Project Management
PRINCE2®
in 30 mins
P R I N C E 2 I N 3 0 M I N U T E S
Introduction
2
Karen Swanston
A very enthusiastic and experienced trainer,
specialising in PRINCE2 and M_o_R
(Management of Risk) training for more than
nine years.
Along with her experience, Karen has a
passion for designing and delivering training
in a fun and easy manner. Because of this,
she consistently receives above average
feedback and exam results from her
students. Her blend of experience and
enthusiasm is what makes her the ideal
speaker for this session
P R I N C E 2 I N 3 0 M I N U T E S
This session will take you through how easy
PRINCE2 can be to learn.
We’ll look at the basics of the framework without
overcomplicating it, and provide you with some
quick and easy-to-use hints and tips.
Easy to learn
P R I N C E 2 I N 3 0 M I N U T E S
Definition of a PRINCE2 Project
A project is a temporary organisation
that is created for the purpose of delivering
one or more business products,
according to an agreed business case.
© Copyright 2013. Reproduced under Licence from AXELOS Limited.
P R I N C E 2 I N 3 0 M I N U T E S
Product
ProjectBusinessasusual
Output
Change
Outcome
Users
Benefit Dis-benefit
Stuff
Specialist Product
P R I N C E 2 I N 3 0 M I N U T E S
OutPut
Change
OutCome
Users
Stuff
Specialist Product
ProjectBusinessasusual
Benefit Dis-benefit
P R I N C E 2 I N 3 0 M I N U T E S
PRINCE2 four integrated elements
7 Principles (guiding obligations and good practices)
Washing your hands
7 Themes (Addressed continually throughout the project)
Ingredients to be used
7 Processes (step-wise progression through a project)
Recipe to follow
Tailoring to the environment (flexibility)
Cottage Pie for one? Including Carrots?
P R I N C E 2 I N 3 0 M I N U T E S
Principles
• Continued business justification
• Learn from experience
• Defined roles & responsibilities
• Manage by stages
• Manage by exception
• Focus on products
• Tailor to suit the project environment
P R I N C E 2 I N 3 0 M I N U T E S
Themes
• Business case
• Organization
• Quality
• Plans
• Risk
• Change
• Progress
P R I N C E 2 I N 3 0 M I N U T E S
PRINCE2 processes
Authorize
the project
M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
MANAGING
A STAGE
BOUNDARY
CLOSING A
PROJECT
CONTROLLING
A STAGE
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
INITIATING
A PROJECT
DIRECTING A PROJECT
P R I N C E 2 I N 3 0 M I N U T E S
PRINCE2 processes
Authorize
the project
M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
MANAGING
A STAGE
BOUNDARY
CLOSING A
PROJECT
CONTROLLING
A STAGE
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
INITIATING
A PROJECT
DIRECTING A PROJECT
P R I N C E 2 I N 3 0 M I N U T E S
Starting up a project
© Copyright 2013. Reproduced under Licence from AXELOS Limited.
P R I N C E 2 I N 3 0 M I N U T E S
Organization
PROJECTMANAGEMENTTEAM
© Copyright 2013. Reproduced under Licence from AXELOS Limited.
Corporate or programme management
Directing – Project Board
Managing – Project Manager
Delivering – Team Manager
ProjectManagementTeam
P R I N C E 2 I N 3 0 M I N U T E S
Business case
Confirm
benefit
Verify
updated
Business Case
Verify
outline
Business Case
Verify
detailed
Business Case
Develop
Business Case
Maintain
Business Case
Pre-
project
Initiation
stage
Subsequent delivery
stage(s)
Final delivery
stage
Post-
project
Confirm
benefit
Confirm
benefit
© Copyright 2013. Reproduced under Licence from AXELOS Limited.
P R I N C E 2 I N 3 0 M I N U T E S
Authorize
the project
M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
Initiation
MANAGING
A STAGE
BOUNDARY
CLOSING A
PROJECT
CONTROLLING
A STAGE
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
DIRECTING A PROJECT
INITIATING
A PROJECT
PRINCE2 processes
P R I N C E 2 I N 3 0 M I N U T E S
Authorize
the project
M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
MANAGING
A STAGE
BOUNDARY
CLOSING A
PROJECT
CONTROLLING
A STAGE
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
DIRECTING A PROJECT
Authorize
Initiation
PRINCE2 processes
