SlideShare a Scribd company logo
1 of 7
CURRICULUM VITAE
** PERSONAL DETAILS **
Name : Bayu irawan Maindonald
Address : Tipar Halim Street, RT.005/RW.06 No: 104 A. Mekar Sari-Cimanggis
Depok - West Java, Indonesia.
Country : Indonesia
Nationality : Indonesian
Gender : Male
Date of Birth : 21 January 1976
Phone : ~ +62 8567 688 567
~ +62 87888 67 1166
Email Address: ~ bayuirawanmaindonald@gmail.com
~ bayumaindonald@yahoo.com
** EDUCATION QUALIFICATIONS **
From To
Education
type
Branch of
study
Institution name
Certificate
/ Degree
1995 2002 Technical Engineering Institute Technology of Indonesia S1
** LANGUACE SKILL **
• Indonesian : Mother Tongue .
• English : Fluent.
CURRICULUM VITAE
** CARRIER HISTORY **
*ERICSSON INDONESIA~ (16 December ‘2013 - 28 February ‘2015)
Department : Radio Access Network department
Division : XL Project
Position : RTS Engineer (GRAN , WRAN and LTE).
Project : ®. XL-AXIS Consolidation - JUPITER (3G & 2G) Jabodetabek.
®. 3G Network Improvement XL - Lions Gate Jabodetabek.
Responsibility :
• Support Monitoring LTE for XL Network Jabodetabek.
• Trouble Shoot by Remote with Winfiol and Moshell after Integration or Migration RBS.
• Support Filed Engineer and ASP Engineer for trouble shoot before and After Integration.
• Upgrade Software package RBS 3G by remote.
• Support Field Engineer for Analyze and Trouble shoot degrade performance of RBS.
• Monitoring Alarm , High temp and VSWR of XL operator Network.
• Support Field Engineer for Locked/ Unlocked or Halted/Open, resetting TG,TRX and etc.
• Handle Smart Laptop Script for RBS New Integration, Upgrade RU & DU Module.
• Activation 3rd Carrier RBS 3G.
*ERICSSON INDONESIA~ (01 August ‘2013 - 15 December ‘2013)
Department : Radio Access Network department
Division : INDOSAT Project
Position : RTS Engineer (GRAN & WRAN)
Project : ®. Antenna Triple band Indosat Modernization RBS (3G & 2G) Jabodetabek.
Responsibility :
• Trouble Shoot by Remote with Winfiol and Moshell after Integration or Migration RBS.
• Support Filed Engineer and ASP Engineer for trouble shoot before and After Integration.
• Upgrade Software package RBS 3G by remote.
• Support Field Engineer to Analyze and Trouble shoot degrade performance of RBS.
• Monitoring Alarm , High temp and VSWR of XL operator Network.
• Handle Smart Laptop Script for RBS New Integration, SIU and Upgrade RU & DU Module.
CURRICULUM VITAE
*ERICSSON INDONESIA~ ( 24 November ‘2012 - 30 July ‘2013)
Department : Radio Access Network department
Division : INDOSAT Project
Position : RBS Engineer (GRAN & WRAN)
Project : ®. Antenna Triple band Indosat Modernization RBS (3G & 2G) Jabodetabek.
®. 3G - Upgrade Capacity RBS & Upgrade Radio Unit – Indosat Jakarta.
Responsibility :
• Support SPV and ASP for ATP with Indosat Consultant.
• Task Force team for Trouble Shooting All System RBS and support PIM Test.
• Trouble shoot RBS system Antenna Triple Band (GSM, DCS, WCDMA , U900 and TCU).
• Integration and Commissioning All System RBS (GSM, DCS, WCDMA , U900 and TCU).
• Integration and Commissioning All System RBS ( U900 mixed mode).
• Responsible for Take Data and Testing of before and after execution swap all RBS system.
• Support SPV for Supervise Asp Team of Installation Antenna Triple band system.
*ERICSSON INDONESIA~ ( 09 July ‘2010 - 21 November ‘2012)
Department : Radio Access Network department
Division : INDOSAT Project
Position : RBS Engineer (GRAN & WRAN)
Project : ®. Upgrade Capacity Indosat Network – West Java Area.
®. Migration 3G System E1 to Native IP – Indosat West Java Area.
®. Upgrade Capacity E1 for 3G System – Indosat West Java Area.
®. Indosat new site 3G System Rollout - West Java Area.
®. Swap 2G System (GSM & DCS) from Nokia to Ericsson – West Java area.
Responsibility :
• Upgrade TRX on RBS for GSM and DCS System RBS Ericsson.
• Cross Connection E1, support Routing E1 from BSC end to end.
• Upgrade Capacity E1 and Integration for RBS 3G System .
• Migration and Integration RBS 3G from E1 system to Native IP system.
• Supervise ASP team and support Integration New site 3G WCDMA System.
CURRICULUM VITAE
• Trouble shooting Hardware RBS 2G and 3G system.
• support Trouble shooting performance with Optimization team for 2G & 3G system.
• Support ATP upgrade capacity (TRX).
• Support ATP GSM and DCS with Field Engineer from operator.
• Support ATP WCDMA system with Field Engineer.
• Swap Module RUG& RUW to RUS for GSMand WCDMA system.
• Trial New Module (RUS) for GSM and DCS system.
• Supervise ASP team for Checking Material on site, request LOM, and supervise
