BTS Site Installation
               (Training Material)

Prepare By:-Usman Riaz
Date:- 1-July-2011
Types Of Installation:

Contents:

     Types Of Installation

     Indoor Installation

     Outdoor Installation
Indoor Installation:



   Indoor Cable Tray

   Grounding Bar

   Battery Bank Installation

   SMPS Installation

   BTS Installation

   Connection of Power Cable
Installation Of Indoor Cable Tray:




Indoor Cable tray types-

   Wall mounted

   Roof Mounted
Some Basic Things for the cable tray installation:


   Grounding of cable tray with IGB (Internal Grounding Bus Bar).

   Distance between cable tray & roof of shelter is Depends on the dimension of Hatch
    plate.

   Cable tray should right below the hatch Plate.

   Drills are made on the shelter walls or roof to provide support for Horizontal Cable
    Tray.

   After marking the drilling holes, the ladder is fixed using supporting clamps.

   Cable Tray forms a major part of installation work since all the Grounding,Power,E1,IF
    & RF Cable routing is done over this Cable tray.
Cable Tray forms a major part of
installation work since all the
Grounding,Power,E1,IF & RF Cable
routing is done over this Cable
tray.
Grounding Bar Installation:




There are two types of grounding bars-

   External Grounding Bar (EGB)

   Internal Grounding Bar (IGB)
Some Basic Things for Grounding Bar installation:


   EGB and IGB both are installed right below the hatch plate, and both are connected
    to each other by double connection of 35 mm square grounding cable.

   EGB (External Grounding Bar) is directly connected by the Earth Pit by the GI strip.

   IGB (Internal Grounding Bar) which is installed inside the shelter room, this is made
    up of GI strip.

   EGB (External Grounding Bar) which is installed on the out side of shelter, This is
    totally made of Copper strip.

   Every indoor equipment should be grounded through IGB.

   Then crimp and fix the Lugs at both ends of above these three types of cables &
    wrap with insulating tape with same color of cable.

   Grounding resistance of working ground, Protection ground and lightening arrester
    should be not more than 5 Ω. (Recommended range 0.5 Ω to 5Ω for working ground
    &1-5 Ω for protection ground).
Battery Bank Installation:


   In Telecom BTS site 48 volt DC battery bank installed. there are 24 cells in each
    Battery Bank each is having the 2 volt DC. These battery bank are installed on stand
    and grouted in the shelter properly.

   These battery bank have certain distance from the SMPS and we should try to keep
    O/P of each terminal is in opposite direction of SMPS.

   Grounding of Battery bank is done with the IGB by the 35 mm square grounding
    cable & connected to EGB (Internal Grounding Bar).
SMPS INSTALLATION:


   SMPS is installed nearby the Shelter Door.

   Battery bank directly connected with the SMPS.

   SMPS is the DC supply source by which all the equipment inside the shelter is
    connected like BTS and MW Rack.

   It charges the battery bank by the AC supply, There are modules which converts AC
    supply to DC supply.

   In absence of AC supply it gives the supply by Battery Bank to equipments.

   It Should be grounded on two points One is on positive bus bar and one is with the
    body of SMPS with the 35 mm square grounding cable.
SMPS GROUNDING:


  Positive Bus bar grounding   Body grounding
BTS Installation:


   The BTS installation position should be consistent and must be as per shelter layout
    design.

   Now mark the position of BTS base bolts position at ground & do the grouting of
    Bolts.

   Then fix base of BTS into grouted bolts also check the leveling.

   BTS, Microwave rack, DDF box and all the equipment except power equipment are
    installed on the same side right in front the power equipments.

   BTS should be grouted properly.
SURGE ARRESTER INSTALLATION:


   Surge arrester are high frequency protector, these surge arrester protects the BTS
    from the lightning. These surge arrester fix on the surge arrester stand and this
    surge arrester stand grounded with EGB.




            Surge Arrester Stand           Surge Arrester
JUMPER CABLE CONNECTION ON BTS:


   Jumper cable connects on the BTS top.

   All feeder of three sector connects by the jumper cable.

   Feeder connects by the jumper via Surge Arrester.
Power cable connection On BTS:


   BTS power cable blue one connects with the negative bar which is right in front the
    SMPS via the particular rating of fuses. And positive bus bar connect with black wire
    of BTS terminal. This negative blue cable connects with the negative terminal of BTS
    and black one connects with the Gnd of BTS.
Out Door Installation:


   GSM Antenna Installation on the Tower.

