This document provides a summary of Yaya Sunarya's professional experience and qualifications. It outlines over 16 years of experience in instrumentation for pre-commissioning and commissioning activities on onshore and offshore oil and gas facilities. It details work history with companies like Pertamina Hulu Energy, Premier Oil, ConocoPhillips, Total, and others. Technical skills include knowledge of instrumentation installation, commissioning, testing, and reporting. Professional roles include Instrument Commissioning Supervisor, Electrical Commissioning Superintendent, and other technical positions.
Over 20 years of Electrical Engineering Experience in Electrical and Instruments installation, QC and commissioning activities in various oil and gas and subsea projects.
Almost 5 years detailed experience working on hazardous area inspection and verification to meet ATEX, AS/NZS & IEC requirements.
Experience includes Construction, Inspection and Commissioning activities.
Over 20 years of Electrical Engineering Experience in Electrical and Instruments installation, QC and commissioning activities in various oil and gas and subsea projects.
Almost 5 years detailed experience working on hazardous area inspection and verification to meet ATEX, AS/NZS & IEC requirements.
Experience includes Construction, Inspection and Commissioning activities.
RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)RAMA SAMY
Electrical Engineer with around 7 years’ experience in Site Management and QA/QC activities in the field of Cathodic Protection of Oil and Gas Pipeline in On- shore, Off- shore & Well head .
Electrical Engineer with around 6.8 years’ experience in Site Management and QA/QC activities in the field of Cathodic Protection of Oil and Gas Pipeline in On- shore, Off- shore & Well head .
RAMASAMY (NACE CERTIFIED CP LEVEL II ENGINEER)RAMA SAMY
Electrical Engineer with around 7 years’ experience in Site Management and QA/QC activities in the field of Cathodic Protection of Oil and Gas Pipeline in On- shore, Off- shore & Well head .
Electrical Engineer with around 6.8 years’ experience in Site Management and QA/QC activities in the field of Cathodic Protection of Oil and Gas Pipeline in On- shore, Off- shore & Well head .
I am urgently looking for job change in Electrical Engineer -Projects Marine profile, having a +12 Years of experience in installation, commissioning, consulting , quantity survey (electrical) in singapore shipyards, as well as india shipyard
Please do let me know if you have any openings or references,
kindly share with me. Preferred Location – Ahmedabad, Overseas
Thanks and Regards,
Project Manager with 17+ years international experience in upstream/midstream/downstream oil and gas projects especially on challenging and complex environment.
1. YAYA SUNARYA
Mobile Phone : +62812 77 060949.
E-mail : yays.sunarya@yahoo.com
Date of birth : May 09, 1977.
Status : Married.
Nationality : Indonesia.
Education : Senior High School.
Address : Jl. Rajawali Timur Gg. R.A Barnas No. 110/77 Rt.04 Rw.06
Dungus Cariang Andir Kabupaten Bandung.
Jawa Barat 40183.
INSTRUMENT Pre-Commissioning & Commissioning.
For Onshore / Offshore at Oil & Gas Facilities.
Profile :
A more than 16-years of Instrumentation for Installation, pre-commissioning and commissioning activities
at onshore and offshore oil & gas facilities. Good attitude, kind, communicative, diligent, tolerant, target
oriented, discipline, honest, and be responsible.
Seeking a similar role with more competitive challenge and growth where deep and consistence learning
plus great team player in a fast growing environment will be utilized and advanced.
Summary of Technical Skills :
Knowledge and experienced in instrument pre-commissioning activities.
Knowledge and experienced in instrument commissioning activities such as loop testing, function
test (for all field instrument, fire and gas detector and etc), cause/effect test, trouble shoot and
etc.
Knowledge and experienced in inspection installation electrical and instrument equipment.
Having knowledge with instrument and electrical drawing such as P&ID, loop drawing, hook-up
drawing, schematic drawing, cause and effect diargam etc.
Having knowledge for cause and effect test.
Having knowledge with reporting activities (daily report, function test report).
2. Professional Experience :
PERTAMINA HULU ENERGY WEST MADURA OFFSHORE (PHE WMO).
Periode March 2016 up to present (at PT. Teknika Regulindo Asia).
Electrical Commissioning Superintendent.
Project Assignment :
EPCI – 1 PHE-12, PHE-24 and CPP2 Platforms and Pipeline.
Responsibilities :
Verify for pre-commissioning document such as check sheet and test sheet.
Prepare for commissioning dossier.