INITIATING
A PROJECT
P R I N C E 2 I N 3 0 M I N U T E S
Initiating a project
© Copyright 2013.
Reproduced under
Licence from
AXELOS Limited.
P R I N C E 2 I N 3 0 M I N U T E S
Risk definition
A risk is: an uncertain event or set of
events that, should it occur, will have an
effect on the achievement of objectives
MAY
MIGHT
COULD
P R I N C E 2 I N 3 0 M I N U T E S
Issue definition
A issue is: something that has happened
or it will happen that was not planned.
WILL
HAS
NO UNCERTAINTY
P R I N C E 2 I N 3 0 M I N U T E S
Quality
PRODUCT
DESCRIPTION
Engine: petrol,
3.5L
PROJECT PRODUCT DESCRIPTION
PRODUCT
DESCRIPTION
Cream leather
seats
PRODUCT
DESCRIPTION
Tyres: Dunlop
245/40 R19
ACCEPTANCE
CRITERIA
1. 0-60 mph in 3 seconds
2. Up to 2 years old
3. ‘What Car’ top 10 most
desirable cars
CUSTOMER
QUALITY
EXPECTATIONS
1.Fast Car
2.New Car
3.Flashy Car
P R I N C E 2 I N 3 0 M I N U T E S
Plans
TIME & COSTPROJECT PLAN
e e e e
P R I N C E 2 I N 3 0 M I N U T E S
Authorize
the project
M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
MANAGING
A STAGE
BOUNDARY
CLOSING A
PROJECT
CONTROLLING
A STAGE
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
INITIATING
A PROJECT
Strategies &
registers
Project plan
Business case
Project
Initiation
Documentation
(PID)
DIRECTING A PROJECT
PRINCE2 processes
P R I N C E 2 I N 3 0 M I N U T E S
Plans
TIME & COSTSTAGE PLAN
TIME & COSTPROJECT PLAN
e e e e
e e e e
P R I N C E 2 I N 3 0 M I N U T E S
Authorize
the project
M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
Workpackage
PM
TM
Checkpoint
report
PRINCE2 processes
MANAGING
A STAGE
BOUNDARY
Stage plan
CLOSING A
PROJECT
CONTROLLING
A STAGE
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
DIRECTING A PROJECT
INITIATING
A PROJECT
Strategies &
registers
Project plan
Business case
Project
Initiation
Documentation
(PID)
P R I N C E 2 I N 3 0 M I N U T E S
Authorize
the project
M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
Workpackage
PM
PRINCE2 processes
MANAGING
A STAGE
BOUNDARY
Stage plan
CLOSING A
PROJECT
CONTROLLING
A STAGE
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
DIRECTING A PROJECT
INITIATING
A PROJECT
Strategies &
registers
Project plan
Business case
Project
Initiation
Documentation
(PID)
P R I N C E 2 I N 3 0 M I N U T E S
Authorize
the project
M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
Workpackage
PM
TM
PRINCE2 processes
MANAGING
A STAGE
BOUNDARY
Stage plan
CLOSING A
PROJECT
CONTROLLING
A STAGE
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
DIRECTING A PROJECT
INITIATING
A PROJECT
Strategies &
registers
Project plan
Business case
Project
Initiation
Documentation
(PID)
P R I N C E 2 I N 3 0 M I N U T E S
Plans
TEAM
PLAN
WORKPACKAGE
TIME & COSTSTAGE PLAN
TIME & COSTPROJECT PLAN
e e e e
e e e e
P R I N C E 2 I N 3 0 M I N U T E S
PRINCE2 processes
Authorize
the project
M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
Workpackage
PM
TM
MANAGING
A STAGE
BOUNDARY
Stage plan
CLOSING A
PROJECT
CONTROLLING
A STAGE
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
DIRECTING A PROJECT
Checkpoint
report
INITIATING
A PROJECT
Strategies &
registers
Project plan
Business case
Project
Initiation
Documentation
(PID)
P R I N C E 2 I N 3 0 M I N U T E S
Progress – reporting
P R O J E C T B O A R D
S e n i o r u s e r E x e c u t i v e S e n i o r s u p p l i e r
C O R P O R AT E O R P R O G R AM M E M AN A G E M E N T
P R O J E C T M A N A G E R
T E A M M A N A G E R
H I G H L I G H T R E P O R T
C H E C K P O I N T R E P O R T
H I G H L I G H T R E P O R T
P R I N C E 2 I N 3 0 M I N U T E S
Progress – tolerances
P R I N C E 2 I N 3 0 M I N U T E S
Authorize
the project
C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
Workpackage
PM
TM
Checkpoint
report
MANAGING
A STAGE
BOUNDARY
Stage plan
Update:
project plan
business
case
End-stage
report
CLOSING A
PROJECT
CONTROLLING
A STAGE
Update
Stage Plan
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
DIRECTING A PROJECT
M A N D A T E
PRINCE2 processes
INITIATING
A PROJECT
Strategies &
