SlideShare a Scribd company logo
1 of 13
Jack Brophy Resume
Jack Brophy (PMP)
Senior Project/Program Manager
Street Address 66 Springbok Road, Rispark, Johannesburg, South Africa
Postal Address PO. Box 82628, Southdale, Johannesburg, South Africa, 2135
Home Phone Number +27 11 943 6071
Mobile Phone Number +27 83 461 0776
Fax Number +27 86 672 7656
eMail brophy@iafrica.com
Profile
SAP Program/Project Manager with PMP and hands on experience of all SAP ERP modules, a
number of the new age SAP products and services, across many of the industry specific solutions
and best practices. 30+ years of consulting and system implementation experience with more than
23 years in SAP on projects in South Africa, Africa, Europe, UK, USA, Canada and Australia as
business consultant, integration manager, application consultant, team lead, project manager and
program manager. Strong leadership skills with emphasis on organising, directing, controlling,
Team Building, communication, integrity and professionalism with an absolute commitment to
delivering quality results according to requirements and specifications.
Utilizes project management tools such as ASAP Methodology, SAP Roadmap composer, Solution
Composer, Solution Manager and ValueSAP to ensure successful customer implementations.
Has worked extensively with SAP GD, local and other international SAP consultants and experts.
Strong partner relationships having worked with numerous partners on many projects in Africa,
Europe, Americas and Australia.
SAP Experience – Summary
– 26+ years of SAP R/2 and R/3 configuration, implementation, upgrade, training, integration and
project management experience. Configuration experience includes PP, MM, WM, PM, QM, FI,
CO and SD. Other SAP products including APO, GRC AC, BI and BO. Implementation and use
of Solution Manager.
– Integration of 3rd
Party products including Documentum, Hansen and Labware
– Industry experience includes Manufacturing, Banking, Utilities, Chemical, Automotive,
Defense, High Tech, Oil and Gas and public sector
– Considerable project management experience implementing SAP R/2 and R/3 as well as
numerous other systems.
– Integration experience implementing all SAP modules and as Integration Manager on a number
of projects.
– Extensive business experience and Continuous Business Improvement experience using
Theory of Constraints and ValueSAP
– In-depth knowledge and experience of business processes and business process optimisation
– Proven problem solving and troubleshooting skill on both implementation and productive
systems
Page 1 of 13
Jack Brophy Resume
Professional Experience & Certifications – Summary
– More than 12 years business experience moving up to Logistics/Materials Manager in one of
South Africa’s top Pharmaceutical Manufacturers prior to moving into business and system
consulting
– Materials Manager, Adcock Ingram, Johannesburg - From Planning Manager to Materials
Manager, managing Warehouse, Planning, Procurement and distribution
– 8 years non-SAP consulting experience
– Manufacturing Business Unit Manager, ICL, Johannesburg - Worked up from
Manufacturing Consultant to Major Applications Support manager and then National MBU
Manager
– 26+ years SAP implementation experience including implementation of MM, PP, SD, FI, CO,
PM, PS, QM, Integration and 10 years Project/Programme Management.
– PMP (Project Management Professional)
– CPIM (Certificate of Production and Inventory Control Management)
– Numerous Management and motivational courses including,
– Spectrum Solutions – The Dealmaker course,
– TRIANAGRAM - Project Management Course,
– Louis Allen Management Course
– TOC - Jonah Programme
– Lecturer for Purchasing Management Services covering a number of diploma and certification
courses in Purchasing and Inventory practices and management
– Business experience including all aspect of management and control such as Budget
development, approval and control, human resources and employee relations, KPI and target
setting, monitoring and control and development and implementation of systems to support
management activities.
– Certified Ramp-up coach
– Project Management Fundamentals
Page 2 of 13
Jack Brophy Resume
SAP Project Experience – Detail
Customer EY for Toyota
Duration 6th
June 2016 to 20th
June 2016
Industry Automotive Manufacture
Project Description Preparation for SAP PM implementation for Toyota South
Africa.
Role Project Manager
Responsibilities/
Deliverables
Prepare a proposal for a Rapid deployment of SAP PM at
Toyota South Africa. To be presented to the executive to gain
approval for the proposed implementation.
Reporting structure – Reporting to EY Durban.
– Reporting to the Maintenance Manager of Toyota South
Africa.
Customer Transnet Port Terminals
Duration 2nd
March 2015 to 30th
September 2015
Industry Transportation
Project Description – National Rollout of the Fixed Asset Stabilisation Project
Role TPT Technical Rollout Manager
Responsibilities/
Deliverables
– Take over the primary role of project management from the
consulting partner’s project manager on behalf of TPT as the
project moves into the testing and preparation for data
migration and go-live.
Reporting structure – Reporting to the Transnet Port Terminals FAS Project
Manager and Global FAS PMO.
– Collaborating with the Consulting Partner’s Rollout
manager taking over the primary role as the Consulting
Partner hands over to Transnet prior to go-live.
Customer Engineering IT for Ferrero
Duration 16th January 2014 to end May 2014
Industry Food Manufacture
Project Description – Global Rollout of the Ferrero SAP Implementation
Role PP, MM, QM, WM and CO support for Global Rollout
Responsibilities/
Deliverables
– Provide local SA support, training, advice and guidance to
the Client, consultants and Project Management
concentrating on PP, MM, WM and QM initially extending to
other areas FI, CO, HR as required.
Reporting structure – Ferrero Italy as main client with Imsofer Manufacturing
and Ithemba in South Africa.
– Engineering IT (Italy) – Implementation and Rollout
Partner
Page 3 of 13
Jack Brophy Resume
Customer NHBRC – National Home Builders Registration Council
Duration 1st
March 2013 to 15th
August 2013
Industry Public Sector
Project Description – Programme Management of Green field SAP
Implementation including Solution Manager project, ECC
project (FI, SD, SCM, CO, PS/PPM, HCM, DMS), CRM Project,
SRM project, SPP project, Technology project, Mobility
project, Data Migration Project, GRC Project, PI Project,
Portal project, BI/Bobj project and OCM project with
integration of all SAP Systems and GIS.
Role Programme Manager
Responsibilities/
Deliverables
– Communication between client and Project teams and
within client organisation
– Ensure pre-requisites completed as required
– Ensure hardware and connectivity is established and
maintained
– Resolve issues as they arise
– Planning, monitoring and controlling through to project
and Programme close
– Present report and ensure customer understanding and
satisfaction
– Post go-live support and plan next steps
– Projects Close
– Programme Close
Reporting structure – Government ERP Council
– NHBRC CEO and Sponsor
– Steering Committee
– Programme Management office (NHBRC Programme
Manager and AL Indigo Programme Manager)
– Quality Manager, Account Executive,
– Assistant Project Manager,
– Project Administrator
– Technology Project
– GRC Project
– Basis
– Data Migration
– Solution Manager
– PI
– Development
– ECC project
– CRM Project
– SRM Project
– OCM Project
– Training,
– Organisational Development,
– Communication,
– Change Management
– Mobility Project
Page 4 of 13
Jack Brophy Resume
Customer Sabatical - home business development
Duration 8 Months (August 2012 to February 2013)
Customer Toyota South Africa
Duration 2 Months (January 2012 February 2012)
Industry Automotive
Project Description – Project Manage SAP Global Delivery Technical Upgrade
Assessment Services delivered remotely for ERP, Parts BW and
Marketing BW systems.
Role Project Manager
Responsibilities/
Deliverables
– Communication between client and offshore project team
– Ensure pre-requisites completed as required
– Ensure connectivity is established and maintained
– Resolve issues as they arise
– Planning, monitoring and controlling through to project close
– Present report and ensure customer understanding and
satisfaction
– Monitor and control cost and revenue budgets
– Post go-live support and plan next steps
– Project Close
Customer Standard Bank Of South Africa Knowledge Centre
Duration 8 Months (in parallel with Solution Manager Implementation.)
(April 2011 to November 2011.)
Industry Banking
Project Description – Plan, Prepare and execute Upgrade from ERP 4.7 to ECC6.0
Role Project Manager
Responsibilities/
Deliverables
– Clarify requirements
– Define Scope
– Identify, Analyse and recommend options
– Identify resources and source
– Execute using SAP SLO resources from Germany and SAP
Global Delivery resources from India working mainly remotely.
Customer Standard Bank Of South Africa Knowledge Centre
Duration 18 Months (February 2011 to July 2012)
Industry Banking
Project Description – Plan, Prepare and implement Solution Manager based on the
RunSAP assessment and recommendations
Role Project Manager
Page 5 of 13
Jack Brophy Resume
Responsibilities/
Deliverables
– Clarify requirements
– Define Scope
– Identify, Analyse and recommend options
– Identify resources and source
– Prepare Roadmap
– Prepare Business Case
– Estimating and Budgeting for early 2011 start
– Implement E2E operation Standards in the very complex SAP
KC environment
Customer Internal Projects (RFI, RFP, SoW, Approvals)
Duration 4 Months (January 2011 to April 2011)
Industry All
Project Description – RFI, RFP and Demo for Tanzania Port Authority
– RFP for First Rand Bank
– RFP for SITA
– Standard Bank Near Zero Down Time Upgrade PoC
– Standard Bank Cloud Computing PoC
– RFI for Department of Labour UIF
– RFP for Rand Water PPM
– Masstores UCS Netweaver Ramp-Up.
– Telecom Namibia ESS/MSS implementation SoW
– Toyota Tsusho problem resolution
Role Project Manager
Responsibilities/
Deliverables
– Define requirements
