SlideShare a Scribd company logo
1 of 35
Download to read offline
Ian M. Ainslie, AIA
Portfolio
American Energy – Utica,
Field Office Project
Chesapeake Buildings 25 and 26
Oklahoma River Race Course
Windscreen
Chesapeake Building 15
Chesapeake Building 28
Chesapeake Lake
Chesapeake Building 18
Ainslie Residence
UNCG Dining Hall Renovation
UNCG Honors Classroom
NCANG – ASE Facility
UNCC Center City Building
CPCC Health Careers Building
NCANG – ATC Training,
RAPCON, and Storage Facility
UNCG Aycock Auditorium
Renovation
CPCC Harris Conference Center
American Energy – Utica,
Field Office Complex
Cambridge, Ohio
Elliott + Associates Architects
Project Architect
Completion 2015
Office Building	 31,000sf
Shop Building	 5,000sf
Laydown Yard	 5 acres
$ undisclosed
Chesapeake
Buildings 25 and 26
Oklahoma City,
Oklahoma
Elliott + Associates Architects
Project Architect
Completion 2014
Central Plant	 49,273sf
Data Center	 55,277sf
Total	 104,550sf
$ undisclosed
Oklahoma River
Race Course Windscreen
Oklahoma City,
Oklahoma
Elliott + Associates Architects
Project Architect
Unbuilt 2013
40ft tall, 600m long
$3,500,000
The windscreen on the south
bank of the Oklahoma River,
in the Boathouse District of
Oklahoma City, is designed to
make the wind conditions more
equitable for rowing, kayak, and
canoe races in all lanes across
the width of the river. The initial
project would affect the final
500m of the race course with
later phases to protect the entire
2,000m course.
Chesapeake
Building 15
Oklahoma City,
Oklahoma
Elliott + Associates Architects
Architect
Completion 2013
Office Building	 252,000sf
$ undisclosed
Although my involvement in
this project was limited to the
final month of construction
documents during my first
month at Elliott + Associates
Architects, the architectural
vocabulary is representative
of the vocabulary used in the
design of two unbuilt projects
on the Chesapeake Energy
Campus in Oklahoma City.
Building 28 was taken into
construction documents and
Building 18 was taken into
design development with
both making use of a similar
language to create a cohesive
campus environment for
Chesapeake Energy.
Chesapeake
Building 28
Oklahoma City,
Oklahoma
Elliott + Associates Architects
Project Architect
Unbuilt 2013
Office Building	 251,839sf
Fitness	 159,670sf
Wellness	 61,957sf
Restaurant	 21,620sf
Bandshell	 8,417sf
Daycare		 2,652sf
Store		 1,658sf
Total	 507,813sf
Elec. Equip. Enclosure	 7,231sf
Athletic Fields	 2.75 acres
Amphitheater	 2.00 acres
Concessions	 2,538sf
Lake (completed) 3.00 acres
Boat Storage	 1,603sf
Lake Equip. Enclosure	 350sf
Total Site	 12 acres
$ undisclosed
Basement 2
Level 3
Basement 1
Level 4
Level 1
Level 5
Level 2
Chesapeake Lake
Oklahoma City,
Oklahoma
Elliott + Associates Architects
Project Architect
Completion 2015
3 acres
$ undisclosed
Close coordination with civil
engineers was required to
completely integrate the design
of the retention lake with
Building 28, which was intended
to wrap around the lake.
Chesapeake
Building 18
Oklahoma City,
Oklahoma
Elliott + Associates Architects
Project Architect
Unbuilt 2011
Office Building	 303,000sf
$ undisclosed
Level 5Level 2Level 1Basement
Ainslie Residence
Ian M. Ainslie, Architect
Project Architect
Completion 2012
3,200sf	
$ undisclosed
University of North
Carolina at Greensboro
Dining Hall Renovation
Gantt Huberman Architects
Project Architect
Completion 2014
Renovation	 85,000sf
Addition	 38,000sf
Total		 123,000sf
$29,000,000
Existing Lower Level Floor Plan Existing Dining Level Floor Plan
Existing Section at Centerline
Renovated Lower Level Floor Plan Renovated Dining Level Floor Plan
Renovated Section at Centerline
Renovated ModelExisting Model
University of North
Carolina at Greensboro
Honors Classroom
Gantt Huberman Architects
Project Architect
Completion 2010
Renovation	 1,400sf
$300,000
North Carolina
Air National Guard
ASE Facility
Gantt Huberman Architects
Project Architect
Completion 2011
Shop Building	 6,600sf
$1,200,000
University of North
Carolina at Charlotte
Center City Building
Gantt Huberman Architects
Architect
Completion 2011
Academic Building 143,000sf
$50,000,000
Levels 10-12Levels 7-9Levels 4-6Level 1
Central Piedmont
Community College
Health Careers Building
Gantt Huberman Architects
Architect
Completion 2010
Addition	 96,000sf
Renovation	 59,000sf
Total		 155,000sf
$22,000,000
Level 4Level 1
North Carolina
Air National Guard
ATC Training, RAPCON,
and Storage Facility
Gantt Huberman Architects
Project Architect
Completion 2009
Office Addition	 20,000sf
Office	 2,000sf
Storage	 9,000sf
Total	 31,000sf
$3,200,000
University of North
Carolina at Greensboro
Aycock Auditorium
Renovation
Gantt Huberman Architects
Completion 2008
Renovation	 63,000sf
Addition		 2,000sf
Total	 65,000sf
$18,000,000
Existing Lower Level Existing Level 1 Existing Level 4Existing Level 3Existing Level 2
Renovated Lower Level Renovated Level 1 Renovated Level 4Renovated Level 3Renovated Level 2
Central Piedmont
Community College
Harris Conference
Center
Gantt Huberman Architects
Completion 2004
65,000sf
$7,000,000
Parking Level First Floor Second Floor