registers
Project plan
Business case
Project
Initiation
Documentation
(PID)
P R I N C E 2 I N 3 0 M I N U T E S
Authorize
the project
C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
Workpackage
PM
TM
Checkpoint
report
MANAGING
A STAGE
BOUNDARY
Stage plan
Update:
project plan
business
case
End-stage
report
CLOSING A
PROJECT
CONTROLLING
A STAGE
Update
Stage Plan
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
DIRECTING A PROJECT
M A N D A T E
PRINCE2 processes
INITIATING
A PROJECT
Strategies &
registers
Project plan
Business case
Project
Initiation
Documentation
(PID)
P R I N C E 2 I N 3 0 M I N U T E S
Authorize
the project
C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
Workpackage
PM
TM
Checkpoint
report
MANAGING
A STAGE
BOUNDARY
Stage plan
Update:
project plan
business
case
End-stage
report
CLOSING A
PROJECT
CONTROLLING
A STAGE
Update
Stage Plan
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
DIRECTING A PROJECT
M A N D A T E
PRINCE2 processes
INITIATING
A PROJECT
Strategies &
registers
Project plan
Business case
Project
Initiation
Documentation
(PID)
P R I N C E 2 I N 3 0 M I N U T E S
Authorize
the project
C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
Workpackage
PM
TM
Checkpoint
report
MANAGING
A STAGE
BOUNDARY
Stage plan
Update:
project plan
business
case
End-stage
report
CLOSING A
PROJECT
CONTROLLING
A STAGE
Update
Stage Plan
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
DIRECTING A PROJECT
M A N D A T E
PRINCE2 processes
INITIATING
A PROJECT
Strategies &
registers
Project plan
Business case
Project
Initiation
Documentation
(PID)
P R I N C E 2 I N 3 0 M I N U T E S
Authorize
the project
M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
Workpackage
PM
TM
Checkpoint
report
MANAGING
A STAGE
BOUNDARY
Stage plan
Update:
project plan
business
case
End-stage
report
CLOSING A
PROJECT
CONTROLLING
A STAGE
Update
Stage Plan
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
Confirm all
products are
completed
Evaluate the
project
Communication
Archive project
documentation
PRINCE2 processes
DIRECTING A PROJECT
INITIATING
A PROJECT
Strategies &
registers
Project plan
Business case
Project
Initiation
Documentation
(PID)
P R I N C E 2 I N 3 0 M I N U T E S
Authorize
the project
C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T
Authorize a stage
or exception plan
Authorize
project closure
Authorize
initiation
Workpackage
Checkpoint
report
MANAGING
A STAGE
BOUNDARY
Stage plan
Update:
project plan
business
case
End-stage
report
CLOSING A
PROJECT
Confirm all
products are
completed
Evaluate the
project
Communication
Archive project
documentation
CONTROLLING
A STAGE
Update
Stage Plan
MANAGING
PRODUCT
DELIVERY
STARTING
UP A
PROJECT
Executive &
PM
Outline
business
case
PMT
Project
approach
Project brief
Initiation
stage plan
PRINCE2 processes
M A N D A T E
DIRECTING A PROJECT
INITIATING
A PROJECT
Strategies &
registers
Project plan
Business case
Project
Initiation
Documentation
(PID)
P R I N C E 2 I N 3 0 M I N U T E S
During this session we
have stepped through some of the
basic concepts of PRINCE2
without overcomplicating it,
and provided you with some quick,
easy-to-use hints and tips.
Easy to learn
P R I N C E 2 I N 3 0 M I N U T E S
Questions?
P R I N C E 2 I N 3 0 M I N U T E S
Why ILX?
For more information about our courses,
visit our website ilxgroup.com,
give us a call on +44 (0) 1270 611 600 or send an email to:
Individuals enquiries suzanne.bailey@ilxgroup.com
Corporate enquiries paula.gower@ilxgroup.com
P R I N C E 2 I N 3 0 M I N U T E S
Recommended courses
PRINCE2
Programme
& Project
Sponsorship
APM Project
Management
Qualification
Change
Management
P R I N C E 2 I N 3 0 M I N U T E S
I L X G R O U P, U n i t e d K i n g d o m
7 t h F l o o r
9 5 A l d w y c h
L o n d o n W C 2 B 4 J F - U K
T: + 4 4 ( 0 ) 2 0 7 3 7 1 4 4 4 4
Thank you for listening
I L X G R O U P, Au s t r a l i a
7 3 0 S p r i n g v a l e R d
M u l g r a v e , V I C 3 1 7 0
A u s t r a l i a
T: + 6 1 1 3 0 0 4 5 9 4 5 9
www.ilxgroup.com

