This document provides instructions for installing BTS equipment both indoors and outdoors. It discusses installing indoor cable trays and grounding bars, as well as outdoor equipment like antennas, feeder cables, and jumpers. Key steps include properly grounding all equipment, routing cables to avoid sharp bends, taking safety precautions during installation, and ensuring tight connections between components. The goal is to setup the BTS site according to specifications while grounding and weatherproofing equipment for optimal performance and protection.
5. Some Basic Things for the cable tray installation:
Grounding of cable tray with IGB (Internal Grounding Bus Bar).
Distance between cable tray & roof of shelter is Depends on the dimension of Hatch
plate.
Cable tray should right below the hatch Plate.
Drills are made on the shelter walls or roof to provide support for Horizontal Cable
Tray.
After marking the drilling holes, the ladder is fixed using supporting clamps.
Cable Tray forms a major part of installation work since all the Grounding,Power,E1,IF
& RF Cable routing is done over this Cable tray.
6. Cable Tray forms a major part of
installation work since all the
Grounding,Power,E1,IF & RF Cable
routing is done over this Cable
tray.
8. Some Basic Things for Grounding Bar installation:
EGB and IGB both are installed right below the hatch plate, and both are connected
to each other by double connection of 35 mm square grounding cable.
EGB (External Grounding Bar) is directly connected by the Earth Pit by the GI strip.
IGB (Internal Grounding Bar) which is installed inside the shelter room, this is made
up of GI strip.
EGB (External Grounding Bar) which is installed on the out side of shelter, This is
totally made of Copper strip.
Every indoor equipment should be grounded through IGB.
Then crimp and fix the Lugs at both ends of above these three types of cables &
wrap with insulating tape with same color of cable.
Grounding resistance of working ground, Protection ground and lightening arrester
should be not more than 5 Ω. (Recommended range 0.5 Ω to 5Ω for working ground
&1-5 Ω for protection ground).
9. Battery Bank Installation:
In Telecom BTS site 48 volt DC battery bank installed. there are 24 cells in each
Battery Bank each is having the 2 volt DC. These battery bank are installed on stand
and grouted in the shelter properly.
These battery bank have certain distance from the SMPS and we should try to keep
O/P of each terminal is in opposite direction of SMPS.
Grounding of Battery bank is done with the IGB by the 35 mm square grounding
cable & connected to EGB (Internal Grounding Bar).
10. SMPS INSTALLATION:
SMPS is installed nearby the Shelter Door.
Battery bank directly connected with the SMPS.
SMPS is the DC supply source by which all the equipment inside the shelter is
connected like BTS and MW Rack.
It charges the battery bank by the AC supply, There are modules which converts AC
supply to DC supply.
In absence of AC supply it gives the supply by Battery Bank to equipments.
It Should be grounded on two points One is on positive bus bar and one is with the
body of SMPS with the 35 mm square grounding cable.
12. BTS Installation:
The BTS installation position should be consistent and must be as per shelter layout
design.
Now mark the position of BTS base bolts position at ground & do the grouting of
Bolts.
Then fix base of BTS into grouted bolts also check the leveling.
BTS, Microwave rack, DDF box and all the equipment except power equipment are
installed on the same side right in front the power equipments.
BTS should be grouted properly.
13. SURGE ARRESTER INSTALLATION:
Surge arrester are high frequency protector, these surge arrester protects the BTS
from the lightning. These surge arrester fix on the surge arrester stand and this
surge arrester stand grounded with EGB.
Surge Arrester Stand Surge Arrester
14. JUMPER CABLE CONNECTION ON BTS:
Jumper cable connects on the BTS top.
All feeder of three sector connects by the jumper cable.
Feeder connects by the jumper via Surge Arrester.
15. Power cable connection On BTS:
BTS power cable blue one connects with the negative bar which is right in front the
SMPS via the particular rating of fuses. And positive bus bar connect with black wire
of BTS terminal. This negative blue cable connects with the negative terminal of BTS
and black one connects with the Gnd of BTS.
16. Out Door Installation:
GSM Antenna Installation on the Tower.
Feeder cable Installation and routing.
Earthing of Feeder cable.
Connection of Jumper cable to Feeder on GSM antenna end.
Connection of Jumper cable to Feeder on BTS end.
17. GSM Antenna Installation on the Tower:
GSM Antenna installed on the tower according to the RF plan.
The orientation (Azimuth) of the GSM antenna should be according to network
plan.
GSM antenna also have the tilt by which the coverage area can be increased or
decreased, it is also according to plan.
Tilt may be zero, two, three or four degree.
GSM antenna clamp should be tightened on the tower properly, it should be not
loose.
18. Feeder cable Installation and routing:
Feeder cable ( 7/8”) connects with the BTS and GSM antenna.
It is connected with BTS and GSM antenna via the Jumper cable.
Feeder cable should be routed on the tower by Dummy clamp.
In feeder cable installation feeder cable should not be bend more then 90 degree at
certain point.
Feeder cable routing Bending is not more then 90 degree
19. Feeder cable comes in the shelter and
before entering in the shelter it takes a
“U” drop. Due to this U drop the water
do not go inside the shelter. So we
must take care about this U drop just
before the entrance in shelter.
U drop of Feeder
20. GROUNDING OF FEEDER CABLE:
• Feeder cable should be grounded
on three points. Two on the tower
and one with the EGB.
• Grounding is very necessary and it
must be on three points.
• Grounding is done by the
Grounding kit and it should be
properly shield with weather proof.
21. Connection of Jumper cable to Feeder on GSM antenna end:
• Feeder cable connects with GSM antenna by the
jumper cable .
.
• Connection should be very tight and shield with
weather proof.
• Weather proof should be properly done, if it is
not proper then this may be on of the reason of
VSWR.
Weather proofing on GSM
and jumper cable on Tower
22. Connection of Jumper cable to Feeder on BTS end:
Feeder cable connect with BTS by the
jumper cable.
Between jumper and feeder surge arrester
should be connected
Feeder Cable
Surge Arrester Stand
Jumper cable
23. Precaution:
Connection of each power cable should be proper.
Before switching on the BTS we should check the Input voltage on the BTS
terminal by the Multimeter, If it is ok then we should switch on the BTS.
We should visually check the Grounding connection of each equipment.
All equipments inside the shelter must be grouted.
At the time of connection of power cable to Battery Bank we must take care about
the safety.