   Feeder cable Installation and routing.

   Earthing of Feeder cable.

   Connection of Jumper cable to Feeder on GSM antenna end.

   Connection of Jumper cable to Feeder on BTS end.
GSM Antenna Installation on the Tower:


   GSM Antenna installed on the tower according to the RF plan.

   The orientation (Azimuth) of the GSM antenna should be according to network
    plan.

   GSM antenna also have the tilt by which the coverage area can be increased or
    decreased, it is also according to plan.

   Tilt may be zero, two, three or four degree.

   GSM antenna clamp should be tightened on the tower properly, it should be not
    loose.
Feeder cable Installation and routing:


   Feeder cable ( 7/8”) connects with the BTS and GSM antenna.
   It is connected with BTS and GSM antenna via the Jumper cable.
   Feeder cable should be routed on the tower by Dummy clamp.
   In feeder cable installation feeder cable should not be bend more then 90 degree at
    certain point.




                                  Feeder cable routing   Bending is not more then 90 degree
Feeder cable comes in the shelter and
before entering in the shelter it takes a
“U” drop. Due to this U drop the water
do not go inside the shelter. So we
must take care about this U drop just
before the entrance in shelter.




                  U drop of Feeder
GROUNDING OF FEEDER CABLE:



• Feeder cable should be grounded
  on three points. Two on the tower
  and one with the EGB.

• Grounding is very necessary and it
  must be on three points.

• Grounding is done by the
  Grounding kit and it should be
  properly shield with weather proof.
Connection of Jumper cable to Feeder on GSM antenna end:


•   Feeder cable connects with GSM antenna by the
    jumper cable .
.

•   Connection should be very tight and shield with
    weather proof.

•   Weather proof should be properly done, if it is
    not proper then this may be on of the reason of
    VSWR.




                                                      Weather proofing on GSM
                                                      and jumper cable on Tower
Connection of Jumper cable to Feeder on BTS end:



    Feeder cable connect with BTS by the
     jumper cable.

    Between jumper and feeder surge arrester
     should be connected




                         Feeder Cable

                    Surge Arrester Stand

                         Jumper cable
Precaution:


   Connection of each power cable should be proper.

   Before switching on the BTS we should check the Input voltage on the BTS
    terminal by the Multimeter, If it is ok then we should switch on the BTS.

   We should visually check the Grounding connection of each equipment.

   All equipments inside the shelter must be grouted.

   At the time of connection of power cable to Battery Bank we must take care about
    the safety.
Thank You

More Related Content

What's hot

Huawei BTS 3900 Hardware Structure
Huawei BTS 3900 Hardware StructureHuawei BTS 3900 Hardware Structure
Huawei BTS 3900 Hardware Structureibrahimnabil17
 
Nokia ultra site bts
Nokia ultra site btsNokia ultra site bts
Nokia ultra site btsAnkit Ricks
 
Mw training slide
Mw training slideMw training slide
Mw training slidededoyin
 
02 opti x rtn 900 v100r002 system hardware-20100223-a
02 opti x rtn 900 v100r002 system hardware-20100223-a02 opti x rtn 900 v100r002 system hardware-20100223-a
02 opti x rtn 900 v100r002 system hardware-20100223-aWaheed Ali
 
Mobile tower site, Nimay Giri
Mobile tower site, Nimay GiriMobile tower site, Nimay Giri
Mobile tower site, Nimay Girinimay1
 
240243228 huawei-bts-3900-training
240243228 huawei-bts-3900-training240243228 huawei-bts-3900-training
240243228 huawei-bts-3900-trainingShelton Siziba
 
Routing over ericsson mini link
Routing over ericsson mini linkRouting over ericsson mini link
Routing over ericsson mini linkAhmed Nabeeh
 
Microwave Links Correct Installation at Telecom Site
Microwave Links Correct Installation at Telecom SiteMicrowave Links Correct Installation at Telecom Site
Microwave Links Correct Installation at Telecom Siteibrahimnabil17
 
Lte principles overview
Lte principles  overviewLte principles  overview
Lte principles overviewNdukwe Amandi
 