Prepare for operational test procedure such as navigation aids system, lighting system, 24 Vdc
UPS system, 230 Vac UPS system, DC system.
PERTAMINA HULU ENERGY OFFSHORE WEST JAVA (PHE ONWJ).
Periode Dec 2012 – Sept 2015 (at PT. Teknika Regulindo Asia).
Instrument Commissioning Supervisor.
Project Assignment :
On Behalf PHE ONWJ C&OR (Commissioning & Operation Readiness) for PHE ONWJ Project (ECHO
F&G and HVAC System Upgrade, LIMA Subsidence Remediation, MRA-MMJ Gas Lift, ULA Project,
Foxtrot Reactivation, KL Gas Lift, ZUB NUI Reactivation, Bravo F&G Upgrade. etc).
Responsibilities :
Inspection for installation and review pre-commissioning document document for closing
Mechanical Completion Certificate (MC1).
Witnessing for commissioning activities and review commissioning document for closing System
Handover (SH1) to operation.
Performed for cause and effect test.
Assist operation for Plan Performance activities.
Witness for closing punch list.
PREMIER OIL
Period Aug 2012 – Sept 2012 (at PT. Teknika Regulindo Asia)
Electrical Commissioning Technician
Project Assignment :
ANOA Phase 4 AGX Compression Reconfiguration Project, AGX Platform Natuna Sea
Offshore
Responsibilities :
Responsible for performing functional test for electrical equipment such as Gas Turbine.
Generator (GT) Solar Turbine, all accessories at GT 7500 such as DC/AC Back up oil Pump,
Ventilation Fan, Starter Motor, Pre post Lube Oil Pump, and Lube Oil Cooler. Also responsible for
GT 7500, GT 7400, GT 7300 Load Sharing KVAR and KW. Functional Test for Load Shedding
GT 7500 Causes and Effect.
Responsible for Normal Lighting and Emergency Lighting Pre-commissioning and
Commissioning.
Functional Test Fin Fan after Cooler, Local Operation and Remote Operation. Status
motor at MCS.
Assist Start up Gas Turbine Generator.
3. CONOCO PHILLIPS INDONESIA
Period Oct 2011 – Feb 2012 (at PT. Teknika Regulindo Asia)
Instrument Commissioning Supervisor
Project Assignment :
Bawal Subsea Development Project - Hang Tuah Platform, Natuna.
Topside Modification Onshore Fabrication and Offshore Hook-Up.
Responsibilities :
Dismantling & Installing various electrical panel & control.
The covered modification work in chemical injection.
Dismantling & Installing line tubing , hook up in chemical injection & PHPU for supply TUTU
panel.
Cable pulling, continuity & insulation test.
Dismantling & Installing accumulator & modification line filter in PHPU.
Assist vendor for connection umbilical in TUTU panel.
Assist Commissioning team for start-up process.
Closing Punch List & mark-up drawing.
TOTAL BONGKOT (PTT Exploration and Production)
Period June 2011 – July 2011 (at PT. Teknika Regulindo Asia)
Electrical Commissioning Technician
Project Assignment :
Commissioning Living Quarter Bongkot Thailand Project.
Responsibilities :
Performed Commissioning lighting.
HESS INDONESIA PANGKAH LTD
Period Sept 2010 – May 2011 (at PT. Teknika Regulindo Asia)
Electrical Commissioning Technician
Projects Assignments :
CPP & AUP EPCC Project - Ujung Pangkah Development Phase 2 Project Commissioning
Services.
Responsibilities :
Assist vendors for performed functional and operation test of:
Grounding system.
UPS system.
HV/LV switchboard system
Diesel engine generator.
Gas engine generator.
Air compressor and air dryer system.
Motors and pumps control system.
Lighting distribution board system.
HVAC system.
Fuel gas system.
4. PT. TRANSPORTASI GAS INDONESIA (TGI)
Period Jan 2010 – Aug 2010 (at PT. Teknika Regulindo Asia)
Electrical Maintenance
Projects Assignments :
Operations & Maintenance for Balance of Plant EPCC for Jabung Gas Booster Station Project – Jambi.
Responsibilities :
Performed operation and maintenance activities of:
Routine visit and recording gauge metering.
Lubrication schedule.
Check for provision of consumable and spare parts.
Operate and monitoring electrical equipment.
Troubleshooting.
Performing maintenance task.
