A 4-Storey Steel Office Building
Presented to: Dr. Anjan Bhowmick
Presented by: Benyame Bahiru, Jessica Carmosino, (Karis)Ho Yuen Cheung,
Salvatore Lee Giulione, Robin Ramirez, Andrew Tam
Quebec City
• Located in North-Eastern
Quebec in the Saint-
Lawrence River valley
• 2 ½ hour drive from
Montreal
• Population: 765 000
• Average high temperature:
22°C to 25°C
• Average low temperature: -
13°C to -18°C
• Last major earthquake: 1663
Charlevoix earthquake with a
moment magnitude of
between 7.3 and 7.9
4 Storey Office Building
Design according to National Building Code of Canada (NBCC 2010) and the Canadian Standard for Design
and Construction of Steel Building (CSA-S16-09).
Plan Dimensions: Length = 55m, Width = 30m
First Floor Height: 5.8m
Typical Storey Height: 3.75m
Total Elevation: 17.05m (low-rise)
CBF’s on either side of building to resist lateral loads (wind & earthquake)
2 staircases: East & West side of building
Designed the office building by determining the live, dead, snow, wind, and earthquake load that the
structure must resist under specific conditions that vary in Quebec City.
Also designed the CBF’s to satisfy safety standards.
AutoCAD for the structural and architectural drawings.
ETABS for analysis of the structure.
Assumptions
Dead Load Calculation: 10% steel allowance
Importance Factor, I: 1.0 (normal building)
Open terrain environment
CBF stiffness, K = 1
Building is situated on top of very dense soil and soft rocks -> Class C
No storage load for each floor
Considered the beams as laterally supported
Introduction
Objective: A four story office building
Location: Quebec City, Quebec
Climatic Data:
Table1: Climatic Data of Québec City (Appendix C – Climate Data)
Province
and
Location
Elev.
(m)
Design Temperature
Degree
- Days
Below
18oC
Snow
Load,
kPa 1/50
Hourly
Wind
Pressures,
kPa
Seismic Data
January July 2.5%
2.5%
oC
1%
oC
Dry
oC
Wet
oC
Ss Sr 1/50 Sa(0.2) Sa(0.5) Sa(1.0) Sa(2.0) PGA
Québec 120 -25 -28 28 22 5080 3.6 0.6 0.41 0.55 0.32 0.15 0.052 0.30
Load Calculations
Ground Floor 2nd Storey 3rd Storey 4th Storey Roof
Dead Load, kPa 4.51 4.51 4.51 4.51 1.045
Live Load, kPa 4.80 2.40 2.40 2.40 1.00
Snow Load, kPa - - - - 3.48
Wind Load E-W direction, kN - 47.30 37.18 37.18 18.89
Wind Load N-S direction, kN - 84.72 66.54 66.54 33.29
Earthquake Load E-W, kN - 222.91 367.03 511.15 151.83
Earthquake Load N-S, kN - 231.05 380.44 529.83 157.38
Table2: Load Calculations
Structural Plan
Structural Plan
Structural
Plan in
East and
West
Direction
Structural
Plan in
North and
South
Direction
Selected Sections for Beams: Hand
Calculations
Floor Ground 2nd Story 3rd Story Roof
Floor Beam W310x33 W310x28 W310x28 W310x33
Main Beam W530x74 W460x68 W460x68 W460x68
Edge Beam W410x54 W360x39 W360x39 W410x46
Table3: Selected Sections
Selected Sections for Columns: Hand
Calculations
Columns Section
Interior W310x118
Edge Horizontal W310x86
Edge Vertical W360x74
Corner W360x74
Table4: Selected Sections
Elevation with Final Beam and Column
Sections (ETABS)
EAST
AND WEST CBF
NORTH
AND SOUTH CBF
Deflected Shape
Deflected Shape
3D
Mode Shape
Architectural –
Ground Floor
Plan Layout
- 1 Security Desk
- 1 Coffee Shop
- 2 Staircases
- 2 Entrances
- 2 Washrooms
Architectural –
Typical Floor
Plan Layout
- 1 Electrical Room
- 1 Store Room
- 2 Lunch Rooms
- 2 Washrooms
- 2 Conference Rooms
- 2 Reception Areas
- 2 Staircases
- 2 General Manager
Office Rooms
- 10 Office Rooms
- 128 Cubical Offices
Architectural
Elevation- North
Architectural
Elevation- South
Architectural
Elevation- West
Cost EstimationProject: 4 Story Office Building
Type of Work:
Owner:
Contactor:
Period Ending:
Item Unit Estimated Quantity Unit Price Amount
Total W section Beam/Columns lb 504,890.32 $ 1.50 $ 757,335.48
Total HSS Section ft 263.82 $ 4.50 $ 1,187.19
Deliver Steel Members lump sum 1 $ 25,000.00 $ 25,000.00
Erection of Steel Members lump sum 1 $ 20,000.00 $ 20,000.00
Steel Deck square foot 71041.8 $ 6.50 $ 461,771.70
Slab Concrete cubic meter 471.9 $ 1,050.00 $ 495,495.00
Floor Finish square foot 71041.8 $ 8.03 $ 570,465.65
Wall (Brick) square foot 2936.39 $ 16.25 $ 47,716.34
Dry Wall Partition square foot 14734.39 $ 3.49 $ 51,423.02
Exterior Glass square meter 2625.7 $ 41.65 $ 109,360.41
Gravel cubic yard 0.566 $ 29.50 $ 16.70
HVAC System lump sum 1 $ 41,675.00 $ 41,675.00
Total $ 2,581,446.48Table3: Cost Estimation
Steel Design

