2
The Project
Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is
NAL-60
Contract NAL-60
Bjarnarflag (BJA)
Design and construction supervision
45 MWe + 45 MWe optional
Þeistareykir (THR)
Design and construction supervision
90 MWe
3
Þeistareykir (THR)
Bjarnarflag (BJA)
Krafla - 150 MWe
4
JökulsááFjöllum
Mývatn
Reykjahlíð
Húsavík
4
Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is
Contract parties
4
ENGINEEROWNER NAL-60
Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is
Obligations
5
Preparation
Review of
feasibility
design
Finalise design
criteria
Internal system
setup
Tendering
Tender design
Tender
documents
Assistance to
Owner
HSE
assessments
Execution
Detail design
Construction
drawings
Construction
supervision
Reporting
Commissioning
Projectclosure
As-built
drawings
Final reports
Document
handover
Wrap-up
Start-up Plan & execute Close
Target contract: -25% on overrun
Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is
Schedule
6
Design contract signed 20.10.2011
First Tender Documents: Turbines,
Generators and Cold End Equipment to
be issued 15.02.2012
Electricity production BJA: 31.12.2014
Electricity production THR:
First stage (45 MW) - 11.05.2015
Second stage (+45 MW) - 01.10.2015
4months
Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is 7
Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is
Reality check
8
STRICT PROJECT CONTROL
9
Project Control
Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is
First steps
10
Activate organisation - Set up office, systems & procedures – Develop Project Control
Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is
3 Main facets
11
Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is
Selection
12
Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is
Earned Value Analysis
13
Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is
Baseline
14
Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is
Work package
15
Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is
Final setup
16
Operation
Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is
Utilisation
18
BaselineBaseline
Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is
Status report
19
Issued every 2nd week
Open to all team members
Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is
Actions
20
Much effort - Wasted if no action follows status
Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is
Sum-up
21
In summary
Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is
Experience
Advantages:
Project management aware of current status
Deviations addressed timely
Disadvantages:
Cumbersome to set up
„Expensive“ to operate
Bottom line:
Completely worth the effort
Benefits designer and owner alike
23
24
THANK YOU

More Related Content

More from Iceland Geothermal

More from Iceland Geothermal (20)

C4 - Transforming CO2 into a commercial product
C4 - Transforming CO2 into a commercial productC4 - Transforming CO2 into a commercial product
C4 - Transforming CO2 into a commercial product
 
C3 - Production Modelling for Sustainability
C3 - Production Modelling for SustainabilityC3 - Production Modelling for Sustainability
C3 - Production Modelling for Sustainability
 
C3 - IDDP2 A better tomorrow
C3 - IDDP2 A better tomorrowC3 - IDDP2 A better tomorrow
C3 - IDDP2 A better tomorrow
 
C3 - Production and reinjection at Hellisheiði: Holistic approach
C3 - Production and reinjection at Hellisheiði: Holistic approachC3 - Production and reinjection at Hellisheiði: Holistic approach
C3 - Production and reinjection at Hellisheiði: Holistic approach
 
C3 - Geothermal reservoir management and sustainable use
C3 - Geothermal reservoir management and sustainable useC3 - Geothermal reservoir management and sustainable use
C3 - Geothermal reservoir management and sustainable use
 
C2 - Optimization of existing systems: Improvement of plants in operation and...
C2 - Optimization of existing systems: Improvement of plants in operation and...C2 - Optimization of existing systems: Improvement of plants in operation and...
C2 - Optimization of existing systems: Improvement of plants in operation and...
 
C2 - Managing Silica Deposits in Geothermal: Pros & Cons of pH Mod vs. Silica...
C2 - Managing Silica Deposits in Geothermal: Pros & Cons of pH Mod vs. Silica...C2 - Managing Silica Deposits in Geothermal: Pros & Cons of pH Mod vs. Silica...
C2 - Managing Silica Deposits in Geothermal: Pros & Cons of pH Mod vs. Silica...
 
C2 - BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION
C2 - BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATIONC2 - BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION
C2 - BINARY POWER PLANTS FOR HIGH-ENTHALPY WELL-HEAD GENERATION
 
C2 - ENGINEERING THE ENERGY TRANSITION
C2 - ENGINEERING THE  ENERGY TRANSITIONC2 - ENGINEERING THE  ENERGY TRANSITION
C2 - ENGINEERING THE ENERGY TRANSITION
 
C1 - Impacting Operating Costs and Revenues: If Geothermal is so Clever, wher...
C1 - Impacting Operating Costs and Revenues: If Geothermal is so Clever, wher...C1 - Impacting Operating Costs and Revenues: If Geothermal is so Clever, wher...
C1 - Impacting Operating Costs and Revenues: If Geothermal is so Clever, wher...
 
C1 - Operation: Ownership Structure and its Effects
C1 - Operation: Ownership Structure and its EffectsC1 - Operation: Ownership Structure and its Effects
C1 - Operation: Ownership Structure and its Effects
 
C1 - STATUS OF GEOTHERMAL DEVELOPMENT IN MENENGAI AND BARINGO- SILALI PROJECTS
C1 - STATUS OF GEOTHERMAL DEVELOPMENT IN MENENGAI AND BARINGO- SILALI PROJECTSC1 - STATUS OF GEOTHERMAL DEVELOPMENT IN MENENGAI AND BARINGO- SILALI PROJECTS
C1 - STATUS OF GEOTHERMAL DEVELOPMENT IN MENENGAI AND BARINGO- SILALI PROJECTS
 
C1 - Financing Geothermal Development: Overview, Challenges and opportunities...
C1 - Financing Geothermal Development: Overview, Challenges and opportunities...C1 - Financing Geothermal Development: Overview, Challenges and opportunities...
C1 - Financing Geothermal Development: Overview, Challenges and opportunities...
 