PT. TRANSPORTASI GAS INDONESIA (TGI)
Period Feb 2009 – Dec 2009 (at PT. Teknika Regulindo Asia)
Electrical Commissioning Supervisor
Projects Assignments :
Commissioning for EPCC of Jabung Gas Booster Station Project – Jambi.
Responsibilities :
Performing preliminary check:
Physical check on site of the installation.
Through review of the Pre-commissioning dossier.
Monitoring for performed functional test of:
Grounding system.
UPS system.
LV switchboard system
Diesel engine generator.
Gas engine generator.
Air compressor and air dryer system.
Motors and pumps control system.
Lighting distribution board system.
Fuel gas system.
Cathodic protection system.
TOTAL E&P INDONESIA
Period July 2008 – March 2009 (at PT. Teknika Regulindo Asia)
Electrical Commissioning Technician
Projects Assignments :
PECIKO Field Development Project Phase 5.
Responsibilities :
Performing preliminary check:
Physical check on site of the installation.
Through review of the Pre-commissioning dossier.
Assist vendors.
5. Performed functional test of:
Grounding system.
AC/DC switchboard system
Diesel engine generator.
Lighting distribution board system.
Cathodic protection system.
PAGA System.
PT. PROSAFE / VME
Period Jan 2008 – June 2008 (at PT. Angkasa Engineers Indonesia)
QC Instrument
Project Assignments :
FPSO Cidade de Sao Mateus Project - PT. PROSAFE/VME (Global Separation Technology), Batam
Island, Indonesia.
Responsibilities :
Verification of Electrical / Instrument Material & Equipment for palform M-30 (Flare system),
paltform M-50 (Water Injection System), and Platform M-63 (Dehydration System).
Inspection for Installation Junction Boxes, Cable Tray, Hook up Tubing, Field Instrument,
Lighting.
Review for Mechanical Completion document.
CONOCO PHILLIPS INDONESIA
Period Oct 2007 – Jan 2008 (at PT. Angkasa Engineers Indonesia)
Instrument Commissioning
Project Assignments :
KERISI CPP Project / Conoco Phillips Indonesia Offshore Natuna Sea, Indonesia.
Responsibilities :
Loops test of all field instrument such as F&G System, Cause and Effect Test and Trouble
shooting.
CONOCO PHILLIPS INDONESIA
Period Aug 2007 – Sept 2007 (at PT. Angkasa Engineers Indonesia)
Instrument Commissioning
Projects Assignments :
KERISI CPP Project / Conoco Phillips Indonesia – Onshore SMOE kabil, Batam.
Responsibilities :
Loops test and functional test F&G system at Living Quarter Area.
KODECO PPP
Period March 2007 – Aug 2007 (at PT. Angkasa Engineers Indonesia)
Instrument QA/QC
Project Assignments :
KODECO PPP – EPC Project - PROFAB INDONESIA Batam Island, Indonesia
Responsibilities :
6. Assist PT. Sempec for Material Verification.
Inspection for Installation Junction boxes, Cable Tray, Hook Up Tubing, Field Instrument.
CONOCO PHILLIPS INDONESIA
Period Jan 2007 – March 2007 (at PT. Angkasa Engineers Indonesia)
Instrument Technician
Project Assignments :
Kerisi CPP Project/ Conoco Philiips SOME Kabil Batam Island, Indonesia.
Responsibilities :
Hydro Testing Ball Valve (Manual & SDV/ BDV Valve).
CONOCO PHILLIPS INDONESIA
Period Sept 2006 – Oct 2006 (at PT. Angkasa Engineers Indonesia)
Instrument Pre-commissioning
Project Assignments :
Kerisi WHP-K Project / Conoco Philips SMOE Kabil Batam Island, Indonesia.
Responsibilities :
Closing for Mechanical Completions (MC) such as Leak Testing for Impulse Line, inpection
installation for instrumentation.
BABCOCK & WILCOX
Period April 2005 – June 2006 (at PT. Wasamitra Engineering)
Instrument Commissioning
Project Assignments :
Tanjung Jati B " Coal Fired Power Plant 2 x 660 MW "Jepara, Central Java.
Responsibilities :
Performed calibration of all field instrument such as smart type transmitters, Converters,
Switches, Pressure Gauge, Stroke of Control Valve, etc.
Loop test, Function Test, Trouble shooting and Assistance for Start-Up.
PT. PUPUK KUJANG
Period Nov 2004 – April 2005(at PT. Wijaya Engindo Nusa).