– Solution Response
– Scope definition
– Resource definition
– Project Management Approach, Strategy and Methodology
– Estimating and Budgeting
– Options definition, analysis and recommendation
Customer Botswana MVA Post Go-Live Review
Duration 1 Week (May 2010 to June 2010)
Industry Insurance
Project Description – Post Go-Live Review of
– FI
– CO
– HR Payroll and Leave
– HR Personnel Administration, Organisational and Performance
Management
– Treasury
– Claims
– BI
– Basis/Technical
Role Project Manager
Page 6 of 13
Jack Brophy Resume
Responsibilities/
Deliverables
– Review FICO, HR, Treasury, Claims and Technical setup post
GO-Live
– Review all documentation from Blueprint through Configuration
to final setup, training, testing and Change Management
– Provide an interim on-site verbal report.
– Provide complete Review report and supporting presentation.
Customer ABSA Bank
Duration 3 Months (January 2010 to June 2010)
Industry Banking
Project Description – Technical upgrade of the ABSA Ops systems
Role Project Manager
Responsibilities/
Deliverables
– Technical Upgrade of ECC, SRM and XI.
– Upgrade 5 tier landscape for each system.
– Convert XI to PI
– Implement Portal
– Define ESS/MSS for portal
– Project to run in conjunction with other projects. The main
impact from
– OS and DB migration
– Implementation of RunSAP including TOA and Quality Circle
– SAP Productivity Pack to assist with training after upgrade
– 18 Other projects with direct impact on the Upgrade programme
– Very high profile project within the ABSA and Barclays Group.
Customer IFMIS Zambia Realisation/Final Prep QA Review
Duration 1 Week (December 2009 to March 2010)
Industry Public sector
Project Description – Realisation and final preparation QA Review in preparation for
go-live on 4th
January 2010
Role Project Manager
Responsibilities/
Deliverables
– Review Project Management, FICO, PS, MM, PM, Fleet
Management, SRM, SEM, BW, AIS and Technical setup in
preparation for GO-Live
– Review all documentation from Blueprint through Configuration
to final setup, training, testing and Change Management
– Provide an interim report for the Steercom Go/NoGo decision.
– Provide complete Review report and supporting presentation.
Customer ABSA Africa
Duration 3 Months (September 2010 to November 2010)
Industry Banking
Project Description – ABSA Africa re-platforming project Business Objects Universe
design, development and report writing for Tanzania and
Mozambique.
Role Project Manager
Page 7 of 13
Jack Brophy Resume
Responsibilities/
Deliverables
– Project Management of a Time and Material project to design
and develop Business Objects universes and convert the current
flexcube reports to BO reports using both Webi and Deski to
provide more flexible, user driven reporting capabilities for ABSA
Africa.
– This was the first implementation of SAP in DBSA.
– The project started late and ended late due to the clients lack of
knowledge of SAP and the ASAP methodology.
– Considerable Change Management and QA intervention was
required to complete the Blueprint and gain acceptance.
– Despite extended timeline and additional resources the
Blueprint was completed under budget.
Customer Development Bank of Southern Africa
Duration 8 Months (December 2008 to March 2009)
Industry Banking
Project Description – Implement Loans Management, Finance, Controlling and
Business Partner
Role Programme Manager
Responsibilities/
Deliverables
– Project Management of a fixed price project, with SAP
resources and 2 implementation partners, to develop a Blueprint
for the Implementation of Loans Management, Finance,
Controlling and Business Partner in the development banking
environment.
– This was the first implementation of Sap in DBSA.
– The project started late and ended late due to the clients lack of
knowledge of SAP and the ASAP methodology.
– Considerable Change Management and QA intervention was
required to complete the Blueprint and gain acceptance.
– Despite extended timeline and additional resources the
Blueprint was completed under budget.
Customer Transnet, Johannesburg
Duration 3 Months (October 2009 to December 2009)
Industry Transport
Project Description – Blueprint for Real Estate enhancements to improve use of
functionality and comply with legislated and internal policy
requirements
Role Project Manager
Responsibilities/
Deliverables
– Project Management to develop a Blueprint for the required
enhancements to the SAP Real Estate implementation. Blueprint
Delivered and accepted on time and in budget.
Customer ABSA Bank, Johannesburg
Duration 9 Months (March 2008 to October 2008)
Page 8 of 13
Jack Brophy Resume
Industry Banking
Project Description – GRC AC Implementation including
– RA&R
– CUP
– SPM
– ERM
– Risk terminator
Role Programme Manager
Responsibilities/
Deliverables
Project Management to implement the above products and
modules from March 2008 to September 2008 with a diverse
team from SAP, Deloitte and Touche and TWC.
Milestones, set by the group and Barclays Bank as Control
Issues of Group Level Significance, all met on time and in budget.
Major achievements.
– Ran the first reports against the SAP Standard ruleset early
May. 5.7 million SoD violations identified.
– Reduced to 1.1 million SoD violations by early June.
– Customised ruleset introduced resulting in 400000 rules. The
SoD violations increased to 1.7 million against the customised
ruleset.
– SoD Violations reduced to 8000 low risk violations by the
deadline of 30th
September.
Customer Standard Bank of South Africa, Knowledge Centre,
Johannesburg
Duration 5 Months (August 2007 to February 2008)
Industry Banking
Project Description – TDMS PoC for full implementation
– GRC for Knowledge Centre starting with Virsa implementation
– GRC for Lending program starting with Virsa implementation
– Data Volume Services (DVS)
– System Landscape Optimization (SLO)
Role Program Manager
Responsibilities/
Deliverables
Project Management of each of the above projects involving the
Knowledge areas of
– Integration
– Scope
– Time
– Human resources
– Cost
– Risk
– Quality
– Procurement
– Communication
Through the Process areas
– Initiating
– Planning
– Executing
Page 9 of 13
Jack Brophy Resume
– Monitoring and Controlling
– Closing
Customer SAB Ltd
UCS/MAKRO
UCS/MASSBUILD
SASOL POLYMERS
Duration Each project running over 3 to 4 weeks (May 2007 to September
2007)
Industry Industrials …
Project Description Remote offshore services for Upgrade, Unicode conversion and
OS/DB migration Assessment
Role On-site Project Manager
Responsibilities/
Deliverables
– Communication between client and offshore project team
– Ensure pre-requisites completed as required
– Ensure connectivity is established and maintained
– Resolve issues as they arise
– Planning, monitoring and controlling through to project close
– Present report and ensure customer understanding and
satisfaction
– Monitor and control cost and revenue budgets
– Post go-live support and plan next steps
– Project Close
Customer Toyota South Africa , Automotive Manufacturer, Durban
Duration 13 Months ( January 2006 to February 2007)
Industry Automotive …
Project Description IMPI – Inventory Management Process Improvement
Role Business and Systems Consultant (All modules and Integration)
Responsibilities/
Deliverables
– Short term goals to ensure a clean audit followed by
optimization of the business processes and supporting systems
to make the clean audit sustainable.
– Integration across all business functions, systems and manual
functions
– Clean audit with minimal issues and discrepancies, well within
the required guidelines, achieved. The next audit was also
successful.
– Many processes simplified and streamlined amid massive
growth and development of new plant facilities.
Customer Johannesburg Water , ISU implementation, Johannesburg
Duration 11 months (November 2002 to September 2003)
Industry Public Utility
Project Description Implementing a mix of the following products; SAP R/3, SAP ISU,
Hansen, Labware and Documentum
Page 10 of 13
Jack Brophy Resume
Role Program Manager
Responsibilities/
Deliverables
– Implementing a mix of the following products; SAP, SAP ISU,
Hansen, Labware and Documentum.
– Managing a fast track program involving a number of
companies implementing separate products and projects to be
integrated into a single system and interfaces to a number of
legacy systems and importing and exporting data to external
organisations.
– Scope and product mix selected by the client covered:
– SAP for finance and management accounting, purchasing,
inventory management, sales and distribution and project
systems
– SAP ISU for Device Management, Customer Interaction
Centre, FICA (Contract Accounting), Billing and Revenue
management.
– Hansen for Land Management, maintenance of the Water
Utilities networks, reservoirs, waste, pump stations and Electro/
mechanical depots.
– Documentum for document management.
– Labware as the LIMS system for the Laboratory.
Page 11 of 13
Jack Brophy Resume
Other SAP-Related Experience
Nissan PP
Great Basin Gold FI/CO
Turbomeca PP/CO
Rand Water PP/QM
Distell SD/MM
Consol Glass FI/CO
Sasol Synergy FI/CO
Trans Hex SD/MM
GSSC FI Trainer
SUPRACHEM SD/MM
Saldanha Steel SD/MM
Mintek FI/CO
BHP Billiton FI/CO
SASOL Synergy FI/CO
SASOL Infrachem MM
SASOL CARBO-TAR FI/CO
Brother (UK) SD/MM/PP
SASOL AGRI FI/CO
SA Mint FI/CO
Mondi Paper FI/CO
Sasol SMX PP
BC Gas Continuous Business Improvement (CBI)
Ariel Technologies All
AMPLATS PP/MM
Ster Kinekor FI/CO/PS
Sasol Fertilisers Integration
Samancor FI/CO
Bamburi Cement SD/MM
Western Mining FI/CO/QM
Sasol Oil MM
Polifin GSD MM
Polifin (Group) Integration
Kynoch Feeds Integration
Kynoch Fertiliser Integration
Queensland Rail All
Sasol Twistdraai FI/CO
Engen PP
Howmet QM
SNI Support group All
Siemens Components PP
Page 12 of 13
Jack Brophy Resume
Kentron All
Simera PM/FI/CO/MM/PP
Dowbrands MM/SD
Hoechst All
Delta PP
Bayer All
Sappi PP
Telkom PP
Spoornet PP
Unilever All
Anglo Alpha All
ASG All
African Cable All
Bosch PP
Afrox PP
SAA PP/FI/CO
Caltex PP
General Information
Citizenship South African
Languages English and Afrikaans (Both Spoken and Written)
Page 13 of 13