BTS Reserves for Installation, Preventative Maintenance and Acceptance
BTS Reserves for Installation, Preventative Maintenance and AcceptanceBTS Reserves for Installation, Preventative Maintenance and Acceptance
BTS Reserves for Installation, Preventative Maintenance and Acceptanceibrahimnabil17
 
Ericsson BTS commisioning
Ericsson BTS commisioningEricsson BTS commisioning
Ericsson BTS commisioningShahid Rasool
 
3G BTS and DBS Hardware at Ericsson, Huawei, ZTE and NSN
3G BTS and DBS Hardware at Ericsson, Huawei, ZTE and NSN3G BTS and DBS Hardware at Ericsson, Huawei, ZTE and NSN
3G BTS and DBS Hardware at Ericsson, Huawei, ZTE and NSNibrahimnabil17
 
Introduction to Mobile Core Network
Introduction to Mobile Core NetworkIntroduction to Mobile Core Network
Introduction to Mobile Core Networkyusufd
 
Hw lte rf-optimization-guide
Hw lte rf-optimization-guideHw lte rf-optimization-guide
Hw lte rf-optimization-guidetharinduwije
 

What's hot (20)

Rtn
RtnRtn
Rtn
 
Huawei BTS 3900 Hardware Structure
Huawei BTS 3900 Hardware StructureHuawei BTS 3900 Hardware Structure
Huawei BTS 3900 Hardware Structure
 
Antenna Installation Engineering.
Antenna Installation Engineering.Antenna Installation Engineering.
Antenna Installation Engineering.
 
Nokia ultra site bts
Nokia ultra site btsNokia ultra site bts
Nokia ultra site bts
 
BTS SITE VISIT
BTS SITE VISITBTS SITE VISIT
BTS SITE VISIT
 
Mw training slide
Mw training slideMw training slide
Mw training slide
 
02 opti x rtn 900 v100r002 system hardware-20100223-a
02 opti x rtn 900 v100r002 system hardware-20100223-a02 opti x rtn 900 v100r002 system hardware-20100223-a
02 opti x rtn 900 v100r002 system hardware-20100223-a
 
IBS Training
IBS TrainingIBS Training
IBS Training
 
Mobile tower site, Nimay Giri
Mobile tower site, Nimay GiriMobile tower site, Nimay Giri
Mobile tower site, Nimay Giri
 
240243228 huawei-bts-3900-training
240243228 huawei-bts-3900-training240243228 huawei-bts-3900-training
240243228 huawei-bts-3900-training
 
Routing over ericsson mini link
Routing over ericsson mini linkRouting over ericsson mini link
Routing over ericsson mini link
 
Microwave Links Correct Installation at Telecom Site
Microwave Links Correct Installation at Telecom SiteMicrowave Links Correct Installation at Telecom Site
Microwave Links Correct Installation at Telecom Site
 
Lte principles overview
Lte principles  overviewLte principles  overview
Lte principles overview
 
Bsc configuration
Bsc configurationBsc configuration
Bsc configuration
 
BTS Reserves for Installation, Preventative Maintenance and Acceptance
BTS Reserves for Installation, Preventative Maintenance and AcceptanceBTS Reserves for Installation, Preventative Maintenance and Acceptance
BTS Reserves for Installation, Preventative Maintenance and Acceptance
 
Ericsson BTS commisioning
Ericsson BTS commisioningEricsson BTS commisioning
Ericsson BTS commisioning
 
3G BTS and DBS Hardware at Ericsson, Huawei, ZTE and NSN
3G BTS and DBS Hardware at Ericsson, Huawei, ZTE and NSN3G BTS and DBS Hardware at Ericsson, Huawei, ZTE and NSN
3G BTS and DBS Hardware at Ericsson, Huawei, ZTE and NSN
 
Introduction to Mobile Core Network
Introduction to Mobile Core NetworkIntroduction to Mobile Core Network
Introduction to Mobile Core Network
 
GSM Base transceiver station
GSM Base transceiver stationGSM Base transceiver station
GSM Base transceiver station
 
Hw lte rf-optimization-guide
Hw lte rf-optimization-guideHw lte rf-optimization-guide
Hw lte rf-optimization-guide
 

