Air Force
Renewable Energy
Opportunity Assessments
Multiple Air Force Bases
2011 ESOH Training Symposium Technical Session, 22 March 2011
Overview

 AF RE goals
 Strategy to identify best projects
 Evaluation factors
 Technologies assessed
 Resource issues
 Stakeholder roles for success

Covanta 80 MW WTE
Plant, Fairfax VA
2
Air Force RE Goals

 Meet renewable energy goals stated in Energy Policy Act of 2005, EOs


13423 and 13514, and 10 USC 2911
Projects identified may be funded through:
 ECIP
 SRM
 Power Purchase Agreements
 Energy Savings Performance Contracts
 Utility Energy Service Contracts
 EULs

3
AF RE: Current Situation

 AF has $9B energy bill, 17% dedicated to facility operations/utilities
 Facilitating development of renewables is one approach to increasing


supply, decreasing cost
<1% came from renewable sources in 2009

4
Approaches to Meeting RE Goals

 First priority:

Develop on-site RE

 Second: Purchase RE from off-site power providers
 Third: Purchase Renewable Energy Credits (RECs)

Tonopah Test Range Grid Access
5
Strategy

 Ongoing three-phase process
 Phase 2, Opportunity Assessment

– Phase 1, Feasibility Study –
completed
– Phase 3, Business Case
Analysis – future

 Successful projects must advance


through the complete process
Deliverables include:
 Preliminary design and cost
estimate
 Financial analysis
 Project profile
300’ GSHP Test Bore, Creech AFB
6
Evaluation Factors: Mission & Safety
Constraints

 Existing or proposed training/facilities
 Clear Zone (CZ), Accident Potential




Zone (APZ) I and APZ II
UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings
Quantity-Distance (QD) arcs
Any other constraints that local
stakeholders believe will negatively
impact the operational mission

7
Evaluation Factors: Environmental
Constraints

 Air quality and emissions
 Hazardous Materials and





Wastes/ERP
Land use (compatible uses,
future projects, etc.)
Transportation
Water resources (including
floodplains and wetlands)
Socioeconomic/Environmental
Justice

 Historical, cultural







and
archaeological resources
Biological resources
Topography, soils, and geology
Aesthetics
Climate
Noise
Odor

8
Evaluation Factors: Financial Analysis

 Projects deemed economically viable under two definitions:
 For AF-owned (ECIP-funded) projects, savings-to-investment ratio > 1.0
 For developer- or independent power producer-owned, return on
investment > 10%

 Typical discriminators between AF- and developer-owned cost
models:
 Developer cost of financing
 Developer access to renewable energy credits and tax incentives

9
Technologies Assessed

 Waste to Energy (WTE) fueled by Municipal Solid Waste (MSW)
 Landfill Gas (LFG)
 Biomass-sourced electricity generation
 Biomass-sourced thermal generation
 Solar
 Wind

16 MW WTE Plant, Tulsa
10
Technical Description:
Waste to Energy

 MSW fed to a boiler creates







steam for a turbine to produce
electricity
Requires connection to
electrical grid, water, waste
water, gas
Chemicals control air quality
Boilers and MSW are enclosed
in a building to minimize noise,
odor, and visual concerns
Requires approximately 10
acres for a 15 MW facility
Stoker boiler technology
applied in this project
Inside Covanta 80 MW WTE Plant,
Fairfax VA
11
WTE: Stoker Boiler Technology

12
WTE Plant Schematic

13
Technical Description:
Biomass – Thermal and Electricity

 Biomass (woody waste) is fed to a boiler:



 To produce steam for a thermal user
 To operate a steam turbine to produce electricity
As with a WTE plant, requires water supply, sewer connection, gas
supply, and access to the grid
 Fluidized bed
 Stoker boiler
Can be combined for
cogeneration

14
Biomass-sourced Electrical and Thermal
Generation
48 MW Wood fired Power Plant – Craven County, NC
540,000 tpy waste wood; two drum boiler/stoker system,
423,000 pph/1,500 psig/955F superheat

APC

Boiler

Wood
yard

15
Technical Description: Landfill Gas to
Electricity

16
Landfill Gas To Energy – Example Project Profile

 Seven Mile Creek Landfill, Eau Claire, Wisconsin
 Landfill Size: 4.8 million tons waste-in-place (2009)
 Project Size: 4.2 MW
17
Technical Description: Solar Energy

 A photovoltaic system consists of these primary components
 Solar collector module
 Inverter
 Transformer