More Related Content

Similar to Steel Design

Advanced seismic analysis of building-م.54-مبادرة#تواصل_تطوير-أ.د.ناجى أبو شادى
Advanced seismic analysis of building-م.54-مبادرة#تواصل_تطوير-أ.د.ناجى أبو شادىAdvanced seismic analysis of building-م.54-مبادرة#تواصل_تطوير-أ.د.ناجى أبو شادى
Advanced seismic analysis of building-م.54-مبادرة#تواصل_تطوير-أ.د.ناجى أبو شادىEgyptian Engineers Association
 
The Energy Modeling Improv Game: Can Your Team Achieve the Lowest EUI?
The Energy Modeling Improv Game: Can Your Team Achieve the Lowest EUI?The Energy Modeling Improv Game: Can Your Team Achieve the Lowest EUI?
The Energy Modeling Improv Game: Can Your Team Achieve the Lowest EUI?juliekannai
 
Team 2 mep presentation
Team 2  mep presentationTeam 2  mep presentation
Team 2 mep presentationCampus
 
Design Proposal of a 5-Storey Steel Building with Cost Analysis
Design Proposal of a 5-Storey Steel Building with Cost AnalysisDesign Proposal of a 5-Storey Steel Building with Cost Analysis
Design Proposal of a 5-Storey Steel Building with Cost AnalysisMichael Masi, Jr. Eng.
 
Design and analysis of RC structures with flat slab
Design and analysis of RC structures with flat slabDesign and analysis of RC structures with flat slab
Design and analysis of RC structures with flat slabDeepak Patil
 
Selleck, Matthew NEDF Built Environment Project
Selleck, Matthew NEDF Built Environment Project Selleck, Matthew NEDF Built Environment Project
Selleck, Matthew NEDF Built Environment Project MatthewSelleck1
 
Modeling of the Heating Sequences of Lightweight Steel/Aluminum Bimaterial Bi...
Modeling of the Heating Sequences of Lightweight Steel/Aluminum Bimaterial Bi...Modeling of the Heating Sequences of Lightweight Steel/Aluminum Bimaterial Bi...
Modeling of the Heating Sequences of Lightweight Steel/Aluminum Bimaterial Bi...Fluxtrol Inc.
 