More Related Content

What's hot (17)

CV_Rex Fu_PP QM
CV_Rex Fu_PP QMCV_Rex Fu_PP QM
CV_Rex Fu_PP QM
 
K sreedhar
K sreedharK sreedhar
K sreedhar
 
Dhinagar gnanapragasam mar2016-pm
Dhinagar gnanapragasam mar2016-pmDhinagar gnanapragasam mar2016-pm
Dhinagar gnanapragasam mar2016-pm
 
Project/Program Manager
Project/Program ManagerProject/Program Manager
Project/Program Manager
 
Vijai Gunalan
Vijai GunalanVijai Gunalan
Vijai Gunalan
 
Bala murali sapui5 abapcv
Bala murali sapui5 abapcvBala murali sapui5 abapcv
Bala murali sapui5 abapcv
 
Resume-Mousa_32016
Resume-Mousa_32016Resume-Mousa_32016
Resume-Mousa_32016
 
Logistics consultant wilson_CV upto date Jan 2017
Logistics consultant wilson_CV upto date Jan 2017Logistics consultant wilson_CV upto date Jan 2017
Logistics consultant wilson_CV upto date Jan 2017
 
SAP ABAP CONSULTANT CV
SAP ABAP CONSULTANT CVSAP ABAP CONSULTANT CV
SAP ABAP CONSULTANT CV
 
Sunil Babu_EN
Sunil Babu_ENSunil Babu_EN
Sunil Babu_EN
 
SAP_Functional_Tester_Kavita Pandey
SAP_Functional_Tester_Kavita PandeySAP_Functional_Tester_Kavita Pandey
SAP_Functional_Tester_Kavita Pandey
 