ASP team for new installation and Swap.
• Upgrade software package RBS 3G on site.
*ERICSSON INDONESIA~ ( 27 October ‘2008 - 08 July ‘2010)
Department : Radio Access Network department
Division : INDOSAT Project
Position : RBS Engineer (GRAN & WRAN)
Project : ®. Modernization and Activation 2nd Carrier Indosat 3G - Central Java area.
®. Decongestion 3G Project - Central Java area.
®. Upgrade Capacity WCDMA system - Indosat Central Java.
®. Decongestion 3G project - Indosat Jabodetabek.
®. Activation 2nd Carrier - Indosat Jabodetabek.
®. Migration IuB over IP system.
Responsibility:
• Supervise ASP team of Swap and Installation RBS 3G system.
• Upgrade Channel Element with Add HSTX and RAX board for RBS 3000 family.
• Upgrade Capacity from RBS middle to RBS Full Configuration.
• Activation 2nd Carrier RBS 3G system.
• Trouble shoot Hardware and software.
• Upgrade Software Package RBS on site.
• Commissioning and Integration RBS 3G (3000 Family).
• Trouble shooting RBS 3G (3000 Family).
CURRICULUM VITAE
* PT. KOKO ENGINEERING ~ ( 03 June ‘2008 - 21 October ‘2008)
Department : ITC department
Division : Telecomunication.
Position : Project Manager
Project : ®. Roll out BTS Huawei CDMA for Sampoerna Telecom Indonesia – Riau area.
®. Roll out BTS and Transmission Huawei CDMA for Telkom Flexi – Riau area.
Responsibility :
• Manage project team for CDMA Huawei of STI Cellular operator at Riau – Sumatera.
• Coordination with Consultant STI person for project mechanism and Progress or Blocking.
• Manage project team for CDMA Huawei of Telkom Flexi at Riau – Sumatera.
• Manage Cost operational and Cost Controller.
*PT. GREEN TELECOM INDONESIA~ ( 01 January ‘2007 - 30 May ‘2008)
Department : FOC department.
Division : Telecomunication.
Position : Ass Manager
Project : ®. Broad band Wireless Access of Indosat Matrix 2.
Responsibility :
• Manage Operation team of ITC Process.
• Prepare Team for Roll out PNG project for GreenCom.
*PT. DAWAMIBA ENGINEERING ~ ( 01 June ‘2006 - 31 December ‘2007)
Department : ITC department
Division : Telecomunication.
Position : Project Coordinator
Project : ®. SMT and JTC Project (Star One) - Central Java area.
®. Alcatel Microwave Project - Central Java area.
®. Nokia (Ultra Site and Flexi Hopper) Project East Java area.
CURRICULUM VITAE
Responsibility :
• Arrange ITC team of project implementation.
• Coordination with Customer for project mechanism and progress.
• Coordination with Internal staff for financial, transportation, Warehouse and other Division.
• Reporting direct to ITC Manager.
*PT. DAWAMIBA ENGINEERING ~ ( 15 January ‘2005 - 30 May ‘2006)
Department : ITC department
Division : Telecomunication.
Position : Test Engineer.
Project : ®. BSS Single Network Indosat Jabotabek.
Responsibility :
• Acceptance Test Procedure with customer (Test All Equipment after swap ).
• Trouble shoot RBS system, Antenna system and Power system .
• Commissioning and Integration RBS system.
• Support Cross connection e1 from BSC to end site.
*PT. DAWAMIBA ENGINEERING ~ ( 04 June ‘2004 - 12 January ‘2005 )
Department : ITC department
Division : Telecomunication.
Position : Design Engineer.
Project : ®. BSS Single Network Indosat Jabotabek.
Responsibility :
• Providing RBS and Transmission database Plan Spec of C-Module.
• Providing Detail drawing of Installation Binder document.
• Providing Site Survey engineering Report document.
• Providing Site Survey Loss report.
• Providing Site Survey Engineering.
CURRICULUM VITAE
** TRAINING & COURSES **
Year Course Organized by Duration
2014 LTE Ericsson WorkShop ERICSSON Indonesia 2 days
2013 Advance Moshell Training ERICSSON Indonesia – Fin Magnusson 1 day
2013 Basic Moshell Training ERICSSON Indonesia – Fin Magnusson 1 day
2013 TCU training ERICSSON Indonesia 1 day
2010 ITC RBS 6000 Family for 2G & 3G System ERICSSON Indonesia 2 days
2009 ITC RBS 3000 Family for 3G Ericsson Indonesia 2 days
2008 BSS CDMA Huawei UI – Huawei Training Centre 3 days
2007 ITC MUX (4+4) of CERAGON Microwave GPT – Training Centre 3 days
2007
ITC Ceraview of CERAGON Microwave (1+1
and 2+1)
GPT – Training Centre 2 days
2007 ITC 155C MUX of CERAGON GPT – Training Centre 2 days
2005 RBS 2000 Family ERICSSON Indonesia 3 days
2005 MINILINK – E Transmission ERICSSON Indonesia 2 days
2004 Site Engineering Survey and Documentation ERICSSON Indonesia 7 days
2004 AUTODESK – AutoCad R12 Solusi Pratama Training Centre 7 days
1999 Electro Pneumatic Basic Level (EP-211) FESTO Indonesia 4 days
1999 Machinery Testing and Maintenance LTMP - Puspiptek 12 days
1998 Metallurgy Physic LTMP - Puspiptek 12 days