Viewers also liked

Telecommunication Tower
Telecommunication TowerTelecommunication Tower
Telecommunication Towerayishairshad
 
analysis and design of telecommunication tower
analysis and design of telecommunication toweranalysis and design of telecommunication tower
analysis and design of telecommunication towerRohithasangaraju
 
Construction of telecommunication towers
Construction of telecommunication towersConstruction of telecommunication towers
Construction of telecommunication towerssnookala
 
telecommunication Towers
telecommunication Towerstelecommunication Towers
telecommunication TowersTowerpeople
 
Throughput Calculation for LTE TDD and FDD System
Throughput Calculation for  LTE TDD and FDD SystemThroughput Calculation for  LTE TDD and FDD System
Throughput Calculation for LTE TDD and FDD SystemSukhvinder Singh Malik
 
How to dimension user traffic in LTE
How to dimension user traffic in LTEHow to dimension user traffic in LTE
How to dimension user traffic in LTEAlthaf Hussain
 

Viewers also liked (7)

LTE Planning
LTE PlanningLTE Planning
LTE Planning
 
Telecommunication Tower
Telecommunication TowerTelecommunication Tower
Telecommunication Tower
 
analysis and design of telecommunication tower
analysis and design of telecommunication toweranalysis and design of telecommunication tower
analysis and design of telecommunication tower
 
Construction of telecommunication towers
Construction of telecommunication towersConstruction of telecommunication towers
Construction of telecommunication towers
 
telecommunication Towers
telecommunication Towerstelecommunication Towers
telecommunication Towers
 
Throughput Calculation for LTE TDD and FDD System
Throughput Calculation for  LTE TDD and FDD SystemThroughput Calculation for  LTE TDD and FDD System
Throughput Calculation for LTE TDD and FDD System
 
How to dimension user traffic in LTE
How to dimension user traffic in LTEHow to dimension user traffic in LTE
How to dimension user traffic in LTE
 

Similar to Bts-site-installation

RF Reserves for Installation, Preventative Maintenance and Acceptance
RF Reserves for Installation, Preventative Maintenance and AcceptanceRF Reserves for Installation, Preventative Maintenance and Acceptance
RF Reserves for Installation, Preventative Maintenance and Acceptanceibrahimnabil17
 
EtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptxEtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptxssuser8298f2
 
Industrial training in telecom
Industrial training in telecomIndustrial training in telecom
Industrial training in telecom123sudha
 
KL1034 Lect2 Electrical wiring.pdf
KL1034 Lect2 Electrical wiring.pdfKL1034 Lect2 Electrical wiring.pdf
KL1034 Lect2 Electrical wiring.pdfSysteDesig
 
WIRE BREAK CIRCUIT ALARAM
WIRE BREAK CIRCUIT ALARAMWIRE BREAK CIRCUIT ALARAM
WIRE BREAK CIRCUIT ALARAMrookiedope8326
 
IGBT circuit diagram.pptx
IGBT circuit diagram.pptxIGBT circuit diagram.pptx
IGBT circuit diagram.pptxyogeshkute
 
DC potentiometers
DC potentiometersDC potentiometers
DC potentiometerstadi1padma
 
Substation structures
Substation structuresSubstation structures
Substation structuresJebitta Paul
 
Slide Wire Dc potentiometer
Slide Wire Dc potentiometerSlide Wire Dc potentiometer
Slide Wire Dc potentiometerZulfiqar Mangrio
 
Microwave Reserves for Installation, Preventative Maintenance and Acceptance
Microwave Reserves for Installation, Preventative Maintenance and AcceptanceMicrowave Reserves for Installation, Preventative Maintenance and Acceptance
Microwave Reserves for Installation, Preventative Maintenance and Acceptanceibrahimnabil17
 
Installation and troubleshooting of solar pv power plants
Installation and troubleshooting of solar pv power plantsInstallation and troubleshooting of solar pv power plants
Installation and troubleshooting of solar pv power plantsGomathy Sengottaiyan
 

Similar to Bts-site-installation (20)

RF Reserves for Installation, Preventative Maintenance and Acceptance
RF Reserves for Installation, Preventative Maintenance and AcceptanceRF Reserves for Installation, Preventative Maintenance and Acceptance
RF Reserves for Installation, Preventative Maintenance and Acceptance
 
EtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptxEtisalatTelecom Model 2016 modified.pptx
EtisalatTelecom Model 2016 modified.pptx
 