More Related Content

What's hot

Learn the PRINCE2 Principles ebook
Learn the PRINCE2 Principles ebookLearn the PRINCE2 Principles ebook
Learn the PRINCE2 Principles ebook
Knowledge Train
 

What's hot (20)

PMP® Training Video | PMBOK® Guide Sixth Edition Training | PMP® Certificatio...
PMP® Training Video | PMBOK® Guide Sixth Edition Training | PMP® Certificatio...PMP® Training Video | PMBOK® Guide Sixth Edition Training | PMP® Certificatio...
PMP® Training Video | PMBOK® Guide Sixth Edition Training | PMP® Certificatio...
 
Agile Program and Portfolio Management
Agile Program and Portfolio ManagementAgile Program and Portfolio Management
Agile Program and Portfolio Management
 
project management concepts
project management conceptsproject management concepts
project management concepts
 
PMP vs Prince2 vs PMI-ACP
PMP vs Prince2 vs PMI-ACPPMP vs Prince2 vs PMI-ACP
PMP vs Prince2 vs PMI-ACP
 
PRINCE2 Foundation Slides - Sample
PRINCE2 Foundation Slides - Sample PRINCE2 Foundation Slides - Sample
PRINCE2 Foundation Slides - Sample
 
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
PMP NOTES Based on PMBOK Guide 5th Edition and updated PMP syllabus after 11 ...
 
Learn the PRINCE2 Principles ebook
Learn the PRINCE2 Principles ebookLearn the PRINCE2 Principles ebook
Learn the PRINCE2 Principles ebook
 
Project management
Project managementProject management
Project management
 
Project Management Framework
Project Management FrameworkProject Management Framework
Project Management Framework
 
Project Management Tutorial | PMP Certification | Edureka
Project Management Tutorial | PMP Certification | EdurekaProject Management Tutorial | PMP Certification | Edureka
Project Management Tutorial | PMP Certification | Edureka
 
Project Management Fundamentals | Project Management Simplified | PMP® Traini...
Project Management Fundamentals | Project Management Simplified | PMP® Traini...Project Management Fundamentals | Project Management Simplified | PMP® Traini...
Project Management Fundamentals | Project Management Simplified | PMP® Traini...
 
PMP Exam Notes
PMP Exam NotesPMP Exam Notes
PMP Exam Notes
 
Pmp study-notes
Pmp study-notesPmp study-notes
Pmp study-notes
 
Fundamentals of project management
Fundamentals of project managementFundamentals of project management
Fundamentals of project management
 
PMBOK® Guide Processes Flow – 6th Edition
PMBOK® Guide Processes Flow – 6th EditionPMBOK® Guide Processes Flow – 6th Edition
PMBOK® Guide Processes Flow – 6th Edition
 
PRINCE2 Foundation Workshops -- Organization
PRINCE2 Foundation Workshops -- OrganizationPRINCE2 Foundation Workshops -- Organization
PRINCE2 Foundation Workshops -- Organization
 
Project Management Concepts
Project Management ConceptsProject Management Concepts
Project Management Concepts
 
PMP Course Presentation.pptx
PMP Course Presentation.pptxPMP Course Presentation.pptx
PMP Course Presentation.pptx
 
7 Processes of Prince2
7 Processes of Prince27 Processes of Prince2
7 Processes of Prince2
 
Project Management Professional (PMP)
Project Management Professional (PMP) Project Management Professional (PMP)
Project Management Professional (PMP)
 

Similar to Prince2 explained in 30mins

PMBOK® Vs PRINCE2®
PMBOK®  Vs PRINCE2®PMBOK®  Vs PRINCE2®
PMBOK® Vs PRINCE2®
Rajiv Sharma
 
Pmi Pmbok Vs Prince2
Pmi Pmbok Vs Prince2Pmi Pmbok Vs Prince2
Pmi Pmbok Vs Prince2
sundong
 
your-prince2-processes-and-products-roadmap-projex-academy_compress.pdf
your-prince2-processes-and-products-roadmap-projex-academy_compress.pdfyour-prince2-processes-and-products-roadmap-projex-academy_compress.pdf
your-prince2-processes-and-products-roadmap-projex-academy_compress.pdf
hiwotmengistu3
 

Similar to Prince2 explained in 30mins (20)

prince2in30mins-170503124814.pdf
prince2in30mins-170503124814.pdfprince2in30mins-170503124814.pdf
prince2in30mins-170503124814.pdf
 
A guide for project managers prince2
A guide for project managers prince2A guide for project managers prince2
A guide for project managers prince2
 
4Cite Capability Statement (pdf)
4Cite Capability Statement (pdf)4Cite Capability Statement (pdf)
4Cite Capability Statement (pdf)
 
PRINCE2 Basic Concepts
PRINCE2 Basic ConceptsPRINCE2 Basic Concepts
PRINCE2 Basic Concepts
 
PRINCE2 quick guide
PRINCE2 quick guidePRINCE2 quick guide
PRINCE2 quick guide
 
Project Management Methodology
Project Management MethodologyProject Management Methodology
Project Management Methodology
 
Project management in easy steps
Project management in easy stepsProject management in easy steps
Project management in easy steps
 
ePMO & Enterprise Implementations
ePMO & Enterprise ImplementationsePMO & Enterprise Implementations
ePMO & Enterprise Implementations
 
Project management intro from prince2 foundation
Project management intro from prince2  foundationProject management intro from prince2  foundation
Project management intro from prince2 foundation
 
pmiprojectmanagementprinciples20141006-141006181426-conversion-gate01-convert...
pmiprojectmanagementprinciples20141006-141006181426-conversion-gate01-convert...pmiprojectmanagementprinciples20141006-141006181426-conversion-gate01-convert...
pmiprojectmanagementprinciples20141006-141006181426-conversion-gate01-convert...
 
