DEMOLITION and
EXPLOSIVES
SAFE DEMOLITION REQUIRES ADEQUATE
PLANNING
Why Plan?
Identify the Hazards
Meet Legislative Requirements
Ensure Appropriate Equipment
Ensure Safe Disposal of Materials
Determine Appropriate Methods of Demolition
Determine Cost of Demolition
SAFE DEMOLITION REQUIRES ADEQUATE
PLANNING
Key Areas for Planning
Type of Construction
Type of Structure (Ht., Use)
State of Structure
Structural Hazards
Hazardous Substances
Location of Services
General Conditions of Adjoining Structures
Access and Egress
Suitability of Site for Equipment
DEMOLITION TECHNIQUE
Sequential – gradual reduction of
height in reverse order to its
construction
Induced – key structural members
are weakened or removed, causing the
whole part of the structure to collapse
METHODS OF DEMOLITION
Manual – use of hand held tools
Mechanical – use of heavy
equipment, wires and chain, power
shear, etc.
Explosives – use of explosives
RULE 1417 - 1418: DEMOLITION
1. Structures over 6m high must be under the
supervision of a competent person
2. The area is strictly for demolition workers only
(Demolition area - w/in a distance equal to 1.5 x H of
structure)
3. If the above distance is not possible, the structure
shall be fenced around
4. Danger signs should be posted around the structure
5. Ensure all electrical services are cut-off
RULE 1417 - 1418: DEMOLITION
7. Demolition should proceed storey by storey, in a
descending order; work on the upper floors should be
completely over before removing the supporting
members on the lower floor
8. No part of the structure shall be overloaded w/ debris
or mat’ls.
9. Stairs (incl. railings), passageways & ladders should
be demolished last
HAZARDS ASSOCIATED WITH DEMOLITION
Falls
Being Hit/Trapped/Crushed by Objects
Manual Handling
Hazardous Substances and Dangerous Goods
Noise and Vibration
Electric Shock
Fires and Explosions
Equipment
EXPLOSIVES
By Competent Person
Precautions from:
Smokes, matches & open flames
Radio Frequency for Electrical Detonators
Transport of Explosives
Vehicles shall have tight floors covered w/ wood
Explosives and Blasting implements shall not be
transported with other materials
EXPLOSIVES
Storage
All explosives must be accounted for
Follow manufacturer’s instructions
Detonators should be stored in a separate magazine
Storage should be fire and bullet-resistant
Proper Use
Operation between Sunup & Sundown
Precaution on the use of f mobile radio transmitting
equipment.
Suspension of operation during electrical storm
EXPLOSIVES
After Blasting
Disconnect firing line from blasting
machine
Allow dust and smoke to subside
Inspect if all charges have been
exploded

More Related Content

Similar to demolition.ppt

JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJESUSBASILIOANTONIO
 
Module-4-Electrical Safety in industrial safety
Module-4-Electrical Safety in industrial safetyModule-4-Electrical Safety in industrial safety
Module-4-Electrical Safety in industrial safetysrujanmoily
 
Pp 13 electrical hazards, risks and controls
Pp 13 electrical hazards, risks  and controlsPp 13 electrical hazards, risks  and controls
Pp 13 electrical hazards, risks and controlsScottDickenson2
 
FIRE AND EXPLOSION (Industrial Hazards).pptx
FIRE AND EXPLOSION (Industrial Hazards).pptxFIRE AND EXPLOSION (Industrial Hazards).pptx
FIRE AND EXPLOSION (Industrial Hazards).pptxSnehaGhadigaonkar
 
Demolition of building and its precautionary measures as per IS code
Demolition of building and its precautionary measures as per IS codeDemolition of building and its precautionary measures as per IS code
Demolition of building and its precautionary measures as per IS codejaimin1702
 
2 Fire Risk Assessment Template Risk Assessment Templates.docx
2 Fire Risk Assessment Template Risk Assessment Templates.docx2 Fire Risk Assessment Template Risk Assessment Templates.docx
2 Fire Risk Assessment Template Risk Assessment Templates.docxDwarika Bhushan Sharma
 
2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templatesDwarika Bhushan Sharma
 
Group-6-Overview-Of-Safety-And-Basic-Safety-Procedures-In-High-Risk-Activitie...
Group-6-Overview-Of-Safety-And-Basic-Safety-Procedures-In-High-Risk-Activitie...Group-6-Overview-Of-Safety-And-Basic-Safety-Procedures-In-High-Risk-Activitie...
Group-6-Overview-Of-Safety-And-Basic-Safety-Procedures-In-High-Risk-Activitie...LisayahManobangs
 
International Journal of Computational Engineering Research (IJCER)
International Journal of Computational Engineering Research (IJCER) International Journal of Computational Engineering Research (IJCER)
International Journal of Computational Engineering Research (IJCER) ijceronline
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfJESUSBASILIOANTONIO
 
Construction Safety Training_Session 07_Construction Demolition, Hazards and ...
Construction Safety Training_Session 07_Construction Demolition, Hazards and ...Construction Safety Training_Session 07_Construction Demolition, Hazards and ...
Construction Safety Training_Session 07_Construction Demolition, Hazards and ...Muizz Anibire
 