More Related Content

What's hot (20)

Devesh CV
Devesh CVDevesh CV
Devesh CV
 
John Greenwood CV (Telco Tech-Rigger)
John Greenwood CV (Telco Tech-Rigger)John Greenwood CV (Telco Tech-Rigger)
John Greenwood CV (Telco Tech-Rigger)
 
Resume_Suvankar_UPDATED
Resume_Suvankar_UPDATEDResume_Suvankar_UPDATED
Resume_Suvankar_UPDATED
 
CV Shabbir 1
CV Shabbir 1CV Shabbir 1
CV Shabbir 1
 
Ihab Eltahan's C.V.
Ihab Eltahan's C.V.Ihab Eltahan's C.V.
Ihab Eltahan's C.V.
 
MOHAMMAD SALEEM CV.
MOHAMMAD SALEEM CV.MOHAMMAD SALEEM CV.
MOHAMMAD SALEEM CV.
 
Mark G Quiambao's CV
Mark G Quiambao's CVMark G Quiambao's CV
Mark G Quiambao's CV
 
rahul rathour
rahul  rathourrahul  rathour
rahul rathour
 
Cv huawe alcate zte_nsn cv
Cv huawe alcate zte_nsn cvCv huawe alcate zte_nsn cv
Cv huawe alcate zte_nsn cv
 
pravendra -cv
pravendra -cvpravendra -cv
pravendra -cv
 
shriram2016
shriram2016shriram2016
shriram2016
 
Rohit Kumar Jaswal_CV
Rohit Kumar Jaswal_CV Rohit Kumar Jaswal_CV
Rohit Kumar Jaswal_CV
 
Resume_Pavan
Resume_PavanResume_Pavan
Resume_Pavan
 
my Resume
my Resumemy Resume
my Resume
 
Atif-Network-Security-ProjectEngineer
Atif-Network-Security-ProjectEngineerAtif-Network-Security-ProjectEngineer
Atif-Network-Security-ProjectEngineer
 
Illyas-latest_v.3.2
Illyas-latest_v.3.2Illyas-latest_v.3.2
Illyas-latest_v.3.2
 
Jhon CV
Jhon CVJhon CV
Jhon CV
 
APAA SIMON AHUNGWA
APAA SIMON AHUNGWAAPAA SIMON AHUNGWA
APAA SIMON AHUNGWA
 
Rakesh
RakeshRakesh
Rakesh
 
Eslam CV-19062016
Eslam CV-19062016Eslam CV-19062016
Eslam CV-19062016
 

Similar to CV~Bayu Maindonald20150221

Similar to CV~Bayu Maindonald20150221 (20)