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead StrategyB4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
B4 - Successful Implementation of a Modular Geothermal Wellhead Strategy
 
B4 - RG: The Corbetti and Tulu Moye Geothermal Projects
B4 - RG: The Corbetti and Tulu Moye Geothermal ProjectsB4 - RG: The Corbetti and Tulu Moye Geothermal Projects
B4 - RG: The Corbetti and Tulu Moye Geothermal Projects
 
B4 - Maibarara Geothermal Inc., Philippines: Geothermal Start-Up in a Deregul...
B4 - Maibarara Geothermal Inc., Philippines: Geothermal Start-Up in a Deregul...B4 - Maibarara Geothermal Inc., Philippines: Geothermal Start-Up in a Deregul...
B4 - Maibarara Geothermal Inc., Philippines: Geothermal Start-Up in a Deregul...
 
B4 - Status of Geothermal Exploration and Development in Ethiopia
B4 - Status of  Geothermal Exploration and Development in EthiopiaB4 - Status of  Geothermal Exploration and Development in Ethiopia
B4 - Status of Geothermal Exploration and Development in Ethiopia
 
B4 - Quantum Power - Menengai 35MW Geothermal Project Nakuru County, Kenya
B4 - Quantum Power - Menengai 35MW Geothermal Project Nakuru County, KenyaB4 - Quantum Power - Menengai 35MW Geothermal Project Nakuru County, Kenya
B4 - Quantum Power - Menengai 35MW Geothermal Project Nakuru County, Kenya
 
B4 - Theistareykir Geothermal Power Plant An update on successful project
B4 - Theistareykir Geothermal Power Plant An update on successful projectB4 - Theistareykir Geothermal Power Plant An update on successful project
B4 - Theistareykir Geothermal Power Plant An update on successful project
 
B3 - Geothermal Project Risk Management Using Conceptual Reservoir Modeling
B3 - Geothermal Project Risk Management Using Conceptual Reservoir ModelingB3 - Geothermal Project Risk Management Using Conceptual Reservoir Modeling
B3 - Geothermal Project Risk Management Using Conceptual Reservoir Modeling
 

Recently uploaded

Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
ciinovamais
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
Chris Hunter
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
QucHHunhnh
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
heathfieldcps1
 

Recently uploaded (20)

Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17Advanced Views - Calendar View in Odoo 17
Advanced Views - Calendar View in Odoo 17
 
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
Ecological Succession. ( ECOSYSTEM, B. Pharmacy, 1st Year, Sem-II, Environmen...
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptxBasic Civil Engineering first year Notes- Chapter 4 Building.pptx
Basic Civil Engineering first year Notes- Chapter 4 Building.pptx
 
Role Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptxRole Of Transgenic Animal In Target Validation-1.pptx
Role Of Transgenic Animal In Target Validation-1.pptx
 
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural ResourcesEnergy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
Energy Resources. ( B. Pharmacy, 1st Year, Sem-II) Natural Resources
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17How to Give a Domain for a Field in Odoo 17
How to Give a Domain for a Field in Odoo 17
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Making and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdfMaking and Justifying Mathematical Decisions.pdf
Making and Justifying Mathematical Decisions.pdf
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
The basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptxThe basics of sentences session 3pptx.pptx
The basics of sentences session 3pptx.pptx
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 

Project Control – Design Contract

  • 1. Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is Iceland Geothermal Conference / Harpa Project Control – Design Contract V. Yrsa Sigurðardóttir 06/03/2013
  • 3. Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is NAL-60 Contract NAL-60 Bjarnarflag (BJA) Design and construction supervision 45 MWe + 45 MWe optional Þeistareykir (THR) Design and construction supervision 90 MWe 3 Þeistareykir (THR) Bjarnarflag (BJA) Krafla - 150 MWe 4 JökulsááFjöllum Mývatn Reykjahlíð Húsavík 4
  • 4. Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is Contract parties 4 ENGINEEROWNER NAL-60
  • 5. Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is Obligations 5 Preparation Review of feasibility design Finalise design criteria Internal system setup Tendering Tender design Tender documents Assistance to Owner HSE assessments Execution Detail design Construction drawings Construction supervision Reporting Commissioning Projectclosure As-built drawings Final reports Document handover Wrap-up Start-up Plan & execute Close Target contract: -25% on overrun
  • 6. Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is Schedule 6 Design contract signed 20.10.2011 First Tender Documents: Turbines, Generators and Cold End Equipment to be issued 15.02.2012 Electricity production BJA: 31.12.2014 Electricity production THR: First stage (45 MW) - 11.05.2015 Second stage (+45 MW) - 01.10.2015 4months
  • 7. Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is 7
  • 8. Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is Reality check 8 STRICT PROJECT CONTROL
  • 10. Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is First steps 10 Activate organisation - Set up office, systems & procedures – Develop Project Control
  • 11. Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is 3 Main facets 11
  • 12. Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is Selection 12
  • 13. Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is Earned Value Analysis 13
  • 14. Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is Baseline 14
  • 15. Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is Work package 15
  • 16. Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is Final setup 16
  • 18. Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is Utilisation 18 BaselineBaseline
  • 19. Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is Status report 19 Issued every 2nd week Open to all team members
  • 20. Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is Actions 20 Much effort - Wasted if no action follows status
  • 21. Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is Sum-up 21
  • 23. Verkís hf | Ármúla 4 | 108 Reykjavík | +354 422 8000 | www.verkis.is | verkis@verkis.is Experience Advantages: Project management aware of current status Deviations addressed timely Disadvantages: Cumbersome to set up „Expensive“ to operate Bottom line: Completely worth the effort Benefits designer and owner alike 23