18
Solar Siting Options

 Prime decision driver:

Find largest areas

of available space
 Increase MW output, make investment
economically worthwhile
 Roofs, free-standing panels in underutilized
places
 Solar assessment focused on Thin-Film PV
at McGuire AFB

 AF operational needs must be considered


carefully
 Reflectance, sun angle
New construction of a large footprint facility
is a good siting opportunity
 Consider during pre-design planning
19
Technical Description: Wind Power

 Engineering




 Turbine power vs. wind speed
 Match resource to turbine curve
Siting
 Avoid ground-generated turbulence
 Distance from occupied structures
 Airfield imaginary surfaces
 Radar interference
 Consider geo-remote lands
Multiple unit installation
 Lateral distance
 Down wind distance

660 kW turbine, Wind Farm, FE Warren AFB
20
Feedstock Issues

 Hauling radius of 50-75 miles depending on road conditions, traffic
 Can you contract for the resource?



 Who owns it?
 What is the market price?
 Who is the competition?
 What is its projected sustainability?
 Can you bring it in from out of state?
Base average daily demand (MW)
is the design driver

21
Sample Competition Assessment

22
Land Issues

 Consider roads, separate access/gate/security, haul routes
 Compatible land use
 Upwind? Visible steam?

23
Local Stakeholder Engagement

 Grass roots project development—Security, Fire, flying and training










communities; Legal; Contracting…..
Knowledge of local competition
Knowledge of regulators
Knowledge of local success stories
Myth busting
Positive publicity
Wing Commander enthusiasm
Work-arounds
Economic impact
You need a local champion!

24
POC

 AMEC Project Manager/Facilitator
 Mary Matthews Hains (mary.matthewshains@amec.com)
 (727) 289-3321

25

More Related Content

What's hot

Assessment of Photovoltaic Module Failures in the Field
Assessment of Photovoltaic Module Failures in the FieldAssessment of Photovoltaic Module Failures in the Field
Assessment of Photovoltaic Module Failures in the FieldLeonardo ENERGY
 
Battery testing-report-6-june-2019
Battery testing-report-6-june-2019Battery testing-report-6-june-2019
Battery testing-report-6-june-2019Marco Achilli
 
Session 3A - Gary Krivopapich
Session 3A - Gary KrivopapichSession 3A - Gary Krivopapich
Session 3A - Gary KrivopapichReenergize
 
Concentrating photovoltaics
Concentrating photovoltaicsConcentrating photovoltaics
Concentrating photovoltaicsLeonardo ENERGY
 
Energy storage system
Energy storage systemEnergy storage system
Energy storage systemmikkumar5
 
Sep 13 corporatepresentation
Sep 13 corporatepresentationSep 13 corporatepresentation
Sep 13 corporatepresentationCompany Spotlight
 
Foothill College Energy Program
Foothill College Energy ProgramFoothill College Energy Program
Foothill College Energy ProgramRobert Cormia
 
Getting to Zero Forum 2019 - Buildings and the Grid
Getting to Zero Forum 2019 - Buildings and the GridGetting to Zero Forum 2019 - Buildings and the Grid
Getting to Zero Forum 2019 - Buildings and the GridShanti Pless
 
Bill Jolly Keo Dubai Sustainability Design Process 19 March 2009
Bill Jolly   Keo Dubai Sustainability Design Process   19 March 2009Bill Jolly   Keo Dubai Sustainability Design Process   19 March 2009
Bill Jolly Keo Dubai Sustainability Design Process 19 March 2009Billjolly
 
RSF Net zero operations 2020
RSF Net zero operations 2020RSF Net zero operations 2020
RSF Net zero operations 2020Shanti Pless
 
Jaydip Das - Carpenter Technology Corporation
Jaydip Das - Carpenter Technology Corporation Jaydip Das - Carpenter Technology Corporation
Jaydip Das - Carpenter Technology Corporation cwiemeexpo
 
BCSDZ West Coast USA Experience- Existing Buildings
BCSDZ  West Coast USA Experience- Existing BuildingsBCSDZ  West Coast USA Experience- Existing Buildings
BCSDZ West Coast USA Experience- Existing BuildingsErikPoint1990
 
ESTIMATION AND COMPARISION OF COST OF COAL POWER GENERATION WITH EXTERNAL COS...
ESTIMATION AND COMPARISION OF COST OF COAL POWER GENERATION WITH EXTERNAL COS...ESTIMATION AND COMPARISION OF COST OF COAL POWER GENERATION WITH EXTERNAL COS...
ESTIMATION AND COMPARISION OF COST OF COAL POWER GENERATION WITH EXTERNAL COS...Ankur Tyagi
 