RamanaShankar 2 -2015
RamanaShankar 2 -2015RamanaShankar 2 -2015
RamanaShankar 2 -2015
 
Amit_Kumar
Amit_KumarAmit_Kumar
Amit_Kumar
 
Andrew_Thomas
Andrew_ThomasAndrew_Thomas
Andrew_Thomas
 
Amit_Kumar
Amit_KumarAmit_Kumar
Amit_Kumar
 
AJ Best PM ENG
AJ Best PM ENGAJ Best PM ENG
AJ Best PM ENG
 
SAP BI Resume of Vishal Sharma
SAP BI Resume of Vishal SharmaSAP BI Resume of Vishal Sharma
SAP BI Resume of Vishal Sharma
 

Viewers also liked

Vrux talks 160708
Vrux talks 160708Vrux talks 160708
Vrux talks 160708VRUX
 
Unicorns and the Future of Virtual Reality
Unicorns and the Future of Virtual  RealityUnicorns and the Future of Virtual  Reality
Unicorns and the Future of Virtual RealityVRUX
 
Setup for Visualisation & Interactive Prototyping with Unity3D
Setup for Visualisation & Interactive Prototyping with Unity3DSetup for Visualisation & Interactive Prototyping with Unity3D
Setup for Visualisation & Interactive Prototyping with Unity3DBond University
 
Developing for Room-Scale VR Using Unity3d
Developing for Room-Scale VR Using Unity3dDeveloping for Room-Scale VR Using Unity3d
Developing for Room-Scale VR Using Unity3dRising Media, Inc.
 
Interactive Mixed Reality for Enhanced Learning, Skills and Engagement
Interactive Mixed Reality for Enhanced Learning, Skills and EngagementInteractive Mixed Reality for Enhanced Learning, Skills and Engagement
Interactive Mixed Reality for Enhanced Learning, Skills and EngagementBond University
 
"Potencialidades educativas de la Realidad Virtual (VR) inmersiva". CITIE 2016
"Potencialidades educativas de la Realidad Virtual (VR) inmersiva". CITIE 2016"Potencialidades educativas de la Realidad Virtual (VR) inmersiva". CITIE 2016
"Potencialidades educativas de la Realidad Virtual (VR) inmersiva". CITIE 2016aCanelma
 
Taller de google cardboard
Taller de google cardboardTaller de google cardboard
Taller de google cardboardFrancesc Nadal
 
Developers, productividad, herramientas y cosas que deberíamos hacer
Developers, productividad, herramientas y cosas que deberíamos hacerDevelopers, productividad, herramientas y cosas que deberíamos hacer
Developers, productividad, herramientas y cosas que deberíamos hacerDaniel Alvarez
 
Composición estructura del campo visual
Composición estructura del campo visualComposición estructura del campo visual
Composición estructura del campo visualCLP12
 

Viewers also liked (10)

Ruta de investigacion
Ruta de investigacionRuta de investigacion
Ruta de investigacion
 
Vrux talks 160708
Vrux talks 160708Vrux talks 160708
Vrux talks 160708
 
Unicorns and the Future of Virtual Reality
Unicorns and the Future of Virtual  RealityUnicorns and the Future of Virtual  Reality
Unicorns and the Future of Virtual Reality
 
Setup for Visualisation & Interactive Prototyping with Unity3D
Setup for Visualisation & Interactive Prototyping with Unity3DSetup for Visualisation & Interactive Prototyping with Unity3D
Setup for Visualisation & Interactive Prototyping with Unity3D
 
Developing for Room-Scale VR Using Unity3d
Developing for Room-Scale VR Using Unity3dDeveloping for Room-Scale VR Using Unity3d
Developing for Room-Scale VR Using Unity3d
 
Interactive Mixed Reality for Enhanced Learning, Skills and Engagement
Interactive Mixed Reality for Enhanced Learning, Skills and EngagementInteractive Mixed Reality for Enhanced Learning, Skills and Engagement
Interactive Mixed Reality for Enhanced Learning, Skills and Engagement
 
"Potencialidades educativas de la Realidad Virtual (VR) inmersiva". CITIE 2016
"Potencialidades educativas de la Realidad Virtual (VR) inmersiva". CITIE 2016"Potencialidades educativas de la Realidad Virtual (VR) inmersiva". CITIE 2016
"Potencialidades educativas de la Realidad Virtual (VR) inmersiva". CITIE 2016
 
Taller de google cardboard
Taller de google cardboardTaller de google cardboard
Taller de google cardboard
 
Developers, productividad, herramientas y cosas que deberíamos hacer
Developers, productividad, herramientas y cosas que deberíamos hacerDevelopers, productividad, herramientas y cosas que deberíamos hacer
Developers, productividad, herramientas y cosas que deberíamos hacer
 
Composición estructura del campo visual
Composición estructura del campo visualComposición estructura del campo visual
Composición estructura del campo visual
 

Similar to Jack brophy resume_june_2016

Rajib paul Resume
Rajib paul   ResumeRajib paul   Resume
Rajib paul ResumeRajib Paul
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resumeRajib Paul
 
PlamCV-15-Summary
PlamCV-15-SummaryPlamCV-15-Summary
PlamCV-15-SummaryPaul Lam
 
CV-Lite_Ugo Gregorio LACOPO vJuly 17
CV-Lite_Ugo Gregorio LACOPO vJuly 17CV-Lite_Ugo Gregorio LACOPO vJuly 17
CV-Lite_Ugo Gregorio LACOPO vJuly 17Ugo Gregorio Lacopo
 
Ghofran kelany recent updated resume
Ghofran kelany recent updated resumeGhofran kelany recent updated resume
Ghofran kelany recent updated resumeGhofran Kelany
 
Ashok Kannan CV 05032015
Ashok Kannan CV 05032015Ashok Kannan CV 05032015
Ashok Kannan CV 05032015Ashok Kannan
 
Suresh SAP Project Manager-Resume
Suresh SAP Project Manager-ResumeSuresh SAP Project Manager-Resume
Suresh SAP Project Manager-ResumeSuresh Nayak
 
Ng, Timothy CV as of 14 May 2015
Ng, Timothy CV as of 14 May 2015Ng, Timothy CV as of 14 May 2015
Ng, Timothy CV as of 14 May 2015Tim Ng
 
Resume - David Lazarus 21.05.2015 - Demand Planner - NEW
Resume - David Lazarus 21.05.2015 - Demand Planner - NEWResume - David Lazarus 21.05.2015 - Demand Planner - NEW
Resume - David Lazarus 21.05.2015 - Demand Planner - NEWDAVID LAZARUS
 
Resume Dirk van Tuinen IT Project Manager
Resume Dirk van Tuinen IT Project ManagerResume Dirk van Tuinen IT Project Manager
Resume Dirk van Tuinen IT Project ManagerDirk van Tuinen
 
Dan Salameh resume shrt vers v1.98_d98.DOC
Dan Salameh resume shrt  vers v1.98_d98.DOCDan Salameh resume shrt  vers v1.98_d98.DOC
Dan Salameh resume shrt vers v1.98_d98.DOCDaniel Salameh
 

Similar to Jack brophy resume_june_2016 (20)

