Site insurers on an Active Pharmaceutical Ingredients Plant instructed that all joints
on Hydrogen Lines, where there was the potential for the Line to be struck by
operatives or machinery working in the vicinity, must be welded connections.
Existing twin ferrule fittings were to be replaced by a welded or weld equivalent
connection.
The risk of loss of containment and the potential for explosion were the driving forces
behind this initiative.
Advantages Discovered
 Hot-work permits were not required as Lokring is
a Cold-worked solution.
o Always a requirement when welding.
 Habitat erection was not required as the
installation of a Lokring fitting is an intrinsically
safe operation with no spark potential.
o Often a requirement when welding
 These installations were carried out using a
Mobile Elevating Work Platform (MEWP)
therefore eradicating the need for & expense of
scaffolding.
 Installation of Lokring fittings could be carried
out irrespective of weather conditions.
o Wind & rain have the potential to cause
welding work to cease at any point
during the task.
 There is no requirement for post installation
NDT on a Lokring fitting which further reduces
time & cost implications
 Using Lokring fittings, the entire job, including a
60-minute pressure test, took less than 5 hours
to complete.
o As per the tender which quoted
traditional welding methods, this task
would have taken 3 days.
 A 3-day cessation of sampling would not have
been deemed acceptable.
Details of Task
 Two hydrogen lines, approximately 25m in length,
constructed with twin ferrule fittings were to be
upgraded to fully welded systems.
 Hydrogen is used as part of the process of sampling
site emissions to the atmosphere.
 Sampling is carried out on a continuous basis and can
only be interrupted for brief periods of time.
Options Available
 Two possible methods of upgrading the system were
considered.
o On Site Orbital Welding
o Lokring Mechanical Weld Equivalent
Connectors
 Based on tenders received from independent
contractors, Lokring was priced at 20% less than the
cost of the traditional welded option.
 Lokring was chosen for the project and further
benefits were uncovered during the execution of this
work scope.
 8 x 3/8” Stainless Steel Tube Couplings were used to
complete the task.
Conclusion
Cost reductions greater than the expected 20% were
found due to the speed of the installation and
associated reduction in man hours required to
complete the task.

More Related Content

What's hot

Presentation on Technique of Engin Inspection(1)
Presentation on Technique of Engin Inspection(1)Presentation on Technique of Engin Inspection(1)
Presentation on Technique of Engin Inspection(1)
Ferdous Kabir
 

What's hot (20)

Presentation on Technique of Engin Inspection(1)
Presentation on Technique of Engin Inspection(1)Presentation on Technique of Engin Inspection(1)
Presentation on Technique of Engin Inspection(1)
 
Inspecting Lead-Clad Pipes with Pulsed Eddy Current (PEC)
Inspecting Lead-Clad Pipes with Pulsed Eddy Current (PEC)Inspecting Lead-Clad Pipes with Pulsed Eddy Current (PEC)
Inspecting Lead-Clad Pipes with Pulsed Eddy Current (PEC)
 
Rocker arm for vertical mill
Rocker arm for vertical millRocker arm for vertical mill
Rocker arm for vertical mill
 
Effect of boron content on steels and recommended practice for welding Sasank...
Effect of boron content on steels and recommended practice for welding Sasank...Effect of boron content on steels and recommended practice for welding Sasank...
Effect of boron content on steels and recommended practice for welding Sasank...
 
Challenges of Pipe & Tube Testing
Challenges of Pipe & Tube TestingChallenges of Pipe & Tube Testing
Challenges of Pipe & Tube Testing
 
Composites on the Move: The Need for Dynamic Testing
Composites on the Move: The Need for Dynamic Testing Composites on the Move: The Need for Dynamic Testing
Composites on the Move: The Need for Dynamic Testing
 
04 ajm, wjm, awjm
04 ajm, wjm, awjm04 ajm, wjm, awjm
04 ajm, wjm, awjm
 
Repairing of kiln shell crack
Repairing of kiln shell crackRepairing of kiln shell crack
Repairing of kiln shell crack
 
Water jet machining WJM & AWJM
Water jet machining WJM & AWJMWater jet machining WJM & AWJM
Water jet machining WJM & AWJM
 
Hot wire tig
Hot wire tigHot wire tig
Hot wire tig
 
Waterjetpresentation
WaterjetpresentationWaterjetpresentation
Waterjetpresentation
 