PMBOK® Vs PRINCE2®
PMBOK®  Vs PRINCE2®PMBOK®  Vs PRINCE2®
PMBOK® Vs PRINCE2®
 
Pmi Pmbok Vs Prince2
Pmi Pmbok Vs Prince2Pmi Pmbok Vs Prince2
Pmi Pmbok Vs Prince2
 
PRINCE2 Executive Briefing
PRINCE2 Executive BriefingPRINCE2 Executive Briefing
PRINCE2 Executive Briefing
 
Guidelines for Managing Projects
Guidelines for Managing ProjectsGuidelines for Managing Projects
Guidelines for Managing Projects
 
your-prince2-processes-and-products-roadmap-projex-academy_compress.pdf
your-prince2-processes-and-products-roadmap-projex-academy_compress.pdfyour-prince2-processes-and-products-roadmap-projex-academy_compress.pdf
your-prince2-processes-and-products-roadmap-projex-academy_compress.pdf
 
Project Management Slides Powerpoint Template.pptx
Project Management Slides Powerpoint Template.pptxProject Management Slides Powerpoint Template.pptx
Project Management Slides Powerpoint Template.pptx
 
PRINCE 2 foundation & practitioner certification training
PRINCE 2   foundation & practitioner certification trainingPRINCE 2   foundation & practitioner certification training
PRINCE 2 foundation & practitioner certification training
 
Project management - Basics for all
Project management - Basics for allProject management - Basics for all
Project management - Basics for all
 
Northern Finishing School: IT Project Managment
Northern Finishing School: IT Project ManagmentNorthern Finishing School: IT Project Managment
Northern Finishing School: IT Project Managment
 
Prince2009
Prince2009Prince2009
Prince2009
 

More from ILX Group

More from ILX Group (16)

Agile: a fresh perspective
Agile: a fresh perspectiveAgile: a fresh perspective
Agile: a fresh perspective
 
How to identify and manage resistance to change
How to identify and manage resistance to changeHow to identify and manage resistance to change
How to identify and manage resistance to change
 
What's changing with ITIL® 4?
What's changing with ITIL® 4?What's changing with ITIL® 4?
What's changing with ITIL® 4?
 
PRINCE2®: The 7 principles of football management
PRINCE2®: The 7 principles of football managementPRINCE2®: The 7 principles of football management
PRINCE2®: The 7 principles of football management
 
An introduction to the Praxis Framework™ webinar
An introduction to the Praxis Framework™ webinarAn introduction to the Praxis Framework™ webinar
An introduction to the Praxis Framework™ webinar
 
Identifying and managing resistance to change
Identifying and managing resistance to change Identifying and managing resistance to change
Identifying and managing resistance to change
 
Prince2 2017
Prince2 2017 Prince2 2017
Prince2 2017
 
Change Management - Implementing Swift & Sudden Change (Brexit)
Change Management - Implementing Swift & Sudden Change (Brexit)Change Management - Implementing Swift & Sudden Change (Brexit)
Change Management - Implementing Swift & Sudden Change (Brexit)
 
Lean six sigma demystified webinar
Lean six sigma demystified webinarLean six sigma demystified webinar
Lean six sigma demystified webinar
 
Actionable outputs from capability assessments - project challenge
Actionable outputs from capability assessments - project challengeActionable outputs from capability assessments - project challenge
Actionable outputs from capability assessments - project challenge
 
Project management - Stakeholders and project success - Overcoming project f...
Project management - Stakeholders and project success  - Overcoming project f...Project management - Stakeholders and project success  - Overcoming project f...
Project management - Stakeholders and project success - Overcoming project f...
 
How combining the methodology of PRINCE2 and the framework of ITIL can enable...
How combining the methodology of PRINCE2 and the framework of ITIL can enable...How combining the methodology of PRINCE2 and the framework of ITIL can enable...
How combining the methodology of PRINCE2 and the framework of ITIL can enable...
 
AN INSIGHT INTO PRINCE2®
AN INSIGHT INTO PRINCE2®AN INSIGHT INTO PRINCE2®
AN INSIGHT INTO PRINCE2®
 
Introduction to ITIL® Practitioner
Introduction to ITIL® Practitioner Introduction to ITIL® Practitioner
Introduction to ITIL® Practitioner
 
Mind the Gap - Learning Technologies Conference 2016 by Russell Kenrick
Mind the Gap - Learning Technologies Conference 2016 by Russell KenrickMind the Gap - Learning Technologies Conference 2016 by Russell Kenrick
Mind the Gap - Learning Technologies Conference 2016 by Russell Kenrick
 
Maximising and monitoring project management competence
Maximising and monitoring project management competenceMaximising and monitoring project management competence
Maximising and monitoring project management competence
 

Recently uploaded

The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
SandaliGurusinghe2
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Riyadh +966572737505 get cytotec
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
Nimot Muili
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
AllTops
 

Recently uploaded (14)

Marketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docxMarketing Management 16th edition by Philip Kotler test bank.docx
Marketing Management 16th edition by Philip Kotler test bank.docx
 
The Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard BrownThe Psychology Of Motivation - Richard Brown
The Psychology Of Motivation - Richard Brown
 
digital Human resource management presentation.pdf
digital Human resource management presentation.pdfdigital Human resource management presentation.pdf
digital Human resource management presentation.pdf
 
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot ModelGautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
Gautam Buddh Nagar Call Girls 🥰 8617370543 Service Offer VIP Hot Model
 
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professionalW.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
W.H.Bender Quote 62 - Always strive to be a Hospitality Service professional
 
Information Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docxInformation Technology Project Management, Revised 7th edition test bank.docx
Information Technology Project Management, Revised 7th edition test bank.docx
 
How Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptxHow Software Developers Destroy Business Value.pptx
How Software Developers Destroy Business Value.pptx
 
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTECAbortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
Abortion pills in Jeddah |• +966572737505 ] GET CYTOTEC
 
Safety T fire missions army field Artillery
Safety T fire missions army field ArtillerySafety T fire missions army field Artillery
Safety T fire missions army field Artillery
 
Beyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable developmentBeyond the Codes_Repositioning towards sustainable development
Beyond the Codes_Repositioning towards sustainable development
 
International Ocean Transportation p.pdf
International Ocean Transportation p.pdfInternational Ocean Transportation p.pdf
International Ocean Transportation p.pdf
 
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime SiliguriSiliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
Siliguri Escorts Service Girl ^ 9332606886, WhatsApp Anytime Siliguri
 
internship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamrainternship thesis pakistan aeronautical complex kamra
internship thesis pakistan aeronautical complex kamra
 
Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.Persuasive and Communication is the art of negotiation.
Persuasive and Communication is the art of negotiation.
 