Rajib paul Resume
Rajib paul   ResumeRajib paul   Resume
Rajib paul Resume
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resume
 
PlamCV-15-Summary
PlamCV-15-SummaryPlamCV-15-Summary
PlamCV-15-Summary
 
CV-Lite_Ugo Gregorio LACOPO vJuly 17
CV-Lite_Ugo Gregorio LACOPO vJuly 17CV-Lite_Ugo Gregorio LACOPO vJuly 17
CV-Lite_Ugo Gregorio LACOPO vJuly 17
 
Ghofran kelany recent updated resume
Ghofran kelany recent updated resumeGhofran kelany recent updated resume
Ghofran kelany recent updated resume
 
Ashok Kannan CV 05032015
Ashok Kannan CV 05032015Ashok Kannan CV 05032015
Ashok Kannan CV 05032015
 
CV_AYAN DASGUPTA
CV_AYAN DASGUPTACV_AYAN DASGUPTA
CV_AYAN DASGUPTA
 
SUBHA18092016
SUBHA18092016SUBHA18092016
SUBHA18092016
 
Manie-CV-2015
Manie-CV-2015Manie-CV-2015
Manie-CV-2015
 
Suresh SAP Project Manager-Resume
Suresh SAP Project Manager-ResumeSuresh SAP Project Manager-Resume
Suresh SAP Project Manager-Resume
 
SAPBI_7Years_Sweden_CV
SAPBI_7Years_Sweden_CVSAPBI_7Years_Sweden_CV
SAPBI_7Years_Sweden_CV
 
Ng, Timothy CV as of 14 May 2015
Ng, Timothy CV as of 14 May 2015Ng, Timothy CV as of 14 May 2015
Ng, Timothy CV as of 14 May 2015
 
Resume - David Lazarus 21.05.2015 - Demand Planner - NEW
Resume - David Lazarus 21.05.2015 - Demand Planner - NEWResume - David Lazarus 21.05.2015 - Demand Planner - NEW
Resume - David Lazarus 21.05.2015 - Demand Planner - NEW
 
Pramod Resume
Pramod ResumePramod Resume
Pramod Resume
 
IM Richards CV
IM Richards CVIM Richards CV
IM Richards CV
 
CV_PP
CV_PPCV_PP
CV_PP
 
CV_PP
CV_PPCV_PP
CV_PP
 
Resume Dirk van Tuinen IT Project Manager
Resume Dirk van Tuinen IT Project ManagerResume Dirk van Tuinen IT Project Manager
Resume Dirk van Tuinen IT Project Manager
 
Dan Salameh resume shrt vers v1.98_d98.DOC
Dan Salameh resume shrt  vers v1.98_d98.DOCDan Salameh resume shrt  vers v1.98_d98.DOC
Dan Salameh resume shrt vers v1.98_d98.DOC
 
Nigel Tebbutt Profile - Fin Tech PDF
Nigel Tebbutt Profile - Fin Tech PDFNigel Tebbutt Profile - Fin Tech PDF
Nigel Tebbutt Profile - Fin Tech PDF
 

Recently uploaded

Black and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdfBlack and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdfpadillaangelina0023
 
8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCRdollysharma2066
 
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样umasea
 
VIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service Bhilai
VIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service BhilaiVIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service Bhilai
VIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service BhilaiSuhani Kapoor
 
Ch. 9- __Skin, hair and nail Assessment (1).pdf
Ch. 9- __Skin, hair and nail Assessment (1).pdfCh. 9- __Skin, hair and nail Assessment (1).pdf
Ch. 9- __Skin, hair and nail Assessment (1).pdfJamalYaseenJameelOde
 
定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一
定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一
定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一Fs
 
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一lvtagr7
 
VIP Call Girls Service Jamshedpur Aishwarya 8250192130 Independent Escort Ser...
VIP Call Girls Service Jamshedpur Aishwarya 8250192130 Independent Escort Ser...VIP Call Girls Service Jamshedpur Aishwarya 8250192130 Independent Escort Ser...
VIP Call Girls Service Jamshedpur Aishwarya 8250192130 Independent Escort Ser...Suhani Kapoor
 
VIP Call Girls Service Saharanpur Aishwarya 8250192130 Independent Escort Ser...
VIP Call Girls Service Saharanpur Aishwarya 8250192130 Independent Escort Ser...VIP Call Girls Service Saharanpur Aishwarya 8250192130 Independent Escort Ser...
VIP Call Girls Service Saharanpur Aishwarya 8250192130 Independent Escort Ser...Suhani Kapoor
 
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改yuu sss
 
Call Girl in Low Price Delhi Punjabi Bagh 9711199012
Call Girl in Low Price Delhi Punjabi Bagh  9711199012Call Girl in Low Price Delhi Punjabi Bagh  9711199012
Call Girl in Low Price Delhi Punjabi Bagh 9711199012sapnasaifi408
 
原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证
原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证
原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证diploma001
 
Gray Gold Clean CV Resume2024tod (1).pdf
Gray Gold Clean CV Resume2024tod (1).pdfGray Gold Clean CV Resume2024tod (1).pdf
Gray Gold Clean CV Resume2024tod (1).pdfpadillaangelina0023
 
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service Cuttack
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service CuttackVIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service Cuttack
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service CuttackSuhani Kapoor
 
加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf
加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf
加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdfobuhobo
 
do's and don'ts in Telephone Interview of Job
do's and don'ts in Telephone Interview of Jobdo's and don'ts in Telephone Interview of Job
do's and don'ts in Telephone Interview of JobRemote DBA Services
 
Storytelling, Ethics and Workflow in Documentary Photography
Storytelling, Ethics and Workflow in Documentary PhotographyStorytelling, Ethics and Workflow in Documentary Photography
Storytelling, Ethics and Workflow in Documentary PhotographyOrtega Alikwe
 
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...Suhani Kapoor
 

Recently uploaded (20)

Black and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdfBlack and White Minimalist Co Letter.pdf
Black and White Minimalist Co Letter.pdf
 
8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Pitampura Delhi NCR
 
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
办理学位证(纽伦堡大学文凭证书)纽伦堡大学毕业证成绩单原版一模一样
 
VIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service Bhilai
VIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service BhilaiVIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service Bhilai
VIP Call Girl Bhilai Aashi 8250192130 Independent Escort Service Bhilai
 
Ch. 9- __Skin, hair and nail Assessment (1).pdf
Ch. 9- __Skin, hair and nail Assessment (1).pdfCh. 9- __Skin, hair and nail Assessment (1).pdf
Ch. 9- __Skin, hair and nail Assessment (1).pdf
 
Young Call~Girl in Pragati Maidan New Delhi 8448380779 Full Enjoy Escort Service
Young Call~Girl in Pragati Maidan New Delhi 8448380779 Full Enjoy Escort ServiceYoung Call~Girl in Pragati Maidan New Delhi 8448380779 Full Enjoy Escort Service
Young Call~Girl in Pragati Maidan New Delhi 8448380779 Full Enjoy Escort Service
 
定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一
定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一
定制(Waikato毕业证书)新西兰怀卡托大学毕业证成绩单原版一比一
 
FULL ENJOY Call Girls In Gautam Nagar (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In Gautam Nagar (Delhi) Call Us 9953056974FULL ENJOY Call Girls In Gautam Nagar (Delhi) Call Us 9953056974
FULL ENJOY Call Girls In Gautam Nagar (Delhi) Call Us 9953056974
 
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
定制(UQ毕业证书)澳洲昆士兰大学毕业证成绩单原版一比一
 
VIP Call Girls Service Jamshedpur Aishwarya 8250192130 Independent Escort Ser...
VIP Call Girls Service Jamshedpur Aishwarya 8250192130 Independent Escort Ser...VIP Call Girls Service Jamshedpur Aishwarya 8250192130 Independent Escort Ser...
VIP Call Girls Service Jamshedpur Aishwarya 8250192130 Independent Escort Ser...
 
