Third Set of Locks: From Conceptual
Design until RFC Design
Pablo Arecco
PIANC YP-Com Chairman / MWH Global

1
Challenge the future
From 2007, the story keeps going…
• Prequalification period: 4 months.
• Tender Design: 14 months from 2008.

US$ 3,221,631,384.00
Best technical
proposal

Design
& Build
2
Challenge the future
Design of the Third Set of Locks
CICP Design Integration Office and Design Centers
Design phases: Preliminary, Intermediate, Final, Release for Construction,
Optimization & As Built (Engineering services during construction).

Tetratech Bellevue

MWH - Chicago

IV-Infra - Rotterdam Netherlands
Sembenelli - Milano, Italy

Panama

MWH - Buenos Aires

3
Challenge the future
Design of the Third Set of Locks
Engineering Discipline Interfaces
• Hydraulic
• Geotechnical
• Seismic
• Lock Heads & Rolling Gates / Culvert Valves
• Mechanical / Electrical / I & C
• Buildings (by Others)
• Site Development & Infrastructure
4
Challenge the future
Components of each new Lock Complex
Three Lock Chambers and four Lock Heads in each site
Upper Chamber
Middle Chamber
Lower
Chamber

Lock
Head 4

5
Challenge the future
6
Challenge the future
7
Challenge the future
8
Challenge the future
9
Challenge the future
10
Challenge the future
11
Challenge the future
12
Challenge the future
13
Challenge the future
14
Challenge the future
15
Challenge the future
16
Challenge the future
Numerical & Physical models

17
Challenge the future
Numerical & Physical models

18
Challenge the future
Atlantic & Pacific Locks
Major differences
• Use of existing 1939 excavations for New Locks
• Geology (Sandstone vs. Basalt)
• Excavation, slope protection & rock restitution
• Availability of concrete aggregate at Atlantic
• Seismic criteria / Fault zones
• Lock floor slabs
• Borinquen dams / Approach channels
19
Challenge the future
Lock chamber components
For each type a structural model was identified for the design
Lock Head
Lock Walls with
central connection
Typical
Lock Walls
Crossunder
23 monoliths per side per chamber
7 types of structural Lock Walls
Several loads combinations

Chamber
Conduit
20

Challenge the future
Lock Chamber monolith walls
Pacific & Atlantic Lock Wall monoliths are different

August 2012

Lock Wall
Typical
Monolith

up to 350

Final concrete volumes: Lock walls ≈ 2.100.000 m3
Lock heads ≈ 1.200.000 m3
21
Challenge the future
Finite Elements Models with Abaqus®

22
Challenge the future
Finite Elements Models with Abaqus®
Lock Walls
(Concrete)
Lock Head
Small
Recess
(Concrete)

Rock
Foundation
(Gatún
Rock)

Lock Head
Large Recess
(Concrete)
Rolling
gates
(Steel)
Lock Head
Slab
(Concrete)

Backfill
(Gatún
Rockfill)

Lock Walls
(Concrete)
23

Challenge the future
Finite Elements Models with Abaqus®

24
Challenge the future
Lock structures - Seismic criteria
Earthquake level & performance criteria

Level I

475 years

Level II
950 years

• No service disruption
• Reparable damage
• Structure essentially elastic

ATL 0,33g
PAC 0,52g

• No collapse
• Reparable damage
• Limited non linear behavior

ATL 0,42g
PAC 0,72g

25
Challenge the future
Concrete reinforcement
Weight 190,000 tonnes or 26 Eiffel Towers
Final design quantities reduction
maintaining same Design Req.:
• Concrete and excavation of over
10% compared to tender
• Reduction in reinforcement of 40%
(around 17 Eiffel Towers)

26
Challenge the future
27
Challenge the future
Design Facts & Figures
Total for Atlantic and Pacific
• The MWH-led team peaked at over Equivalent 300 Full Time Staff
working in 6 design offices on 3 continents.
• 9,500 Design Drawings (Atlantic & Pacific Total)
• 13,000 Concrete Lift Shop Drawings Reviewed
• 26,000 Reinforcement Shop Drawings Reviewed
• 50 Quality Audits (33 Internal, 17 External – GUPC, ACP)
• Design 95% Complete, 88.5% Design Packages Submitted

28
Challenge the future
THIS IS THE
EFFORT OF A
HUGE TEAM!
29
Challenge the future

More Related Content

What's hot

Precast concrete for sustainable buildings
Precast concrete for sustainable buildingsPrecast concrete for sustainable buildings
Precast concrete for sustainable buildingsMECandPMV
 