CV Yudi Syah Putra OS
CV Yudi Syah Putra OSCV Yudi Syah Putra OS
CV Yudi Syah Putra OS
 
CV LUTFI DESTIAN
CV LUTFI DESTIANCV LUTFI DESTIAN
CV LUTFI DESTIAN
 
Anthony_Fan_Curriculum_Vitae
Anthony_Fan_Curriculum_VitaeAnthony_Fan_Curriculum_Vitae
Anthony_Fan_Curriculum_Vitae
 
CV A. Hadiyanto Suroso
CV A. Hadiyanto SurosoCV A. Hadiyanto Suroso
CV A. Hadiyanto Suroso
 
sunil CV _2016
sunil CV _2016sunil CV _2016
sunil CV _2016
 
CV A. Hadiyanto Suroso
CV A. Hadiyanto SurosoCV A. Hadiyanto Suroso
CV A. Hadiyanto Suroso
 
Cv meynard
Cv meynardCv meynard
Cv meynard
 
Cv meynard
Cv meynardCv meynard
Cv meynard
 
Cv sivam oct.doc 1
Cv sivam oct.doc 1Cv sivam oct.doc 1
Cv sivam oct.doc 1
 
Cv sivam oct.doc 1
Cv sivam oct.doc 1Cv sivam oct.doc 1
Cv sivam oct.doc 1
 
Er. Navdeep Thaman-Resume
Er. Navdeep Thaman-ResumeEr. Navdeep Thaman-Resume
Er. Navdeep Thaman-Resume
 
Resume kasi
Resume kasiResume kasi
Resume kasi
 
Transmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathiTransmission_Profile_swatantra tripathi
Transmission_Profile_swatantra tripathi
 
MTA
MTAMTA
MTA
 
Wan_Mohd_Azri_-_CV_May_2015
Wan_Mohd_Azri_-_CV_May_2015Wan_Mohd_Azri_-_CV_May_2015
Wan_Mohd_Azri_-_CV_May_2015
 
Resume_Eko Supriyanto
Resume_Eko SupriyantoResume_Eko Supriyanto
Resume_Eko Supriyanto
 
VED RESUME(1)
VED RESUME(1)VED RESUME(1)
VED RESUME(1)
 
Curriculum vitae_Anas Ijaz
Curriculum vitae_Anas IjazCurriculum vitae_Anas Ijaz
Curriculum vitae_Anas Ijaz
 
CV_Achmad Solah Hudin_15 FEB 2016
CV_Achmad Solah Hudin_15 FEB 2016CV_Achmad Solah Hudin_15 FEB 2016
CV_Achmad Solah Hudin_15 FEB 2016
 
Mohd_Noor_Azman_CV2015
Mohd_Noor_Azman_CV2015Mohd_Noor_Azman_CV2015
Mohd_Noor_Azman_CV2015
 

