  1. RIBA 2030 24th March 2022 hta.co.uk I @HTADesignLLP I
  2. Corporate Members Roundtable HTA Design Parks & Gardens • Designers and placemakers in the built environment. • Making Great Places to live and a Great Place to Work. • Planning, Urban Design, Community Engagement, Landscape Architecture, Environmental & Sustainability Consultancy, Architecture (pre & post planning), Communication Design, Wayfinding, Web Design & Maintenance. • 240 staff, studios in London, Bristol, Manchester and Edinburgh.
  3. Timeline of our involvement June 2019 RIBA joins global declaration of Climate Emergency September 2019 RIBA launches 2030 Climate Challenge October 2019 HTA signs up to Climate Challenge HTA completes guidance & reporting structure March 2020 March 2021 First full year of monitoring Set up collaboration of Four Housing Architects April 2021 Corporate Members Roundtable March 2022 Second full year of monitoring POE collaboration of Four Housing Architects launched March 2022
  4. Corporate Members Roundtable Quality assurance • PQP • Statutory compliance • ISO 9001 • ISO 14001
  5. Carbon footprint methodology • Identify • Collect data • Measure • Reduce • Offset • Set future targets Corporate Members Roundtable *GHG Protocol
  6. History of Post occupancy Evaluation Research on Home Performance labelling Hanham Hall Design for Manufacture Velux Cabonlight houses Officers’ Field Corporate Members Roundtable
  7. Service offerings • Sustainable Futures Business Unit • Two levels of service: 1) HTA providing sustainability advice 2) Others providing sustainability advice • Post Occupancy Evaluation • RIBA 2030 Climate Challenge criteria • Social Value questionnaire Corporate Members Roundtable
  8. 2030 2025 2020 Pre 2020 2030 2025 2020 Pre 2020 2030 2025 2020 Pre 2020 Regulated energy Unregulated energy Ratio Total Energy TID-CRC College Road 35 35 35 41 60 76 88 100 30 45 60 100 11.84 10.47 0.88 22.31 CLA-SUT The Sutton Estate 35 35 35 41 60 76 88 100 30 45 60 100 24 36.00 1.50 60.00 ARE-PDE The Wiltern 35 35 35 41 60 76 88 100 30 45 60 100 25.42 35.26 1.39 60.68 RBG-TTG Kidbrooke Park Road (Phase 1) (Site TT) 35 35 35 41 60 76 88 100 30 45 60 100 21.77 34.14 1.57 55.91 BEF-PLB Padnall Lake (Phase 1) 35 35 35 41 60 76 88 100 30 45 60 100 31.73 36.80 1.16 68.53 LBB-LSG Little Strand 35 35 35 41 60 76 88 100 30 45 60 100 -5 7.50 -1.50 2.50 SHP-ODC The Old Dairy 35 35 35 41 60 76 88 100 30 45 60 100 30 40.08 1.34 70.08 SHP-FSE Fore Street 35 35 35 41 60 76 88 100 30 45 60 100 49.7 34.43 0.69 84.13 LBS-PAR Parkhouse Street (LBS) 35 35 35 41 60 76 88 100 30 45 60 100 21.89 0.59 0.03 22.48 YMK-MKR The Lakes Estate 35 35 35 41 60 76 88 100 30 45 60 100 15 22.50 1.50 37.50 RBC-WLR Wensley Road 35 35 35 41 60 76 88 100 30 45 60 100 15 22.50 1.50 37.50 JOH-PSS Parkhouse Street (JOH) 35 35 35 41 60 76 88 100 30 45 60 100 9.5 0.03 0.00 9.53 TID-GSC George St 35 35 35 41 60 76 88 100 30 45 60 100 43.24 21.62 0.50 64.86 CAG-REM Ravensbury Phase 1 35 35 35 41 60 76 88 100 30 45 60 100 63.45 31.73 0.50 95.18 TID-VAL Valentine Pub, Gants Hill, Redbridge 35 35 35 41 60 76 88 100 30 45 60 100 136.2 15.95 0.12 152.15 CIT-GCS Gypsy Corner PRS/The Portal 35 35 35 41 60 76 88 100 30 45 60 100 43.69 18.05 0.41 61.74 ENF-CCE New Avenue Enfield 35 35 35 41 60 76 88 100 30 45 60 100 50 75.00 1.50 125.00 SHP-MRE Moorfield Road 35 35 35 41 60 76 88 100 30 45 60 100 40 60.00 1.50 100.00 PAR-EDI Edinburgh Park 35 35 35 41 60 76 88 100 30 45 60 100 30 45.00 1.50 75.00 NHH-FDS Aylebsury FDS 35 35 35 41 60 76 88 100 30 45 60 100 69.22 22.57 0.33 91.79 SBC-TAH Tower and Ashbourne 35 35 35 41 60 76 88 100 30 45 60 100 67.96 43.35 0.64 111.31 PLL-WGP West green Place 