Forging machine clamp arm
Forging machine clamp armForging machine clamp arm
Forging machine clamp arm
 
Step By Step Instructions To Avoid The Risks Related To Metal Forging
Step By Step Instructions To Avoid The Risks Related To Metal ForgingStep By Step Instructions To Avoid The Risks Related To Metal Forging
Step By Step Instructions To Avoid The Risks Related To Metal Forging
 
Water Jet & Abrasive Water Jet Machining
Water Jet & Abrasive Water Jet MachiningWater Jet & Abrasive Water Jet Machining
Water Jet & Abrasive Water Jet Machining
 
Electrochemical grinding
Electrochemical grindingElectrochemical grinding
Electrochemical grinding
 
A design presentation of Chris Witkowski
A design presentation of Chris WitkowskiA design presentation of Chris Witkowski
A design presentation of Chris Witkowski
 
water jet machining
water jet machining water jet machining
water jet machining
 
Abrasive Jet Machining
Abrasive Jet MachiningAbrasive Jet Machining
Abrasive Jet Machining
 
Complete Presentation
Complete PresentationComplete Presentation
Complete Presentation
 
Welding works in steel piping
Welding works in steel pipingWelding works in steel piping
Welding works in steel piping
 

Similar to Hydrogen Line Upgrade

2014 04 (a4) naogp editorial - q&a maats bending machines
2014   04 (a4) naogp editorial - q&a maats bending machines2014   04 (a4) naogp editorial - q&a maats bending machines
2014 04 (a4) naogp editorial - q&a maats bending machines
Maats
 
Internship presentation at Fabrimax Engg Pvt Ltd
Internship presentation at Fabrimax Engg Pvt LtdInternship presentation at Fabrimax Engg Pvt Ltd
Internship presentation at Fabrimax Engg Pvt Ltd
abhishekgawande
 
Underwaterwelding
Underwaterwelding Underwaterwelding
Underwaterwelding
manoj
 
Mining Market_MB-306 REV E
Mining Market_MB-306 REV EMining Market_MB-306 REV E
Mining Market_MB-306 REV E
Graeme Simmers
 

Similar to Hydrogen Line Upgrade (20)

Esab world pipelines
Esab world pipelinesEsab world pipelines
Esab world pipelines
 
ONGOING PROGRESS IN ADVANCED WELDING PROCESSES AND MATERIALS
ONGOING PROGRESS IN ADVANCED WELDING PROCESSES AND MATERIALSONGOING PROGRESS IN ADVANCED WELDING PROCESSES AND MATERIALS
ONGOING PROGRESS IN ADVANCED WELDING PROCESSES AND MATERIALS
 
2014 04 (a4) naogp editorial - q&a maats bending machines
2014   04 (a4) naogp editorial - q&a maats bending machines2014   04 (a4) naogp editorial - q&a maats bending machines
2014 04 (a4) naogp editorial - q&a maats bending machines
 
Final Project Presentation
Final Project PresentationFinal Project Presentation
Final Project Presentation
 
Orbital Welding Seminar report
Orbital Welding Seminar reportOrbital Welding Seminar report
Orbital Welding Seminar report
 
Advanced welding processes by Hamid Taghipour Armaki
Advanced welding processes by Hamid Taghipour ArmakiAdvanced welding processes by Hamid Taghipour Armaki
Advanced welding processes by Hamid Taghipour Armaki
 
Qa QC SEPL NOV 2017
Qa QC SEPL NOV  2017Qa QC SEPL NOV  2017
Qa QC SEPL NOV 2017
 
Internship presentation at Fabrimax Engg Pvt Ltd
Internship presentation at Fabrimax Engg Pvt LtdInternship presentation at Fabrimax Engg Pvt Ltd
Internship presentation at Fabrimax Engg Pvt Ltd
 
Underwaterwelding
Underwaterwelding Underwaterwelding
Underwaterwelding
 
Automated Orbital Welding Machines
Automated Orbital Welding MachinesAutomated Orbital Welding Machines
Automated Orbital Welding Machines
 
Under water welding
Under water weldingUnder water welding
Under water welding
 
Submerged Arc Welding
Submerged Arc WeldingSubmerged Arc Welding
Submerged Arc Welding
 
Qnet: fully automatic robotic laser welding station
Qnet: fully automatic robotic laser welding stationQnet: fully automatic robotic laser welding station
Qnet: fully automatic robotic laser welding station
 