Instrument Commissioning
Project Assignments :
Pupuk Kujang 1B project.
Responsibilities :
Performed calibration of all field instrument such as smart type transmitters, converters,
Switches, Pressure Gauge, Stroke of Control Valve, etc.
Loop test, Function Test, Cause & Effect test, Trouble shooting and Assist for Start-Up.
7. BELANAK FPSO CONOCO PHILLIPS
Period Aug 2004 – Nov 2004 (at Kellog Brow & Root / Total Automation Singapore).
Instrument Commissioning
Project Assignments :
ConocoPhillips FPSO “Belanak” Project Batam Island – Indonesia.
Responsibilities :
Loop test, Function test and Trouble shooting.
BELANAK FPSO CONOCO PHILLIPS
Periode June 2003 – July 2004 (at PT. J Ray Mc Dermott Indonesia)
Instrument Technician
Project Assignments :
ConocoPhillips FPSO “Belanak” Project Batam Island, Indonesia
Responsibilities :
Fabrication and Installation of Support Line Tubing, Hook Up, Impulse Line Tubing, Air
signal Tubing and Leak Test Instrument Tubing.
PT. PUPUK KALIMANTAN TIMUR
Period April 2002 – Jan 2003 (at PT. Foxboro Perkind Indonesia)
Instrument Commissioning
Project Assignments :
Pupuk Kaltim - 4 Project - Pupuk Kalimantan Timur
Responsibilities :
Calibration of all field instrument such as smart type transmitters, converters, Switches,
Pressure Gauge, Stroke of Control Valve, etc.
Loop Test, Function Test, Trouble shooting, Commissioning and Assist for Start-Up.
PT. BADAK NGL BONTANG
Period April 2000 – Nov 2001 (at PT. Wijaya Engindo Nusa)
Instrument Commissioning
Project Assignments :
Train A-F DCS/ESD Retrofit Project (PGR) PT. BADAK NGL Bontang, East Kalimantan
Responsibilities :
Calibration of all field instrument such as smart type transmitters, converters, Switches,
Pressure Gauge, Stroke of Control Valve, etc.
Loop test, Function Test, Trouble shooting, Commissioning and Assist for Start-Up.
PT. CALTEX FACIFIC INDONESIA
Period Aug 2000 – March 2001 (at PT. Wijaya Engindo Nusa)
Instrument Commissioning
Project Assignments :
Central Gathering Station Area-10 - Caltex Pacific Indonesia Duri Riau, Sumatera.
8. Responsibilities :
Calibration of all field Instrument such as smart type transmitters, converters, Switches,
Pressure Gauge, Stroke of Control Valve, etc.
Loop test, Function Test, Trouble shooting, Commissioning and Assist for Start-Up.
PT. BADAK NGL BONTANG
Period Dec 1998 – July 2000 (at PT. Wijaya Engindo Nusa)
Instrument Commissioning
Project Assignments :
Train-H Project - BADAK NGL Bontang, East Kalimantan
Responsibilities :
Calibration of all field instrument such as smart type transmitters, converters, Switches, Pressure
Gauge, Stroke of Control Valve, etc.
Loop test, Function test, Trouble shooting, Commissioning and Assist for Start-Up.
PT. BADAK NGL BONTANG
Period June 1998 – Dec 1998 (at PT. Wijaya Engindo Nusa)
Instrument Technician
Project Assignments :
3
rd
Loading Dock/LPG Storage Project, PT. BADAK NGL
Responsibilities :
Calibration of all field instrument such as smart type transmitters, converters, Switches, Pressure
Gauge, Stroke of Control Valve, etc.
Loop test, Function test, Trouble shooting, Commissioning and Assist for Start-Up.
9. TRAININGS / COURSES
Location & Organizer Specialized Training Years
PT. Teknika Regulindo Asia -
Jakarta Opercom Methodology & ICAPS 2012
PT. Samson Tiara – Cilegon Tropical BOSIET & Travel Safety by Boat Code 2011
5502
BSI Jakarta OHSAS / Hazard Identification, Risk Assessment 2011
& Control (HIRAC) Training
BSI Jakarta Identify Legal & Other Requirements HIRAC 2011
Training
PT. BARRON International -
Bogor SEA SURVIVAL Training 2011
P2M-Mechanical Electrical and Instrument System 2009
Engineering Department,
Faculty of Engineering
University of Indonesia - Jakarta
Fun English Center - Jakarta Basic for Conversation - Elementary 2009