VIP Call Girls Service Saharanpur Aishwarya 8250192130 Independent Escort Ser...
VIP Call Girls Service Saharanpur Aishwarya 8250192130 Independent Escort Ser...VIP Call Girls Service Saharanpur Aishwarya 8250192130 Independent Escort Ser...
VIP Call Girls Service Saharanpur Aishwarya 8250192130 Independent Escort Ser...
 
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
办澳洲詹姆斯库克大学毕业证成绩单pdf电子版制作修改
 
Call Girl in Low Price Delhi Punjabi Bagh 9711199012
Call Girl in Low Price Delhi Punjabi Bagh  9711199012Call Girl in Low Price Delhi Punjabi Bagh  9711199012
Call Girl in Low Price Delhi Punjabi Bagh 9711199012
 
原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证
原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证
原版定制卡尔加里大学毕业证(UC毕业证)留信学历认证
 
Gray Gold Clean CV Resume2024tod (1).pdf
Gray Gold Clean CV Resume2024tod (1).pdfGray Gold Clean CV Resume2024tod (1).pdf
Gray Gold Clean CV Resume2024tod (1).pdf
 
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service Cuttack
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service CuttackVIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service Cuttack
VIP Call Girl Cuttack Aashi 8250192130 Independent Escort Service Cuttack
 
加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf
加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf
加利福尼亚大学伯克利分校硕士毕业证成绩单(价格咨询)学位证书pdf
 
do's and don'ts in Telephone Interview of Job
do's and don'ts in Telephone Interview of Jobdo's and don'ts in Telephone Interview of Job
do's and don'ts in Telephone Interview of Job
 
Storytelling, Ethics and Workflow in Documentary Photography
Storytelling, Ethics and Workflow in Documentary PhotographyStorytelling, Ethics and Workflow in Documentary Photography
Storytelling, Ethics and Workflow in Documentary Photography
 
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
VIP Call Girls Firozabad Aaradhya 8250192130 Independent Escort Service Firoz...
 

