Javier Garcia - Verdugo Sanchez - Six Sigma Training - W1 Rifle Shot Studies
1. "Rifle Shot Studies"Rifle Shot Studies
Hip shots Week 1
Knorr-Bremse Group
"Rifle Shot Studies"
O i t f thi t i i i t t i th• One main part of this training is structuring the process
improvement efforts.
• The key to process improvement is a successful
completion of the measure and analysis phase, which
b ild th f d ti f th i tbuilds the foundation for the improvement.
• However, if those in charge are very familiar with the
process they often contribute good ideas. These should
be examined independent from the stage or working
phase the project is inphase the project is in.
• These examinations are called „Rifle shot Studies“
(Juran).
Knorr-Bremse Group 11 BB W1 Rifle shots, 04, D. Szemkus/H. Winkler Page 2/5
2. Aspects of the "Rifle Shot Studies"
P• Purpose:
– "Rifle shot Studies" should concentrate on one or two
i t i bl th t hi hl l t d t th blinput variables that are highly related to the problem.
• Example: We are quite sure to know the new raw
t i l f b ttmaterial performs better.
• Example: Increasing the temperature about 10° in the
ti l i th i ldreaction vessel improves the yield.
• Methodology:
– Steps that lead to a proper experimental design shouldSteps t at ead to a p ope e pe e ta des g s ou d
always be followed.
– The factors should be examined in small and fast pilote acto s s ou d be e a ed s a a d ast p ot
studies.
– „Rifle shot Studies“ should be completed in less than a
Knorr-Bremse Group 11 BB W1 Rifle shots, 04, D. Szemkus/H. Winkler Page 3/5
„Rifle shot Studies should be completed in less than a
week.
Basics
• Do not wait for the improvement phase to test promisingp p p g
ideas.
• "Rifle Shot Studies" are the fastest way to evaluate• Rifle Shot Studies are the fastest way to evaluate
factors. These facts build the foundation for later
decisions.
• „Rifle Shot Studies“ executed at the beginning of a
project help the team to become a unit for two reasons:project help the team to become a unit for two reasons:
– The team‘s ideas are worth to follow
– Facts can make decisions very easy
• Sometimes it is good to use the „Ready - Shot - Aim“Sometimes it is good to use the „Ready Shot Aim
process during the improvement phase.
Knorr-Bremse Group 11 BB W1 Rifle shots, 04, D. Szemkus/H. Winkler Page 4/5
3. Team Management
Always have a „Flipchart“ for ideas and „Rifle shot Studies“ with
you. Evaluate those ideas and develop useful studies.you. Evaluate those ideas and develop useful studies.
What do we not Which questions
Which actions
What do we know?
What do we not
know?
Which questions
should be answered?
actually lead to
answers?
Knorr-Bremse Group 11 BB W1 Rifle shots, 04, D. Szemkus/H. Winkler Page 5/5