35 35 35 41 60 76 88 100 30 45 60 100 58.79 37.76 0.64 96.55 LBB-SMP-40 The Croft 35 35 35 41 60 76 88 100 30 45 60 100 94.8 56.88 0.60 151.68 OHG-BCL Wood Wharf 35 35 35 41 60 76 88 100 30 45 60 100 58 37.76 0.65 95.76 ECO-GPB Griffin Park 35 35 35 41 60 76 88 100 30 45 60 100 50.66 34.28 0.68 84.94 MAC-SDC 1-3 South Drive, Croydon 35 35 35 41 60 76 88 100 30 45 60 100 50.62 34.62 0.68 85.24 AVERAGE 35 35 35 41 42.59534617 31.34 0.74 73.94 Energy Water Embodied CO2 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 0 20 40 60 80 100 120 140 160 0 20 40 60 80 100 120 140 160 TID-CRC CLA-SUT ARE-PDE RBG-TTG BEF-PLB LBB-LSG SHP-ODC SHP-FSE LBS-PAR YMK-MKR RBC-WLR JOH-PSS TID-GSC CAG-REM TID-VAL CIT-GCS ENF-CCE SHP-MRE PAR-EDI NHH-FDS SBC-TAH PLL-WGP LBB-SMP- 400 OHG-BCL ECO-GPB MAC-SDC AVERAGE Operational energy 2030 2025 2020 Pre 2020 Regulated energy kWh/m2/yr Unregulated energy kWh/m2/yr Monitoring • Benchmarking and global average performance Corporate Members Roundtable 35 35 35 41 0 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 5 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 0 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 P DE RBG-TTG BEF-PLB LBB-LSG SHP-ODC SHP-FSE LBS-PAR YMK-MKR RBC-WLR JOH-PSS TID-GSC CAG-REM TID-VAL CIT-GCS ENF-CCE S Operational energy 2030 2025 2020 Pre 2020 Regulated energy kWh/m2/yr Unregulated en green Place 35 35 35 41 60 76 88 100 30 45 60 100 58.79 roft 35 35 35 41 60 76 88 100 30 45 60 100 94.8 Wharf 35 35 35 41 60 76 88 100 30 45 60 100 58 Park 35 35 35 41 60 76 88 100 30 45 60 100 50.66 uth Drive, Croydon 35 35 35 41 60 76 88 100 30 45 60 100 50.62 35 35 35 41 42.59534617 030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 2030 025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 2025 020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 Pre 2020 A-SUT ARE-PDE RBG-TTG BEF-PLB LBB-LSG SHP-ODC SHP-FSE LBS-PAR YMK-MKR RBC-WLR JOH-PSS TID-GSC CAG-REM TID-VAL CIT-GCS ENF-CCE SHP-MRE PAR-EDI NHH-FDS Operational energy 2030 2025 2020 Pre 2020 Regulated energy kWh/m2/yr Unregulated energy kWh/m2/yr Operational Energy - selected projects Operational Energy - all projects project 1 project 2 project 3 project 4 project 5 project 6 project 7 project 1 project 2 project 3 project 4 project 5 project 6 project 7 project 8 project 9 project 10 project 11 project 12 project 13 project 14 project 15 project 16 project 17 project 18 project 19 project 20 project 21 project 22 project 23 project 24 project 25 project 26 project 27
  9. Monitoring Corporate Members Roundtable Operational Energy kWh/m2 /y 2025 2030 2020 2040 Less efficient I More efficient Embodied Carbon kgC02 e/m2 2025 2030 2020 2040 2025 2030 2020 2040 Potable Water Use litres/person/day 120 <60 <35 <20 125 <95 <75 <65 <625 <475 1200 <800 • Infographic to quickly illustrate project performance
  10. Headline outcomes Year 1 • 70 projects tracked since April 2020 • 12% complete • 64% in progress • 24% no data expected • Data on embodied carbon on 6 projects • 16 projects identified for POE • Research commissioned Corporate Members Roundtable
  11. Obstacles to progress • Empowerment of client development staff • Learning curve for project teams • Lack of widely available methodology: Social Value Unregulated energy Embodied Carbon • Professional Indemnity Insurance • Clients under ambition Corporate Members Roundtable
  12. Housing Architects collaboration 1. Summarise Existing Guidance 2. Developing POE Playbook 3. Playbook Framework 4. Building an Evidence Base 5. Peer Review & benefits 6. Current Obstacles to POE 7. Solutions for Now 8. Anticipated outcomes of this work, Next steps. Corporate Members Roundtable