1. CURRICULUM VITAE
** PERSONAL DETAILS **
Name : Bayu irawan Maindonald
Address : Tipar Halim Street, RT.005/RW.06 No: 104 A. Mekar Sari-Cimanggis
Depok - West Java, Indonesia.
Country : Indonesia
Nationality : Indonesian
Gender : Male
Date of Birth : 21 January 1976
Phone : ~ +62 8567 688 567
~ +62 87888 67 1166
Email Address: ~ bayuirawanmaindonald@gmail.com
~ bayumaindonald@yahoo.com
** EDUCATION QUALIFICATIONS **
From To
Education
type
Branch of
study
Institution name
Certificate
/ Degree
1995 2002 Technical Engineering Institute Technology of Indonesia S1
** LANGUACE SKILL **
• Indonesian : Mother Tongue .
• English : Fluent.
2. CURRICULUM VITAE
** CARRIER HISTORY **
*ERICSSON INDONESIA~ (16 December ‘2013 - 28 February ‘2015)
Department : Radio Access Network department
Division : XL Project
Position : RTS Engineer (GRAN , WRAN and LTE).
Project : ®. XL-AXIS Consolidation - JUPITER (3G & 2G) Jabodetabek.
®. 3G Network Improvement XL - Lions Gate Jabodetabek.
Responsibility :
• Support Monitoring LTE for XL Network Jabodetabek.
• Trouble Shoot by Remote with Winfiol and Moshell after Integration or Migration RBS.
• Support Filed Engineer and ASP Engineer for trouble shoot before and After Integration.
• Upgrade Software package RBS 3G by remote.
• Support Field Engineer for Analyze and Trouble shoot degrade performance of RBS.
• Monitoring Alarm , High temp and VSWR of XL operator Network.
• Support Field Engineer for Locked/ Unlocked or Halted/Open, resetting TG,TRX and etc.
• Handle Smart Laptop Script for RBS New Integration, Upgrade RU & DU Module.
• Activation 3rd Carrier RBS 3G.
*ERICSSON INDONESIA~ (01 August ‘2013 - 15 December ‘2013)
Department : Radio Access Network department
Division : INDOSAT Project
Position : RTS Engineer (GRAN & WRAN)
Project : ®. Antenna Triple band Indosat Modernization RBS (3G & 2G) Jabodetabek.
Responsibility :
• Trouble Shoot by Remote with Winfiol and Moshell after Integration or Migration RBS.
• Support Filed Engineer and ASP Engineer for trouble shoot before and After Integration.
• Upgrade Software package RBS 3G by remote.
• Support Field Engineer to Analyze and Trouble shoot degrade performance of RBS.
• Monitoring Alarm , High temp and VSWR of XL operator Network.
• Handle Smart Laptop Script for RBS New Integration, SIU and Upgrade RU & DU Module.
3. CURRICULUM VITAE
*ERICSSON INDONESIA~ ( 24 November ‘2012 - 30 July ‘2013)
Department : Radio Access Network department
Division : INDOSAT Project
Position : RBS Engineer (GRAN & WRAN)
Project : ®. Antenna Triple band Indosat Modernization RBS (3G & 2G) Jabodetabek.
®. 3G - Upgrade Capacity RBS & Upgrade Radio Unit – Indosat Jakarta.
Responsibility :
• Support SPV and ASP for ATP with Indosat Consultant.
• Task Force team for Trouble Shooting All System RBS and support PIM Test.
• Trouble shoot RBS system Antenna Triple Band (GSM, DCS, WCDMA , U900 and TCU).
• Integration and Commissioning All System RBS (GSM, DCS, WCDMA , U900 and TCU).
• Integration and Commissioning All System RBS ( U900 mixed mode).
• Responsible for Take Data and Testing of before and after execution swap all RBS system.
• Support SPV for Supervise Asp Team of Installation Antenna Triple band system.
*ERICSSON INDONESIA~ ( 09 July ‘2010 - 21 November ‘2012)
Department : Radio Access Network department
Division : INDOSAT Project
Position : RBS Engineer (GRAN & WRAN)
Project : ®. Upgrade Capacity Indosat Network – West Java Area.
®. Migration 3G System E1 to Native IP – Indosat West Java Area.
®. Upgrade Capacity E1 for 3G System – Indosat West Java Area.
®. Indosat new site 3G System Rollout - West Java Area.
®. Swap 2G System (GSM & DCS) from Nokia to Ericsson – West Java area.
Responsibility :
• Upgrade TRX on RBS for GSM and DCS System RBS Ericsson.
• Cross Connection E1, support Routing E1 from BSC end to end.
• Upgrade Capacity E1 and Integration for RBS 3G System .
• Migration and Integration RBS 3G from E1 system to Native IP system.
• Supervise ASP team and support Integration New site 3G WCDMA System.
4. CURRICULUM VITAE
• Trouble shooting Hardware RBS 2G and 3G system.
• support Trouble shooting performance with Optimization team for 2G & 3G system.
• Support ATP upgrade capacity (TRX).
• Support ATP GSM and DCS with Field Engineer from operator.
• Support ATP WCDMA system with Field Engineer.
• Swap Module RUG& RUW to RUS for GSMand WCDMA system.
• Trial New Module (RUS) for GSM and DCS system.
• Supervise ASP team for Checking Material on site, request LOM, and supervise
ASP team for new installation and Swap.
• Upgrade software package RBS 3G on site.