Prince2 explained in 30mins

  • 1. www.ilxgroup.com by Karen Swanston Project Management PRINCE2® in 30 mins
  • 2. P R I N C E 2 I N 3 0 M I N U T E S Introduction 2 Karen Swanston A very enthusiastic and experienced trainer, specialising in PRINCE2 and M_o_R (Management of Risk) training for more than nine years. Along with her experience, Karen has a passion for designing and delivering training in a fun and easy manner. Because of this, she consistently receives above average feedback and exam results from her students. Her blend of experience and enthusiasm is what makes her the ideal speaker for this session
  • 3. P R I N C E 2 I N 3 0 M I N U T E S This session will take you through how easy PRINCE2 can be to learn. We’ll look at the basics of the framework without overcomplicating it, and provide you with some quick and easy-to-use hints and tips. Easy to learn
  • 4. P R I N C E 2 I N 3 0 M I N U T E S Definition of a PRINCE2 Project A project is a temporary organisation that is created for the purpose of delivering one or more business products, according to an agreed business case. © Copyright 2013. Reproduced under Licence from AXELOS Limited.
  • 5. P R I N C E 2 I N 3 0 M I N U T E S Product ProjectBusinessasusual Output Change Outcome Users Benefit Dis-benefit Stuff Specialist Product
  • 6. P R I N C E 2 I N 3 0 M I N U T E S OutPut Change OutCome Users Stuff Specialist Product ProjectBusinessasusual Benefit Dis-benefit
  • 7. P R I N C E 2 I N 3 0 M I N U T E S PRINCE2 four integrated elements 7 Principles (guiding obligations and good practices) Washing your hands 7 Themes (Addressed continually throughout the project) Ingredients to be used 7 Processes (step-wise progression through a project) Recipe to follow Tailoring to the environment (flexibility) Cottage Pie for one? Including Carrots?
  • 8. P R I N C E 2 I N 3 0 M I N U T E S Principles • Continued business justification • Learn from experience • Defined roles & responsibilities • Manage by stages • Manage by exception • Focus on products • Tailor to suit the project environment
  • 9. P R I N C E 2 I N 3 0 M I N U T E S Themes • Business case • Organization • Quality • Plans • Risk • Change • Progress
  • 10. P R I N C E 2 I N 3 0 M I N U T E S PRINCE2 processes Authorize the project M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation MANAGING A STAGE BOUNDARY CLOSING A PROJECT CONTROLLING A STAGE MANAGING PRODUCT DELIVERY STARTING UP A PROJECT INITIATING A PROJECT DIRECTING A PROJECT
  • 11. P R I N C E 2 I N 3 0 M I N U T E S PRINCE2 processes Authorize the project M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation MANAGING A STAGE BOUNDARY CLOSING A PROJECT CONTROLLING A STAGE MANAGING PRODUCT DELIVERY STARTING UP A PROJECT INITIATING A PROJECT DIRECTING A PROJECT
  • 12. P R I N C E 2 I N 3 0 M I N U T E S Starting up a project © Copyright 2013. Reproduced under Licence from AXELOS Limited.
  • 13. P R I N C E 2 I N 3 0 M I N U T E S Organization PROJECTMANAGEMENTTEAM © Copyright 2013. Reproduced under Licence from AXELOS Limited. Corporate or programme management Directing – Project Board Managing – Project Manager Delivering – Team Manager ProjectManagementTeam
  • 14. P R I N C E 2 I N 3 0 M I N U T E S Business case Confirm benefit Verify updated Business Case Verify outline Business Case Verify detailed Business Case Develop Business Case Maintain Business Case Pre- project Initiation stage Subsequent delivery stage(s) Final delivery stage Post- project Confirm benefit Confirm benefit © Copyright 2013. Reproduced under Licence from AXELOS Limited.
  • 15. P R I N C E 2 I N 3 0 M I N U T E S Authorize the project M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize Initiation MANAGING A STAGE BOUNDARY CLOSING A PROJECT CONTROLLING A STAGE MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan DIRECTING A PROJECT INITIATING A PROJECT PRINCE2 processes
  • 16. P R I N C E 2 I N 3 0 M I N U T E S Authorize the project M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure MANAGING A STAGE BOUNDARY CLOSING A PROJECT CONTROLLING A STAGE MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan DIRECTING A PROJECT Authorize Initiation PRINCE2 processes INITIATING A PROJECT
  • 17. P R I N C E 2 I N 3 0 M I N U T E S Initiating a project © Copyright 2013. Reproduced under Licence from AXELOS Limited.
  • 18. P R I N C E 2 I N 3 0 M I N U T E S Risk definition A risk is: an uncertain event or set of events that, should it occur, will have an effect on the achievement of objectives MAY MIGHT COULD
  • 19. P R I N C E 2 I N 3 0 M I N U T E S Issue definition A issue is: something that has happened or it will happen that was not planned. WILL HAS NO UNCERTAINTY
  • 20. P R I N C E 2 I N 3 0 M I N U T E S Quality PRODUCT DESCRIPTION Engine: petrol, 3.5L PROJECT PRODUCT DESCRIPTION PRODUCT DESCRIPTION Cream leather seats PRODUCT DESCRIPTION Tyres: Dunlop 245/40 R19 ACCEPTANCE CRITERIA 1. 0-60 mph in 3 seconds 2. Up to 2 years old 3. ‘What Car’ top 10 most desirable cars CUSTOMER QUALITY EXPECTATIONS 1.Fast Car 2.New Car 3.Flashy Car
  • 21. P R I N C E 2 I N 3 0 M I N U T E S Plans TIME & COSTPROJECT PLAN e e e e
  • 22. P R I N C E 2 I N 3 0 M I N U T E S Authorize the project M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation MANAGING A STAGE BOUNDARY CLOSING A PROJECT CONTROLLING A STAGE MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan INITIATING A PROJECT Strategies & registers Project plan Business case Project Initiation Documentation (PID) DIRECTING A PROJECT PRINCE2 processes
  • 23. P R I N C E 2 I N 3 0 M I N U T E S Plans TIME & COSTSTAGE PLAN TIME & COSTPROJECT PLAN e e e e e e e e
  • 24. P R I N C E 2 I N 3 0 M I N U T E S Authorize the project M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation Workpackage PM TM Checkpoint report PRINCE2 processes MANAGING A STAGE BOUNDARY Stage plan CLOSING A PROJECT CONTROLLING A STAGE MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan DIRECTING A PROJECT INITIATING A PROJECT Strategies & registers Project plan Business case Project Initiation Documentation (PID)
