Mr. M. L. Sinhal, Sr. Vice President
Reliance Industries Limited gave presentation on Green Data centres at 15th Green Building Congress 2017 event at Jaipur
3. 3Confidential Reliance Jio Infocomm Limited
• What is data center?
• Use and functions of Data Center.
• Basic Infrastructure requirement for data center.
• Energy consumption heads in data center.
4. 4
What is Data Center
Confidential Reliance Jio Infocomm Limited
Installation of large number of
networked computer servers
and data storage equipment for digital services
is called Data Center.
5. 5
Use and Functions of Data Center
Confidential Reliance Jio Infocomm Limited
Data centers are back bones of Digital life.
They are prerequisite for ATM operation, Point of sale transactions
& even very simple applications like Booking a cab.
Data Centers are providing Digital Content like Videos, Music,
Books & Digital services like Google, Facebook, Twitter
Finance Stocks Medical
Education Governance Commerce
6. • Data Center Building
Data Center Hall
Meet Me Room
Configuration area
Battery Rooms
UPS Rooms
BMS Room
Security Control room
6
Basic infrastructure
Requirement of data centre.
Confidential Reliance Jio Infocomm Limited
• Efficient Electrical Power System with
UPS & standby DG
• Utility Block with efficient chiller &
cooling tower
• STP/ETP Plant
• Administration Building
7. Major Power consumers in Data
Center are
• IT servers
• Data Storage
• Utility services
• Air Conditioning system
• Infrastructure- Lighting,
Elevator etc.
• STP/ ETP Plant
7
Energy consumption in Data center
Confidential Reliance Jio Infocomm Limited
8. 8Confidential Reliance Jio Infocomm Limited
Case study of Two Data Center
1. First Data center designed & constructed in the
year 2009 based on conventional design at that
time.
2. Second Data Center designed & constructed in
year 2013 based on improved green design
concept.
9. 9Confidential Reliance Jio Infocomm Limited
• Basic design basis
• Electrical design basis
• Air-cooling system design basis
• Reliability improvement
• Different Air-flow configuration in the server rack
• Most efficient configuration
• Comparison of actual operating data of energy
consumption
• Awareness of Green concept
• The conclusion
10. 10
Case Study
(Basic Design Data)
Confidential Reliance Jio Infocomm Limited
Conventional Design Improved Design
Facility Designed Year 2009 Year 2013
Data Center Server IT
Load
5 KW Per Rack 10 KW Per Rack
Total Racks 1,500 Nos 1,500 Nos
Total IT Power 7.5 MW 15 MW
Inlet air Temperature
cooling requirement of
Servers
18°C Inlet Air
Temperature to servers
rack
27°C Inlet Air
Temperature to servers
rack
Containment NO aisle containment
for server racks
Hot aisle containment
for server racks
11. 11
Case Study
(Electrical Design Data)
Confidential Reliance Jio Infocomm Limited
Electrical Conventional Design Improved Design
Battery System VRLA battery VRLA Battery
UPS System Standard static UPS High Efficiency UPS with
Unity power factor
UPS Operation Standard Operation Core wise dynamic
Operation of the UPS to
modulate to handle
partial load
Power Distribution
to servers
Individual cable system with
PDU for individual server.
Bus bar trunking system
for individual server.
12. 12
Case Study
(Design data of cooling system)
Confidential Reliance Jio Infocomm Limited
HVAC Conventional Design Improved Design
Air Temp 22 ±1 °C (Room Temp) Air inlet to server 27°C
Equipment-Chiller
Chilled Water
Temperature
8°C / 14°C 20°C / 27°C
Compressor Motor
Rating
811 KW 598 KW
Evaporator Design Flow
Rate
626 CMH 521 CMH
Condenser Design Flow
Rate
955 CMH 796.3 CMH
Design Power
Consumption (ikw/TR)
0.588 ikw/TR 0.32 ikw/TR
13. 13
Case Study
(Reliability)
Confidential Reliance Jio Infocomm Limited
System Conventional Design Improved Design
Reliability Back up
system
None Chilled Water (20°C)
Thermal Storage for 10
minute Back up.
15. Aisle containment
15Confidential Reliance Jio Infocomm Limited
The cold aisle provides cold air directly to front
side of all the racks and hence to the servers,
while the hot aisle receives the warm air
discharged by the servers.
16. 16
Case Study
(Actual Operating Data)
Confidential Reliance Jio Infocomm Limited
System Conventional Design Improved Design
Total IT load (KWh) 79,328 64,553
Total Facility load
(KWh)
1,17,248 89,152
PUE 1.47 1.38
Facility power bill
considering Rs 10
per KWh
11,72,480 8,91,520
Money savings in
terms of
Rs./Day 2,80,960
Rs./Month 84,28,800
Rs./Annum 10,11,45,600
(All energy reading for 24 hrs)
17. 17
Steps for Sustenance
Confidential Reliance Jio Infocomm Limited
Modern
Lifestyle
demands
more energy
To Generate
more power ,
Large fossil
fuel are used
Fossil Fuels
lead to High
GHG Gas
Emission
High GHG
Emission leads
to Global
Warming
IGBC Green
Guidelines to
reduce global
worming
To reduce the chain effect of power demand to
global warming impact we have to follow the IGBC
Green Guidelines
18. By following the IGBC Green
guidelines we have seen the direct
impacts on
• Power
• Carbon Foot Print
• Money
18
Green Impact
Confidential Reliance Jio Infocomm Limited
19. • Different server
manufacturers adopt
different configuration of
server Air flow pattern.
• Cooling performance gets
affected by the same.
• Uniform approach as
explained with Hot aisle
containment will improve
the PUE.
• Requesting IGBC to discuss
the air management
standardization with all
server manufacturer.
19
Food for thought
Confidential Reliance Jio Infocomm Limited