Energy transfer and heat load analysis
Energy transfer and heat load analysisEnergy transfer and heat load analysis
Energy transfer and heat load analysisSatwinder Singh
 
HVAC analysis.pptx
HVAC analysis.pptxHVAC analysis.pptx
HVAC analysis.pptxkylenesti2
 
Labour Productivity for construction projects
Labour Productivity for construction projectsLabour Productivity for construction projects
Labour Productivity for construction projectsKapugantikapuganti Gupta
 
EarthQuake Reistant Building
EarthQuake Reistant BuildingEarthQuake Reistant Building
EarthQuake Reistant BuildingHemant Srivastava
 
Design basis report on-14.11.2016
Design basis report  on-14.11.2016Design basis report  on-14.11.2016
Design basis report on-14.11.2016bhavesh raysoni
 
USGBC SC Chapter-SustainSC 2013_Building Commissioning - Sustainability Verif...
USGBC SC Chapter-SustainSC 2013_Building Commissioning - Sustainability Verif...USGBC SC Chapter-SustainSC 2013_Building Commissioning - Sustainability Verif...
USGBC SC Chapter-SustainSC 2013_Building Commissioning - Sustainability Verif...CxA Commissioning Authority
 
Staad Pro Intro
Staad Pro IntroStaad Pro Intro
Staad Pro IntroSolai Raja
 

Similar to Steel Design (20)

Wilshire Grand Redevelopment Project
Wilshire Grand Redevelopment ProjectWilshire Grand Redevelopment Project
Wilshire Grand Redevelopment Project
 
Advanced seismic analysis of building-م.54-مبادرة#تواصل_تطوير-أ.د.ناجى أبو شادى
Advanced seismic analysis of building-م.54-مبادرة#تواصل_تطوير-أ.د.ناجى أبو شادىAdvanced seismic analysis of building-م.54-مبادرة#تواصل_تطوير-أ.د.ناجى أبو شادى
Advanced seismic analysis of building-م.54-مبادرة#تواصل_تطوير-أ.د.ناجى أبو شادى
 
The Energy Modeling Improv Game: Can Your Team Achieve the Lowest EUI?
The Energy Modeling Improv Game: Can Your Team Achieve the Lowest EUI?The Energy Modeling Improv Game: Can Your Team Achieve the Lowest EUI?
The Energy Modeling Improv Game: Can Your Team Achieve the Lowest EUI?
 
Team 2 mep presentation
Team 2  mep presentationTeam 2  mep presentation
Team 2 mep presentation
 
Design Proposal of a 5-Storey Steel Building with Cost Analysis
Design Proposal of a 5-Storey Steel Building with Cost AnalysisDesign Proposal of a 5-Storey Steel Building with Cost Analysis
Design Proposal of a 5-Storey Steel Building with Cost Analysis
 
Design and analysis of RC structures with flat slab
Design and analysis of RC structures with flat slabDesign and analysis of RC structures with flat slab
Design and analysis of RC structures with flat slab
 
Selleck, Matthew NEDF Built Environment Project
Selleck, Matthew NEDF Built Environment Project Selleck, Matthew NEDF Built Environment Project
Selleck, Matthew NEDF Built Environment Project
 
Modeling of the Heating Sequences of Lightweight Steel/Aluminum Bimaterial Bi...
Modeling of the Heating Sequences of Lightweight Steel/Aluminum Bimaterial Bi...Modeling of the Heating Sequences of Lightweight Steel/Aluminum Bimaterial Bi...
Modeling of the Heating Sequences of Lightweight Steel/Aluminum Bimaterial Bi...
 