  • 25. P R I N C E 2 I N 3 0 M I N U T E S Authorize the project M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation Workpackage PM PRINCE2 processes MANAGING A STAGE BOUNDARY Stage plan CLOSING A PROJECT CONTROLLING A STAGE MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan DIRECTING A PROJECT INITIATING A PROJECT Strategies & registers Project plan Business case Project Initiation Documentation (PID)
  • 26. P R I N C E 2 I N 3 0 M I N U T E S Authorize the project M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation Workpackage PM TM PRINCE2 processes MANAGING A STAGE BOUNDARY Stage plan CLOSING A PROJECT CONTROLLING A STAGE MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan DIRECTING A PROJECT INITIATING A PROJECT Strategies & registers Project plan Business case Project Initiation Documentation (PID)
  • 27. P R I N C E 2 I N 3 0 M I N U T E S Plans TEAM PLAN WORKPACKAGE TIME & COSTSTAGE PLAN TIME & COSTPROJECT PLAN e e e e e e e e
  • 28. P R I N C E 2 I N 3 0 M I N U T E S PRINCE2 processes Authorize the project M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation Workpackage PM TM MANAGING A STAGE BOUNDARY Stage plan CLOSING A PROJECT CONTROLLING A STAGE MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan DIRECTING A PROJECT Checkpoint report INITIATING A PROJECT Strategies & registers Project plan Business case Project Initiation Documentation (PID)
  • 29. P R I N C E 2 I N 3 0 M I N U T E S Progress – reporting P R O J E C T B O A R D S e n i o r u s e r E x e c u t i v e S e n i o r s u p p l i e r C O R P O R AT E O R P R O G R AM M E M AN A G E M E N T P R O J E C T M A N A G E R T E A M M A N A G E R H I G H L I G H T R E P O R T C H E C K P O I N T R E P O R T H I G H L I G H T R E P O R T
  • 30. P R I N C E 2 I N 3 0 M I N U T E S Progress – tolerances
  • 31. P R I N C E 2 I N 3 0 M I N U T E S Authorize the project C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation Workpackage PM TM Checkpoint report MANAGING A STAGE BOUNDARY Stage plan Update: project plan business case End-stage report CLOSING A PROJECT CONTROLLING A STAGE Update Stage Plan MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan DIRECTING A PROJECT M A N D A T E PRINCE2 processes INITIATING A PROJECT Strategies & registers Project plan Business case Project Initiation Documentation (PID)
  • 32. P R I N C E 2 I N 3 0 M I N U T E S Authorize the project C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation Workpackage PM TM Checkpoint report MANAGING A STAGE BOUNDARY Stage plan Update: project plan business case End-stage report CLOSING A PROJECT CONTROLLING A STAGE Update Stage Plan MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan DIRECTING A PROJECT M A N D A T E PRINCE2 processes INITIATING A PROJECT Strategies & registers Project plan Business case Project Initiation Documentation (PID)
  • 33. P R I N C E 2 I N 3 0 M I N U T E S Authorize the project C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation Workpackage PM TM Checkpoint report MANAGING A STAGE BOUNDARY Stage plan Update: project plan business case End-stage report CLOSING A PROJECT CONTROLLING A STAGE Update Stage Plan MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan DIRECTING A PROJECT M A N D A T E PRINCE2 processes INITIATING A PROJECT Strategies & registers Project plan Business case Project Initiation Documentation (PID)
  • 34. P R I N C E 2 I N 3 0 M I N U T E S Authorize the project C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation Workpackage PM TM Checkpoint report MANAGING A STAGE BOUNDARY Stage plan Update: project plan business case End-stage report CLOSING A PROJECT CONTROLLING A STAGE Update Stage Plan MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan DIRECTING A PROJECT M A N D A T E PRINCE2 processes INITIATING A PROJECT Strategies & registers Project plan Business case Project Initiation Documentation (PID)
  • 35. P R I N C E 2 I N 3 0 M I N U T E S Authorize the project M A N D A T E C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation Workpackage PM TM Checkpoint report MANAGING A STAGE BOUNDARY Stage plan Update: project plan business case End-stage report CLOSING A PROJECT CONTROLLING A STAGE Update Stage Plan MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan Confirm all products are completed Evaluate the project Communication Archive project documentation PRINCE2 processes DIRECTING A PROJECT INITIATING A PROJECT Strategies & registers Project plan Business case Project Initiation Documentation (PID)
  • 36. P R I N C E 2 I N 3 0 M I N U T E S Authorize the project C O R P O R A T E O R P R O G R A M M E M A N A G E M E N T Authorize a stage or exception plan Authorize project closure Authorize initiation Workpackage Checkpoint report MANAGING A STAGE BOUNDARY Stage plan Update: project plan business case End-stage report CLOSING A PROJECT Confirm all products are completed Evaluate the project Communication Archive project documentation CONTROLLING A STAGE Update Stage Plan MANAGING PRODUCT DELIVERY STARTING UP A PROJECT Executive & PM Outline business case PMT Project approach Project brief Initiation stage plan PRINCE2 processes M A N D A T E DIRECTING A PROJECT INITIATING A PROJECT Strategies & registers Project plan Business case Project Initiation Documentation (PID)
  • 37. P R I N C E 2 I N 3 0 M I N U T E S During this session we have stepped through some of the basic concepts of PRINCE2 without overcomplicating it, and provided you with some quick, easy-to-use hints and tips. Easy to learn
  • 38. P R I N C E 2 I N 3 0 M I N U T E S Questions?
  • 39. P R I N C E 2 I N 3 0 M I N U T E S Why ILX? For more information about our courses, visit our website ilxgroup.com, give us a call on +44 (0) 1270 611 600 or send an email to: Individuals enquiries suzanne.bailey@ilxgroup.com Corporate enquiries paula.gower@ilxgroup.com
  • 40. P R I N C E 2 I N 3 0 M I N U T E S Recommended courses PRINCE2 Programme & Project Sponsorship APM Project Management Qualification Change Management
  • 41. P R I N C E 2 I N 3 0 M I N U T E S I L X G R O U P, U n i t e d K i n g d o m 7 t h F l o o r 9 5 A l d w y c h L o n d o n W C 2 B 4 J F - U K T: + 4 4 ( 0 ) 2 0 7 3 7 1 4 4 4 4 Thank you for listening I L X G R O U P, Au s t r a l i a 7 3 0 S p r i n g v a l e R d M u l g r a v e , V I C 3 1 7 0 A u s t r a l i a T: + 6 1 1 3 0 0 4 5 9 4 5 9 www.ilxgroup.com