Industrial training in telecom
Industrial training in telecomIndustrial training in telecom
Industrial training in telecom
 
Ipmu ic procedure
Ipmu ic procedureIpmu ic procedure
Ipmu ic procedure
 
KL1034 Lect2 Electrical wiring.pdf
KL1034 Lect2 Electrical wiring.pdfKL1034 Lect2 Electrical wiring.pdf
KL1034 Lect2 Electrical wiring.pdf
 
WIRE BREAK CIRCUIT ALARAM
WIRE BREAK CIRCUIT ALARAMWIRE BREAK CIRCUIT ALARAM
WIRE BREAK CIRCUIT ALARAM
 
IGBT circuit diagram.pptx
IGBT circuit diagram.pptxIGBT circuit diagram.pptx
IGBT circuit diagram.pptx
 
System Works Knowledge Sharing
System Works Knowledge SharingSystem Works Knowledge Sharing
System Works Knowledge Sharing
 
User manual-part-2-3501466
User manual-part-2-3501466User manual-part-2-3501466
User manual-part-2-3501466
 
DC potentiometers
DC potentiometersDC potentiometers
DC potentiometers
 
Substation structures
Substation structuresSubstation structures
Substation structures
 
Slide Wire Dc potentiometer
Slide Wire Dc potentiometerSlide Wire Dc potentiometer
Slide Wire Dc potentiometer
 
ppt_ae.pdf
ppt_ae.pdfppt_ae.pdf
ppt_ae.pdf
 
igbt and its characteristics
igbt and its characteristicsigbt and its characteristics
igbt and its characteristics
 
igbt and its characteristics
igbt and its characteristicsigbt and its characteristics
igbt and its characteristics
 
Microwave Reserves for Installation, Preventative Maintenance and Acceptance
Microwave Reserves for Installation, Preventative Maintenance and AcceptanceMicrowave Reserves for Installation, Preventative Maintenance and Acceptance
Microwave Reserves for Installation, Preventative Maintenance and Acceptance
 
Installation and troubleshooting of solar pv power plants
Installation and troubleshooting of solar pv power plantsInstallation and troubleshooting of solar pv power plants
Installation and troubleshooting of solar pv power plants
 
System Works Knowledge Sharing
System Works Knowledge SharingSystem Works Knowledge Sharing
System Works Knowledge Sharing
 
Inverters
InvertersInverters
Inverters
 
Strain Gauges
Strain GaugesStrain Gauges
Strain Gauges
 

More from Ali Usman

Cisco Packet Tracer Overview
Cisco Packet Tracer OverviewCisco Packet Tracer Overview
Cisco Packet Tracer OverviewAli Usman
 
Islamic Arts and Architecture
Islamic Arts and  ArchitectureIslamic Arts and  Architecture
Islamic Arts and ArchitectureAli Usman
 
Database ,18 Current Issues
Database ,18 Current IssuesDatabase ,18 Current Issues
Database ,18 Current IssuesAli Usman
 
Database , 17 Web
Database , 17 WebDatabase , 17 Web
Database , 17 WebAli Usman
 
Database ,16 P2P
Database ,16 P2P Database ,16 P2P
Database ,16 P2P Ali Usman
 
Database , 15 Object DBMS
Database , 15 Object DBMSDatabase , 15 Object DBMS
Database , 15 Object DBMSAli Usman
 
Database ,14 Parallel DBMS
Database ,14 Parallel DBMSDatabase ,14 Parallel DBMS
Database ,14 Parallel DBMSAli Usman
 
Database , 13 Replication
Database , 13 ReplicationDatabase , 13 Replication
Database , 13 ReplicationAli Usman
 
Database , 12 Reliability
Database , 12 ReliabilityDatabase , 12 Reliability
Database , 12 ReliabilityAli Usman
 
Database ,11 Concurrency Control
Database ,11 Concurrency ControlDatabase ,11 Concurrency Control
Database ,11 Concurrency ControlAli Usman
 
Database ,10 Transactions
Database ,10 TransactionsDatabase ,10 Transactions
Database ,10 TransactionsAli Usman
 
Database , 8 Query Optimization
Database , 8 Query OptimizationDatabase , 8 Query Optimization
Database , 8 Query OptimizationAli Usman
 