CV~Bayu Maindonald20150221

  • 1. CURRICULUM VITAE ** PERSONAL DETAILS ** Name : Bayu irawan Maindonald Address : Tipar Halim Street, RT.005/RW.06 No: 104 A. Mekar Sari-Cimanggis Depok - West Java, Indonesia. Country : Indonesia Nationality : Indonesian Gender : Male Date of Birth : 21 January 1976 Phone : ~ +62 8567 688 567 ~ +62 87888 67 1166 Email Address: ~ bayuirawanmaindonald@gmail.com ~ bayumaindonald@yahoo.com ** EDUCATION QUALIFICATIONS ** From To Education type Branch of study Institution name Certificate / Degree 1995 2002 Technical Engineering Institute Technology of Indonesia S1 ** LANGUACE SKILL ** • Indonesian : Mother Tongue . • English : Fluent.
  • 2. CURRICULUM VITAE ** CARRIER HISTORY ** *ERICSSON INDONESIA~ (16 December ‘2013 - 28 February ‘2015) Department : Radio Access Network department Division : XL Project Position : RTS Engineer (GRAN , WRAN and LTE). Project : ®. XL-AXIS Consolidation - JUPITER (3G & 2G) Jabodetabek. ®. 3G Network Improvement XL - Lions Gate Jabodetabek. Responsibility : • Support Monitoring LTE for XL Network Jabodetabek. • Trouble Shoot by Remote with Winfiol and Moshell after Integration or Migration RBS. • Support Filed Engineer and ASP Engineer for trouble shoot before and After Integration. • Upgrade Software package RBS 3G by remote. • Support Field Engineer for Analyze and Trouble shoot degrade performance of RBS. • Monitoring Alarm , High temp and VSWR of XL operator Network. • Support Field Engineer for Locked/ Unlocked or Halted/Open, resetting TG,TRX and etc. • Handle Smart Laptop Script for RBS New Integration, Upgrade RU & DU Module. • Activation 3rd Carrier RBS 3G. *ERICSSON INDONESIA~ (01 August ‘2013 - 15 December ‘2013) Department : Radio Access Network department Division : INDOSAT Project Position : RTS Engineer (GRAN & WRAN) Project : ®. Antenna Triple band Indosat Modernization RBS (3G & 2G) Jabodetabek. Responsibility : • Trouble Shoot by Remote with Winfiol and Moshell after Integration or Migration RBS. • Support Filed Engineer and ASP Engineer for trouble shoot before and After Integration. • Upgrade Software package RBS 3G by remote. • Support Field Engineer to Analyze and Trouble shoot degrade performance of RBS. • Monitoring Alarm , High temp and VSWR of XL operator Network. • Handle Smart Laptop Script for RBS New Integration, SIU and Upgrade RU & DU Module.
  • 3. CURRICULUM VITAE *ERICSSON INDONESIA~ ( 24 November ‘2012 - 30 July ‘2013) Department : Radio Access Network department Division : INDOSAT Project Position : RBS Engineer (GRAN & WRAN) Project : ®. Antenna Triple band Indosat Modernization RBS (3G & 2G) Jabodetabek. ®. 3G - Upgrade Capacity RBS & Upgrade Radio Unit – Indosat Jakarta. Responsibility : • Support SPV and ASP for ATP with Indosat Consultant. • Task Force team for Trouble Shooting All System RBS and support PIM Test. • Trouble shoot RBS system Antenna Triple Band (GSM, DCS, WCDMA , U900 and TCU). • Integration and Commissioning All System RBS (GSM, DCS, WCDMA , U900 and TCU). • Integration and Commissioning All System RBS ( U900 mixed mode). • Responsible for Take Data and Testing of before and after execution swap all RBS system. • Support SPV for Supervise Asp Team of Installation Antenna Triple band system. *ERICSSON INDONESIA~ ( 09 July ‘2010 - 21 November ‘2012) Department : Radio Access Network department Division : INDOSAT Project Position : RBS Engineer (GRAN & WRAN) Project : ®. Upgrade Capacity Indosat Network – West Java Area. ®. Migration 3G System E1 to Native IP – Indosat West Java Area. ®. Upgrade Capacity E1 for 3G System – Indosat West Java Area. ®. Indosat new site 3G System Rollout - West Java Area. ®. Swap 2G System (GSM & DCS) from Nokia to Ericsson – West Java area. Responsibility : • Upgrade TRX on RBS for GSM and DCS System RBS Ericsson. • Cross Connection E1, support Routing E1 from BSC end to end. • Upgrade Capacity E1 and Integration for RBS 3G System . • Migration and Integration RBS 3G from E1 system to Native IP system. • Supervise ASP team and support Integration New site 3G WCDMA System.