More Related Content

What's hot

CPAC Meeting 5-17-05
CPAC Meeting 5-17-05CPAC Meeting 5-17-05
CPAC Meeting 5-17-05HartTWI
 
Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020Crosstown TO
 
Alamo Heights CCM 10.28.19 Item #5 ppt 5500 Broadway Update
Alamo Heights CCM 10.28.19 Item #5   ppt 5500 Broadway UpdateAlamo Heights CCM 10.28.19 Item #5   ppt 5500 Broadway Update
Alamo Heights CCM 10.28.19 Item #5 ppt 5500 Broadway Updateahcitycouncil
 
Station Design Update Meeting: East Open House
Station Design Update Meeting: East Open HouseStation Design Update Meeting: East Open House
Station Design Update Meeting: East Open HouseCrosstown TO
 
Avenue & Chaplin CLC - Construction Update: September 9, 2020
Avenue & Chaplin CLC - Construction Update: September 9, 2020Avenue & Chaplin CLC - Construction Update: September 9, 2020
Avenue & Chaplin CLC - Construction Update: September 9, 2020Crosstown TO
 
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - September ...
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - September ...Eglinton & Mount Pleasant Construction Liaison Committee Meeting - September ...
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - September ...Crosstown TO
 
Western Works Construction Liaison Committee Meeting - January 2018
Western Works Construction Liaison Committee Meeting - January 2018Western Works Construction Liaison Committee Meeting - January 2018
Western Works Construction Liaison Committee Meeting - January 2018Crosstown TO
 
Eastern Works Open House - October 24, 2019
Eastern Works Open House  - October 24, 2019Eastern Works Open House  - October 24, 2019
Eastern Works Open House - October 24, 2019Crosstown TO
 
Mc kenna great marsh symposium 11-12-14
Mc kenna great marsh symposium 11-12-14Mc kenna great marsh symposium 11-12-14
Mc kenna great marsh symposium 11-12-14greenbelt82
 
Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020Crosstown TO
 
Beating the Mid-Summer Heat - Air Handling Units Replacement
Beating the Mid-Summer Heat - Air Handling Units ReplacementBeating the Mid-Summer Heat - Air Handling Units Replacement
Beating the Mid-Summer Heat - Air Handling Units ReplacementMcKenney's Inc
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - February 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - February 2018Pharmacy to Kennedy Construction Liaison Committee Meeting - February 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - February 2018Crosstown TO
 
Cushman & Wakefield Clean Harbors Case Study
Cushman & Wakefield Clean Harbors Case StudyCushman & Wakefield Clean Harbors Case Study
Cushman & Wakefield Clean Harbors Case StudyMatthew Marshall
 