*ERICSSON INDONESIA~ ( 27 October ‘2008 - 08 July ‘2010)
Department : Radio Access Network department
Division : INDOSAT Project
Position : RBS Engineer (GRAN & WRAN)
Project : ®. Modernization and Activation 2nd Carrier Indosat 3G - Central Java area.
®. Decongestion 3G Project - Central Java area.
®. Upgrade Capacity WCDMA system - Indosat Central Java.
®. Decongestion 3G project - Indosat Jabodetabek.
®. Activation 2nd Carrier - Indosat Jabodetabek.
®. Migration IuB over IP system.
Responsibility:
• Supervise ASP team of Swap and Installation RBS 3G system.
• Upgrade Channel Element with Add HSTX and RAX board for RBS 3000 family.
• Upgrade Capacity from RBS middle to RBS Full Configuration.
• Activation 2nd Carrier RBS 3G system.
• Trouble shoot Hardware and software.
• Upgrade Software Package RBS on site.
• Commissioning and Integration RBS 3G (3000 Family).
• Trouble shooting RBS 3G (3000 Family).
5. CURRICULUM VITAE
* PT. KOKO ENGINEERING ~ ( 03 June ‘2008 - 21 October ‘2008)
Department : ITC department
Division : Telecomunication.
Position : Project Manager
Project : ®. Roll out BTS Huawei CDMA for Sampoerna Telecom Indonesia – Riau area.
®. Roll out BTS and Transmission Huawei CDMA for Telkom Flexi – Riau area.
Responsibility :
• Manage project team for CDMA Huawei of STI Cellular operator at Riau – Sumatera.
• Coordination with Consultant STI person for project mechanism and Progress or Blocking.
• Manage project team for CDMA Huawei of Telkom Flexi at Riau – Sumatera.
• Manage Cost operational and Cost Controller.
*PT. GREEN TELECOM INDONESIA~ ( 01 January ‘2007 - 30 May ‘2008)
Department : FOC department.
Division : Telecomunication.
Position : Ass Manager
Project : ®. Broad band Wireless Access of Indosat Matrix 2.
Responsibility :
• Manage Operation team of ITC Process.
• Prepare Team for Roll out PNG project for GreenCom.
*PT. DAWAMIBA ENGINEERING ~ ( 01 June ‘2006 - 31 December ‘2007)
Department : ITC department
Division : Telecomunication.
Position : Project Coordinator
Project : ®. SMT and JTC Project (Star One) - Central Java area.
®. Alcatel Microwave Project - Central Java area.
®. Nokia (Ultra Site and Flexi Hopper) Project East Java area.
6. CURRICULUM VITAE
Responsibility :
• Arrange ITC team of project implementation.
• Coordination with Customer for project mechanism and progress.
• Coordination with Internal staff for financial, transportation, Warehouse and other Division.
• Reporting direct to ITC Manager.
*PT. DAWAMIBA ENGINEERING ~ ( 15 January ‘2005 - 30 May ‘2006)
Department : ITC department
Division : Telecomunication.
Position : Test Engineer.
Project : ®. BSS Single Network Indosat Jabotabek.
Responsibility :
• Acceptance Test Procedure with customer (Test All Equipment after swap ).
• Trouble shoot RBS system, Antenna system and Power system .
• Commissioning and Integration RBS system.
• Support Cross connection e1 from BSC to end site.
*PT. DAWAMIBA ENGINEERING ~ ( 04 June ‘2004 - 12 January ‘2005 )
Department : ITC department
Division : Telecomunication.
Position : Design Engineer.
Project : ®. BSS Single Network Indosat Jabotabek.
Responsibility :
• Providing RBS and Transmission database Plan Spec of C-Module.
• Providing Detail drawing of Installation Binder document.
• Providing Site Survey engineering Report document.
• Providing Site Survey Loss report.
• Providing Site Survey Engineering.
7. CURRICULUM VITAE
** TRAINING & COURSES **
Year Course Organized by Duration
2014 LTE Ericsson WorkShop ERICSSON Indonesia 2 days
2013 Advance Moshell Training ERICSSON Indonesia – Fin Magnusson 1 day
2013 Basic Moshell Training ERICSSON Indonesia – Fin Magnusson 1 day
2013 TCU training ERICSSON Indonesia 1 day
2010 ITC RBS 6000 Family for 2G & 3G System ERICSSON Indonesia 2 days
2009 ITC RBS 3000 Family for 3G Ericsson Indonesia 2 days
2008 BSS CDMA Huawei UI – Huawei Training Centre 3 days
2007 ITC MUX (4+4) of CERAGON Microwave GPT – Training Centre 3 days
2007
ITC Ceraview of CERAGON Microwave (1+1
and 2+1)
GPT – Training Centre 2 days
2007 ITC 155C MUX of CERAGON GPT – Training Centre 2 days
2005 RBS 2000 Family ERICSSON Indonesia 3 days
2005 MINILINK – E Transmission ERICSSON Indonesia 2 days
2004 Site Engineering Survey and Documentation ERICSSON Indonesia 7 days
2004 AUTODESK – AutoCad R12 Solusi Pratama Training Centre 7 days
1999 Electro Pneumatic Basic Level (EP-211) FESTO Indonesia 4 days
1999 Machinery Testing and Maintenance LTMP - Puspiptek 12 days
1998 Metallurgy Physic LTMP - Puspiptek 12 days