Energy transfer and heat load analysis
Energy transfer and heat load analysisEnergy transfer and heat load analysis
Energy transfer and heat load analysis
 
HVAC analysis.pptx
HVAC analysis.pptxHVAC analysis.pptx
HVAC analysis.pptx
 
Labour Productivity for construction projects
Labour Productivity for construction projectsLabour Productivity for construction projects
Labour Productivity for construction projects
 
design c
design cdesign c
design c
 
EarthQuake Reistant Building
EarthQuake Reistant BuildingEarthQuake Reistant Building
EarthQuake Reistant Building
 
Design basis report on-14.11.2016
Design basis report  on-14.11.2016Design basis report  on-14.11.2016
Design basis report on-14.11.2016
 
Bahniuk Utility Job
Bahniuk Utility JobBahniuk Utility Job
Bahniuk Utility Job
 
USGBC SC Chapter-SustainSC 2013_Building Commissioning - Sustainability Verif...
USGBC SC Chapter-SustainSC 2013_Building Commissioning - Sustainability Verif...USGBC SC Chapter-SustainSC 2013_Building Commissioning - Sustainability Verif...
USGBC SC Chapter-SustainSC 2013_Building Commissioning - Sustainability Verif...
 
Presentation
PresentationPresentation
Presentation
 
Structural Design Project
Structural Design ProjectStructural Design Project
Structural Design Project
 
Audiotorium Calcs.pdf
Audiotorium Calcs.pdfAudiotorium Calcs.pdf
Audiotorium Calcs.pdf
 
Staad Pro Intro
Staad Pro IntroStaad Pro Intro
Staad Pro Intro
 

Recently uploaded

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college projectTonystark477637
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxupamatechverse
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...ranjana rawat
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxpranjaldaimarysona
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Christo Ananth
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlysanyuktamishra911
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 

Recently uploaded (20)

result management system report for college project
result management system report for college projectresult management system report for college project
result management system report for college project
 
Introduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptxIntroduction and different types of Ethernet.pptx
Introduction and different types of Ethernet.pptx
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
The Most Attractive Pune Call Girls Budhwar Peth 8250192130 Will You Miss Thi...
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Processing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptxProcessing & Properties of Floor and Wall Tiles.pptx
Processing & Properties of Floor and Wall Tiles.pptx
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
Call for Papers - Educational Administration: Theory and Practice, E-ISSN: 21...
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 