Next Generation Net Zero Vision
Next Generation Net Zero VisionNext Generation Net Zero Vision
Next Generation Net Zero VisionShanti Pless
 
Net Zero Energy Buildings
Net Zero Energy BuildingsNet Zero Energy Buildings
Net Zero Energy BuildingsIllinois ASHRAE
 

What's hot (20)

Assessment of Photovoltaic Module Failures in the Field
Assessment of Photovoltaic Module Failures in the FieldAssessment of Photovoltaic Module Failures in the Field
Assessment of Photovoltaic Module Failures in the Field
 
Battery testing-report-6-june-2019
Battery testing-report-6-june-2019Battery testing-report-6-june-2019
Battery testing-report-6-june-2019
 
Energy Optimization
Energy OptimizationEnergy Optimization
Energy Optimization
 
Session 3A - Gary Krivopapich
Session 3A - Gary KrivopapichSession 3A - Gary Krivopapich
Session 3A - Gary Krivopapich
 
Optimazation energy ppt
Optimazation energy pptOptimazation energy ppt
Optimazation energy ppt
 
9 incorporating energy storage into pv system design
9   incorporating energy storage into pv system design9   incorporating energy storage into pv system design
9 incorporating energy storage into pv system design
 
Concentrating photovoltaics
Concentrating photovoltaicsConcentrating photovoltaics
Concentrating photovoltaics
 
Energy storage system
Energy storage systemEnergy storage system
Energy storage system
 
Sep 13 corporatepresentation
Sep 13 corporatepresentationSep 13 corporatepresentation
Sep 13 corporatepresentation
 
NZC - Ben Taube
NZC - Ben TaubeNZC - Ben Taube
NZC - Ben Taube
 
Foothill College Energy Program
Foothill College Energy ProgramFoothill College Energy Program
Foothill College Energy Program
 
Bonnie Dean - SPark Presentation
Bonnie Dean - SPark PresentationBonnie Dean - SPark Presentation
Bonnie Dean - SPark Presentation
 
Getting to Zero Forum 2019 - Buildings and the Grid
Getting to Zero Forum 2019 - Buildings and the GridGetting to Zero Forum 2019 - Buildings and the Grid
Getting to Zero Forum 2019 - Buildings and the Grid
 
Bill Jolly Keo Dubai Sustainability Design Process 19 March 2009
Bill Jolly   Keo Dubai Sustainability Design Process   19 March 2009Bill Jolly   Keo Dubai Sustainability Design Process   19 March 2009
Bill Jolly Keo Dubai Sustainability Design Process 19 March 2009
 
RSF Net zero operations 2020
RSF Net zero operations 2020RSF Net zero operations 2020
RSF Net zero operations 2020
 
Jaydip Das - Carpenter Technology Corporation
Jaydip Das - Carpenter Technology Corporation Jaydip Das - Carpenter Technology Corporation
Jaydip Das - Carpenter Technology Corporation
 
BCSDZ West Coast USA Experience- Existing Buildings
BCSDZ  West Coast USA Experience- Existing BuildingsBCSDZ  West Coast USA Experience- Existing Buildings
BCSDZ West Coast USA Experience- Existing Buildings
 
ESTIMATION AND COMPARISION OF COST OF COAL POWER GENERATION WITH EXTERNAL COS...
ESTIMATION AND COMPARISION OF COST OF COAL POWER GENERATION WITH EXTERNAL COS...ESTIMATION AND COMPARISION OF COST OF COAL POWER GENERATION WITH EXTERNAL COS...
ESTIMATION AND COMPARISION OF COST OF COAL POWER GENERATION WITH EXTERNAL COS...
 
Next Generation Net Zero Vision
Next Generation Net Zero VisionNext Generation Net Zero Vision
Next Generation Net Zero Vision
 
Net Zero Energy Buildings
Net Zero Energy BuildingsNet Zero Energy Buildings
Net Zero Energy Buildings
 

Similar to Air Force Bases Opportunity for Renewable Energy Projects

PVN SOQ Presentation 2016 Final
PVN SOQ Presentation 2016 FinalPVN SOQ Presentation 2016 Final
PVN SOQ Presentation 2016 FinalRobert Potter
 
Solar On Brownfields
Solar On BrownfieldsSolar On Brownfields
Solar On Brownfieldscanelson
 