Database ,7 query localization
Database ,7 query localizationDatabase ,7 query localization
Database ,7 query localizationAli Usman
 
Database , 6 Query Introduction
Database , 6 Query Introduction Database , 6 Query Introduction
Database , 6 Query Introduction Ali Usman
 
Database , 5 Semantic
Database , 5 SemanticDatabase , 5 Semantic
Database , 5 SemanticAli Usman
 
Database , 4 Data Integration
Database , 4 Data IntegrationDatabase , 4 Data Integration
Database , 4 Data IntegrationAli Usman
 
Database, 3 Distribution Design
Database, 3 Distribution DesignDatabase, 3 Distribution Design
Database, 3 Distribution DesignAli Usman
 
Database ,2 Background
 Database ,2 Background Database ,2 Background
Database ,2 BackgroundAli Usman
 
Database , 1 Introduction
 Database , 1 Introduction Database , 1 Introduction
Database , 1 IntroductionAli Usman
 
Processor Specifications
Processor SpecificationsProcessor Specifications
Processor SpecificationsAli Usman
 

More from Ali Usman (20)

Cisco Packet Tracer Overview
Cisco Packet Tracer OverviewCisco Packet Tracer Overview
Cisco Packet Tracer Overview
 
Islamic Arts and Architecture
Islamic Arts and  ArchitectureIslamic Arts and  Architecture
Islamic Arts and Architecture
 
Database ,18 Current Issues
Database ,18 Current IssuesDatabase ,18 Current Issues
Database ,18 Current Issues
 
Database , 17 Web
Database , 17 WebDatabase , 17 Web
Database , 17 Web
 
Database ,16 P2P
Database ,16 P2P Database ,16 P2P
Database ,16 P2P
 
Database , 15 Object DBMS
Database , 15 Object DBMSDatabase , 15 Object DBMS
Database , 15 Object DBMS
 
Database ,14 Parallel DBMS
Database ,14 Parallel DBMSDatabase ,14 Parallel DBMS
Database ,14 Parallel DBMS
 
Database , 13 Replication
Database , 13 ReplicationDatabase , 13 Replication
Database , 13 Replication
 
Database , 12 Reliability
Database , 12 ReliabilityDatabase , 12 Reliability
Database , 12 Reliability
 
Database ,11 Concurrency Control
Database ,11 Concurrency ControlDatabase ,11 Concurrency Control
Database ,11 Concurrency Control
 
Database ,10 Transactions
Database ,10 TransactionsDatabase ,10 Transactions
Database ,10 Transactions
 
Database , 8 Query Optimization
Database , 8 Query OptimizationDatabase , 8 Query Optimization
Database , 8 Query Optimization
 
Database ,7 query localization
Database ,7 query localizationDatabase ,7 query localization
Database ,7 query localization
 
Database , 6 Query Introduction
Database , 6 Query Introduction Database , 6 Query Introduction
Database , 6 Query Introduction
 
Database , 5 Semantic
Database , 5 SemanticDatabase , 5 Semantic
Database , 5 Semantic
 
Database , 4 Data Integration
Database , 4 Data IntegrationDatabase , 4 Data Integration
Database , 4 Data Integration
 
Database, 3 Distribution Design
Database, 3 Distribution DesignDatabase, 3 Distribution Design
Database, 3 Distribution Design
 
Database ,2 Background
 Database ,2 Background Database ,2 Background
Database ,2 Background
 
Database , 1 Introduction
 Database , 1 Introduction Database , 1 Introduction
Database , 1 Introduction
 
Processor Specifications
Processor SpecificationsProcessor Specifications
Processor Specifications
 

Recently uploaded

4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptxmary850239
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...JojoEDelaCruz
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSJoshuaGantuangco2
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Seán Kennedy
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSMae Pangan
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxAnupkumar Sharma
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designMIPLM
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...Postal Advocate Inc.
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONHumphrey A Beña
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operationalssuser3e220a
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfTechSoup
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management systemChristalin Nelson
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17Celine George
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Projectjordimapav
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Mark Reed
 

Recently uploaded (20)

4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx4.18.24 Movement Legacies, Reflection, and Review.pptx
4.18.24 Movement Legacies, Reflection, and Review.pptx
 
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
ENG 5 Q4 WEEk 1 DAY 1 Restate sentences heard in one’s own words. Use appropr...
 