Mining Market_MB-306 REV E
Mining Market_MB-306 REV EMining Market_MB-306 REV E
Mining Market_MB-306 REV E
 
Wind farm planning and commissioning
Wind farm planning and commissioningWind farm planning and commissioning
Wind farm planning and commissioning
 
Distribution part
Distribution partDistribution part
Distribution part
 
KNPC Volume 3B.pdf
KNPC Volume 3B.pdfKNPC Volume 3B.pdf
KNPC Volume 3B.pdf
 
Solar latest jmv products and services information with seci specication sola...
Solar latest jmv products and services information with seci specication sola...Solar latest jmv products and services information with seci specication sola...
Solar latest jmv products and services information with seci specication sola...
 
Snw ht-sea-trial-paper-rev2
Snw ht-sea-trial-paper-rev2Snw ht-sea-trial-paper-rev2
Snw ht-sea-trial-paper-rev2
 
Under water weilding
Under water weildingUnder water weilding
Under water weilding
 

Recently uploaded

Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Dr.Costas Sachpazis
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
rknatarajan
 

Recently uploaded (20)

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank  Design by Working Stress - IS Method.pdfIntze Overhead Water Tank  Design by Working Stress - IS Method.pdf
Intze Overhead Water Tank Design by Working Stress - IS Method.pdf
 
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptxBSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
BSides Seattle 2024 - Stopping Ethan Hunt From Taking Your Data.pptx
 
KubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghlyKubeKraft presentation @CloudNativeHooghly
KubeKraft presentation @CloudNativeHooghly
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
(INDIRA) Call Girl Bhosari Call Now 8617697112 Bhosari Escorts 24x7
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Ramesh Nagar Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Walvekar Nagar Call Me 7737669865 Budget Friendly No Advance Booking
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and workingUNIT-V FMM.HYDRAULIC TURBINE - Construction and working
UNIT-V FMM.HYDRAULIC TURBINE - Construction and working
 
Unit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdfUnit 1 - Soil Classification and Compaction.pdf
Unit 1 - Soil Classification and Compaction.pdf
 
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICSUNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
UNIT-IFLUID PROPERTIES & FLOW CHARACTERISTICS
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 

Hydrogen Line Upgrade

  • 1. Hydrogen Line Upgrade Overview Site insurers on an Active Pharmaceutical Ingredients Plant instructed that all joints on Hydrogen Lines, where there was the potential for the Line to be struck by operatives or machinery working in the vicinity, must be welded connections. Existing twin ferrule fittings were to be replaced by a welded or weld equivalent connection. The risk of loss of containment and the potential for explosion were the driving forces behind this initiative. Advantages Discovered  Hot-work permits were not required as Lokring is a Cold-worked solution. o Always a requirement when welding.  Habitat erection was not required as the installation of a Lokring fitting is an intrinsically safe operation with no spark potential. o Often a requirement when welding  These installations were carried out using a Mobile Elevating Work Platform (MEWP) therefore eradicating the need for & expense of scaffolding.  Installation of Lokring fittings could be carried out irrespective of weather conditions. o Wind & rain have the potential to cause welding work to cease at any point during the task.  There is no requirement for post installation NDT on a Lokring fitting which further reduces time & cost implications  Using Lokring fittings, the entire job, including a 60-minute pressure test, took less than 5 hours to complete. o As per the tender which quoted traditional welding methods, this task would have taken 3 days.  A 3-day cessation of sampling would not have been deemed acceptable. Details of Task  Two hydrogen lines, approximately 25m in length, constructed with twin ferrule fittings were to be upgraded to fully welded systems.  Hydrogen is used as part of the process of sampling site emissions to the atmosphere.  Sampling is carried out on a continuous basis and can only be interrupted for brief periods of time. Options Available  Two possible methods of upgrading the system were considered. o On Site Orbital Welding o Lokring Mechanical Weld Equivalent Connectors  Based on tenders received from independent contractors, Lokring was priced at 20% less than the cost of the traditional welded option.  Lokring was chosen for the project and further benefits were uncovered during the execution of this work scope.  8 x 3/8” Stainless Steel Tube Couplings were used to complete the task. Conclusion Cost reductions greater than the expected 20% were found due to the speed of the installation and associated reduction in man hours required to complete the task.