Combination Club_Redrow_Oct 15
Combination Club_Redrow_Oct 15Combination Club_Redrow_Oct 15
Combination Club_Redrow_Oct 15Ron O'Connor
 
Earth House Field Building Process
Earth House Field Building ProcessEarth House Field Building Process
Earth House Field Building ProcessTimo Kettunen
 
Mason Construction Presentation
Mason Construction Presentation Mason Construction Presentation
Mason Construction Presentation BNI
 
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)Toronto Public Consultation Unit
 
Tidi-Cable-New Flyer Jan 2016
Tidi-Cable-New Flyer Jan 2016Tidi-Cable-New Flyer Jan 2016
Tidi-Cable-New Flyer Jan 2016Phil Seymour
 
213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15Ron O'Connor
 
Water Lane, Wootton-under-Edge_Mar13
Water Lane, Wootton-under-Edge_Mar13Water Lane, Wootton-under-Edge_Mar13
Water Lane, Wootton-under-Edge_Mar13Ron O'Connor
 
6710 127 l1_powerpoint_4
6710 127 l1_powerpoint_46710 127 l1_powerpoint_4
6710 127 l1_powerpoint_4Gordon Turner
 

What's hot (15)

1 New Street Square
1 New Street Square1 New Street Square
1 New Street Square
 
Precast concrete for sustainable buildings
Precast concrete for sustainable buildingsPrecast concrete for sustainable buildings
Precast concrete for sustainable buildings
 
Combination Club_Redrow_Oct 15
Combination Club_Redrow_Oct 15Combination Club_Redrow_Oct 15
Combination Club_Redrow_Oct 15
 
Replacement metal roofing sheet
Replacement metal roofing sheetReplacement metal roofing sheet
Replacement metal roofing sheet
 
Jacques Cartier Bridge Good Neighbourly Relations Committee - May 8, 2018
Jacques Cartier Bridge Good Neighbourly Relations Committee - May 8, 2018Jacques Cartier Bridge Good Neighbourly Relations Committee - May 8, 2018
Jacques Cartier Bridge Good Neighbourly Relations Committee - May 8, 2018
 
Earth House Field Building Process
Earth House Field Building ProcessEarth House Field Building Process
Earth House Field Building Process
 
Mason Construction Presentation
Mason Construction Presentation Mason Construction Presentation
Mason Construction Presentation
 
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
King-Liberty Pedestrian / Cycling Bridge (Dec. 8 2016 Information Panels)
 
Tidi-Cable-New Flyer Jan 2016
Tidi-Cable-New Flyer Jan 2016Tidi-Cable-New Flyer Jan 2016
Tidi-Cable-New Flyer Jan 2016
 
J. s. w. engineers private limited brochure
J. s. w. engineers private limited  brochureJ. s. w. engineers private limited  brochure
J. s. w. engineers private limited brochure
 
Airport Boulevard Railroad Grade Separation Project
Airport Boulevard Railroad Grade Separation ProjectAirport Boulevard Railroad Grade Separation Project
Airport Boulevard Railroad Grade Separation Project
 
213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15213A Bath Rd Cheltenham project sheet_July 15
213A Bath Rd Cheltenham project sheet_July 15
 
Disposal
Disposal Disposal
Disposal
 
Water Lane, Wootton-under-Edge_Mar13
Water Lane, Wootton-under-Edge_Mar13Water Lane, Wootton-under-Edge_Mar13
Water Lane, Wootton-under-Edge_Mar13
 
6710 127 l1_powerpoint_4
6710 127 l1_powerpoint_46710 127 l1_powerpoint_4
6710 127 l1_powerpoint_4
 

Similar to 02 tsl from tender until rfc by pablo arecco

Affordable Housing company in India WorldHaus Inc.
Affordable Housing company in India WorldHaus Inc.Affordable Housing company in India WorldHaus Inc.
Affordable Housing company in India WorldHaus Inc.WorldHaus
 
Morocco Mall Post Tensioned Concrete Case Study
Morocco Mall Post Tensioned Concrete Case StudyMorocco Mall Post Tensioned Concrete Case Study
Morocco Mall Post Tensioned Concrete Case StudyCCL Concrete
 