Reston Fire Station #25
Reston Fire Station #25Reston Fire Station #25
Reston Fire Station #25Fairfax County
 
Addison Capital Projects Update
Addison Capital Projects UpdateAddison Capital Projects Update
Addison Capital Projects UpdateTownofAddison
 
Eglinton & Mount Pleasant Stations Construction Liaison Committee Meeting - J...
Eglinton & Mount Pleasant Stations Construction Liaison Committee Meeting - J...Eglinton & Mount Pleasant Stations Construction Liaison Committee Meeting - J...
Eglinton & Mount Pleasant Stations Construction Liaison Committee Meeting - J...Crosstown TO
 

What's hot (20)

CPAC Meeting 5-17-05
CPAC Meeting 5-17-05CPAC Meeting 5-17-05
CPAC Meeting 5-17-05
 
Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020Central Spring Open House Presentation Deck - March 23 2020
Central Spring Open House Presentation Deck - March 23 2020
 
Fitchburg Commuter Rail Line Improvement Project
Fitchburg Commuter Rail Line Improvement ProjectFitchburg Commuter Rail Line Improvement Project
Fitchburg Commuter Rail Line Improvement Project
 
Alamo Heights CCM 10.28.19 Item #5 ppt 5500 Broadway Update
Alamo Heights CCM 10.28.19 Item #5   ppt 5500 Broadway UpdateAlamo Heights CCM 10.28.19 Item #5   ppt 5500 Broadway Update
Alamo Heights CCM 10.28.19 Item #5 ppt 5500 Broadway Update
 
KASHIF DADA - Projects List
KASHIF DADA - Projects ListKASHIF DADA - Projects List
KASHIF DADA - Projects List
 
Station Design Update Meeting: East Open House
Station Design Update Meeting: East Open HouseStation Design Update Meeting: East Open House
Station Design Update Meeting: East Open House
 
Avenue & Chaplin CLC - Construction Update: September 9, 2020
Avenue & Chaplin CLC - Construction Update: September 9, 2020Avenue & Chaplin CLC - Construction Update: September 9, 2020
Avenue & Chaplin CLC - Construction Update: September 9, 2020
 
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - September ...
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - September ...Eglinton & Mount Pleasant Construction Liaison Committee Meeting - September ...
Eglinton & Mount Pleasant Construction Liaison Committee Meeting - September ...
 
Jason.Haraway, PE
Jason.Haraway, PEJason.Haraway, PE
Jason.Haraway, PE
 
Western Works Construction Liaison Committee Meeting - January 2018
Western Works Construction Liaison Committee Meeting - January 2018Western Works Construction Liaison Committee Meeting - January 2018
Western Works Construction Liaison Committee Meeting - January 2018
 
Eastern Works Open House - October 24, 2019
Eastern Works Open House  - October 24, 2019Eastern Works Open House  - October 24, 2019
Eastern Works Open House - October 24, 2019
 
Mc kenna great marsh symposium 11-12-14
Mc kenna great marsh symposium 11-12-14Mc kenna great marsh symposium 11-12-14
Mc kenna great marsh symposium 11-12-14
 
Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020Avenue & Chaplin CLC - Construction Update: July 8, 2020
Avenue & Chaplin CLC - Construction Update: July 8, 2020
 
Beating the Mid-Summer Heat - Air Handling Units Replacement
Beating the Mid-Summer Heat - Air Handling Units ReplacementBeating the Mid-Summer Heat - Air Handling Units Replacement
Beating the Mid-Summer Heat - Air Handling Units Replacement
 
Pharmacy to Kennedy Construction Liaison Committee Meeting - February 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - February 2018Pharmacy to Kennedy Construction Liaison Committee Meeting - February 2018
Pharmacy to Kennedy Construction Liaison Committee Meeting - February 2018
 
Cushman & Wakefield Clean Harbors Case Study
Cushman & Wakefield Clean Harbors Case StudyCushman & Wakefield Clean Harbors Case Study
Cushman & Wakefield Clean Harbors Case Study
 
Curriculum Vitae Muhammad Taufiq
Curriculum Vitae Muhammad TaufiqCurriculum Vitae Muhammad Taufiq
Curriculum Vitae Muhammad Taufiq
 
Reston Fire Station #25
Reston Fire Station #25Reston Fire Station #25
Reston Fire Station #25
 
Addison Capital Projects Update
Addison Capital Projects UpdateAddison Capital Projects Update
Addison Capital Projects Update
 
Eglinton & Mount Pleasant Stations Construction Liaison Committee Meeting - J...
Eglinton & Mount Pleasant Stations Construction Liaison Committee Meeting - J...Eglinton & Mount Pleasant Stations Construction Liaison Committee Meeting - J...
Eglinton & Mount Pleasant Stations Construction Liaison Committee Meeting - J...
 

