City Council April 5, 2011 Lone Wolf Bridge Presentation

606 views

Published on

Published in: News & Politics
0 Comments
0 Likes
Statistics
Notes
  • Be the first to comment

  • Be the first to like this

No Downloads
Views
Total views
606
On SlideShare
0
From Embeds
0
Number of Embeds
3
Actions
Shares
0
Downloads
5
Comments
0
Likes
0
Embeds 0
No embeds

No notes for slide

City Council April 5, 2011 Lone Wolf Bridge Presentation

  1. 1. Donald A. Peterson, P.E. Project Engineer/ San Angelo Area Engineer
  2. 2. Lone Wolf Historic Bridge Project
  3. 3. Lone Wolf Historic Bridge Project Limits: On Avenue K at the South Concho River The Proposed Work Consists: Refurbishing a Historic City Street Bridge to a Pedestrian/ Bike Path Bridge. Project Length: Roadway = 1,289 Feet. Bridge = 585 Feet. Total Length = 1,874 Feet.
  4. 4. Funding: 100% Federal Funding Funds from American Recovery and Reinvestment Act (ARRA) of 2009, Economic Stimulus Package Enacted by Congress. Any additional work requested would required funding be provided by the City Of San Angelo. Lowest Bid was $ $1,399,601.86.
  5. 5. Contractor : SCR Construction Company, Inc. We have paid Contractor the amount of $695,964.22 Time set for project = 210 working days. Contractor has used = 167 working days. Project is 61.22 percent complete. Contractor has used 79.52 percent of time set for the project. Project is behind of schedule by 18.30 percent. Project is behind of schedule by 38 working days. As of February 28, 2011.
  6. 21. Questions?

×