Knauf Akademija 2017 - Alfred Mahlhoff - Knauf Aquapanel
Knauf Akademija 2017 - Alfred Mahlhoff - Knauf AquapanelKnauf Akademija 2017 - Alfred Mahlhoff - Knauf Aquapanel
Knauf Akademija 2017 - Alfred Mahlhoff - Knauf AquapanelKnauf Insulation Srbija
 
Capital Gate Abu Dhabhi - Case Study
Capital Gate Abu Dhabhi - Case Study Capital Gate Abu Dhabhi - Case Study
Capital Gate Abu Dhabhi - Case Study Jeesmon Babu
 
Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Yee Len Wan
 
Base Ambrico 3 4 08 (Nx Power Lite)
Base Ambrico 3 4 08 (Nx Power Lite)Base Ambrico 3 4 08 (Nx Power Lite)
Base Ambrico 3 4 08 (Nx Power Lite)mty917
 
MIVAN CONSTRUCTION TECHNOLOGY for const
MIVAN CONSTRUCTION TECHNOLOGY  for constMIVAN CONSTRUCTION TECHNOLOGY  for const
MIVAN CONSTRUCTION TECHNOLOGY for constPradeepPandya1
 
Electrical maintanance
Electrical maintananceElectrical maintanance
Electrical maintananceMadhan Gopal
 
Cicabloc india
Cicabloc indiaCicabloc india
Cicabloc indiacicabloc
 
Marina barrage (09/10s2)
Marina barrage (09/10s2)Marina barrage (09/10s2)
Marina barrage (09/10s2)gn022010sem1
 
Challenges during Design and Construction of an Underground Chip Factory (Waf...
Challenges during Design and Construction of an Underground Chip Factory (Waf...Challenges during Design and Construction of an Underground Chip Factory (Waf...
Challenges during Design and Construction of an Underground Chip Factory (Waf...Helmut Wannenmacher
 
Ateco dome power point presentation master
Ateco dome  power point presentation   masterAteco dome  power point presentation   master
Ateco dome power point presentation masterBrian Quinn
 
Experimental study of precast portal frame
Experimental study of precast portal frameExperimental study of precast portal frame
Experimental study of precast portal frameSatish Kambaliya
 
Designing a Concrete Beam Using the New AS3600:2018 - Webinar Slides - ClearC...
Designing a Concrete Beam Using the New AS3600:2018 - Webinar Slides - ClearC...Designing a Concrete Beam Using the New AS3600:2018 - Webinar Slides - ClearC...
Designing a Concrete Beam Using the New AS3600:2018 - Webinar Slides - ClearC...ClearCalcs
 

Similar to 02 tsl from tender until rfc by pablo arecco (20)

Affordable Housing company in India WorldHaus Inc.
Affordable Housing company in India WorldHaus Inc.Affordable Housing company in India WorldHaus Inc.
Affordable Housing company in India WorldHaus Inc.
 
Morocco Mall Post Tensioned Concrete Case Study
Morocco Mall Post Tensioned Concrete Case StudyMorocco Mall Post Tensioned Concrete Case Study
Morocco Mall Post Tensioned Concrete Case Study
 
Knauf Akademija 2017 - Alfred Mahlhoff - Knauf Aquapanel
Knauf Akademija 2017 - Alfred Mahlhoff - Knauf AquapanelKnauf Akademija 2017 - Alfred Mahlhoff - Knauf Aquapanel
Knauf Akademija 2017 - Alfred Mahlhoff - Knauf Aquapanel
 
03 tsl rolling gates design by jeremy augustijn
03 tsl rolling gates design by jeremy augustijn03 tsl rolling gates design by jeremy augustijn
03 tsl rolling gates design by jeremy augustijn
 
Capital Gate Abu Dhabhi - Case Study
Capital Gate Abu Dhabhi - Case Study Capital Gate Abu Dhabhi - Case Study
Capital Gate Abu Dhabhi - Case Study
 
Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3Construction Technology III (Group Assignment) - Semester 3
Construction Technology III (Group Assignment) - Semester 3
 
Base Ambrico 3 4 08 (Nx Power Lite)
Base Ambrico 3 4 08 (Nx Power Lite)Base Ambrico 3 4 08 (Nx Power Lite)
Base Ambrico 3 4 08 (Nx Power Lite)
 
Presentation
PresentationPresentation
Presentation
 
MIVAN CONSTRUCTION TECHNOLOGY for const
MIVAN CONSTRUCTION TECHNOLOGY  for constMIVAN CONSTRUCTION TECHNOLOGY  for const
MIVAN CONSTRUCTION TECHNOLOGY for const
 