Similar to ima portfolio 2015 Press Quality

Project List 10-31-2016
Project List 10-31-2016Project List 10-31-2016
Project List 10-31-2016Kevin Seyko
 
Accotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream RestorationAccotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream RestorationFairfax County
 
AECOM Design Overview
AECOM Design OverviewAECOM Design Overview
AECOM Design Overviewjlohnes
 
Hunting Creek at Fairfield Stream Restoration
Hunting Creek at Fairfield Stream RestorationHunting Creek at Fairfield Stream Restoration
Hunting Creek at Fairfield Stream RestorationFairfax County
 
Cover Letter & Resume
Cover Letter & ResumeCover Letter & Resume
Cover Letter & ResumeRichard Rask
 
Oakton Swim and Racquet Water Quality Retrofit
Oakton Swim and Racquet Water Quality RetrofitOakton Swim and Racquet Water Quality Retrofit
Oakton Swim and Racquet Water Quality RetrofitFairfax County
 
Project List R_McCray OCT2015
Project List R_McCray OCT2015Project List R_McCray OCT2015
Project List R_McCray OCT2015Robert McCray
 
Swofford Construction Brochure Schools Churches
Swofford Construction Brochure Schools ChurchesSwofford Construction Brochure Schools Churches
Swofford Construction Brochure Schools Churcheskellyjohnson
 
Brian Rich's Resume & Portfolio
Brian Rich's Resume & PortfolioBrian Rich's Resume & Portfolio
Brian Rich's Resume & PortfolioBrian Rich
 
Project Listing-Career-2016 (V2)
Project Listing-Career-2016 (V2)Project Listing-Career-2016 (V2)
Project Listing-Career-2016 (V2)Cary Jones
 
ima resume 2015 linkedin
ima resume 2015 linkedinima resume 2015 linkedin
ima resume 2015 linkedinIan Ainslie
 
2008 Engineering Excellence Awards
2008 Engineering Excellence Awards 2008 Engineering Excellence Awards
2008 Engineering Excellence Awards ACECSDES
 
Bradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectBradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectFairfax County
 
Sp6 cip facilities and parks public works presentation final 1.13.14
Sp6 cip facilities and parks public works presentation final 1.13.14Sp6 cip facilities and parks public works presentation final 1.13.14
Sp6 cip facilities and parks public works presentation final 1.13.14cityofevanston
 
Rick Stinnett Projects
Rick Stinnett ProjectsRick Stinnett Projects
Rick Stinnett Projectsrstinnett
 
Retrofit Facility DP0625 West Potomac High School
Retrofit Facility DP0625 West Potomac High SchoolRetrofit Facility DP0625 West Potomac High School
Retrofit Facility DP0625 West Potomac High SchoolFairfax County
 
Lake View Commons - 56 acre project, South lake Tahoe
Lake View Commons - 56 acre project, South lake TahoeLake View Commons - 56 acre project, South lake Tahoe
Lake View Commons - 56 acre project, South lake TahoeCrowdbrite
 

Similar to ima portfolio 2015 Press Quality (20)

Project List 10-31-2016
Project List 10-31-2016Project List 10-31-2016
Project List 10-31-2016
 
Accotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream RestorationAccotink Tributary at Oakford Drive Stream Restoration
Accotink Tributary at Oakford Drive Stream Restoration
 
AECOM Design Overview
AECOM Design OverviewAECOM Design Overview
AECOM Design Overview
 
Hunting Creek at Fairfield Stream Restoration
Hunting Creek at Fairfield Stream RestorationHunting Creek at Fairfield Stream Restoration
Hunting Creek at Fairfield Stream Restoration
 