PVAmerica-2013-Presentation-FINAL
PVAmerica-2013-Presentation-FINALPVAmerica-2013-Presentation-FINAL
PVAmerica-2013-Presentation-FINALRobert Potter
 
FE Warren AFB Outbrief Kristin Anderson
FE Warren AFB Outbrief   Kristin AndersonFE Warren AFB Outbrief   Kristin Anderson
FE Warren AFB Outbrief Kristin Andersonkanderson111
 
Solar PV on Dry Lakebed Soil
Solar PV on Dry Lakebed SoilSolar PV on Dry Lakebed Soil
Solar PV on Dry Lakebed SoilYamen Nanne
 
EM web content 2
EM web content 2EM web content 2
EM web content 2NC Sustain
 
WindFarmFeasibility (1).ppt
WindFarmFeasibility (1).pptWindFarmFeasibility (1).ppt
WindFarmFeasibility (1).pptssuserfdb06f
 
Industrial energy efficiency - approaches, technologies and policies, Girish ...
Industrial energy efficiency - approaches, technologies and policies, Girish ...Industrial energy efficiency - approaches, technologies and policies, Girish ...
Industrial energy efficiency - approaches, technologies and policies, Girish ...ESD UNU-IAS
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...guest3e1229f
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Alliance To Save Energy
 
Phoenix Energy Systems
Phoenix Energy SystemsPhoenix Energy Systems
Phoenix Energy Systemshemdell
 
Phoenix Energy Systems - Vertical Axis Wind Turbines
Phoenix Energy Systems - Vertical Axis Wind TurbinesPhoenix Energy Systems - Vertical Axis Wind Turbines
Phoenix Energy Systems - Vertical Axis Wind Turbineshemdell
 
Phoenix Energy Systems
Phoenix Energy SystemsPhoenix Energy Systems
Phoenix Energy Systemshemdell01
 
Phoenix Energy Systems
Phoenix Energy SystemsPhoenix Energy Systems
Phoenix Energy Systemshemdell01
 
Connecting Renewable Generation To A Transmission Grid
Connecting Renewable Generation To A Transmission GridConnecting Renewable Generation To A Transmission Grid
Connecting Renewable Generation To A Transmission GridStephen Lee
 
How Changes to Time of Use (TOU) Rates are Impacting Commercial & Industrial ...
How Changes to Time of Use (TOU) Rates are Impacting Commercial & Industrial ...How Changes to Time of Use (TOU) Rates are Impacting Commercial & Industrial ...
How Changes to Time of Use (TOU) Rates are Impacting Commercial & Industrial ...Jim Dodenhoff
 
Fuelcellapplicationspresentation
FuelcellapplicationspresentationFuelcellapplicationspresentation
FuelcellapplicationspresentationZondits
 
Benefiting from Solar Power - Raoul Tufnell (Belectric) - Energy & Environmen...
Benefiting from Solar Power - Raoul Tufnell (Belectric) - Energy & Environmen...Benefiting from Solar Power - Raoul Tufnell (Belectric) - Energy & Environmen...
Benefiting from Solar Power - Raoul Tufnell (Belectric) - Energy & Environmen...Protectionandmanagement
 

Similar to Air Force Bases Opportunity for Renewable Energy Projects (20)

PVN SOQ Presentation 2016 Final
PVN SOQ Presentation 2016 FinalPVN SOQ Presentation 2016 Final
PVN SOQ Presentation 2016 Final
 
Solar On Brownfields
Solar On BrownfieldsSolar On Brownfields
Solar On Brownfields
 
PVAmerica-2013-Presentation-FINAL
PVAmerica-2013-Presentation-FINALPVAmerica-2013-Presentation-FINAL
PVAmerica-2013-Presentation-FINAL
 
FE Warren AFB Outbrief Kristin Anderson
FE Warren AFB Outbrief   Kristin AndersonFE Warren AFB Outbrief   Kristin Anderson
FE Warren AFB Outbrief Kristin Anderson
 
Solar PV on Dry Lakebed Soil
Solar PV on Dry Lakebed SoilSolar PV on Dry Lakebed Soil
Solar PV on Dry Lakebed Soil
 
9th IWERN Meeting Presentation
9th IWERN Meeting Presentation9th IWERN Meeting Presentation
9th IWERN Meeting Presentation
 
EM web content 2
EM web content 2EM web content 2
EM web content 2
 
WindFarmFeasibility (1).ppt
WindFarmFeasibility (1).pptWindFarmFeasibility (1).ppt
WindFarmFeasibility (1).ppt
 
Industrial energy efficiency - approaches, technologies and policies, Girish ...
Industrial energy efficiency - approaches, technologies and policies, Girish ...Industrial energy efficiency - approaches, technologies and policies, Girish ...
Industrial energy efficiency - approaches, technologies and policies, Girish ...
 