Jack brophy resume_june_2016

  • 1. Jack Brophy Resume Jack Brophy (PMP) Senior Project/Program Manager Street Address 66 Springbok Road, Rispark, Johannesburg, South Africa Postal Address PO. Box 82628, Southdale, Johannesburg, South Africa, 2135 Home Phone Number +27 11 943 6071 Mobile Phone Number +27 83 461 0776 Fax Number +27 86 672 7656 eMail brophy@iafrica.com Profile SAP Program/Project Manager with PMP and hands on experience of all SAP ERP modules, a number of the new age SAP products and services, across many of the industry specific solutions and best practices. 30+ years of consulting and system implementation experience with more than 23 years in SAP on projects in South Africa, Africa, Europe, UK, USA, Canada and Australia as business consultant, integration manager, application consultant, team lead, project manager and program manager. Strong leadership skills with emphasis on organising, directing, controlling, Team Building, communication, integrity and professionalism with an absolute commitment to delivering quality results according to requirements and specifications. Utilizes project management tools such as ASAP Methodology, SAP Roadmap composer, Solution Composer, Solution Manager and ValueSAP to ensure successful customer implementations. Has worked extensively with SAP GD, local and other international SAP consultants and experts. Strong partner relationships having worked with numerous partners on many projects in Africa, Europe, Americas and Australia. SAP Experience – Summary – 26+ years of SAP R/2 and R/3 configuration, implementation, upgrade, training, integration and project management experience. Configuration experience includes PP, MM, WM, PM, QM, FI, CO and SD. Other SAP products including APO, GRC AC, BI and BO. Implementation and use of Solution Manager. – Integration of 3rd Party products including Documentum, Hansen and Labware – Industry experience includes Manufacturing, Banking, Utilities, Chemical, Automotive, Defense, High Tech, Oil and Gas and public sector – Considerable project management experience implementing SAP R/2 and R/3 as well as numerous other systems. – Integration experience implementing all SAP modules and as Integration Manager on a number of projects. – Extensive business experience and Continuous Business Improvement experience using Theory of Constraints and ValueSAP – In-depth knowledge and experience of business processes and business process optimisation – Proven problem solving and troubleshooting skill on both implementation and productive systems Page 1 of 13
  • 2. Jack Brophy Resume Professional Experience & Certifications – Summary – More than 12 years business experience moving up to Logistics/Materials Manager in one of South Africa’s top Pharmaceutical Manufacturers prior to moving into business and system consulting – Materials Manager, Adcock Ingram, Johannesburg - From Planning Manager to Materials Manager, managing Warehouse, Planning, Procurement and distribution – 8 years non-SAP consulting experience – Manufacturing Business Unit Manager, ICL, Johannesburg - Worked up from Manufacturing Consultant to Major Applications Support manager and then National MBU Manager – 26+ years SAP implementation experience including implementation of MM, PP, SD, FI, CO, PM, PS, QM, Integration and 10 years Project/Programme Management. – PMP (Project Management Professional) – CPIM (Certificate of Production and Inventory Control Management) – Numerous Management and motivational courses including, – Spectrum Solutions – The Dealmaker course, – TRIANAGRAM - Project Management Course, – Louis Allen Management Course – TOC - Jonah Programme – Lecturer for Purchasing Management Services covering a number of diploma and certification courses in Purchasing and Inventory practices and management – Business experience including all aspect of management and control such as Budget development, approval and control, human resources and employee relations, KPI and target setting, monitoring and control and development and implementation of systems to support management activities. – Certified Ramp-up coach – Project Management Fundamentals Page 2 of 13
  • 3. Jack Brophy Resume SAP Project Experience – Detail Customer EY for Toyota Duration 6th June 2016 to 20th June 2016 Industry Automotive Manufacture Project Description Preparation for SAP PM implementation for Toyota South Africa. Role Project Manager Responsibilities/ Deliverables Prepare a proposal for a Rapid deployment of SAP PM at Toyota South Africa. To be presented to the executive to gain approval for the proposed implementation. Reporting structure – Reporting to EY Durban. – Reporting to the Maintenance Manager of Toyota South Africa. Customer Transnet Port Terminals Duration 2nd March 2015 to 30th September 2015 Industry Transportation Project Description – National Rollout of the Fixed Asset Stabilisation Project Role TPT Technical Rollout Manager Responsibilities/ Deliverables – Take over the primary role of project management from the consulting partner’s project manager on behalf of TPT as the project moves into the testing and preparation for data migration and go-live. Reporting structure – Reporting to the Transnet Port Terminals FAS Project Manager and Global FAS PMO. – Collaborating with the Consulting Partner’s Rollout manager taking over the primary role as the Consulting Partner hands over to Transnet prior to go-live. Customer Engineering IT for Ferrero Duration 16th January 2014 to end May 2014 Industry Food Manufacture Project Description – Global Rollout of the Ferrero SAP Implementation Role PP, MM, QM, WM and CO support for Global Rollout Responsibilities/ Deliverables – Provide local SA support, training, advice and guidance to the Client, consultants and Project Management concentrating on PP, MM, WM and QM initially extending to other areas FI, CO, HR as required. Reporting structure – Ferrero Italy as main client with Imsofer Manufacturing and Ithemba in South Africa. – Engineering IT (Italy) – Implementation and Rollout Partner Page 3 of 13
  • 4. Jack Brophy Resume Customer NHBRC – National Home Builders Registration Council Duration 1st March 2013 to 15th August 2013 Industry Public Sector Project Description – Programme Management of Green field SAP Implementation including Solution Manager project, ECC project (FI, SD, SCM, CO, PS/PPM, HCM, DMS), CRM Project, SRM project, SPP project, Technology project, Mobility project, Data Migration Project, GRC Project, PI Project, Portal project, BI/Bobj project and OCM project with integration of all SAP Systems and GIS. Role Programme Manager Responsibilities/ Deliverables – Communication between client and Project teams and within client organisation – Ensure pre-requisites completed as required – Ensure hardware and connectivity is established and maintained – Resolve issues as they arise – Planning, monitoring and controlling through to project and Programme close – Present report and ensure customer understanding and satisfaction – Post go-live support and plan next steps – Projects Close – Programme Close Reporting structure – Government ERP Council – NHBRC CEO and Sponsor – Steering Committee – Programme Management office (NHBRC Programme Manager and AL Indigo Programme Manager) – Quality Manager, Account Executive, – Assistant Project Manager, – Project Administrator – Technology Project – GRC Project – Basis – Data Migration – Solution Manager – PI – Development – ECC project – CRM Project – SRM Project – OCM Project – Training, – Organisational Development, – Communication, – Change Management – Mobility Project Page 4 of 13
  • 5. Jack Brophy Resume Customer Sabatical - home business development Duration 8 Months (August 2012 to February 2013) Customer Toyota South Africa Duration 2 Months (January 2012 February 2012) Industry Automotive Project Description – Project Manage SAP Global Delivery Technical Upgrade Assessment Services delivered remotely for ERP, Parts BW and Marketing BW systems. Role Project Manager Responsibilities/ Deliverables – Communication between client and offshore project team – Ensure pre-requisites completed as required – Ensure connectivity is established and maintained – Resolve issues as they arise – Planning, monitoring and controlling through to project close – Present report and ensure customer understanding and satisfaction – Monitor and control cost and revenue budgets – Post go-live support and plan next steps – Project Close Customer Standard Bank Of South Africa Knowledge Centre Duration 8 Months (in parallel with Solution Manager Implementation.) (April 2011 to November 2011.) Industry Banking Project Description – Plan, Prepare and execute Upgrade from ERP 4.7 to ECC6.0 Role Project Manager Responsibilities/ Deliverables – Clarify requirements – Define Scope – Identify, Analyse and recommend options – Identify resources and source – Execute using SAP SLO resources from Germany and SAP Global Delivery resources from India working mainly remotely. Customer Standard Bank Of South Africa Knowledge Centre Duration 18 Months (February 2011 to July 2012) Industry Banking Project Description – Plan, Prepare and implement Solution Manager based on the RunSAP assessment and recommendations Role Project Manager Page 5 of 13
  • 6. Jack Brophy Resume Responsibilities/ Deliverables – Clarify requirements – Define Scope – Identify, Analyse and recommend options – Identify resources and source – Prepare Roadmap – Prepare Business Case – Estimating and Budgeting for early 2011 start – Implement E2E operation Standards in the very complex SAP KC environment Customer Internal Projects (RFI, RFP, SoW, Approvals) Duration 4 Months (January 2011 to April 2011) Industry All Project Description – RFI, RFP and Demo for Tanzania Port Authority – RFP for First Rand Bank – RFP for SITA – Standard Bank Near Zero Down Time Upgrade PoC – Standard Bank Cloud Computing PoC – RFI for Department of Labour UIF – RFP for Rand Water PPM – Masstores UCS Netweaver Ramp-Up. – Telecom Namibia ESS/MSS implementation SoW – Toyota Tsusho problem resolution Role Project Manager Responsibilities/ Deliverables – Define requirements – Solution Response – Scope definition – Resource definition – Project Management Approach, Strategy and Methodology – Estimating and Budgeting – Options definition, analysis and recommendation Customer Botswana MVA Post Go-Live Review Duration 1 Week (May 2010 to June 2010) Industry Insurance Project Description – Post Go-Live Review of – FI – CO – HR Payroll and Leave – HR Personnel Administration, Organisational and Performance Management – Treasury – Claims – BI – Basis/Technical Role Project Manager Page 6 of 13