JSA-Piling or Concreting for Foundations & Building
JSA-Piling or Concreting for Foundations & Building JSA-Piling or Concreting for Foundations & Building
JSA-Piling or Concreting for Foundations & Building Alvin160771
 
Building Operations and Works of Engineering Construction (Safety) Regulatio...
Building Operations and Works of Engineering Construction  (Safety) Regulatio...Building Operations and Works of Engineering Construction  (Safety) Regulatio...
Building Operations and Works of Engineering Construction (Safety) Regulatio...Ahmad Nazib
 
Rigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger g ergr
Rigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger  g ergrRigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger  g ergr
Rigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger g ergrLuisValente37
 
Fire Risk Assessment.pdf
Fire Risk Assessment.pdfFire Risk Assessment.pdf
Fire Risk Assessment.pdfHSEXINYIPROJECT
 
Safety Precautions for Electrician Services.pptx
Safety Precautions for Electrician Services.pptxSafety Precautions for Electrician Services.pptx
Safety Precautions for Electrician Services.pptxRenuka581330
 
BUILDING CONSTRUCTION PROJECT 1
BUILDING CONSTRUCTION PROJECT 1BUILDING CONSTRUCTION PROJECT 1
BUILDING CONSTRUCTION PROJECT 1Cryslyn Tan
 

Similar to demolition.ppt (20)

JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdfJSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
JSA01_De-Ethanizer_Foundation_Execution_Rev00.pdf
 
Module-4-Electrical Safety in industrial safety
Module-4-Electrical Safety in industrial safetyModule-4-Electrical Safety in industrial safety
Module-4-Electrical Safety in industrial safety
 
ConstructionHazards.ppt
ConstructionHazards.pptConstructionHazards.ppt
ConstructionHazards.ppt
 
Pp 13 electrical hazards, risks and controls
Pp 13 electrical hazards, risks  and controlsPp 13 electrical hazards, risks  and controls
Pp 13 electrical hazards, risks and controls
 
FIRE AND EXPLOSION (Industrial Hazards).pptx
FIRE AND EXPLOSION (Industrial Hazards).pptxFIRE AND EXPLOSION (Industrial Hazards).pptx
FIRE AND EXPLOSION (Industrial Hazards).pptx
 
Demolition of building and its precautionary measures as per IS code
Demolition of building and its precautionary measures as per IS codeDemolition of building and its precautionary measures as per IS code
Demolition of building and its precautionary measures as per IS code
 
2 Fire Risk Assessment Template Risk Assessment Templates.docx
2 Fire Risk Assessment Template Risk Assessment Templates.docx2 Fire Risk Assessment Template Risk Assessment Templates.docx
2 Fire Risk Assessment Template Risk Assessment Templates.docx
 
2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates2 fire risk assessment template risk assessment templates
2 fire risk assessment template risk assessment templates
 
Group-6-Overview-Of-Safety-And-Basic-Safety-Procedures-In-High-Risk-Activitie...
Group-6-Overview-Of-Safety-And-Basic-Safety-Procedures-In-High-Risk-Activitie...Group-6-Overview-Of-Safety-And-Basic-Safety-Procedures-In-High-Risk-Activitie...
Group-6-Overview-Of-Safety-And-Basic-Safety-Procedures-In-High-Risk-Activitie...
 
International Journal of Computational Engineering Research (IJCER)
International Journal of Computational Engineering Research (IJCER) International Journal of Computational Engineering Research (IJCER)
International Journal of Computational Engineering Research (IJCER)
 
LPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdfLPG Chloride treaters foundation execution_Rev.00.pdf
LPG Chloride treaters foundation execution_Rev.00.pdf
 
Overhead crane
Overhead crane Overhead crane
Overhead crane
 
Construction Safety Training_Session 07_Construction Demolition, Hazards and ...
Construction Safety Training_Session 07_Construction Demolition, Hazards and ...Construction Safety Training_Session 07_Construction Demolition, Hazards and ...
Construction Safety Training_Session 07_Construction Demolition, Hazards and ...
 
JSA-Piling or Concreting for Foundations & Building
JSA-Piling or Concreting for Foundations & Building JSA-Piling or Concreting for Foundations & Building
JSA-Piling or Concreting for Foundations & Building
 
Building Operations and Works of Engineering Construction (Safety) Regulatio...
Building Operations and Works of Engineering Construction  (Safety) Regulatio...Building Operations and Works of Engineering Construction  (Safety) Regulatio...
Building Operations and Works of Engineering Construction (Safety) Regulatio...
 
Rigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger g ergr
Rigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger  g ergrRigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger  g ergr
Rigger_ENG.PPTX dddd dvgfr rr ergre gerg er gerg erger g ergr
 
Fire Risk Assessment.pdf
Fire Risk Assessment.pdfFire Risk Assessment.pdf
Fire Risk Assessment.pdf
 
Safety Precautions for Electrician Services.pptx
Safety Precautions for Electrician Services.pptxSafety Precautions for Electrician Services.pptx
Safety Precautions for Electrician Services.pptx
 
REMINDING SAFETY
REMINDING SAFETYREMINDING SAFETY
REMINDING SAFETY
 
BUILDING CONSTRUCTION PROJECT 1
BUILDING CONSTRUCTION PROJECT 1BUILDING CONSTRUCTION PROJECT 1
BUILDING CONSTRUCTION PROJECT 1
 

Recently uploaded

Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . pptDineshKumar4165
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxSCMS School of Architecture
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilVinayVitekari
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network DevicesChandrakantDivate1
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxmaisarahman1
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersMairaAshraf6
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VDineshKumar4165
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesMayuraD1
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdfKamal Acharya
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxSCMS School of Architecture
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxJuliansyahHarahap1
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiessarkmank1
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEselvakumar948
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdfKamal Acharya
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Servicemeghakumariji156
 

Recently uploaded (20)

Thermal Engineering Unit - I & II . ppt
Thermal Engineering  Unit - I & II . pptThermal Engineering  Unit - I & II . ppt
Thermal Engineering Unit - I & II . ppt
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptxHOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
HOA1&2 - Module 3 - PREHISTORCI ARCHITECTURE OF KERALA.pptx
 
Moment Distribution Method For Btech Civil
Moment Distribution Method For Btech CivilMoment Distribution Method For Btech Civil
Moment Distribution Method For Btech Civil
 
Computer Networks Basics of Network Devices
Computer Networks  Basics of Network DevicesComputer Networks  Basics of Network Devices
Computer Networks Basics of Network Devices
 
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptxA CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
A CASE STUDY ON CERAMIC INDUSTRY OF BANGLADESH.pptx
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Computer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to ComputersComputer Lecture 01.pptxIntroduction to Computers
Computer Lecture 01.pptxIntroduction to Computers
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
DeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakesDeepFakes presentation : brief idea of DeepFakes
DeepFakes presentation : brief idea of DeepFakes
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptxS1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
S1S2 B.Arch MGU - HOA1&2 Module 3 -Temple Architecture of Kerala.pptx
 
Work-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptxWork-Permit-Receiver-in-Saudi-Aramco.pptx
Work-Permit-Receiver-in-Saudi-Aramco.pptx
 
PE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and propertiesPE 459 LECTURE 2- natural gas basic concepts and properties
PE 459 LECTURE 2- natural gas basic concepts and properties
 
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLEGEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
GEAR TRAIN- BASIC CONCEPTS AND WORKING PRINCIPLE
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 

demolition.ppt

  • 2. SAFE DEMOLITION REQUIRES ADEQUATE PLANNING Why Plan? Identify the Hazards Meet Legislative Requirements Ensure Appropriate Equipment Ensure Safe Disposal of Materials Determine Appropriate Methods of Demolition Determine Cost of Demolition
  • 3. SAFE DEMOLITION REQUIRES ADEQUATE PLANNING Key Areas for Planning Type of Construction Type of Structure (Ht., Use) State of Structure Structural Hazards Hazardous Substances Location of Services General Conditions of Adjoining Structures Access and Egress Suitability of Site for Equipment
  • 4. DEMOLITION TECHNIQUE Sequential – gradual reduction of height in reverse order to its construction Induced – key structural members are weakened or removed, causing the whole part of the structure to collapse
  • 5. METHODS OF DEMOLITION Manual – use of hand held tools Mechanical – use of heavy equipment, wires and chain, power shear, etc. Explosives – use of explosives
  • 6. RULE 1417 - 1418: DEMOLITION 1. Structures over 6m high must be under the supervision of a competent person 2. The area is strictly for demolition workers only (Demolition area - w/in a distance equal to 1.5 x H of structure) 3. If the above distance is not possible, the structure shall be fenced around 4. Danger signs should be posted around the structure 5. Ensure all electrical services are cut-off
  • 7. RULE 1417 - 1418: DEMOLITION 7. Demolition should proceed storey by storey, in a descending order; work on the upper floors should be completely over before removing the supporting members on the lower floor 8. No part of the structure shall be overloaded w/ debris or mat’ls. 9. Stairs (incl. railings), passageways & ladders should be demolished last
  • 8. HAZARDS ASSOCIATED WITH DEMOLITION Falls Being Hit/Trapped/Crushed by Objects Manual Handling Hazardous Substances and Dangerous Goods Noise and Vibration Electric Shock Fires and Explosions Equipment
  • 9. EXPLOSIVES By Competent Person Precautions from: Smokes, matches & open flames Radio Frequency for Electrical Detonators Transport of Explosives Vehicles shall have tight floors covered w/ wood Explosives and Blasting implements shall not be transported with other materials
  • 10. EXPLOSIVES Storage All explosives must be accounted for Follow manufacturer’s instructions Detonators should be stored in a separate magazine Storage should be fire and bullet-resistant Proper Use Operation between Sunup & Sundown Precaution on the use of f mobile radio transmitting equipment. Suspension of operation during electrical storm
  • 11. EXPLOSIVES After Blasting Disconnect firing line from blasting machine Allow dust and smoke to subside Inspect if all charges have been exploded