Hawaii Clean Energy Initiative and NREL: Implementing Energy Efficiency and R...
Hawaii Clean Energy Initiative and NREL: Implementing Energy Efficiency and R...Hawaii Clean Energy Initiative and NREL: Implementing Energy Efficiency and R...
Hawaii Clean Energy Initiative and NREL: Implementing Energy Efficiency and R...
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
 
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
Paul Hamilton, Schneider Electric: Lean and Clean: Equipping Modern Manufactu...
 
Phoenix Energy Systems
Phoenix Energy SystemsPhoenix Energy Systems
Phoenix Energy Systems
 
Phoenix Energy Systems - Vertical Axis Wind Turbines
Phoenix Energy Systems - Vertical Axis Wind TurbinesPhoenix Energy Systems - Vertical Axis Wind Turbines
Phoenix Energy Systems - Vertical Axis Wind Turbines
 
Phoenix Energy Systems
Phoenix Energy SystemsPhoenix Energy Systems
Phoenix Energy Systems
 
Phoenix Energy Systems
Phoenix Energy SystemsPhoenix Energy Systems
Phoenix Energy Systems
 
Connecting Renewable Generation To A Transmission Grid
Connecting Renewable Generation To A Transmission GridConnecting Renewable Generation To A Transmission Grid
Connecting Renewable Generation To A Transmission Grid
 
How Changes to Time of Use (TOU) Rates are Impacting Commercial & Industrial ...
How Changes to Time of Use (TOU) Rates are Impacting Commercial & Industrial ...How Changes to Time of Use (TOU) Rates are Impacting Commercial & Industrial ...
How Changes to Time of Use (TOU) Rates are Impacting Commercial & Industrial ...
 
Fuelcellapplicationspresentation
FuelcellapplicationspresentationFuelcellapplicationspresentation
Fuelcellapplicationspresentation
 
Benefiting from Solar Power - Raoul Tufnell (Belectric) - Energy & Environmen...
Benefiting from Solar Power - Raoul Tufnell (Belectric) - Energy & Environmen...Benefiting from Solar Power - Raoul Tufnell (Belectric) - Energy & Environmen...
Benefiting from Solar Power - Raoul Tufnell (Belectric) - Energy & Environmen...
 

Recently uploaded

Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machinePadma Pradeep
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 

Recently uploaded (20)

Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Install Stable Diffusion in windows machine
Install Stable Diffusion in windows machineInstall Stable Diffusion in windows machine
Install Stable Diffusion in windows machine
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 

