Lccc Campus Strategic Energy Plan Presentation 120408
FE Warren AFB Outbrief Kristin Anderson
1. Contract FA8903-08-D-8766, DO SK29: Basewide Energy Audit at F.E. Warren AFB AFCESA Project No. FEWA-09-K-2904 F.E. Warren Project No. GHLN-09-K-2904 90th Civil Engineering Squadron F.E. Warren Air Force Base Energy Audit Out-Brief 19 November 2009
2.
3.
4.
5. Annual Energy Use Comparison (MMBtu) FY 2008 vs. 2003, 4.1% reduction in energy use FY 2009 vs. 2003, 11.1% reduction in energy use
38. Appendix A Energy Use and Cost Data $4,128,291 0.1566 507,580 Total $1,908,766 0.0423 137,127 Electric $2,219,525 0.1143 370,453 Gas Cost MMBTU/Sq Ft MMBTU FY 2009 $4,362,810 0.1704 547,771 Total $1,925,724 0.0440 141,399 Electric $2,437,086.47 0.1264 406,372 Gas Cost MMBTU/Sq Ft MMBTU FY 2008 $2,719,019 0.1777 571,055 Total $1,427,362 0.0507 163,004 Electric $1,291,657 0.1270 408,051 Gas Cost MMBTU/Sq Ft MMBTU FY2003