Electrical maintanance
Electrical maintananceElectrical maintanance
Electrical maintanance
 
082 Offsite Construction (4)
082 Offsite Construction (4)082 Offsite Construction (4)
082 Offsite Construction (4)
 
Cicabloc india
Cicabloc indiaCicabloc india
Cicabloc india
 
Marina barrage (09/10s2)
Marina barrage (09/10s2)Marina barrage (09/10s2)
Marina barrage (09/10s2)
 
Challenges during Design and Construction of an Underground Chip Factory (Waf...
Challenges during Design and Construction of an Underground Chip Factory (Waf...Challenges during Design and Construction of an Underground Chip Factory (Waf...
Challenges during Design and Construction of an Underground Chip Factory (Waf...
 
Special-concretes
Special-concretesSpecial-concretes
Special-concretes
 
Mivan tech
Mivan techMivan tech
Mivan tech
 
Ateco dome power point presentation master
Ateco dome  power point presentation   masterAteco dome  power point presentation   master
Ateco dome power point presentation master
 
Experimental study of precast portal frame
Experimental study of precast portal frameExperimental study of precast portal frame
Experimental study of precast portal frame
 
Designing a Concrete Beam Using the New AS3600:2018 - Webinar Slides - ClearC...
Designing a Concrete Beam Using the New AS3600:2018 - Webinar Slides - ClearC...Designing a Concrete Beam Using the New AS3600:2018 - Webinar Slides - ClearC...
Designing a Concrete Beam Using the New AS3600:2018 - Webinar Slides - ClearC...
 
Suspended ceiling seismic restraint
Suspended ceiling seismic restraintSuspended ceiling seismic restraint
Suspended ceiling seismic restraint
 

Recently uploaded

PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024CristobalHeraud
 
Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCRdollysharma2066
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造kbdhl05e
 
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfneelspinoy
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case StudySophia Viganò
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档208367051
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfShivakumar Viswanathan
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degreeyuu sss
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degreeyuu sss
 
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts ServiceCall Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Servicejennyeacort
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Rndexperts
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree ttt fff
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一diploma 1
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdfSwaraliBorhade
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一z xss
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfAayushChavan5
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,Aginakm1
 

Recently uploaded (20)

PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
PORTFOLIO DE ARQUITECTURA CRISTOBAL HERAUD 2024
 
Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.Mookuthi is an artisanal nose ornament brand based in Madras.
Mookuthi is an artisanal nose ornament brand based in Madras.
 
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
8377877756 Full Enjoy @24/7 Call Girls in Nirman Vihar Delhi NCR
 
西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造西北大学毕业证学位证成绩单-怎么样办伪造
西北大学毕业证学位证成绩单-怎么样办伪造
 
Call Girls in Pratap Nagar, 9953056974 Escort Service
Call Girls in Pratap Nagar,  9953056974 Escort ServiceCall Girls in Pratap Nagar,  9953056974 Escort Service
Call Girls in Pratap Nagar, 9953056974 Escort Service
 
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
昆士兰大学毕业证(UQ毕业证)#文凭成绩单#真实留信学历认证永久存档
 
group_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdfgroup_15_empirya_p1projectIndustrial.pdf
group_15_empirya_p1projectIndustrial.pdf
 
ARt app | UX Case Study
ARt app | UX Case StudyARt app | UX Case Study
ARt app | UX Case Study
 
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
原版1:1定制堪培拉大学毕业证(UC毕业证)#文凭成绩单#真实留信学历认证永久存档
 
FiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdfFiveHypotheses_UIDMasterclass_18April2024.pdf
FiveHypotheses_UIDMasterclass_18April2024.pdf
 
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
原版美国亚利桑那州立大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
专业一比一美国亚利桑那大学毕业证成绩单pdf电子版制作修改#真实工艺展示#真实防伪#diploma#degree
 
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts ServiceCall Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
Call Girls in Ashok Nagar Delhi ✡️9711147426✡️ Escorts Service
 
Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025Top 10 Modern Web Design Trends for 2025
Top 10 Modern Web Design Trends for 2025
 
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree 毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
毕业文凭制作#回国入职#diploma#degree澳洲弗林德斯大学毕业证成绩单pdf电子版制作修改#毕业文凭制作#回国入职#diploma#degree
 
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
办理(USYD毕业证书)澳洲悉尼大学毕业证成绩单原版一比一
 
3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf3D Printing And Designing Final Report.pdf
3D Printing And Designing Final Report.pdf
 
