1. Third Set of Locks: From Conceptual
Design until RFC Design
Pablo Arecco
PIANC YP-Com Chairman / MWH Global
1
Challenge the future
2. From 2007, the story keeps going…
• Prequalification period: 4 months.
• Tender Design: 14 months from 2008.
US$ 3,221,631,384.00
Best technical
proposal
Design
& Build
2
Challenge the future
3. Design of the Third Set of Locks
CICP Design Integration Office and Design Centers
Design phases: Preliminary, Intermediate, Final, Release for Construction,
Optimization & As Built (Engineering services during construction).
Tetratech Bellevue
MWH - Chicago
IV-Infra - Rotterdam Netherlands
Sembenelli - Milano, Italy
Panama
MWH - Buenos Aires
3
Challenge the future
4. Design of the Third Set of Locks
Engineering Discipline Interfaces
• Hydraulic
• Geotechnical
• Seismic
• Lock Heads & Rolling Gates / Culvert Valves
• Mechanical / Electrical / I & C
• Buildings (by Others)
• Site Development & Infrastructure
4
Challenge the future
5. Components of each new Lock Complex
Three Lock Chambers and four Lock Heads in each site
Upper Chamber
Middle Chamber
Lower
Chamber
Lock
Head 4
5
Challenge the future
19. Atlantic & Pacific Locks
Major differences
• Use of existing 1939 excavations for New Locks
• Geology (Sandstone vs. Basalt)
• Excavation, slope protection & rock restitution
• Availability of concrete aggregate at Atlantic
• Seismic criteria / Fault zones
• Lock floor slabs
• Borinquen dams / Approach channels
19
Challenge the future
20. Lock chamber components
For each type a structural model was identified for the design
Lock Head
Lock Walls with
central connection
Typical
Lock Walls
Crossunder
23 monoliths per side per chamber
7 types of structural Lock Walls
Several loads combinations
Chamber
Conduit
20
Challenge the future
21. Lock Chamber monolith walls
Pacific & Atlantic Lock Wall monoliths are different
August 2012
Lock Wall
Typical
Monolith
up to 350
Final concrete volumes: Lock walls ≈ 2.100.000 m3
Lock heads ≈ 1.200.000 m3
21
Challenge the future
23. Finite Elements Models with Abaqus®
Lock Walls
(Concrete)
Lock Head
Small
Recess
(Concrete)
Rock
Foundation
(Gatún
Rock)
Lock Head
Large Recess
(Concrete)
Rolling
gates
(Steel)
Lock Head
Slab
(Concrete)
Backfill
(Gatún
Rockfill)
Lock Walls
(Concrete)
23
Challenge the future
25. Lock structures - Seismic criteria
Earthquake level & performance criteria
Level I
475 years
Level II
950 years
• No service disruption
• Reparable damage
• Structure essentially elastic
ATL 0,33g
PAC 0,52g
• No collapse
• Reparable damage
• Limited non linear behavior
ATL 0,42g
PAC 0,72g
25
Challenge the future
26. Concrete reinforcement
Weight 190,000 tonnes or 26 Eiffel Towers
Final design quantities reduction
maintaining same Design Req.:
• Concrete and excavation of over
10% compared to tender
• Reduction in reinforcement of 40%
(around 17 Eiffel Towers)
26