Jhon Rodearman Sinaga ST
Male/Married
Dolog Huluan, September 6th
1986
Christian
170 Cm
Indonesian
+62-813-22954932
ro_dearman@yahoo.com
Jl.Nusa Indah VI, No.33,
Perumahan Helvetia, Medan,
20216
Educational Bacground
College Bachelor degree(S1) from Telkom Institute of
Technology (IT Telkom)Bandung, Majoring in
Telecomunication Technic.
Graduated on March 2009
2004 -2009
Senior High School SMU Negeri 2 Pematang Siantar 2001 -2004
Junior High School SLTP Cinta Rakyat 2 Pematang Siantar 1998 – 2001
Elemantary School SD Negeri Dolog Huluan 1992 – 1998
Skill and Other ablity
Familiar with Telecomunication software and tool
o Experience with BTS LTE EnodeB B8300&B8200 ZTE installation and commissioning
o Experience with BTS LTE EnodeB FMR 10 NOKIA installation and commissioning
o Experience with MUX ZTE ZXMP-S330 and ZXMP-S385 installation and commisoning
o Experience with Switch ZTE ZXR10 5928, ZXR10 2920 installation and commisioning
o Experience with IDU IP10 and IP 20(Ceragon) and NEC Pasolink installation and
commisioning
o Experience with CBTSI2, CBTS01, ZXDR8900 CDMA installation and commisioning
o Experience with ZXM10(Eisu) alarm monitoring installation and commisioning
o Experience with site master( Anritsu and Birds)
o Experience with optical power meter (JDSU)
Have knowledge about telecommunication system
o Have good understanding about TSSR, Design pack
o Have good understanding about transmission and microwave
o Have good understanding about vlan route and IP plan
Have a satisfy knowledge about electrical system
Able to work in under pressure and reach project target
Able to work in team and good adaptation with new project
Able to manage some team to get project target achieved
2. Working Experience
* PT.Smartfren Telecom(February 2016 -Present)
Field Operation Engineer
Troubleshooting alarm and BTS down
Daily Preventive Maintenance
Confirmation to TP all site issue and follow up trouble ticket
ATP installation onsite
Daily reporting progress troubleshooting and preventive maintenance
Responsible to closing costumer complain trouble ticket
*PT.Nokia Indonesia
Project Engineer LTE Smartfren project North Sumatra (June 2015 – December 2015)
Making daily plan for MOS (Material on Site), installation,and Commisioning Integration
Request material as design pack requairment
Progress tracking and monitoring MOS, installation and Commisioning Integration
Report progress MOS, installation, commisioning integration, ATP and document
Making MOP and request PWO
Update Material status and request LOM
Confirmation to TP and Smartfren all site site issue
Support integration and check link performance microwave IP-10 and IP-20 Ceragon
*PT.ZTE Indonesia
Project Engineer LTE Smartfren Project Central Java (Dec 2014 – May 2015)
Making survey plan, installation and ATP plan and submit to Smartfren
Progress tracking survey, TSSR, Design pack, Installation,commissioning Integration ATP
and document
Report survey, TSSR, Design pack, Installation, commissioning Integration ,ATP and
document
Making CRF and MOP
Confirmation to Smartfren and tower provider about site issue
Transmission Engineer CDMA Smartfren Project North Sumatra (Jan 2013 –Sept 2014)
Supervision subcon for installatiaon, pointing, and ATP Microwave S340/IP-10 Ceragon and
NEC PASOLINK
Integration ,troubleshoot and upgrade capacity Microwave S340 IP -10/Ceragon(1+0, 1+1
HSB, 1+1 SD, 2+2 XPIC,).
Supervison subcon for installation and ATP MUX ZTE S330,S385
Integration and troubleshoot MUX ZTE S330,S385,Interconnection between BG-
30B(Moratel) using Fiber Optic and Switch ZTE 5928 or ZTE 2920 using fiber optic or UTP
Integration and troubleshoot switch switch (ZTE 5928 and ZTE 2920)
ATP and switch (ZTE 5928 and ZTE 2920) include configuration and installation
Site Engineer CDMA Smartfren Project North Sumatra (Jan 2011 –Dec 2012)
Check material at warehouse and supervision deliver material to site(MOS)
supervision installation Eguard ZXM10 EISU ( monitoring alarm)
Supervision installation and Accepttence Test Procedure(ATP) for CBTSI2,
CBTS01,ZXDR8800(Macro and Micro BTS), Rectifier ZXDU58 S151
Integration and troubleshoot BTS CBTSI2, CBTS01,ZXDR8800(Macro and Micro BTS)
using E1 and IP(Fast Ethernet
3. *PT.Tesko Indo Gemilang
(Nov 2009- Dec 2010)
Staff Engineer
Installation and troubleshoot electrical testand measuring instrument on site
Callibration Hardware and software electrical test and measuring instrument
Give training to costumer haw to use electrical test and measuring instrument
Reponsible to order spare part or equipment as costumer request
Responsible to propose repair or installation cost
Supervision deliver material to costumer
PT.Laju Kurnia Jaya
(May 2009-Oct 2009)
Staff Engineer
Supervission Installation Airport lightning and remote control Airport lighting at Sultan Hasanuddin
Airport Makassar.
Responsible to manage team to reach daily target instllation and commisioning
Responsible to request material for installtion
Give training to local engineer and airport operator how to use remote control Airport lighting at
Sultan Hasanuddin Airport Makassar.
ATP installtion Airport lightning and remote control Airport lighting
Training participant
1.PT Telekomunikasi Indonesia(PT.TELKOM) Kantor Daerah Telekomunikasi, Bandung.
(Jul 2006-Augst 2006)
Practical Training I
Introduction Telecommunication system
Installation and setting modem Speedy in Bandung area
Maintenance public phone in Bandung area
2. PT Industri Telekomunikasi Indonesia (PT.INTI) Bandung (Jul 2007-Augst 2007)
Practical Training II
Introduction WiMAX technology
Introduction Digital video Broadcasting (DVB)
3.Antenna Laboratory IT Telkom Bandung (September 2008)
Drive test using TEMS Investigation CDMA 2.4 in Bandung area
4.ZTE TRAINING CENTRE (December 2010)
Introducing CDMA telecommunication system
Quality standard installtion
Introducing BTS and BSC hardware
5. ZTE LTE Quality and technical training (September 2014 – October 2014)
Quality satandard installation for e-Node B, Switch, Power, Microwave and Eguard
Technical commisioning e-Node B, Switch, Power, Microwave and Eguard
Technical site survey and report(TSSR) for LTE