  • 4. CURRICULUM VITAE • Trouble shooting Hardware RBS 2G and 3G system. • support Trouble shooting performance with Optimization team for 2G & 3G system. • Support ATP upgrade capacity (TRX). • Support ATP GSM and DCS with Field Engineer from operator. • Support ATP WCDMA system with Field Engineer. • Swap Module RUG& RUW to RUS for GSMand WCDMA system. • Trial New Module (RUS) for GSM and DCS system. • Supervise ASP team for Checking Material on site, request LOM, and supervise ASP team for new installation and Swap. • Upgrade software package RBS 3G on site. *ERICSSON INDONESIA~ ( 27 October ‘2008 - 08 July ‘2010) Department : Radio Access Network department Division : INDOSAT Project Position : RBS Engineer (GRAN & WRAN) Project : ®. Modernization and Activation 2nd Carrier Indosat 3G - Central Java area. ®. Decongestion 3G Project - Central Java area. ®. Upgrade Capacity WCDMA system - Indosat Central Java. ®. Decongestion 3G project - Indosat Jabodetabek. ®. Activation 2nd Carrier - Indosat Jabodetabek. ®. Migration IuB over IP system. Responsibility: • Supervise ASP team of Swap and Installation RBS 3G system. • Upgrade Channel Element with Add HSTX and RAX board for RBS 3000 family. • Upgrade Capacity from RBS middle to RBS Full Configuration. • Activation 2nd Carrier RBS 3G system. • Trouble shoot Hardware and software. • Upgrade Software Package RBS on site. • Commissioning and Integration RBS 3G (3000 Family). • Trouble shooting RBS 3G (3000 Family).
  • 5. CURRICULUM VITAE * PT. KOKO ENGINEERING ~ ( 03 June ‘2008 - 21 October ‘2008) Department : ITC department Division : Telecomunication. Position : Project Manager Project : ®. Roll out BTS Huawei CDMA for Sampoerna Telecom Indonesia – Riau area. ®. Roll out BTS and Transmission Huawei CDMA for Telkom Flexi – Riau area. Responsibility : • Manage project team for CDMA Huawei of STI Cellular operator at Riau – Sumatera. • Coordination with Consultant STI person for project mechanism and Progress or Blocking. • Manage project team for CDMA Huawei of Telkom Flexi at Riau – Sumatera. • Manage Cost operational and Cost Controller. *PT. GREEN TELECOM INDONESIA~ ( 01 January ‘2007 - 30 May ‘2008) Department : FOC department. Division : Telecomunication. Position : Ass Manager Project : ®. Broad band Wireless Access of Indosat Matrix 2. Responsibility : • Manage Operation team of ITC Process. • Prepare Team for Roll out PNG project for GreenCom. *PT. DAWAMIBA ENGINEERING ~ ( 01 June ‘2006 - 31 December ‘2007) Department : ITC department Division : Telecomunication. Position : Project Coordinator Project : ®. SMT and JTC Project (Star One) - Central Java area. ®. Alcatel Microwave Project - Central Java area. ®. Nokia (Ultra Site and Flexi Hopper) Project East Java area.
  • 6. CURRICULUM VITAE Responsibility : • Arrange ITC team of project implementation. • Coordination with Customer for project mechanism and progress. • Coordination with Internal staff for financial, transportation, Warehouse and other Division. • Reporting direct to ITC Manager. *PT. DAWAMIBA ENGINEERING ~ ( 15 January ‘2005 - 30 May ‘2006) Department : ITC department Division : Telecomunication. Position : Test Engineer. Project : ®. BSS Single Network Indosat Jabotabek. Responsibility : • Acceptance Test Procedure with customer (Test All Equipment after swap ). • Trouble shoot RBS system, Antenna system and Power system . • Commissioning and Integration RBS system. • Support Cross connection e1 from BSC to end site. *PT. DAWAMIBA ENGINEERING ~ ( 04 June ‘2004 - 12 January ‘2005 ) Department : ITC department Division : Telecomunication. Position : Design Engineer. Project : ®. BSS Single Network Indosat Jabotabek. Responsibility : • Providing RBS and Transmission database Plan Spec of C-Module. • Providing Detail drawing of Installation Binder document. • Providing Site Survey engineering Report document. • Providing Site Survey Loss report. • Providing Site Survey Engineering.
  • 7. CURRICULUM VITAE ** TRAINING & COURSES ** Year Course Organized by Duration 2014 LTE Ericsson WorkShop ERICSSON Indonesia 2 days 2013 Advance Moshell Training ERICSSON Indonesia – Fin Magnusson 1 day 2013 Basic Moshell Training ERICSSON Indonesia – Fin Magnusson 1 day 2013 TCU training ERICSSON Indonesia 1 day 2010 ITC RBS 6000 Family for 2G & 3G System ERICSSON Indonesia 2 days 2009 ITC RBS 3000 Family for 3G Ericsson Indonesia 2 days 2008 BSS CDMA Huawei UI – Huawei Training Centre 3 days 2007 ITC MUX (4+4) of CERAGON Microwave GPT – Training Centre 3 days 2007 ITC Ceraview of CERAGON Microwave (1+1 and 2+1) GPT – Training Centre 2 days 2007 ITC 155C MUX of CERAGON GPT – Training Centre 2 days 2005 RBS 2000 Family ERICSSON Indonesia 3 days 2005 MINILINK – E Transmission ERICSSON Indonesia 2 days 2004 Site Engineering Survey and Documentation ERICSSON Indonesia 7 days 2004 AUTODESK – AutoCad R12 Solusi Pratama Training Centre 7 days 1999 Electro Pneumatic Basic Level (EP-211) FESTO Indonesia 4 days 1999 Machinery Testing and Maintenance LTMP - Puspiptek 12 days 1998 Metallurgy Physic LTMP - Puspiptek 12 days