Steel Design

  • 1. A 4-Storey Steel Office Building Presented to: Dr. Anjan Bhowmick Presented by: Benyame Bahiru, Jessica Carmosino, (Karis)Ho Yuen Cheung, Salvatore Lee Giulione, Robin Ramirez, Andrew Tam
  • 2. Quebec City • Located in North-Eastern Quebec in the Saint- Lawrence River valley • 2 ½ hour drive from Montreal • Population: 765 000 • Average high temperature: 22°C to 25°C • Average low temperature: - 13°C to -18°C • Last major earthquake: 1663 Charlevoix earthquake with a moment magnitude of between 7.3 and 7.9
  • 3. 4 Storey Office Building Design according to National Building Code of Canada (NBCC 2010) and the Canadian Standard for Design and Construction of Steel Building (CSA-S16-09). Plan Dimensions: Length = 55m, Width = 30m First Floor Height: 5.8m Typical Storey Height: 3.75m Total Elevation: 17.05m (low-rise) CBF’s on either side of building to resist lateral loads (wind & earthquake) 2 staircases: East & West side of building Designed the office building by determining the live, dead, snow, wind, and earthquake load that the structure must resist under specific conditions that vary in Quebec City. Also designed the CBF’s to satisfy safety standards. AutoCAD for the structural and architectural drawings. ETABS for analysis of the structure.
  • 4. Assumptions Dead Load Calculation: 10% steel allowance Importance Factor, I: 1.0 (normal building) Open terrain environment CBF stiffness, K = 1 Building is situated on top of very dense soil and soft rocks -> Class C No storage load for each floor Considered the beams as laterally supported
  • 5. Introduction Objective: A four story office building Location: Quebec City, Quebec Climatic Data: Table1: Climatic Data of Québec City (Appendix C – Climate Data) Province and Location Elev. (m) Design Temperature Degree - Days Below 18oC Snow Load, kPa 1/50 Hourly Wind Pressures, kPa Seismic Data January July 2.5% 2.5% oC 1% oC Dry oC Wet oC Ss Sr 1/50 Sa(0.2) Sa(0.5) Sa(1.0) Sa(2.0) PGA Québec 120 -25 -28 28 22 5080 3.6 0.6 0.41 0.55 0.32 0.15 0.052 0.30
  • 6. Load Calculations Ground Floor 2nd Storey 3rd Storey 4th Storey Roof Dead Load, kPa 4.51 4.51 4.51 4.51 1.045 Live Load, kPa 4.80 2.40 2.40 2.40 1.00 Snow Load, kPa - - - - 3.48 Wind Load E-W direction, kN - 47.30 37.18 37.18 18.89 Wind Load N-S direction, kN - 84.72 66.54 66.54 33.29 Earthquake Load E-W, kN - 222.91 367.03 511.15 151.83 Earthquake Load N-S, kN - 231.05 380.44 529.83 157.38 Table2: Load Calculations
  • 11. Selected Sections for Beams: Hand Calculations Floor Ground 2nd Story 3rd Story Roof Floor Beam W310x33 W310x28 W310x28 W310x33 Main Beam W530x74 W460x68 W460x68 W460x68 Edge Beam W410x54 W360x39 W360x39 W410x46 Table3: Selected Sections
  • 12. Selected Sections for Columns: Hand Calculations Columns Section Interior W310x118 Edge Horizontal W310x86 Edge Vertical W360x74 Corner W360x74 Table4: Selected Sections
  • 13. Elevation with Final Beam and Column Sections (ETABS)
  • 19. Architectural – Ground Floor Plan Layout - 1 Security Desk - 1 Coffee Shop - 2 Staircases - 2 Entrances - 2 Washrooms
  • 20. Architectural – Typical Floor Plan Layout - 1 Electrical Room - 1 Store Room - 2 Lunch Rooms - 2 Washrooms - 2 Conference Rooms - 2 Reception Areas - 2 Staircases - 2 General Manager Office Rooms - 10 Office Rooms - 128 Cubical Offices
  • 24. Cost EstimationProject: 4 Story Office Building Type of Work: Owner: Contactor: Period Ending: Item Unit Estimated Quantity Unit Price Amount Total W section Beam/Columns lb 504,890.32 $ 1.50 $ 757,335.48 Total HSS Section ft 263.82 $ 4.50 $ 1,187.19 Deliver Steel Members lump sum 1 $ 25,000.00 $ 25,000.00 Erection of Steel Members lump sum 1 $ 20,000.00 $ 20,000.00 Steel Deck square foot 71041.8 $ 6.50 $ 461,771.70 Slab Concrete cubic meter 471.9 $ 1,050.00 $ 495,495.00 Floor Finish square foot 71041.8 $ 8.03 $ 570,465.65 Wall (Brick) square foot 2936.39 $ 16.25 $ 47,716.34 Dry Wall Partition square foot 14734.39 $ 3.49 $ 51,423.02 Exterior Glass square meter 2625.7 $ 41.65 $ 109,360.41 Gravel cubic yard 0.566 $ 29.50 $ 16.70 HVAC System lump sum 1 $ 41,675.00 $ 41,675.00 Total $ 2,581,446.48Table3: Cost Estimation

Editor's Notes

  1. In order to design the cbf on etabs, We took the tension compression option with the parameter of Rd Ro we assigned seimtic data on etbas
  2. In the center of the floor, there is a security desk. In the north end, there are the washrooms. The staircases are located on the east and west center and it applies for all floors. There is a coffee shop located in the bottom left corner.
  3. This is the floor plan for storey 2 and above, In the center of the floor, there are 128 cubical offices, 2 general manager office rooms and 10 office rooms along the south wall. Along the North wall, 2 washrooms, 2 lunch rooms, 2 conference rooms, an electrical room and a store room. 2 reception areas are located next to the staircases.