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTSGRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
GRADE 4 - SUMMATIVE TEST QUARTER 4 ALL SUBJECTS
 
Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...Student Profile Sample - We help schools to connect the data they have, with ...
Student Profile Sample - We help schools to connect the data they have, with ...
 
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptxYOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
YOUVE_GOT_EMAIL_PRELIMS_EL_DORADO_2024.pptx
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
 
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptxMULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
MULTIDISCIPLINRY NATURE OF THE ENVIRONMENTAL STUDIES.pptx
 
Keynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-designKeynote by Prof. Wurzer at Nordex about IP-design
Keynote by Prof. Wurzer at Nordex about IP-design
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
USPS® Forced Meter Migration - How to Know if Your Postage Meter Will Soon be...
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATIONTHEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
THEORIES OF ORGANIZATION-PUBLIC ADMINISTRATION
 
Expanded definition: technical and operational
Expanded definition: technical and operationalExpanded definition: technical and operational
Expanded definition: technical and operational
 
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdfInclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
Inclusivity Essentials_ Creating Accessible Websites for Nonprofits .pdf
 
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptxFINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
FINALS_OF_LEFT_ON_C'N_EL_DORADO_2024.pptx
 
Concurrency Control in Database Management system
Concurrency Control in Database Management systemConcurrency Control in Database Management system
Concurrency Control in Database Management system
 
How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17How to Add Barcode on PDF Report in Odoo 17
How to Add Barcode on PDF Report in Odoo 17
 
ClimART Action | eTwinning Project
ClimART Action    |    eTwinning ProjectClimART Action    |    eTwinning Project
ClimART Action | eTwinning Project
 
Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)Influencing policy (training slides from Fast Track Impact)
Influencing policy (training slides from Fast Track Impact)
 