Cover Letter & Resume
Cover Letter & ResumeCover Letter & Resume
Cover Letter & Resume
 
Oakton Swim and Racquet Water Quality Retrofit
Oakton Swim and Racquet Water Quality RetrofitOakton Swim and Racquet Water Quality Retrofit
Oakton Swim and Racquet Water Quality Retrofit
 
Portfolio - GH
Portfolio - GHPortfolio - GH
Portfolio - GH
 
Project List R_McCray OCT2015
Project List R_McCray OCT2015Project List R_McCray OCT2015
Project List R_McCray OCT2015
 
Michael Sackler AIA_Portfolio
Michael Sackler AIA_PortfolioMichael Sackler AIA_Portfolio
Michael Sackler AIA_Portfolio
 
Swofford Construction Brochure Schools Churches
Swofford Construction Brochure Schools ChurchesSwofford Construction Brochure Schools Churches
Swofford Construction Brochure Schools Churches
 
Town Lake Center 5th Floor Renovation- LEED Profile
Town Lake Center 5th Floor Renovation- LEED Profile Town Lake Center 5th Floor Renovation- LEED Profile
Town Lake Center 5th Floor Renovation- LEED Profile
 
Brian Rich's Resume & Portfolio
Brian Rich's Resume & PortfolioBrian Rich's Resume & Portfolio
Brian Rich's Resume & Portfolio
 
Project Listing-Career-2016 (V2)
Project Listing-Career-2016 (V2)Project Listing-Career-2016 (V2)
Project Listing-Career-2016 (V2)
 
ima resume 2015 linkedin
ima resume 2015 linkedinima resume 2015 linkedin
ima resume 2015 linkedin
 
2008 Engineering Excellence Awards
2008 Engineering Excellence Awards 2008 Engineering Excellence Awards
2008 Engineering Excellence Awards
 
Bradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit ProjectBradley Acres Pond Retrofit Project
Bradley Acres Pond Retrofit Project
 
Sp6 cip facilities and parks public works presentation final 1.13.14
Sp6 cip facilities and parks public works presentation final 1.13.14Sp6 cip facilities and parks public works presentation final 1.13.14
Sp6 cip facilities and parks public works presentation final 1.13.14
 
Rick Stinnett Projects
Rick Stinnett ProjectsRick Stinnett Projects
Rick Stinnett Projects
 
Retrofit Facility DP0625 West Potomac High School
Retrofit Facility DP0625 West Potomac High SchoolRetrofit Facility DP0625 West Potomac High School
Retrofit Facility DP0625 West Potomac High School
 
Lake View Commons - 56 acre project, South lake Tahoe
Lake View Commons - 56 acre project, South lake TahoeLake View Commons - 56 acre project, South lake Tahoe
Lake View Commons - 56 acre project, South lake Tahoe
 