  • 7. Jack Brophy Resume Responsibilities/ Deliverables – Review FICO, HR, Treasury, Claims and Technical setup post GO-Live – Review all documentation from Blueprint through Configuration to final setup, training, testing and Change Management – Provide an interim on-site verbal report. – Provide complete Review report and supporting presentation. Customer ABSA Bank Duration 3 Months (January 2010 to June 2010) Industry Banking Project Description – Technical upgrade of the ABSA Ops systems Role Project Manager Responsibilities/ Deliverables – Technical Upgrade of ECC, SRM and XI. – Upgrade 5 tier landscape for each system. – Convert XI to PI – Implement Portal – Define ESS/MSS for portal – Project to run in conjunction with other projects. The main impact from – OS and DB migration – Implementation of RunSAP including TOA and Quality Circle – SAP Productivity Pack to assist with training after upgrade – 18 Other projects with direct impact on the Upgrade programme – Very high profile project within the ABSA and Barclays Group. Customer IFMIS Zambia Realisation/Final Prep QA Review Duration 1 Week (December 2009 to March 2010) Industry Public sector Project Description – Realisation and final preparation QA Review in preparation for go-live on 4th January 2010 Role Project Manager Responsibilities/ Deliverables – Review Project Management, FICO, PS, MM, PM, Fleet Management, SRM, SEM, BW, AIS and Technical setup in preparation for GO-Live – Review all documentation from Blueprint through Configuration to final setup, training, testing and Change Management – Provide an interim report for the Steercom Go/NoGo decision. – Provide complete Review report and supporting presentation. Customer ABSA Africa Duration 3 Months (September 2010 to November 2010) Industry Banking Project Description – ABSA Africa re-platforming project Business Objects Universe design, development and report writing for Tanzania and Mozambique. Role Project Manager Page 7 of 13
  • 8. Jack Brophy Resume Responsibilities/ Deliverables – Project Management of a Time and Material project to design and develop Business Objects universes and convert the current flexcube reports to BO reports using both Webi and Deski to provide more flexible, user driven reporting capabilities for ABSA Africa. – This was the first implementation of SAP in DBSA. – The project started late and ended late due to the clients lack of knowledge of SAP and the ASAP methodology. – Considerable Change Management and QA intervention was required to complete the Blueprint and gain acceptance. – Despite extended timeline and additional resources the Blueprint was completed under budget. Customer Development Bank of Southern Africa Duration 8 Months (December 2008 to March 2009) Industry Banking Project Description – Implement Loans Management, Finance, Controlling and Business Partner Role Programme Manager Responsibilities/ Deliverables – Project Management of a fixed price project, with SAP resources and 2 implementation partners, to develop a Blueprint for the Implementation of Loans Management, Finance, Controlling and Business Partner in the development banking environment. – This was the first implementation of Sap in DBSA. – The project started late and ended late due to the clients lack of knowledge of SAP and the ASAP methodology. – Considerable Change Management and QA intervention was required to complete the Blueprint and gain acceptance. – Despite extended timeline and additional resources the Blueprint was completed under budget. Customer Transnet, Johannesburg Duration 3 Months (October 2009 to December 2009) Industry Transport Project Description – Blueprint for Real Estate enhancements to improve use of functionality and comply with legislated and internal policy requirements Role Project Manager Responsibilities/ Deliverables – Project Management to develop a Blueprint for the required enhancements to the SAP Real Estate implementation. Blueprint Delivered and accepted on time and in budget. Customer ABSA Bank, Johannesburg Duration 9 Months (March 2008 to October 2008) Page 8 of 13
  • 9. Jack Brophy Resume Industry Banking Project Description – GRC AC Implementation including – RA&R – CUP – SPM – ERM – Risk terminator Role Programme Manager Responsibilities/ Deliverables Project Management to implement the above products and modules from March 2008 to September 2008 with a diverse team from SAP, Deloitte and Touche and TWC. Milestones, set by the group and Barclays Bank as Control Issues of Group Level Significance, all met on time and in budget. Major achievements. – Ran the first reports against the SAP Standard ruleset early May. 5.7 million SoD violations identified. – Reduced to 1.1 million SoD violations by early June. – Customised ruleset introduced resulting in 400000 rules. The SoD violations increased to 1.7 million against the customised ruleset. – SoD Violations reduced to 8000 low risk violations by the deadline of 30th September. Customer Standard Bank of South Africa, Knowledge Centre, Johannesburg Duration 5 Months (August 2007 to February 2008) Industry Banking Project Description – TDMS PoC for full implementation – GRC for Knowledge Centre starting with Virsa implementation – GRC for Lending program starting with Virsa implementation – Data Volume Services (DVS) – System Landscape Optimization (SLO) Role Program Manager Responsibilities/ Deliverables Project Management of each of the above projects involving the Knowledge areas of – Integration – Scope – Time – Human resources – Cost – Risk – Quality – Procurement – Communication Through the Process areas – Initiating – Planning – Executing Page 9 of 13
  • 10. Jack Brophy Resume – Monitoring and Controlling – Closing Customer SAB Ltd UCS/MAKRO UCS/MASSBUILD SASOL POLYMERS Duration Each project running over 3 to 4 weeks (May 2007 to September 2007) Industry Industrials … Project Description Remote offshore services for Upgrade, Unicode conversion and OS/DB migration Assessment Role On-site Project Manager Responsibilities/ Deliverables – Communication between client and offshore project team – Ensure pre-requisites completed as required – Ensure connectivity is established and maintained – Resolve issues as they arise – Planning, monitoring and controlling through to project close – Present report and ensure customer understanding and satisfaction – Monitor and control cost and revenue budgets – Post go-live support and plan next steps – Project Close Customer Toyota South Africa , Automotive Manufacturer, Durban Duration 13 Months ( January 2006 to February 2007) Industry Automotive … Project Description IMPI – Inventory Management Process Improvement Role Business and Systems Consultant (All modules and Integration) Responsibilities/ Deliverables – Short term goals to ensure a clean audit followed by optimization of the business processes and supporting systems to make the clean audit sustainable. – Integration across all business functions, systems and manual functions – Clean audit with minimal issues and discrepancies, well within the required guidelines, achieved. The next audit was also successful. – Many processes simplified and streamlined amid massive growth and development of new plant facilities. Customer Johannesburg Water , ISU implementation, Johannesburg Duration 11 months (November 2002 to September 2003) Industry Public Utility Project Description Implementing a mix of the following products; SAP R/3, SAP ISU, Hansen, Labware and Documentum Page 10 of 13
  • 11. Jack Brophy Resume Role Program Manager Responsibilities/ Deliverables – Implementing a mix of the following products; SAP, SAP ISU, Hansen, Labware and Documentum. – Managing a fast track program involving a number of companies implementing separate products and projects to be integrated into a single system and interfaces to a number of legacy systems and importing and exporting data to external organisations. – Scope and product mix selected by the client covered: – SAP for finance and management accounting, purchasing, inventory management, sales and distribution and project systems – SAP ISU for Device Management, Customer Interaction Centre, FICA (Contract Accounting), Billing and Revenue management. – Hansen for Land Management, maintenance of the Water Utilities networks, reservoirs, waste, pump stations and Electro/ mechanical depots. – Documentum for document management. – Labware as the LIMS system for the Laboratory. Page 11 of 13
  • 12. Jack Brophy Resume Other SAP-Related Experience Nissan PP Great Basin Gold FI/CO Turbomeca PP/CO Rand Water PP/QM Distell SD/MM Consol Glass FI/CO Sasol Synergy FI/CO Trans Hex SD/MM GSSC FI Trainer SUPRACHEM SD/MM Saldanha Steel SD/MM Mintek FI/CO BHP Billiton FI/CO SASOL Synergy FI/CO SASOL Infrachem MM SASOL CARBO-TAR FI/CO Brother (UK) SD/MM/PP SASOL AGRI FI/CO SA Mint FI/CO Mondi Paper FI/CO Sasol SMX PP BC Gas Continuous Business Improvement (CBI) Ariel Technologies All AMPLATS PP/MM Ster Kinekor FI/CO/PS Sasol Fertilisers Integration Samancor FI/CO Bamburi Cement SD/MM Western Mining FI/CO/QM Sasol Oil MM Polifin GSD MM Polifin (Group) Integration Kynoch Feeds Integration Kynoch Fertiliser Integration Queensland Rail All Sasol Twistdraai FI/CO Engen PP Howmet QM SNI Support group All Siemens Components PP Page 12 of 13
  • 13. Jack Brophy Resume Kentron All Simera PM/FI/CO/MM/PP Dowbrands MM/SD Hoechst All Delta PP Bayer All Sappi PP Telkom PP Spoornet PP Unilever All Anglo Alpha All ASG All African Cable All Bosch PP Afrox PP SAA PP/FI/CO Caltex PP General Information Citizenship South African Languages English and Afrikaans (Both Spoken and Written) Page 13 of 13