Bts-site-installation

  • 1. BTS Site Installation (Training Material) Prepare By:-Usman Riaz Date:- 1-July-2011
  • 2. Types Of Installation: Contents:  Types Of Installation  Indoor Installation  Outdoor Installation
  • 3. Indoor Installation:  Indoor Cable Tray  Grounding Bar  Battery Bank Installation  SMPS Installation  BTS Installation  Connection of Power Cable
  • 4. Installation Of Indoor Cable Tray: Indoor Cable tray types-  Wall mounted  Roof Mounted
  • 5. Some Basic Things for the cable tray installation:  Grounding of cable tray with IGB (Internal Grounding Bus Bar).  Distance between cable tray & roof of shelter is Depends on the dimension of Hatch plate.  Cable tray should right below the hatch Plate.  Drills are made on the shelter walls or roof to provide support for Horizontal Cable Tray.  After marking the drilling holes, the ladder is fixed using supporting clamps.  Cable Tray forms a major part of installation work since all the Grounding,Power,E1,IF & RF Cable routing is done over this Cable tray.
  • 6. Cable Tray forms a major part of installation work since all the Grounding,Power,E1,IF & RF Cable routing is done over this Cable tray.
  • 7. Grounding Bar Installation: There are two types of grounding bars-  External Grounding Bar (EGB)  Internal Grounding Bar (IGB)
  • 8. Some Basic Things for Grounding Bar installation:  EGB and IGB both are installed right below the hatch plate, and both are connected to each other by double connection of 35 mm square grounding cable.  EGB (External Grounding Bar) is directly connected by the Earth Pit by the GI strip.  IGB (Internal Grounding Bar) which is installed inside the shelter room, this is made up of GI strip.  EGB (External Grounding Bar) which is installed on the out side of shelter, This is totally made of Copper strip.  Every indoor equipment should be grounded through IGB.  Then crimp and fix the Lugs at both ends of above these three types of cables & wrap with insulating tape with same color of cable.  Grounding resistance of working ground, Protection ground and lightening arrester should be not more than 5 Ω. (Recommended range 0.5 Ω to 5Ω for working ground &1-5 Ω for protection ground).
  • 9. Battery Bank Installation:  In Telecom BTS site 48 volt DC battery bank installed. there are 24 cells in each Battery Bank each is having the 2 volt DC. These battery bank are installed on stand and grouted in the shelter properly.  These battery bank have certain distance from the SMPS and we should try to keep O/P of each terminal is in opposite direction of SMPS.  Grounding of Battery bank is done with the IGB by the 35 mm square grounding cable & connected to EGB (Internal Grounding Bar).
  • 10. SMPS INSTALLATION:  SMPS is installed nearby the Shelter Door.  Battery bank directly connected with the SMPS.  SMPS is the DC supply source by which all the equipment inside the shelter is connected like BTS and MW Rack.  It charges the battery bank by the AC supply, There are modules which converts AC supply to DC supply.  In absence of AC supply it gives the supply by Battery Bank to equipments.  It Should be grounded on two points One is on positive bus bar and one is with the body of SMPS with the 35 mm square grounding cable.
  • 11. SMPS GROUNDING: Positive Bus bar grounding Body grounding
  • 12. BTS Installation:  The BTS installation position should be consistent and must be as per shelter layout design.  Now mark the position of BTS base bolts position at ground & do the grouting of Bolts.  Then fix base of BTS into grouted bolts also check the leveling.  BTS, Microwave rack, DDF box and all the equipment except power equipment are installed on the same side right in front the power equipments.  BTS should be grouted properly.
  • 13. SURGE ARRESTER INSTALLATION:  Surge arrester are high frequency protector, these surge arrester protects the BTS from the lightning. These surge arrester fix on the surge arrester stand and this surge arrester stand grounded with EGB. Surge Arrester Stand Surge Arrester
  • 14. JUMPER CABLE CONNECTION ON BTS:  Jumper cable connects on the BTS top.  All feeder of three sector connects by the jumper cable.  Feeder connects by the jumper via Surge Arrester.
  • 15. Power cable connection On BTS:  BTS power cable blue one connects with the negative bar which is right in front the SMPS via the particular rating of fuses. And positive bus bar connect with black wire of BTS terminal. This negative blue cable connects with the negative terminal of BTS and black one connects with the Gnd of BTS.
  • 16. Out Door Installation:  GSM Antenna Installation on the Tower.  Feeder cable Installation and routing.  Earthing of Feeder cable.  Connection of Jumper cable to Feeder on GSM antenna end.  Connection of Jumper cable to Feeder on BTS end.
  • 17. GSM Antenna Installation on the Tower:  GSM Antenna installed on the tower according to the RF plan.  The orientation (Azimuth) of the GSM antenna should be according to network plan.  GSM antenna also have the tilt by which the coverage area can be increased or decreased, it is also according to plan.  Tilt may be zero, two, three or four degree.  GSM antenna clamp should be tightened on the tower properly, it should be not loose.
  • 18. Feeder cable Installation and routing:  Feeder cable ( 7/8”) connects with the BTS and GSM antenna.  It is connected with BTS and GSM antenna via the Jumper cable.  Feeder cable should be routed on the tower by Dummy clamp.  In feeder cable installation feeder cable should not be bend more then 90 degree at certain point. Feeder cable routing Bending is not more then 90 degree
  • 19. Feeder cable comes in the shelter and before entering in the shelter it takes a “U” drop. Due to this U drop the water do not go inside the shelter. So we must take care about this U drop just before the entrance in shelter. U drop of Feeder
  • 20. GROUNDING OF FEEDER CABLE: • Feeder cable should be grounded on three points. Two on the tower and one with the EGB. • Grounding is very necessary and it must be on three points. • Grounding is done by the Grounding kit and it should be properly shield with weather proof.
  • 21. Connection of Jumper cable to Feeder on GSM antenna end: • Feeder cable connects with GSM antenna by the jumper cable . . • Connection should be very tight and shield with weather proof. • Weather proof should be properly done, if it is not proper then this may be on of the reason of VSWR. Weather proofing on GSM and jumper cable on Tower
  • 22. Connection of Jumper cable to Feeder on BTS end:  Feeder cable connect with BTS by the jumper cable.  Between jumper and feeder surge arrester should be connected Feeder Cable Surge Arrester Stand Jumper cable
  • 23. Precaution:  Connection of each power cable should be proper.  Before switching on the BTS we should check the Input voltage on the BTS terminal by the Multimeter, If it is ok then we should switch on the BTS.  We should visually check the Grounding connection of each equipment.  All equipments inside the shelter must be grouted.  At the time of connection of power cable to Battery Bank we must take care about the safety.