ima portfolio 2015 Press Quality

  • 1. Ian M. Ainslie, AIA Portfolio American Energy – Utica, Field Office Project Chesapeake Buildings 25 and 26 Oklahoma River Race Course Windscreen Chesapeake Building 15 Chesapeake Building 28 Chesapeake Lake Chesapeake Building 18 Ainslie Residence UNCG Dining Hall Renovation UNCG Honors Classroom NCANG – ASE Facility UNCC Center City Building CPCC Health Careers Building NCANG – ATC Training, RAPCON, and Storage Facility UNCG Aycock Auditorium Renovation CPCC Harris Conference Center
  • 2. American Energy – Utica, Field Office Complex Cambridge, Ohio Elliott + Associates Architects Project Architect Completion 2015 Office Building 31,000sf Shop Building 5,000sf Laydown Yard 5 acres $ undisclosed
  • 3.
  • 4.
  • 5.
  • 6. Chesapeake Buildings 25 and 26 Oklahoma City, Oklahoma Elliott + Associates Architects Project Architect Completion 2014 Central Plant 49,273sf Data Center 55,277sf Total 104,550sf $ undisclosed
  • 7.
  • 8.
  • 9. Oklahoma River Race Course Windscreen Oklahoma City, Oklahoma Elliott + Associates Architects Project Architect Unbuilt 2013 40ft tall, 600m long $3,500,000 The windscreen on the south bank of the Oklahoma River, in the Boathouse District of Oklahoma City, is designed to make the wind conditions more equitable for rowing, kayak, and canoe races in all lanes across the width of the river. The initial project would affect the final 500m of the race course with later phases to protect the entire 2,000m course.
  • 10.
  • 11. Chesapeake Building 15 Oklahoma City, Oklahoma Elliott + Associates Architects Architect Completion 2013 Office Building 252,000sf $ undisclosed Although my involvement in this project was limited to the final month of construction documents during my first month at Elliott + Associates Architects, the architectural vocabulary is representative of the vocabulary used in the design of two unbuilt projects on the Chesapeake Energy Campus in Oklahoma City. Building 28 was taken into construction documents and Building 18 was taken into design development with both making use of a similar language to create a cohesive campus environment for Chesapeake Energy.
  • 12. Chesapeake Building 28 Oklahoma City, Oklahoma Elliott + Associates Architects Project Architect Unbuilt 2013 Office Building 251,839sf Fitness 159,670sf Wellness 61,957sf Restaurant 21,620sf Bandshell 8,417sf Daycare 2,652sf Store 1,658sf Total 507,813sf Elec. Equip. Enclosure 7,231sf Athletic Fields 2.75 acres Amphitheater 2.00 acres Concessions 2,538sf Lake (completed) 3.00 acres Boat Storage 1,603sf Lake Equip. Enclosure 350sf Total Site 12 acres $ undisclosed
  • 13. Basement 2 Level 3 Basement 1 Level 4 Level 1 Level 5 Level 2
  • 14.
  • 15. Chesapeake Lake Oklahoma City, Oklahoma Elliott + Associates Architects Project Architect Completion 2015 3 acres $ undisclosed Close coordination with civil engineers was required to completely integrate the design of the retention lake with Building 28, which was intended to wrap around the lake.
  • 16. Chesapeake Building 18 Oklahoma City, Oklahoma Elliott + Associates Architects Project Architect Unbuilt 2011 Office Building 303,000sf $ undisclosed
  • 17. Level 5Level 2Level 1Basement
  • 18. Ainslie Residence Ian M. Ainslie, Architect Project Architect Completion 2012 3,200sf $ undisclosed
  • 19.
  • 20. University of North Carolina at Greensboro Dining Hall Renovation Gantt Huberman Architects Project Architect Completion 2014 Renovation 85,000sf Addition 38,000sf Total 123,000sf $29,000,000
  • 21. Existing Lower Level Floor Plan Existing Dining Level Floor Plan Existing Section at Centerline Renovated Lower Level Floor Plan Renovated Dining Level Floor Plan Renovated Section at Centerline Renovated ModelExisting Model
  • 22.
  • 23. University of North Carolina at Greensboro Honors Classroom Gantt Huberman Architects Project Architect Completion 2010 Renovation 1,400sf $300,000
  • 24. North Carolina Air National Guard ASE Facility Gantt Huberman Architects Project Architect Completion 2011 Shop Building 6,600sf $1,200,000
  • 25. University of North Carolina at Charlotte Center City Building Gantt Huberman Architects Architect Completion 2011 Academic Building 143,000sf $50,000,000 Levels 10-12Levels 7-9Levels 4-6Level 1
  • 26.
  • 27.
  • 28.
  • 29. Central Piedmont Community College Health Careers Building Gantt Huberman Architects Architect Completion 2010 Addition 96,000sf Renovation 59,000sf Total 155,000sf $22,000,000 Level 4Level 1
  • 30.
  • 31. North Carolina Air National Guard ATC Training, RAPCON, and Storage Facility Gantt Huberman Architects Project Architect Completion 2009 Office Addition 20,000sf Office 2,000sf Storage 9,000sf Total 31,000sf $3,200,000
  • 32. University of North Carolina at Greensboro Aycock Auditorium Renovation Gantt Huberman Architects Completion 2008 Renovation 63,000sf Addition 2,000sf Total 65,000sf $18,000,000
  • 33. Existing Lower Level Existing Level 1 Existing Level 4Existing Level 3Existing Level 2 Renovated Lower Level Renovated Level 1 Renovated Level 4Renovated Level 3Renovated Level 2
  • 34.
  • 35. Central Piedmont Community College Harris Conference Center Gantt Huberman Architects Completion 2004 65,000sf $7,000,000 Parking Level First Floor Second Floor