Air Force Bases Opportunity for Renewable Energy Projects

  • 1. Air Force Renewable Energy Opportunity Assessments Multiple Air Force Bases 2011 ESOH Training Symposium Technical Session, 22 March 2011
  • 2. Overview  AF RE goals  Strategy to identify best projects  Evaluation factors  Technologies assessed  Resource issues  Stakeholder roles for success Covanta 80 MW WTE Plant, Fairfax VA 2
  • 3. Air Force RE Goals  Meet renewable energy goals stated in Energy Policy Act of 2005, EOs  13423 and 13514, and 10 USC 2911 Projects identified may be funded through:  ECIP  SRM  Power Purchase Agreements  Energy Savings Performance Contracts  Utility Energy Service Contracts  EULs 3
  • 4. AF RE: Current Situation  AF has $9B energy bill, 17% dedicated to facility operations/utilities  Facilitating development of renewables is one approach to increasing  supply, decreasing cost <1% came from renewable sources in 2009 4
  • 5. Approaches to Meeting RE Goals  First priority: Develop on-site RE  Second: Purchase RE from off-site power providers  Third: Purchase Renewable Energy Credits (RECs) Tonopah Test Range Grid Access 5
  • 6. Strategy  Ongoing three-phase process  Phase 2, Opportunity Assessment – Phase 1, Feasibility Study – completed – Phase 3, Business Case Analysis – future  Successful projects must advance  through the complete process Deliverables include:  Preliminary design and cost estimate  Financial analysis  Project profile 300’ GSHP Test Bore, Creech AFB 6
  • 7. Evaluation Factors: Mission & Safety Constraints  Existing or proposed training/facilities  Clear Zone (CZ), Accident Potential    Zone (APZ) I and APZ II UFC 4-010-01, DoD Minimum Antiterrorism Standards for Buildings Quantity-Distance (QD) arcs Any other constraints that local stakeholders believe will negatively impact the operational mission 7
  • 8. Evaluation Factors: Environmental Constraints  Air quality and emissions  Hazardous Materials and     Wastes/ERP Land use (compatible uses, future projects, etc.) Transportation Water resources (including floodplains and wetlands) Socioeconomic/Environmental Justice  Historical, cultural       and archaeological resources Biological resources Topography, soils, and geology Aesthetics Climate Noise Odor 8
  • 9. Evaluation Factors: Financial Analysis  Projects deemed economically viable under two definitions:  For AF-owned (ECIP-funded) projects, savings-to-investment ratio > 1.0  For developer- or independent power producer-owned, return on investment > 10%  Typical discriminators between AF- and developer-owned cost models:  Developer cost of financing  Developer access to renewable energy credits and tax incentives 9
  • 10. Technologies Assessed  Waste to Energy (WTE) fueled by Municipal Solid Waste (MSW)  Landfill Gas (LFG)  Biomass-sourced electricity generation  Biomass-sourced thermal generation  Solar  Wind 16 MW WTE Plant, Tulsa 10
  • 11. Technical Description: Waste to Energy  MSW fed to a boiler creates      steam for a turbine to produce electricity Requires connection to electrical grid, water, waste water, gas Chemicals control air quality Boilers and MSW are enclosed in a building to minimize noise, odor, and visual concerns Requires approximately 10 acres for a 15 MW facility Stoker boiler technology applied in this project Inside Covanta 80 MW WTE Plant, Fairfax VA 11
  • 12. WTE: Stoker Boiler Technology 12
  • 14. Technical Description: Biomass – Thermal and Electricity  Biomass (woody waste) is fed to a boiler:    To produce steam for a thermal user  To operate a steam turbine to produce electricity As with a WTE plant, requires water supply, sewer connection, gas supply, and access to the grid  Fluidized bed  Stoker boiler Can be combined for cogeneration 14
  • 15. Biomass-sourced Electrical and Thermal Generation 48 MW Wood fired Power Plant – Craven County, NC 540,000 tpy waste wood; two drum boiler/stoker system, 423,000 pph/1,500 psig/955F superheat APC Boiler Wood yard 15
  • 16. Technical Description: Landfill Gas to Electricity 16
  • 17. Landfill Gas To Energy – Example Project Profile  Seven Mile Creek Landfill, Eau Claire, Wisconsin  Landfill Size: 4.8 million tons waste-in-place (2009)  Project Size: 4.2 MW 17
  • 18. Technical Description: Solar Energy  A photovoltaic system consists of these primary components  Solar collector module  Inverter  Transformer 18
  • 19. Solar Siting Options  Prime decision driver: Find largest areas of available space  Increase MW output, make investment economically worthwhile  Roofs, free-standing panels in underutilized places  Solar assessment focused on Thin-Film PV at McGuire AFB  AF operational needs must be considered  carefully  Reflectance, sun angle New construction of a large footprint facility is a good siting opportunity  Consider during pre-design planning 19
  • 20. Technical Description: Wind Power  Engineering    Turbine power vs. wind speed  Match resource to turbine curve Siting  Avoid ground-generated turbulence  Distance from occupied structures  Airfield imaginary surfaces  Radar interference  Consider geo-remote lands Multiple unit installation  Lateral distance  Down wind distance 660 kW turbine, Wind Farm, FE Warren AFB 20
  • 21. Feedstock Issues  Hauling radius of 50-75 miles depending on road conditions, traffic  Can you contract for the resource?   Who owns it?  What is the market price?  Who is the competition?  What is its projected sustainability?  Can you bring it in from out of state? Base average daily demand (MW) is the design driver 21
  • 23. Land Issues  Consider roads, separate access/gate/security, haul routes  Compatible land use  Upwind? Visible steam? 23
  • 24. Local Stakeholder Engagement  Grass roots project development—Security, Fire, flying and training          communities; Legal; Contracting….. Knowledge of local competition Knowledge of regulators Knowledge of local success stories Myth busting Positive publicity Wing Commander enthusiasm Work-arounds Economic impact You need a local champion! 24
  • 25. POC  AMEC Project Manager/Facilitator  Mary Matthews Hains (mary.matthewshains@amec.com)  (727) 289-3321 25