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
办理(UC毕业证书)查尔斯顿大学毕业证成绩单原版一比一
 
Pharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdfPharmaceutical Packaging for the elderly.pdf
Pharmaceutical Packaging for the elderly.pdf
 
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
'CASE STUDY OF INDIRA PARYAVARAN BHAVAN DELHI ,
 

02 tsl from tender until rfc by pablo arecco

  • 1. Third Set of Locks: From Conceptual Design until RFC Design Pablo Arecco PIANC YP-Com Chairman / MWH Global 1 Challenge the future
  • 2. From 2007, the story keeps going… • Prequalification period: 4 months. • Tender Design: 14 months from 2008. US$ 3,221,631,384.00 Best technical proposal Design & Build 2 Challenge the future
  • 3. Design of the Third Set of Locks CICP Design Integration Office and Design Centers Design phases: Preliminary, Intermediate, Final, Release for Construction, Optimization & As Built (Engineering services during construction). Tetratech Bellevue MWH - Chicago IV-Infra - Rotterdam Netherlands Sembenelli - Milano, Italy Panama MWH - Buenos Aires 3 Challenge the future
  • 4. Design of the Third Set of Locks Engineering Discipline Interfaces • Hydraulic • Geotechnical • Seismic • Lock Heads & Rolling Gates / Culvert Valves • Mechanical / Electrical / I & C • Buildings (by Others) • Site Development & Infrastructure 4 Challenge the future
  • 5. Components of each new Lock Complex Three Lock Chambers and four Lock Heads in each site Upper Chamber Middle Chamber Lower Chamber Lock Head 4 5 Challenge the future
  • 17. Numerical & Physical models 17 Challenge the future
  • 18. Numerical & Physical models 18 Challenge the future
  • 19. Atlantic & Pacific Locks Major differences • Use of existing 1939 excavations for New Locks • Geology (Sandstone vs. Basalt) • Excavation, slope protection & rock restitution • Availability of concrete aggregate at Atlantic • Seismic criteria / Fault zones • Lock floor slabs • Borinquen dams / Approach channels 19 Challenge the future
  • 20. Lock chamber components For each type a structural model was identified for the design Lock Head Lock Walls with central connection Typical Lock Walls Crossunder 23 monoliths per side per chamber 7 types of structural Lock Walls Several loads combinations Chamber Conduit 20 Challenge the future
  • 21. Lock Chamber monolith walls Pacific & Atlantic Lock Wall monoliths are different August 2012 Lock Wall Typical Monolith up to 350 Final concrete volumes: Lock walls ≈ 2.100.000 m3 Lock heads ≈ 1.200.000 m3 21 Challenge the future
  • 22. Finite Elements Models with Abaqus® 22 Challenge the future
  • 23. Finite Elements Models with Abaqus® Lock Walls (Concrete) Lock Head Small Recess (Concrete) Rock Foundation (Gatún Rock) Lock Head Large Recess (Concrete) Rolling gates (Steel) Lock Head Slab (Concrete) Backfill (Gatún Rockfill) Lock Walls (Concrete) 23 Challenge the future
  • 24. Finite Elements Models with Abaqus® 24 Challenge the future
  • 25. Lock structures - Seismic criteria Earthquake level & performance criteria Level I 475 years Level II 950 years • No service disruption • Reparable damage • Structure essentially elastic ATL 0,33g PAC 0,52g • No collapse • Reparable damage • Limited non linear behavior ATL 0,42g PAC 0,72g 25 Challenge the future
  • 26. Concrete reinforcement Weight 190,000 tonnes or 26 Eiffel Towers Final design quantities reduction maintaining same Design Req.: • Concrete and excavation of over 10% compared to tender • Reduction in reinforcement of 40% (around 17 Eiffel Towers) 26 Challenge the future
  • 28. Design Facts & Figures Total for Atlantic and Pacific • The MWH-led team peaked at over Equivalent 300 Full Time Staff working in 6 design offices on 3 continents. • 9,500 Design Drawings (Atlantic & Pacific Total) • 13,000 Concrete Lift Shop Drawings Reviewed • 26,000 Reinforcement Shop Drawings Reviewed • 50 Quality Audits (33 Internal, 17 External – GUPC, ACP) • Design 95% Complete, 88.5% Design Packages Submitted 28 Challenge the future
  • 29. THIS IS THE EFFORT OF A HUGE TEAM! 29 Challenge the future