of Indonesia - Jakarta Fun English Center - Jakarta Basic for Conversation - Elementary 2009